HAUSBECK PICKLE COMPANY, INC. WAREHOUSE ADDITION/ BUILDING RENOVATIONS SAGINAW, MICHIGAN OWNER ARCHITECT / ENGINEER

Similar documents
TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS

PROJECT SPECIFICATIONS. for. Grossmont Community College. Main Chiller Plant Repair. El Cajon, CA. Bid Number B18.014

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TOWNES + architects, P.A.

Ogden Regional Medical Center Courtyard Remodel. Construction Documents. MountainStar Healthcare PROJECT MANUAL FOR

RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109

GADSDEN ELEMENTARY SCHOOL PHOTOVOLTAIC SYSTEM PROJECT

Grossmont-Cuyamaca College District Bldg. D Central Chilled Water Loop Tie-in SPECIFICATION MANUAL CUYAMACA COLLEGE, EL CAJON, CA

SECTION TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SUMMARY

Water service and distribution. Temporary electric power and light. Telephone service.

PROJECT MANUAL UNIVERSITY HALL BOILER REPLACEMENT PROJECT NO. EM 610

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

New Mexico State University Herritage Farm Interpretive Trail

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

East Central College

DIVISION 10 - SPECIALTIES Toilet, Bath, and Laundry Accessories Fire Extinguishers

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

DIVISION 2- EXISTING CONDITIONS

CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT PROJECT MANUAL. Commonwealth Architects

CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia PROJECT MANUAL BID SET April 4, 2018

PROJECT MANUAL POINT BLANK RANGE & GUN SHOP. 600 Corporate way Knoxville, TN. Bid/Permit Set

A. Comply with governing regulations and rules/ recommendations of franchised utility companies, local ordinances, and regulations.

SECTION TEMPORARY FACILITIES AND CONTROLS

SPECIFICATIONS. September 27, 2016 Bid Set

SECTION PAYMENT PROCEDURES

DeKalb County Library Dunwoody Library Staff Area Renovation

INVITATION FOR BIDS FOR

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

OSNI PONCA OFFICE REMODEL

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

ruby ridge terrace apartments

SECTION GENERAL REQUIREMENTS

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT

SPECIFICATIONS. Permit Set RICHMOND CITY HALL: SUITE 110 RENOVATIONS. City of Richmond, Virginia Architect s Project No

Dick s Sporting Goods Demolition Package

SECTION TEMPORARY FACILITIES AND CONTROLS

155 North Beech, Casper, WY * (307) * (307) Fax INDEX

SECTION TEMPORARY FACILITIES AND CONTROLS CONSTRUCTION MANAGER EDITION

Farmington Public Schools 2015 Bond Issue Bid Package 9- Beechview & Kenbrook Elementary School Remodeling Project Wednesday, January 24, 2018

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

SPECIFICATIONS May 25, Ellicott Station Redevelopment Brewery Building - 40 Ellicott Street Ellicott Street Batavia, New York United States

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NOTICE TO BIDDERS. Bids will be publicly opened and read aloud at approximately 2:15pm in the Saugatuck-Douglas District Library.

Project Manual OVERLAND PARK BRANCH & ESIS RELOCATION. for

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

Project Manual Index of Specifications Shenandoah Schools Concession Building

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Specific requirements for individual units of work are included in the appropriate sections in Divisions 2 through 16.

Town of Atkinson, New Hampshire INVITATION TO BID. Town Garage Roof Replacement Issued: June 30, 2015

Beverly Gardens Park City of Beverly Hills, CA. Block #9: Elm Foothill Garden

1ARCHITECTURE TABLE OF CONTENTS

City Of Mendota Construction Procedures

University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual.

VAE VIEW ELEMENTARY WINDOW REPLACEMENT West 1600 North Layton, UT Specifications. Construction Documents

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION

SECTION SUMMARY OF WORK

The following requirements shall supplement the Standard Specifications:

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Division 00 Procurement and Contracting Requirements

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

Scope of Work Bid Package C-8 - West Overhead Doors

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

SECTION A. Examination, preparation, and general installation procedures.

