Construction of Dariali HEPP. Reinstatement Plan

Similar documents
Flow Diversion Banks: General

GRADING, EROSION AND SEDIMENTATION CONTROL

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

Please print or type.

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

Appendix 14-I Description of Stream Crossing for Electrical Interconnect

Table A1: Five Year Limits¹ Bank Protection & Stabilization, Unmodified (Natural) Streams. Expected No. of Projects Acres

CONSTRUCTION SPECIFICATION

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

Construction Inspection Checklists

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Performance Standards Compliance Checklist

Figure Inlet protection (Source: Minnesota DOT)

[1] Level spreaders can release sheet flow down steep slopes, but the level spreader itself must be constructed across a level gradient.

Index. outlet protection Rev. 12/93


Chapter 2: Selecting Best Management Practices (BMPs)

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

New Administration Building

SECTION EROSION CONTROLS

October 2016 CDRPC Workshop

Blue Book Update Overview

Temporary Watercourse Crossing: Fords

Environmental Assessment Chapter 8 Surface Water

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

APPENDIX 1B Construction Mitigation Plans

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

CCSD#1 Stormwater Standards

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

Construction Specification for General Excavation

ARTICLE IV: DEVELOPMENT STANDARDS GRADING AND DRAINAGE

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

SECTION TRENCHING, BACKFILL AND COMPACTION

Stormwater Pollution Prevention Plan Engineering Department Requirements

Canadian Solar Developers Ltd.

SECTION EXCAVATION AND FILL

D EROSION AND SEDIMENT CONTROL. Table of Contents

Module 4 Regulatory requirements for Land Disturbing Activities

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Borrow Pit and Quarry Management Procedure Environmental

Fabric Drop Inlet Protection

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

Conservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

GRASS-LINED CHANNEL (acre) CODE 840

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

Project # Brown County PCN i40h Replace Section Line Road Culvert

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

FORM B: DAMMING AND DIVERSION OF WATER

Earth Dikes and Drainage Swales

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED

Installation and Maintenance of Erosion Control BMPs

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Temporary Watercourse Crossing: Culverts

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

SECTION TRENCHING

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Filter Tube Barriers (Instream)

All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below.

Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

WAKULLA SITE PLANNING

Modular Sediment Barriers (Instream)

Application for resource consent Form B Damming and diversion of water

Project Update. Gas to Great Island Power Station

Tips with Creation of your Erosion and Sediment Control Plan

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

City of Glendale Stormwater Management Plan Checklist

Diversion Dikes. Fe=0.95

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Appendix 16 - Erosion and sediment control guidelines for earthworks

PHASE 1 UPDATES TO DESIGN AND CONSTRUCTION STANDARDS INITIAL DRAFT FOR. Chapter 6 EROSION PREVENTION AND SEDIMENT CONTROL

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

ROADS: OPERATION AND MAINTENANCE

Description. Installation and Implementation Requirements

SECTION 903 EROSION CONTROL

The Construction General Permit and Erosion Prevention and Sedimentation Control

VISUAL SITE INSPECTION REPORT 2018

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Chapter CONSTRUCTION SITE EROSION CONTROL

CLOCA Rural & Agricultural Guide to Permits

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

Transcription:

Construction of Dariali HEPP Reinstatement Plan 2016

Table of Content 1. Introduction... 3 2. Site Clean-up... 4 3. Headwork Site Reinstatement... 4 4. Reinstatement Of The Pipeline Corridor.9 5. Cable Portal Entrance...12 6. Camp Site Reinstatement...10 7. Surface Drainage and Reinstatement...13 2

