.,~) si.j Encl.: As above W ~Z. CIN No,-U40104TG2001PTC Ref.: MoE&F, LKN/KPBK/l040124/340 Date:

J-11011/45/2009- IA II (I)

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd.(Unit I)

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

J.K. Cement WORKS, MANGROL (RAJ) 25 MW Captive Power Plant & 10 MW Waste Heat Recovery Boiler

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

Calcom Cement India Limited

Telefax: 011: Dated:10 th May, 2013

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

(A) Specific Conditions

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

Environmental Clearance Compliance Half Yearly Report

Janki Corp. Ltd., Six Monthly Compliance Report

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

Environment protection measures / technology

COMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)]

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Mangalam Cement Ltd.

Environmental Clearance Compliance Half Yearly Report

Health and safety norms of CPWD should be followed during construction.

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Mining is being carried out keeping safe distance from seasonal nallah/ stream.

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

COMPLIANCE STATUS REPORT

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

HALF YEARLY COMPLIANCE REPORT

Environmental Clearance Compliance Half Yearly Report

BHUSHAN STEEL LIMITED

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

Rajasthan State Pollution Control Board

Environmental Clearance Compliance Half Yearly Report

BHUSHAN STEEL LIMITED

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE

Hind Energy & Coal Beneficiation (India) Ltd.

Environmental Clearance Compliance Half Yearly Report

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

Half yearly EC compliance Status of 1370 (2*685) MW Thermal Power Plant

Environmental Clearance Compliance Half Yearly Report

Cement Manufacturing Company Ltd. Page 1

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)

Six Monthly Compliance Status Report

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with.

Six Monthly Compliance Status Report

MIEL/NP/EMD/ 303/2015 Date:

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE (EC)

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

Additional Proposed (TPA) Total after Expansion (TPA) 3,500 2,500 6, ,880 2,720 5,600 As above under item No. 1.

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

KSK MAHANADI POWER COMPANY LTD.

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur.

Six Monthly Compliance Report Of Environmental Clearance Period: October' March' 2018

Six Monthly Compliance Report. Environmental Clearance Period: April' September' 2017

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

Mill Expansion Cum Augmentation Project Compliance

F. No. J-13012/02/2012-IA.II(T) Government of India Ministry of Environment & Forests

Mangalam Cement Ltd. Clearance Letter No. :- F NO. J / 30/ IA II (I), dtd 17/07/2007

Environmental Clearance Compliance Half Yearly Report

Telefax: 011: Dated: 8 th March, 2013

Name of the Project:- J&K Mineral Development Corporation Limited.

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

Hind Energy & Coal Beneficiation (India) Ltd.

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

SIX MONTHLY COMPLIANCE REPORT OF ENVIRONMENT CLEARANCE

Rajasthan State Pollution Control Board

J.K. Cement WORKS, NIMBAHERA (RAJ)

HALF YEARLY ENVIRONMENTAL MONITORING REPORT

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd.

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014.

SREE RENGARAAJ ISPAT INDUSTRIES (P) LIMITED MM1,2 &5 SIPCOT Industrial Growth Center, Perundurai, Erode district

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

Transcription:

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012

V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite based power project at village Gurha, tehsil Kolayat, Bikaner by M/s VS Lignite Power Pvt. Ltd. Project Code : Raj-25/490/07 Clearance letter no. : J-13011/59/2006-IA.II (T) dated 15.02.2007 Period of Compliance report: October, 2011 to March, 2012 Point wise compliance as on for the conditions specified in Environmental Clearance S N Conditions Compliance status 1 All the conditions stipulated by Installation of pollution control equipments like RPCB vide their letter no. F.5(BK- 193)RPCB/Gr-II/4558,dated 19.09. 2006 shall be strictly implemented. ESP, bag filters, water sprinklers, ETP, STP,100 metres high stack etc have been installed as mentioned in NOC and working satisfactory within the stipulated standards. A total of 6052 plants have been planted covering an area of about 13.5 hectares in the power plant premises. Further plantation is in progress. Fly ash utilization is being done as per Fly ash notification dt. 14.09.1999 and as amended. Part of the fly ash is being sent to cement plants, brick/tiles manufactures and being used for filling/reclaiming low lying areas and mixing with OB in mines. A small fly ash brick manufacturing plant has been set up for popularizing the use of fly ash bricks amongst entrepreneurs and local people. 2 Ash and sulphur content in the lignite shall not exceed 28 % & 1.4% respectively. 3 Circulating Fluidized Bed Combustion (CFBC) boilers with lime injection shall be used 4 A stack of 100 m height with exit velocity of at least 20 m/sec. shall be provided with continuous online monitoring system. Data collected shall be analyzed and submitted regularly to the regional office of this ministry at Lucknow. 5 Water requirement shall not exceed 474.5 m 3 /hr and CoC of 5 shall be adopted. No discharges of effluents directly or indirectly shall be done outside the plant boundary. Presently there is no ash pond. Ash and sulphur content in the lignite is less than 28 % & 1.4% respectively. CFBC boiler with lime injection facility has been installed and is being used. Stack of 100 m height with continuous online monitoring system is provided. Average exit velocity 20 m/s. Online stack emission monitoring results are in line with the monthly environment data generation report. Water requirement for the power plant is not exceeding 474.5 m 3 /hr. COC of 5-6 has been adopted. Part of the treated waste water is being recycled/ reused in cooling tower as make up water after passing through RO plant and the remaining is Six monthly compliance report of M/s V.S Lignite Power Pvt. Ltd for the period October 2011 to March 2012. Page 1

6 Closed circuit cooling with cooling towers shall be provided. 7 Fly-ash shall be collected in dry form and ash generated shall be used in a phased manner as per provisions of the notification of Fly ash utilization issued by the ministry in September 1999 and its amendment.by the end of 9 th year full fly-ash utilization shall be ensured. 8 Ash pond shall be lined with impervious layer to avoid leachate 9 ESP with 99.9% efficiency shall be installed to limit particulate emission up to 100 mg/nm 3.In the event of non functioning of ESPs, the power plant should be shut down 10 A 50 m wide green belt covering an area of 31 Ha shall be developed all around the plant periphery including ash pond area also. 11 Infrastructure facilities including first aid & sanitation arrangement shall be made for the drivers & other contract workers during construction phase. 12 Rain water harvesting should be adopted. Central Groundwater Authority/Board shall be consulted for finalization of appropriate water harvesting scheme/structures. being used in green belt development and controlling fugitive dust and as such there is no wastewater discharge from plant premises. RO reject is also being used for controlling fugitive dust in lignite yard and in mining area. Closed circuit IDCT cooling towers installed. Fly ash is being collected in dry form in silos. Fly ash is being utilized as per Fly ash notification dt. 14.09.1999 and as amended. Part of the fly ash is being sent to cement plants, brick manufacturers etc. and is used for filling/reclaiming low lying areas and stabilizing the overburden dumps of mines. During the half yearly period of October, 2011 to March, 2012 a total of 1381.22 MT (dry basis) was dispatched to cement plants and other industries and 82572.84 MT (moist basis) was utilized in plant and mine area. Presently there is no ash pond. However, monthly monitoring of ground water at Six locations and surface water at Two locations in and around plant area is being carried out. The monitored results do not show any adverse impact on ground or surface water due to power plant. ESP+ bag filter with 99.9% efficiency is installed to limit PM to less than 50 mg/nm 3. There is no visible emission from the stack and measured dust emission from stack is around 25 mg/nm 3. In the event of non functioning of the ESP the plant shall be shut down. A 50 mtr width for green belt is being maintained. A total of 6052 trees (Neem, Shisham, Siris, Ardu, karanj etc.) have been planted presently covering an area of about 13.5 hectares in Power Plant premises. Further plantation is in progress. Plantation photos are attached. All necessary arrangements for the workers were made during the construction phase. Rain water harvesting pit has been constructed and collected rain water is being utilized for dust suppression on roads. Six monthly compliance report of M/s V.S Lignite Power Pvt. Ltd for the period October 2011 to March 2012. Page 2