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

TRUMAN STATE UNIVERSITY SITE IMPROVEMENTS, KIRK BLDG, MISSOURI HALL & STUDENT REC CENTER LTD RENOVATIONS

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

PAWLEYS ISLAND TOWN HALL

ROOF REPLACEMENT FIRE AND EMERGENCY SERVICES BUILDING

AWT 9TH FLOOR IMPROVEMENTS CITY OF ANAHEIM, CALL CENTER CREDIT & BILLING DEPARTMENTS, ANAHEIM, CA TECHNICAL SPECIFICATIONS AUGUST 2, 2018

INFORMAL BID SPECIFICATIONS FOR LDS ISLAND PARK ANNEX FURNACE. Island Park, Idaho. December, 2013

ADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132

PROJECT MANUAL for Phantom Canyon Tunnel Repair Project. Location On Fremont County Road miles North of Intersection US Highway 50 with FCR 67

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

TRAINING ROOM RENOVATION

SECTION ALTERATION PROJECT PROCEDURES

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner.

ELECTRICAL CONSULTANT

707 Minnesota Ave., Suite 506 Kansas City, Kansas Tel Fax

THE FORUM ROME, GEORGIA FOR FLOYD COUNTY PROJECT MANUAL (BALLROOM AND CONCESSIONS) Construction Documents

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

AWT 2ND FLOOR IMPROVEMENTS CITY OF ANAHEIM, HOUSING AUTHORITY & WORKPLACE, ANAHEIM, CA TECHNICAL SPECIFICATIONS OCTOBER 24, 2017

PRIVATE PLAN ROOM. Document Information Sheet

Northern Lights Park and Ride Lot

SPECIFICATIONS FOR. CareSpot Urgent Care

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SANTA FE STATION KDOT Grant No. 23 TE

Façade Access Upgrade Project

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

Transcription:

PROJECT MANUAL FOR HAUSBECK PICKLE COMPANY, INC. WAREHOUSE ADDITION/ BUILDING RENOVATIONS SAGINAW, MICHIGAN 1626 Hess Street SAGINAW, MICHIGAN 48601 May 31, 2013 OWNER HAUSBECK PICKLE COMPANY, INC. ARCHITECT / ENGINEER William A. Kibbe & Associates, Inc. 1475 S. Washington Ave. 48601 WAK Project No. 13-1340-0070

TABLE OF CONTENTS GENERAL DOCUMENTS 00000 COVER PAGE 00001 TABLE OF CONTENTS 00002- DRAWING INDEX 00020 - INVITATION TO BID 00310 - PROPOSAL FORM 01310 - PROJECT MANAGEMENT AND COORDINATION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION 01330 - SUBMITTAL PROCEDURES 01500 - TEMPORARY FACILITIES AND CONTROLS 08710- FINISH HARDWARE The balance of the Project Specifications are noted on the Drawings. TABLE OF CONTENTS 00001

Warehouse Addition/ Building Renovation DRAWING INDEX TS TITLE SHEET ARCHITECTURAL A1.0 DEMOLITION DRAWINGS A2.0 OVERALL FIRST AND SECOND FLOOR PLANS A3.0 ENLARGED FIRST FLOOR PLAN- ADDITION A3.1 ENLARGED SECOND FLOOR PLAN- ADDITION A3.2 ENLARGED LOCKER AND RESTROOM PLANS AND INTERIOR ELEVATIONS A3.3 ROOM FINISH AND DOOR AND FRAME SCHEDULES AND DETAILS A4.0 ENLARGED STAIR PLANS, SECTION AND DETAILS A5.0 EXTERIOR ELEVATIONS- ADDITION A5.1 BUILDING SECTIONS- ADDITION AND VESTIBULE A6.0 ROOF PLAN AND DETAILS- ADDITION A7.0 WALL SECTIONS A8.0 ENLARGED LABORATORY CASEWORK PLANS, ELEVATIONS AND DETAILS A8.1 ENLARGED LUNCHROOM PLANS, ELEVATIONS, CABINETS AND DETAILS A9.0 REFLECTED CEILING PLANS- ADDITION STRUCTURAL S1.0 NOTES S1.1 FOUNDATION/ FIRST FLOOR PLAN S1.2 SECOND FLOOR FRAMING PLAN S1.3 ROOF FRAMING PLAN S1.4 FOUNDATION/ FIRST FLOOR DETAILS S1.5 SECOND FLOOR/ ROOF DETAILS S1.6 TYPICAL DETAILS S1.7 TYPICAL DETAILS AND SCHEDULES PLUMBING P1.1 FIRST FLOOR DWV PLAN- ADDITION P1.2 FIRST FLOOR DOMESTIC WATER PLAN- ADDITION P1.3 ENLARGED LOCKER AND RESTROOM PLUMBING PLANS P1.4 PLUMBING STANDARD DETAILS DRAWING INDEX 00002