1. Introduction Reinstatement of project areas disturbed by Dariali HPP construction activities (e.g.headwork s,pipelineandcamp) to the original landscape character is a specific objective aimed and encapsulates benefits that include: Improved likelihood of maintaining HPP integrity against inclement conditions and natural erosion; Natural landscape and its tourism resource value are maintained; Soil fertility for both natural and agricultural environments is preserved, and thereby reduces the risk of desertification is reduced; Water catchments and the associated water quality are protected; Bio-diversity of the global genetic pool is sustained. This plan summarizes the specific requirements developed for reinstating areas disturbed by the project, and takes in to account the anticipated subsequent development of the Dariali HPP project. The standards for reinstatement are current best practice, and have been developed from international standards and guidelines. Issues addressed include topographical reinstatement, erosion control, and bio-restoration; and requirements for the extraction, re-uses and if necessary the disposal of material excavated from the pipeline and facilities trench. The reinstatement strategy is based on the following principles: Areas disturbed by construction activities will be restored to pre-construction conditions (e.g. contours) to the greatest extent possible; There will be no adverse impacts on sensitive habitats outside of the pipeline and project facilities as a result of construction activities, in particular when forming cuts on side slopes; Soils in disturbed areas will be stabilized, using both temporary and permanent controls, to protect the integrity of the pipeline and minimize potential sediment and erosion impacts; Topsoil will be handled and stored to retain soil structure, viability of its natural seed bank, and its fertility; 3

Topsoil and subsoil operations will be carried out in a way which minimizes the risk of soil loss down slopes and into watercourses; Bio-restoration of disturbed areas will be to conditions similar to the immediately adjacent to pipeline and road corridor, and will be undertaken in order to: (a) (b) restore the ecology existing before construction, particularly the variety and distribution pattern of plant species, using indigenous flora; establish sufficient vegetative cover to minimize erosion and meet the performance target of Erosion Class 3 or better through restoration of the local plant community Surplus excavated material will be disposed of in an environmentally acceptable manner. Reinstatement activities will be monitored until environmental requirements and goals will be achieved. 2. Site Clean-up Prior to demobilization the contractor Peri LLC will clean-up all areas affected by construction operations. In other project areas, the contractor will clean-up immediately on cessation of construction activity. Clean-up includes removal of all plant, equipment and materials not required for replacement of soil and subsequent bio-restoration. The Contractor has started clean-up activities: removal of all plant, equipment and materials not required for replacement of soil and subsequent bio-restoration. In pre-developed areas (either for agriculture or industry) t he cleaned-up condition will be equivalent to, or better than, the condition prior to construction. Waste materials will not be left, or buried or disposed of in any way on any project area, except for: Excess soil and rock; Waste disposed of at approved waste disposal sites that will have been selected the project and that have been approved by the relevant authorities to undertake such operations. 3. Headwork Site Reinstatement Headwork site reinstatement activities will be fully cleared at the completion of the construction activities. At this stage reinstatement of site includes: 4

Removal of excess material; Site clearance activities (waste, litter/trash should be sent to the approved disposal site); Grading and leveling (will be commenced only after the cleanness of the site has been verified); Reshaping of the land surface will be accomplished without disruption to adjacent undisturbed areas; Final grading shall ensure that the contours of the site blend into the surroundings to the extent feasible. Leveling and grading activities should be carried out at the rebar and pipes storage area. Accumulated excavated material to be spread and level so, that the contours blend into the surrounding to the extent feasible. Photo below shows rebar storage area. Monitoring and plan implementation: Headwork site reinstatement activities has been started and continued with: Removal of excess material; Site clearance activities (waste, litter/trash sent to the approved disposal site); Grading and leveling Reshaping of the land surface; The rebar and pipe storage area was cleared from temporary facilities. Leveling and grading activities have been started. 5

6

Another step for Headwork site reinstatement should be the reinstatement of Tergi riverbank. Excavated materials from Headwork site (dam, pipeline, sedimentation basin) has been accumulated alongside to river and also used for river diverting for dam construction. After completion of the Headwork site, Tergi will be returned to its riverbed and excavated material will be used for grading and leveling. Reinstatement of Tergi riverbank was carried out: Excavated materials accumulated alongside to river and also used for river diverting for dam construction was removed and used for leveling and grading and also for stabilization bottom of the adjacent slope. The river was returned to its natural riverbed and the riverbanks were protected by riprap. 7

