Welcome! Thank you for your interest in upgrading your service with Great Lakes Energy Cooperative (GLE).

Similar documents
REQUEST FOR ELECTRIC SERVICE Residential

Thank you for applying for. Natural Gas Service. From

Residential Building Permit Checklist

Thank you for applying for. Natural Gas Service. From

MEMPHIS LIGHT, GAS AND WATER DIVISION Application for Utility Services for Apartment Complexes in the Network Area

VILLAGE OF NORTHFIELD (847) BUILDING CONSTRUCTION PERMIT SUBMISSION LIST

Post Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)

Welcome to Douglas County PUD

MEMPHIS LIGHT, GAS AND WATER DIVISION Application for Utility Services for Apartment Complexes

New Residential Building Permit Check List:

CONSTRUCTION GUIDELINES

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

Need Electric Service?

Fence Permit Information Revised: 10/2/2018

Village of Arlington Heights. Sewer Back-up Rebate Program

PERMIT APPLICATION FOR ALTERATION, BASEMENT FINISH, REMODEL, OR REPAIR

LENAWEE COUNTY HEALTH DEPARTMENT Environmental Health Division Well and/or Sewage Disposal Construction Permit Application

Developer Pre-Construction Guidelines Developer Electric Service Information Form Authorization to Install Underground Facilities Form

Welcome to Douglas County PUD

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)

All new construction, mobile home placement & additions.

Demolition Permit Application

BUILDING PERMIT SUBMISSION REQUIREMENTS

BUILDING PERMIT APPLICATION INSTRUCTIONS CITY OF AUBURN

Basic Service. This Section provides information regarding a. Introduction

Town of Fredonia. 25 N Main St. * PO Box 217 Fredonia AZ Fax: * Office

Application for LIVINGSTON REGIONAL SANITARY SEWER (LRSS) Connection with GRINDER PUMP or Step System

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

The following is required for a complete permit submittal for each unit.

METHOD OF PAYMENT FORM

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

DRIVEWAYS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS) BUILDING PERMIT APPLICATION

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

Permit: *Inspection Scheduling: * Monday thru Friday Receipt #: Between And Property Code#

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

BILLING TIME LOG. Inspector's No: Inspector's Name: Site Address: Contractor's Name: Date Start time End Time Total Hours Comments

NEW COMMERCIAL CONSTRUCTION / INTERIOR RENOVATION / ADDITION BUILDING PERMIT APPLICATION Revised 3/24/2017

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT

NEW ONE & TWO FAMILY PERMIT REQUIREMENTS

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

If a new residence s electrical service is not located within 200 feet of existing

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

New Construction Handbook

City of Friendswood Community Development 910 South Friendswood Drive Friendswood, Texas 77546

FENCE PERMIT APPLICATION

FOR YOUR CONVENIENCE PLACE YOUR ORDER ONLINE AT

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

METHOD OF PAYMENT FORM

Swimming Pool/Spa Permit Information Revised: 10/2/18

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

COMPLETE THE STEPS BELOW IN PLACING YOUR UTILITY ORDERS

On-Site Sewage Program & Well Program Request for Service

Travel & Adventure LA Job # V 500 WATTS (5 AMPS) 1000 WATTS (10 AMPS) 2000 WATTS (20 AMPS) V 10

PLEASE NOTE! *APPLICATION FOR SERVICE should be submitted when foundation work has started.

ELECTRICAL ORDER FORM

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

PLEASE NOTE! *APPLICATION FOR SERVICE should be submitted when foundation work has started.

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

Kalkaska County Road Commission 1049 Island Lake Road Kalkaska, MI Telephone: Facsimile:

City of Roanoke. Commercial Permit Submittal Guidelines

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

ELECTRICAL ORDER FORM

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

ELECTRICAL ORDER FORM

ELECTRICAL ORDER FORM

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

RESIDENTIAL PROJECT GUIDELINES 1500 SOLANA BOULEVARD, BUILDING 7, SUITE 7200 WESTLAKE, TEXAS 76262

On-Site Sewage Program & Well Program Request for Service

Visa MasterCard Amex Account Number: Exp. Date: Check enclosed #: Amount:

Single Family Residential Building Permit Questions & Answers

Deck Permit Information Revised 2/5/2015

The following information is required when submitting a building permit application:

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

Please print or type.

Village of Northbrook

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

San Mateo Event Center

BUILDING DEPARTMEN T

Application. Village of Morton Grove Department of Buildings 6101 Capulina, Morton Grove, IL Phone: 847/ Fax: 847/

Homeowners Building Permit Guide

New Natural Gas Service Informational Packet

*Note: Please contact the Soil Erosion Specialist at with questions regarding application requirements

COMPLETE THE STEPS BELOW TO PLACE UTILITY ORDERS

Cass County Soil Erosion & Sedimentation Control Program

The following materials and documents are required in order for you to obtain a Building Permit:

PERMITS, ADDRESSES, AND INSPECTIONS

Application Requirements for obtaining a Building Permit

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Welcome to Tooele County! Instructions for submitting a Building Permit Application

CITY STATE ZIP CODE TELEPHONE NUMBER (include area code) B. Owner or Lessee

Transcription:

Welcome! Thank you for your interest in upgrading your service with Great Lakes Energy Cooperative (GLE). Enclosed is the information needed to upgrade your service with GLE. Please read the documents carefully and contact us with any questions or concerns at 888-GT-LAKES (888-485-2537) or glenergy@glenergy.com. Any underground equipment installed by property owners (water, septic, sub feeds to out buildings, etc.) will need to be flagged by you, the member, before the design tech visits the property to determine a route and cost of the job. Great Lakes Energy will place a request with Miss Dig prior to completing the job to have any public utilities (cable, gas, phone, sewer, etc.) flagged. GLE provides a standard meter base at no cost to Members. A meter base can be picked up at any of our offices or contact Service Coordination department for local business in your area that keep a supply on hand for our Members convenience. Changes to the wiring at the meter base will require that you apply for an electrical permit with the County or Township this property is located in. GLE will not complete the job without an inspection release from the electrical inspector. Please contact your County offices or GLE Service Coordination department for electrical inspectors contact information. We re looking out for you, Great Lakes Energy Cooperative Great Lakes Energy is an equal opportunity provider and employer.

Application for relocation or upgrade to existing electrical service Please complete and return. If you have any questions, contact your Member Service Coordinator between 7:30am and 4:00pm Monday through Friday, excluding holidays. Applicant legal name (Last, First, M.I.) Joint Applicant legal name (Last, First, M.I.) Social Security number Social Security number Driver s License Number Driver s License Number Applicant Date of Birth Joint Applicant Date of Birth Primary Phone State State Current Mailing Address City State Zip Cell Phone If applicable, Business owner's identification information: Business s legal name Owner's complete legal name (Last, First, M.I.) Business Tax ID. Number Owner's Social Security Number A non-refundable application fee of $ 75.00 is required. Please include this payment when returning the completed application. Is the existing meter base location going to be moved? Yes No (if No, skip to description) Is the new meter base installed? Yes No If No, is the desired meter location clearly marked at the property? Yes No Please describe the work you intend to do at this location:

Load Schedule Sheet Please complete the information below. Applicant Name: SO#: Please select the type of service needed and fill in the loads for the electrical equipment to be installed. Your electrician can assist with this document. Select One: Single Phase Underground 120/240 (Standard Residential Service) Single Phase Overhead 120/240 (Standard Residential Service) Single Phase Underground 240/480 Single Phase Overhead 240/480 Three Phase Underground 120/208 Three Phase Overhead 120/208 Three Phase Underground 277/480 Three Phase Overhead 277/480 Service Size (circle one): 100 Amp 200 Amp 400 Amp Other Lighting Load: amps Electric Water Heater Load: kw Electric Heat Load: kw Geothermal Heat Pump: Ton Central AC/Heat Pump: Ton Electric Oven? Yes No Electric Dryer? Yes No On-demand water heater? Yes No Type of electric motors (list below): HP # of phases soft start (yes/no) Please complete the load data as best as possible to avoid extra charges. Applicant Name (please print): Date: Applicant Signature: Date: Electrician Name: Phone #: Please complete and return. Updated 02-2017.

Electric Service Site Plan SO#: Please stake/mark property and draw below. Symbol Existing Electric Pole if applicable Existing Electric Transformer if applicable X Proposed Meter location Member Preferred Electric routes Include all: Property lines Lot dimensions Buildings Septic and Drain Field Water and Irrigation Lines Driveway Roadways Other (dog fences, landscape lighting wires, private electric lines) N Is the job site marked according to this site plan? Yes No

Member Responsibilities The undersigned hereby applies for membership with Great Lakes Energy Cooperative. I understand and agree: A. I am responsible for marking all property lines and locations of underground facilities on the property (see enclosed site plan). Great Lakes Energy is not liable for damages to your facilities that are not marked or are marked incorrectly. B. For underground service, I am responsible for ensuring there is a 15-foot wide path along the cable route free of dirt piles, debris, construction material, etc. The rough grade must be within 6 inches of the finished grade along the cable route. I am responsible for final site restoration. C. I understand I must obtain electric inspection approval before my electric service can be connected. D. In addition to the fees listed, a line extension charge may be required as a Contribution in Aid of Construction as stated in the Cooperative rules and regulations governing the sales of electric service, approved by the GLE Board of Directors and on file with the Michigan Public Service Commission. The amount of applicable line extension charges will be determined after a field inspection and billed by a separate invoice. All fees must be paid before line construction work can begin. E. A non-refundable Contribution in Aid of Construction (winter charges) in the amount of 30 percent of total construction cost shall be required in addition to all other underground charges when construction work is performed between December 1 and March 31. F. All fees and charges must be paid and permits obtained within 90 days of this application. After 90 days, fees are subject to change and/or the order may be canceled. G. The undersigned understands that he/she shall have all the rights and privileges granted to members under the Articles of Incorporation and By-Laws of the Cooperative or any amendments thereto and agrees to comply with and be bound by such Articles of Incorporation and By-Laws and all tariffs, rules and regulations as may from time to time be adopted by the Board of Directors of the Cooperative. Applicant Name (please print) Applicant Signature Joint Applicant Name (please print) Joint Applicant Signature