SECTION 00020 - INVITATION TO BID 1.1 GENERAL A. The Owner requests proposals on Work as follows: 1. Project: Warehouse Addition and Building Renovations 2. Project Address: 1626 Hess Street 48601 3. Owner: Hausbeck Pickle Company, Inc. 4. Engineer: William A. Kibbe & Associates, Inc. Bob Kjorli Project Manager Cell # 989-239-4245 5. Bid Due: Prior to 2:00 p.m. EST time, June 13, 2013 6. Place Due: Proposal Form via email to: Tim@hausbeck.com B. The term Warehouse Addition as used in this document, shall be comprised of the following work (general overview, not intended to be all inclusive, including but not limited to): 1. Prepare site/surroundings in affected area to receive new addition on the west side of the existing facility. 2. Site prep to include stockpiling of topsoil, selective demolition of walks and asphalt paving, miscellaneous landscaping demo and verification of underground utilities in the affected area. 3. Selective building demolition and rework of various openings for relocated louvers, doors and windows. 4. Construction of a new two-story addition measuring approximately 2000 SF per story, including Lunchroom, Laboratory, Stair and Sanitation Room on the First Level; Office Spaces and Stair on the Second Level. Reinforced concrete foundation system, concrete slab on grade, combination steel column/beam and load-bearing masonry perimeter walls, cavity insulation, CMU veneer, steel beam/ concrete slab/metal deck second floor system, sloped steel framed roof/ metal deck with poly-iso and metal roofing. Upper level metal siding/cladding system. 5. Plumbing work, both underground and above grade, is to be included in this work scope. 6. The Owner intends to hire an HVAC Contractor and an Electrical Contractor outside the scope of work for this package. It is assumed and understood that the successful bidder will be required to coordinate his work and the requirements of this package, with any other work associated with the Owner s HVAC and Electrical Contractors. The term Building Renovations as used in this document, shall be comprised of the following work (general overview, not intended to be all inclusive, including but not limited to): 1. Creation of a new air lock vestibule within the existing building footprint, near the intersection of column lines A and 10. INVITATION TO BID 00020-1

2. Metal panel covering of the existing interior warehouse exposed roof insulation, in the approximate area bounded by column lines A, L, 6 and 10. 3. Renovation of the existing quality control laboratory and lunch room, to create a newly expanded men s locker room. Note: This work may not commence until the proposed new laboratory and lunchroom are constructed and fully functioning in the new addition. 4. Plumbing work related to the new men s locker room, including trough sink and floor drain. 5. Locker bases and installation of men s lockers (supplied by Owner), locker room benches and drip racks for raingear. 6. Selective demolition and miscellaneous patching and finishing work as indicated. All work to be provided as shown in the contract documents prepared by William A. Kibbe & Associates, Inc. dated May 31, 2013. C. Declining: Any firm declining to provide a proposal on this project must state so in writing and return the bidding documents prior to the bid due date. D. Withdrawal: Bids may not be withdrawn for a period of (30) thirty calendar days after the bid due date. END OF SECTION 00020 INVITATION TO BID 00020-2

SECTION 00310 - PROPOSAL FORM TO: HAUSBECK PICKLE COMPANY, INC. (Hereinafter called Owner ) ATTN: TIM HAUSBECK Date Having read the specifications and examined the drawings for the subject project, (Hereinafter called Contractor ) offers the following proposal for the construction of the Hausbeck Pickle Company Warehouse Addition and Building Renovations in. Having examined the Project Manual and Construction Documents prepared by William A. Kibbe & Associates, Inc. and being familiar with the site of the proposed work, and with all conditions surrounding construction of proposed project including availability of materials and labor, Contractor hereby proposes to furnish all labor, materials, tools, equipment, supervision, and services required for the completion of the work in accordance with Request for Proposal and Construction Documents, within time set forth herein, at the price stated below. This price covers all expenses incurred in performing the work required as listed in the Project Manual and Construction Documents. The total lump sum for the combined General Construction contract (excluding mechanical and electrical trades) is Dollars $ Note: The Building Renovations work must be a stand alone price, including its own General Conditions, and may or may not be awarded in conjunction with the Warehouse Addition work. For quote analysis, the base quote must be subdivided as outlined below: General Conditions Warehouse Addition Building Renovations $ $ $ TOTAL BASE BID $ Exceptions to the Project Specifications: If none, please indicate No exceptions taken to the Project Specifications. PROPOSAL FORM 00310-1