13 Regular monitoring of ground water in and around ash pond area shall be carried out, records maintained and six monthly reports shall be submitted to the Regional office of this Ministry 14 Leq of noise level shall be limited to 75 dba and regular maintenance of equipment undertaken. For people working in the high noise area, earplug shall be provided. 15 Regular monitoring of the air quality shall be carried out in and around the power plant and records maintained. Six monthly report shall be submitted to the Regional office of this Ministry. 16 For controlling fugitive dust, regular sprinkling of water in lignite storage area and other vulnerable areas of the plant should be ensured. Presently there is no ash pond. However, monthly monitoring of ground water at Six locations and surface water at Two locations in and around plant area is being carried out and the records are being maintained. The six monthly reports are being submitted regularly to RO, MoEF and RSPCB. Being complied. Regular maintenance of the equipments are being undertaken. The noise levels within the premises at different locations like power plant office and mine office are observed to be in the range of 60.3 to 69.5 db (A). In high noise area earplugs are provided to the workers. Regular monitoring of the air quality is being carried in and around the project area at eight locations through reputed and accredited agency & records maintained. PM10: The maximum value for PM 10 observed in the Power Plant Area was 65.2 µg/m 3 and the minimum value for PM 10 at Chakdadar Village was 23.9 µg/m 3. PM 2.5: The maximum value for PM 2.5 observed in the Power Plant Area 33.7 µg/m 3 and minimum value for PM 2.5 was at Gurha Village to be 17.4 µg/m 3. SO 2 : The maximum value for SO 2 observed in the Power Plant Area was 10.8 µg/m 3 and minimum value for SO 2 was at Rasmedaniya Village to be 5.9 µg/m 3. NO 2 : The maximum value for NO 2 observed at Power Plant Area was 16.6 µg/m 3 and minimum value for NO 2 was at Deh Village to be 8.9 µg/m 3. The results of the monitored data indicate that the ambient air quality of the region is in conformity with respect to norms of National Ambient Air Quality standards of CPCB, at all locations monitored. Half yearly report for the period July, 2011 to December, 2011 was submitted to the Regional office of MoEF vide letter no. MoE&F,LKN/NMM/ 1040124/57 dated 18.01.2012 Water sprinklers have been installed at lignite storage area and other vulnerable areas of the plant fly ash to control fugitive dust. Regular sprinkling of water through mobile water tankers on roads in Plant area is being undertaken for controlling fugitive dust. Six monthly compliance report of M/s V.S Lignite Power Pvt. Ltd for the period October 2011 to March 2012. Page 3

17 The project proponent should advertise in at least two local news papers widely circulated in the region around the project, one of which should be vernacular language of the area of the locality concerned, informing that the project has been accorded environmental clearance and copies of clearance letters are available with the state pollution control board/committee and may also be seen at the website of the MoEF at http://envfor.nic.in 18 A separate environmental monitoring cell with suitable qualified staff should be setup for implementation of the stipulated environmental safeguards 19 Half yearly reports on the status of implementation of the stipulated conditions and environmental safeguards shall be submitted to this ministry/ regional office/cpcb/ SPCB 20 Regional office of the Ministry of Environment & Forests located at Lucknow will monitor the implementation of the stipulated conditions. A complete set of documents including Environment Impact Assessment report and Management Plan shall be forwarded to the regional office. 21 Separate funds should be allocated for implementation of environmental protection measures along with item-wise break-up. These cost should be included as part of the project cost. The funds earmarked for the environment protection measures should be not be diverted for other purposes and year-wise expenditure should be reported to the Ministry The public notice has been given in two newspapers viz. Dainik Bhaskar and Rajasthan Patrika on 02.03.2007. Environmental Management Cell has been set up comprising Manager-environmental and other qualified staff has already been setup to look after the environmental compliance and management. Half yearly compliance reports are being submitted regularly RO, MoEF and RSPCB. Half yearly report for the period July, 2011 to December, 2011 was submitted to the Regional office of MoEF vide letter no. MoE&F,LKN/NMM/ 1040124/57 dated 18.01.2012. A complete set of documents with EIA/EMP has been sent to Regional Office MoEF, Lucknow vide letter ref. No.MOE&F, LKN/PSRAO/113 dated 14.02.2008. Separate funds which was a part of total project cost was utilized for establishment of equipment and implementation of environment protection measures. The environmental funds are used for the environmental activities only. Six monthly compliance report of M/s V.S Lignite Power Pvt. Ltd for the period October 2011 to March 2012. Page 4