Temporary roads at the headwork site will be dismantled and area will be reinstated. Only one main road is considered to be installed as a pipeline corridor access. Dismantling temporary roads have been started. On more point of excavated materials storage has been observed during the site reinstatement survey, close to the headwork. Materials have been used as a layer for pipe temporary storage. Rocky soil has been spread on topsoil for pipe lying. This material should also be taken and reused. Photos below shows rocky soil spread on topsoil. No improvement has been observed yet. According contractor works will be carried out after dismantling temporary facilities next to the accumulated materials. All temporary facilities will be dismantled and removed from site. Major part of temporary facilities was dismantled;however, facilities are still to be removed from settling basin area. Contractor is planning activities after completing with headwork dam area. 8

4. Reinstatement of the Pipeline Corridor Project construction contractor Peri LLC will reinstate the full width of the Pipeline corridor as the base case. Existing Pipeline corridor and road has already been used as a road before Dariali HPP Project has been lunched. Photo below shows the road on Pipeline corridor at the starting phase of the Dariali Project. Peri LLC will backfill pipeline and reinstate the corridor as far as practicable, after installation of the pipeline. Photo below shows backfilled pipeline and slopes installed as extent feasible. This practice will be used at entire length of pipeline. Natural re-vegetation is considered to be sufficient to restore 9

the slopes cover. Re-vegetation process will be monitored and if there will be lack of re-vegetation, grass seeding will be performed next year. Excessive excavated materials from the opposite side of road slopes will be used for pipeline backfilling and the slope will be shaped extent feasible. Installation of the pipeline was completed: entire length was backfilled and the corridor reinstated as far as practicable.natural re-vegetation was considered to be sufficient to restore the slopes cover. A slight vegetative cover is forming from the annual grass growing on the slopes above and a small annual grass species. Monitoring should be continued. 5. Cable Portal Entrance Area at cable portal should be cleaned of waste and debris; oil spills; useless construction materials etc. should be cleaned. Drainage control should be maintained. Existing electrical cables to be renewed and installed as required. 10

Storm water drainage channels installation should be taken in consideration while reinstatement activities will be carried out. Stones will be protected by metal mesh to avoid falling hazards. Area at cable portal wascleaned of waste and debris; oil spills; useless construction materials etc. Drainage control is maintained. Temporaryand improperly installed electrical cables were removed. Final landscaping activities have been started. Stones accumulated in the ravine beside of access tunnel were protected by metal wire mesh and gabion wall. This significantly decreased falling hazard, however as rockfall potential is inherent in these areas and on main public road which is only access and connection of the project headwork and PowerStation facilities, additional caution should be taken when moving across unprotected areas. 11

6. Camp Site Reinstatement Camp site reinstatement should be performed after site clearance. Temporary facilities will be removed, parking area and truck maintenance area will be cleared from minor spills. Area will be leveled and drainage channels will be installed. Natural re-vegetation should be monitored. Seeding will be performed if required.disturbed areas will be reinstated to a condition as good, if not better than that that existed prior to establishment of the facilities, and will be to the satisfaction of the owner/authority. Commencement of reinstatement at camp site is expected after completing all other activities under the project. According contractor early summer of the next year is considered as winter associated natural events may hamper the reinstatement works. 12

7. Surface Drainage and Reinstatement Surface drainage lines will be reinstated to match the existing formations (ephemeral creeks) and contours as soon as practicable (i.e. the period following removal of surface facilities / infrastructure and backfilling or compaction) to ensure any works completed will not be affected by a rainfall event or over a longer summer rainfall period. Most surface drainage lines occur with areas of greater slope so extra measures are required for erosion control and soil establishment. Rock armoringmay be required at drainage outlets and along drainage lines with significant flow, to avoid scoured erosion issues. The need for rock armoring, or other engineered sediment and erosion controls, will be determined by a suitably qualified person, such as a certified practicing engineer. Surface contouring reinstates the pre-construction land formation to the natural contours of theexisting environment. This ensures water flow over the surface is in cohesion with the 13

surroundinglandscape and minimizes the risk of potential erosion. Contouring will payparticular attention to drainage lines for surface waterflows to ensure erosion potential is minimized. Major part of surface drainage lines was reinstated. 14