SUBCONTRACTORS: The Contractor shall state here the names of the Subcontractors that form the basis of this quote. Work Item Subcontractor's Name Value Concrete Work Masonry Work Steel Work Metal Ceiling Panels (Interior) Metal Siding Panels/ Roofing Carpentry- Rough Carpentry- Finish Drywall/ Acoustical Plumbing PRICE GUARANTEE The prices stated in this quotation are guaranteed for days from date thereof, and, if authorized to proceed within that period, we will agree to complete the work covered by this quotation at said price. All taxes are in included in above base Proposals. Each contractor agrees that this Proposal will be valid, and will not be withdrawn for a period of 30 calendar days after the date for opening of the Proposal. Contractor understands the Owner reserves the right to reject any or all Proposals and to waive any informalities or irregularities therein. Upon notice of acceptance of this Proposal, the Contractor will execute Contract Agreement to Owner within 7 days. Contractor, if awarded a Contract, hereby agrees to commence work under this contract on or before a date to be specified within the Notice to Proceed of Owner and to fully complete the Warehouse Addition project within consecutive calendar days thereafter. Assuming the Authorization to Proceed came within two weeks of the bid due date, the building renovations work would be completed in a timeframe commencing on, 2013 and be completed by, 2013. Contractor agrees, that if invited to a pre-award conference for review and discussion of his proposal, that he will prepare and provide a milestone schedule demonstrating his ability and intent to complete the project as required by the bid documents. Contractor acknowledges receipt of the following Addenda: PROPOSAL FORM 00310-2

RESPECTFULLY SUBMITTED, Signature: Printed Name: Company: Business Address: Telephone Number: Email: PROPOSAL FORM 00310-3

SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: 1. General Project coordination procedures. 2. Coordination Drawings. 3. Project meetings. 1.2 COORDINATION A. Coordination: Coordinate construction operations included in various Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation. 1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation. 2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair. 3. Make adequate provisions to accommodate items scheduled for later installation. B. If necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings. 1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required. C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following: 1. Preparation of Contractor's Construction Schedule. 2. Preparation of the Schedule of Values. 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Pre-installation conferences. 7. Project closeout activities. PROJECT MANAGEMENT AND COORDINATION 01310-1

1.3 PROJECT MEETINGS A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated. 1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times. 2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees. 3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Architect, within 3 days of the meeting. B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Owner and Architect, but no later than 7 days after execution of the Agreement. Hold the conference at Project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments. 1. Attendees: Authorized representatives of Owner, Architect, and their consultants; Contractor and its superintendent; major subcontractors; manufacturers; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 2. Agenda: Discuss items of significance that could affect progress, including the following: a. Tentative construction schedule. b. Phasing. c. Critical work sequencing. d. Designation of responsible personnel. e. Procedures for processing field decisions and Change Orders. f. Procedures for processing Applications for Payment. g. Distribution of the Contract Documents. h. Submittal procedures. i. Preparation of Record Documents. j. Use of the premises. k. Responsibility for temporary facilities and controls. l. Parking availability. m. Office, work, and storage areas. n. Equipment deliveries and priorities. o. First aid. p. Security. q. Progress cleaning. r. Working hours. C. Pre-installation Conferences: Conduct a pre-installation conference at Project site before each construction activity that requires coordination with other construction. 1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and PROJECT MANAGEMENT AND COORDINATION 01310-2