22 Full cooperation should be extended to the scientists/officers from the Ministry at Lucknow/ CPCB/SPCB who would be monitoring the compliance of the environmental status Noted and is being complied. Additional conditions vide letter no.j-13011/59/2006-ia.ii(t) dated 4 th June, 2009 1 Transportation of lignite from mine to power project shall be through 35 tonnes tipper Transportation of lignite from mine to power plant is being carried out by tipper/dumper. 2 Extra measures for dust suppression like black topping of road, water sprinklers along the road should be provided. 3 First aid and sanitation arrangement shall be made for the drivers and the contract workers during construction phase 4 Regular monitoring of ground level concentration of SO 2, NOx, SPM and RSPM shall be carried out in the impact zone and record maintained. If at any stage these levels are found to exceed the prescribed limit, necessary control measures shall be provided immediately. The location of the monitoring stations and frequency of monitoring shall be decided in consultation with SPCB. Periodic reports shall be submitted to the Regional office of this Ministry. The data shall also be put on the website of the company. 5 Provision shall be made for the housing of construction labour within the site with all the necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, safe drinking water, medical health care, crèche etc. The housing may be in the form of temporary structure to be removed after the completion of the project. Various extra measures have been implemented to control fugitive emission from the power plant premises. Mobile water tankers are being used for water sprinkling on the roads to control fugitive emission. Black topping of roads is under consideration. First aid and sanitation arrangement have been provided to the drivers and contract workers Ambient air quality monitoring is being done by MoEF recognized agency as per National Ambient Air Quality standers in Eight locations in & around the Plant premises and, records maintained. The results of the monitored data indicate that the ambient air quality is in conformity with respect to norms of National Ambient Air Quality standards of CPCB, at all locations monitored. Half yearly are being submitted to the Regional office of MoEF and RSPCB. Six monthly reports inclusive of monitoring reports are being uploaded to the company web site. Housing facilities with necessary infrastructures facilities and safe drinking water were provided for labour at the site during construction phase. Six monthly compliance report of M/s V.S Lignite Power Pvt. Ltd for the period October 2011 to March 2012. Page 5

6 The proponent shall upload the status of compliance of the stipulated EC conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the regional Office of MoEF, the respective zonal office of CPCB and the SPCB. The criteria pollutant levels namely; SPM, RSPM, SO2, NOx (ambient levels as well as stack emissions) or critical sector parameters indicated for the project shall be monitored and displayed at a convenient location near main gate of the company in the public domain. 7 The project proponent shall also submit six monthly reports on the status of compliance of the stipulated conditions including results of monitored data (both in hard copies as well as by email) to the respective Regional Office of MoEF, the respective zonal Office of CPCB and the SPCB. 8 The project proponent will upload the compliance status in their website and update the same from time to time at least on six monthly bases. Criteria pollutants levels (Stack and ambient levels of NOx) will be displayed at the main gate of the power plant Six monthly reports inclusive of monitoring reports are being uploaded to the company web site and reports is being submitted to regional and head office of RPCB on regular basis. Half yearly report for the period July, 2011 to December, 2011 submitted to the Regional office of MoEF vide letter no. MoE&F,LKN/NMM/ 1040124/57 dated 18.01.2012. Monitoring reports are being displayed near the main gate. Half yearly compliance reports are being submitted to regional and head office of RSPCB regularly. Half yearly report for the period July, 2011 to December, 2011 submitted to the Regional office of MoEF vide letter no. MoE&F,LKN/NMM/ 1040124/57 dated 18.01.2012 Details uploaded on the website and the same will be updated regularly. Salient environmental details as per RSPCB is being displayed and regularly updated at the main gate of power plant. Six monthly compliance report of M/s V.S Lignite Power Pvt. Ltd for the period October 2011 to March 2012. Page 6

Plantation behind weigh Plantation near turbine hall & north of Switch yard

Plantation near turbine hall & north of Switch yard Plantation on north side of Switch yard

Plantation at north side of Power plant Plantation at north side of Power plant