installations that have preceded or will follow, shall attend the meeting. Advise Architect of scheduled meeting dates. 2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following: a. Contract Documents. b. Options. c. Related Change Orders. d. Purchases. e. Deliveries. f. Submittals. g. Review of mockups. h. Possible conflicts. i. Compatibility problems. j. Time schedules. k. Weather limitations. l. Manufacturer's written recommendations. m. Warranty requirements. n. Compatibility of materials. o. Acceptability of substrates. p. Temporary facilities and controls. q. Space and access limitations. r. Regulations of authorities having jurisdiction. s. Testing and inspecting requirements. t. Required performance results. u. Protection of construction and personnel. 3. Record significant conference discussions, agreements, and disagreements. 4. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date. D. Progress Meetings: Conduct progress meetings at weekly intervals. Coordinate dates of meetings with preparation of payment requests. 1. Attendees: In addition to representatives of Owner and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work. 2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. PROJECT MANAGEMENT AND COORDINATION 01310-3

b. Review present and future needs of each entity present, including the following: 1) Interface requirements. 2) Sequence of operations. 3) Status of submittals. 4) Deliveries. 5) Off-site fabrication. 6) Access. 7) Site utilization. 8) Temporary facilities and controls. 9) Work hours. 10) Hazards and risks. 11) Progress cleaning. 12) Quality and work standards. 13) Change Orders. 14) Documentation of information for payment requests. 3. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present. Include a brief summary, in narrative form, of progress since the previous meeting and report. a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 01310 PROJECT MANAGEMENT AND COORDINATION 01310-4

SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following: 1. Contractor's Construction Schedule. 2. Submittals Schedule. 1.2 SUBMITTALS A. Submittals Schedule: Submit three copies of schedule. Arrange the following information in a tabular format: 1. Specification Section number and title. 2. Submittal category (action or informational). 3. Name of subcontractor. 4. Description of the Work covered. B. Contractor's Construction Schedule: Submit two Insert number printed copies of initial schedule, one a reproducible print and one a blue- or black-line print, large enough to show entire schedule for entire construction period. C. Daily Construction Reports: Submit two copies at weekly intervals. 1.3 COORDINATION A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors. B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports. 1. Secure time commitments for performing critical elements of the Work from parties involved. 2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence. CONSTRUCTION PROGRESS DOCUMENTATION 01320-1

PART 2 - PRODUCTS 2.1 SUBMITTALS SCHEDULE A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates. 1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's Construction Schedule. 2. Submit concurrently with the first complete submittal of Contractor's Construction Schedule. 2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL A. Time Frame: Extend schedule from date established for commencement of the Work to date of Final Completion. 1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order. B. Activities: Treat separate area as a separate numbered activity for each principal element of the Work. Comply with the following: 1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by Architect. 2. Procurement Activities: Include procurement process activities for long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery. 3. Submittal Review Time: Include review and resubmittal times indicated in Division 1 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule. 4. Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and allow time for Architect's administrative procedures necessary for certification of Substantial Completion. C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected. 1. Phasing: Arrange list of activities on schedule by phase. a. Coordination with existing construction. b. Limitations of continued occupancies. c. Uninterruptible services. d. Use of premises restrictions. e. Environmental control. CONSTRUCTION PROGRESS DOCUMENTATION 01320-2

2. Work Stages: Indicate important stages of construction for each major portion of the Work. D. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis to demonstrate the effect of the proposed change on the overall project schedule. 2.3 REPORTS A. Daily Construction Reports: Prepare a daily construction report recording events at Project site, including the following: 1. High and low temperatures and general weather conditions. 2. Accidents. 3. Stoppages, delays, shortages, and losses. 4. Orders and requests of authorities having jurisdiction. 5. Services connected and disconnected. 6. Equipment or system tests and startups. B. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare a detailed report. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents. PART 3 - EXECUTION 3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE A. Contractor's Construction Schedule Updating: At weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule two days before each regularly scheduled progress meeting. 1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting. 2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations. 3. As the Work progresses, indicate Actual Completion percentage for each activity. B. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility. 1. Post copies in Project meeting rooms and temporary field offices. 2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities. END OF SECTION 01320 CONSTRUCTION PROGRESS DOCUMENTATION 01320-3

SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. B. See Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's Construction Schedule and the Submittals Schedule. C. See Division 1 Section "Closeout Procedures" for submitting warranties. 1.2 DEFINITIONS A. Action Submittals: Written and graphic information that requires Architect's responsive action. B. Informational Submittals: Written information that does not require Architect's approval. Submittals may be rejected for not complying with requirements. 1.3 SUBMITTAL PROCEDURES A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. 2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. B. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation" for list of submittals and time requirements for scheduled performance of related construction activities. C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. 1. Initial Review: Allow 7 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. Architect will advise Contractor when a submittal being processed must be delayed for coordination. SUBMITTAL PROCEDURES 01330-1

2. If intermediate submittal is necessary, process it in same manner as initial submittal. 3. Allow 7 days for processing each resubmittal. 4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing. D. Identification: Place a permanent label or title block on each submittal for identification. 1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 4 by 5 inches on label or beside title block to record Contractor's review and approval markings and action taken by Architect. 3. Include the following information on label for processing and recording action taken: a. Project name. b. Date. c. Name and address of Architect. d. Name and address of Contractor. e. Name and address of subcontractor. f. Name and address of supplier. g. Name of manufacturer. h. Unique identifier, including revision number. i. Number and title of appropriate Specification Section. j. Drawing number and detail references, as appropriate. k. Other necessary identification. E. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals. F. Additional Copies: Unless additional copies are required for final submittal, and unless Architect observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal. 1. Additional copies submitted for maintenance manuals will not be marked with action taken and will be returned. G. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. 1. Include Contractor's certification stating that information submitted complies with requirements of the Contract Documents. H. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. I. Use for Construction: Use only final submittals with mark indicating action taken by Architect in connection with construction. SUBMITTAL PROCEDURES 01330-2

PART 2 - PRODUCTS 2.1 ACTION SUBMITTALS A. General: Prepare and submit Action Submittals required by individual Specification Sections. 1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. Architect will return two copies. Mark up and retain one returned copy as a Project Record Document. B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. 1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. 2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable: a. Manufacturer's written recommendations. b. Manufacturer's product specifications. c. Manufacturer's installation instructions. d. Manufacturer's catalog cuts. e. Wiring diagrams showing factory-installed wiring. f. Printed performance curves. g. Operational range diagrams. h. Compliance with recognized trade association standards. i. Compliance with recognized testing agency standards. C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. 1. Preparation: Include the following information, as applicable: a. Dimensions. b. Identification of products. c. Fabrication and installation drawings. d. Roughing-in and setting diagrams. e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring. f. Shopwork manufacturing instructions. g. Templates and patterns. h. Schedules. i. Notation of coordination requirements. j. Notation of dimensions established by field measurement. 2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 24 by 36 inches. D. Coordination Drawings: Comply with requirements in Section "Project Management and Coordination." SUBMITTAL PROCEDURES 01330-3

E. Samples: Prepare physical units of materials or products, including the following:. 1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. a. Submit one full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect will return submittal with options selected. 2. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from the same material to be used for the Work, cured and finished in manner specified, and physically identical with the product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection. a. Submit three sets of Samples. Architect will retain two Sample sets; remainder will be returned. 3. Preparation: Mount, display, or package Samples in manner specified to facilitate review of qualities indicated. Prepare Samples to match Architect's sample where so indicated. Attach label on unexposed side. 4. Submit Samples for review of kind, color, pattern, and texture for a final check of these characteristics with other elements and for a comparison of these characteristics between final submittal and actual component as delivered and installed. 5. Disposition: Maintain sets of approved Samples at Project site, available for qualitycontrol comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set. F. Product Schedule or List: Prepare a written summary indicating types of products required for the Work and their intended location. G. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation." H. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. 2.2 INFORMATIONAL SUBMITTALS A. General: Prepare and submit Informational Submittals required by other Specification Sections. 1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. Architect will not return copies. 2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be SUBMITTAL PROCEDURES 01330-4

signed by an officer or other individual authorized to sign documents on behalf of that entity. B. Contractor's Construction Schedule: Comply with requirements in Section "Construction Progress Documentation." C. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements. D. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements and, where required, is authorized for this specific Project. E. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements. Include evidence of manufacturing experience where required. F. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements. G. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements. H. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion. I. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements. J. Product Test Reports: Prepare written reports indicating current product produced by manufacturer complies with requirements. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency. K. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. L. Design Data: Prepare written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers. M. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a SUBMITTAL PROCEDURES 01330-5

product or equipment. Include name of product and name, address, and telephone number of manufacturer. N. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage. PART 3 - EXECUTION 3.1 CONTRACTOR'S REVIEW A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect. B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. 3.2 ARCHITECT'S ACTION A. General: Architect will not review submittals that do not bear Contractor's approval stamp and will return them without action. B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or modifications required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken. C. Informational Submittals: Architect will review each submittal and will not return it, or will reject and return it if it does not comply with requirements. Architect will forward each submittal to appropriate party. D. Submittals not required by the Contract Documents will not be reviewed and may be discarded. END OF SECTION 01330 SUBMITTAL PROCEDURES 01330-6

SECTION 01500 - TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes requirements for temporary facilities and controls, including temporary utilities, support facilities, and security and protection facilities. 1.2 DEFINITIONS A. Permanent Enclosure: As determined by Architect, permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight; and all openings are closed with permanent construction or substantial temporary closures. 1.3 USE CHARGES A. General: Cost or use charges for temporary facilities are not chargeable to Owner or Architect and shall be included in the Contract Sum. Allow other entities to use temporary services and facilities without cost, including, but not limited to, Owner's construction forces Architect testing and inspecting agencies and personnel of authorities having jurisdiction. B. Water Service: Use water from Owner's existing water system without metering and without payment of use charges. C. Electric Power Service: Use electric power from Owner's existing system without metering and without payment of use charges. 1.4 PROJECT CONDITIONS A. Temporary Utilities: At earliest feasible time, when acceptable to Owner, change over from use of temporary service to use of permanent service. 1. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities. B. Conditions of Use: The following conditions apply to use of temporary services and facilities by all parties engaged in the Work: 1. Keep temporary services and facilities clean and neat. 2. Relocate temporary services and facilities as required by progress of the Work. TEMPORARY FACILITIES AND CONTROLS 01500-1

PART 2 - PRODUCTS 2.1 MATERIALS A. General: Provide new materials. Undamaged, previously used materials in serviceable condition may be used if approved by Architect. Provide materials suitable for use intended. B. Tarpaulins: Fire-resistive labeled with flame-spread rating of 15 or less. C. Temporary wall and wall coverings: As required to minimize dust and debris from entering the existing production facilities. Layout, extents, and materials to be submitted for approval prior to installation. 2.2 EQUIPMENT A. Field Offices: Prefabricated, mobile units, or job-built construction with lockable entrances, operable windows, and serviceable finishes; heated and air conditioned; on foundations adequate for normal loading. B. Fire Extinguishers: Hand carried, portable, UL rated. Provide class and extinguishing agent as indicated or a combination of extinguishers of NFPA-recommended classes for exposures. 1. Comply with NFPA 10 and NFPA 241 for classification, extinguishing agent, and size required by location and class of fire exposure. C. Self-Contained Toilet Units: Single-occupant units of chemical, aerated recirculation, or combustion type; vented; fully enclosed with a glass-fiber-reinforced polyester shell or similar nonabsorbent material. D. Heating Equipment: Unless Owner authorizes use of permanent heating system, provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control. 1. Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited. E. Electrical Outlets: Properly configured, NEMA-polarized outlets to prevent insertion of 110- to 120-V plugs into higher-voltage outlets; equipped with ground-fault circuit interrupters, reset button, and pilot light. PART 3 - EXECUTION 3.1 INSTALLATION, GENERAL A. Locate facilities where they will best serve the project and result in minimum interference with performance of the Work. Relocate and modify facilities as required. TEMPORARY FACILITIES AND CONTROLS 01500-2

B. Provide each facility ready for use when needed to avoid delay. Maintain and modify as required. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities. 3.2 TEMPORARY UTILITY INSTALLATION. A. Heating and Cooling: Provide temporary heating and cooling required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of low temperatures or high humidity. Select equipment from that specified that will not have a harmful effect on completed installations or elements being installed. 1. Maintain a minimum temperature of 50 deg F in permanently enclosed portions of building for normal construction activities, and 65 deg F for finishing activities and areas where finished Work has been installed. B. Ventilation and Humidity Control: Provide temporary ventilation required by construction activities for curing or drying of completed installations or for protecting installed construction from adverse effects of high humidity. Select equipment from that specified that will not have a harmful effect on completed installations or elements being installed. Coordinate ventilation requirements to produce ambient condition required and minimize energy consumption. C. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations and traffic conditions. 1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system. 2. Install exterior-yard site lighting that will provide adequate illumination for construction operations, traffic conditions, and signage visibility when the Work is being performed. 3. At your temporary office, post a list of important telephone numbers, including police and fire departments ambulance service, Contractor's home office, Architect's office, and principal subcontractors' field and home offices. 4. Provide a portable cellular telephone for superintendent's use in making and receiving telephone calls when away from field office. 3.3 SUPPORT FACILITIES INSTALLATION A. General: Comply with the following: 1. Locate field offices, storage sheds, sanitary facilities, and other temporary construction and support facilities for easy access. 2. Provide incombustible construction for offices, shops, and sheds located within construction area or within 30 feet of building lines. Comply with NFPA 241. 3. Maintain support facilities until near Substantial Completion. Remove before Substantial Completion. Personnel remaining after Substantial Completion will be permitted to use permanent facilities, under conditions acceptable to Owner. TEMPORARY FACILITIES AND CONTROLS 01500-3

B. Project Identification and Temporary Signs: Prepare Project identification and other signs in sizes indicated. Install signs where indicated to inform public and persons seeking entrance to Project. Do not permit installation of unauthorized signs. 1. Engage an experienced sign painter to apply graphics for Project identification signs. Comply with details indicated. 2. Prepare temporary signs to provide directional information to construction personnel and visitors. C. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. 1. If required by authorities having jurisdiction, provide separate containers, clearly labeled, for each type of waste material to be deposited. D. Existing Stair Usage: Use of Owner's existing stairs will be permitted, as long as stairs are cleaned and maintained in a condition acceptable to Owner. At Substantial Completion, restore stairs to condition existing before initial use. 1. Provide protective coverings, barriers, devices, signs, or other procedures to protect stairs and to maintain means of egress. If, despite such protection, stairs become damaged, restore damaged areas so no evidence remains of correction work. E. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. Avoid using tools and equipment that produce harmful noise. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons or firms near Project site. F. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees to protect vegetation from construction damage. Protect tree root systems from damage, flooding, and erosion. G. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security. H. Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and public of possible hazard. Where appropriate and needed, provide lighting, including flashing red or amber lights. I. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior. TEMPORARY FACILITIES AND CONTROLS 01500-4

1. Where heating or cooling is needed and permanent enclosure is not complete, provide insulated temporary enclosures. Coordinate enclosure with ventilating and material drying or curing requirements to avoid dangerous conditions and effects. 2. Vertical Openings: Close openings of 25 sq. ft. or less with plywood or similar materials. 3. Horizontal Openings: Close openings in floor or roof decks and horizontal surfaces with load-bearing, wood-framed construction. 4. Install tarpaulins securely using fire-retardant-treated wood framing and other materials. J. Temporary Partitions: Erect and maintain dustproof partitions and temporary enclosures to limit dust and dirt migration and to separate areas from fumes and noise. 1. Construct dustproof partitions of not less than nominal 4-inch studs, 5/8-inch type X gypsum wallboard both sides with joints taped on both sides. 2. Seal joints and perimeter. Equip partitions with dustproof doors and security locks. 3. Protect air-handling equipment. 4. Weatherstrip openings. K. Temporary Fire Protection: Until fire-protection needs are supplied by permanent facilities, install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. 1. Provide fire extinguishers, installed on walls on mounting brackets, visible and accessible from space being served, with sign mounted above. a. Locate fire extinguishers where convenient and effective for their intended purpose. Provide not less than one extinguisher on each floor at or near each usable stairwell. 2. Store combustible materials in containers in fire-safe locations. 3. Maintain unobstructed access to fire extinguishers, fire hydrants, temporary fireprotection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas. 4. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition. 5. Develop and supervise an overall fire-prevention and first-aid fire-protection program for personnel at Project site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information. 3.4 OPERATION, TERMINATION, AND REMOVAL A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses. B. Maintenance: Maintain facilities in good operating condition until removal. Protect from damage caused by freezing temperatures and similar elements. TEMPORARY FACILITIES AND CONTROLS 01500-5

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage. 2. Prevent water-filled piping from freezing. Maintain markers for underground lines. Protect from damage during excavation operations. C. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired. 1. Materials and facilities that constitute temporary facilities are the property of Contractor. Owner reserves right to take possession of Project identification signs. 2. At Substantial Completion, clean and renovate permanent facilities used during construction period. END OF SECTION 01500 TEMPORARY FACILITIES AND CONTROLS 01500-6