HACCP audit checklist

Similar documents
Hazard Analysis and Critical Control Point The Almond Board of California. Overview. Definitions

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

UR Startup Inc. ISO Audit Checklist. conducted for. Conducted on (Date and Time) 02 Aug :06 PM. Inspected by Andy Dion

UNIT 10 CLAUSE-WISE INTERPRETATION OF ISO 22000: 2005

Vendor Qualification Survey

HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005

UNI EN ISO 22000:2005 STANDARD CHECK-LIST

Principle 6. Verification & Validation

Verification Program for a Voluntary Hazard Analysis and Critical Control Point (HACCP) Plan. Part I

Feed Quality Assurance and Certification Programs. Representing the Total Feed Industry

JFS-A/B/C Standards <Manufacturing> [Interpretations]

RECOMMENDATIONS FOR DIETARY INGREDIENT PROCESSORS

GOOD MANUFACTURING PRACTICES - AUDIT REPORT FORM AKA GMP Standards Program

SQF Code Food Safety Management System Implementation Workbook

FSMA Food Safety Seminar Japan External Trade Organization

SQF Code Food Safety Management System Implementation Workbook

Wilson-Hurd ATF Quality Manual

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

FDA 21 CFR Part 820 vs. ISO 13485:2016 Comparison Table created by greenlight.guru

BRC Storage and Distribution Quality and Safety Management System Implementation Workbook

Self-Evaluation/Audit Checklist for Food Supplement Manufacturers

General food hygiene requirements and HACCP

QM 001 Food Safety Quality Management System

21CFR Ventilation, air filtration, air heating and cooling. 21CFR211 Details, Details. 21CFR Equipment Cleaning and Maintenance

European Code of Practice For Feed Additive and Premixture Operators

SQF 2000 Food Safety Management System Implementation Workbook

SUPPLIER QUALITY SYSTEM SURVEY

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

SQF Code Food Safety Management System Implementation Workbook

APPENDIX K. HACCP PROGRAM

QM Food Safety Quality Management System

SQF Food Safety Code for Manufacturing Changes from Edition 7 to Edition 8

Food Safety Quality Management System

Annex 4. Guidance on good manufacturing practices: inspection report. Background

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

FSMA. An Industry Perspective Patty Harvey MCAFDO February 24, 2016

The IFSQN FSSC Implementation Package

Checklist for the Auditor

SUPPLIER QUALITY SYSTEM SURVEY

SUPPLIER QUALITY SYSTEM SURVEY

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

Food Safety Quality Management System

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

Connecticut Valve & Fitting Co.

BRC Packaging Management System Implementation Workbook

The best just got better!

SUPPLIER QUALITY ASSESSMENT

AAMI Quality Systems White Paper: Comparison of 21 CFR Part 820 to ISO 13485:2016 1

SQF 2000 Code. 6th Edition AUGUST A HACCP-Based Supplier Assurance Code for the Food Manufacturing and Distributing Industries

Welcome to Introduction to ISO Food Safety Management Systems

Public Health Consumer Protection Program

FSSC Food Safety Management System Implementation Workbook

BELDEN QUALITY SYSTEM OVERVIEW

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Supplier Quality System Survey

INTERNATIONAL FOOD ADDITIVES COUNCIL GOOD MANUFACTURING PRACTICE AND QUALITY ASSURANCE GUIDE FOR FOOD ADDITIVES AND GRAS SUBSTANCES

PLEASE TYPE IN THE INFORMATION AFIA SAFE FEED/SAFE FOOD GUIDELINES AUDIT

Implementation & Documentation Requirements for ISO 22716:2007 Certification

GFSI BENCHMARKING REQUIREMENTS GFSI GUIDANCE DOCUMENT VERSION 7.2 PART III - M PRODUCTION OF FOOD PACKAGING

Quality and Safety System for Specialty Feed Ingredients PROCESS DOCUMENT FORMULATION PROCESS VERSION

Beaver Machine. Quality Manual

Quality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard

SUPPLIER FOOD SAFETY ASSURANCE

QUALITY MANUAL QM0492 ISO SUPPLEMENT III

INS QA Programme Requirements

Good Manufacturing Practices (GMPs) for Infant Formula

CORPORATE QUALITY MANUAL

Brumund Foundry Inc.

WARNING LETTER AUG 3, 2016

Prequalification of Medicines Programme

BRC Food Safety and Quality Management System

Quality Assurance Policy and Procedures

The World Bank. Aide Memoire for use during GMP inspections

Master Air Parts, Inc Skyway Drive, Suite 303 Santa Maria, CA (805) Phone (805) Fax

SUPPLIER QUALITY MANAGEMENT SYSTEM

Quality System Regulation (QSR) Training

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT

I. Development, Submittal, and Acceptance of a Quality Management System

Quality and Safety System for Specialty Feed Ingredients PROCESS DOCUMENT CHEMICAL PROCESS VERSION

Changes in the EXCiPACT 2017 Edition Requirements from the 2012 Edition

EVANS CAPACITOR COMPANY

SUPPLIER SURVEY FORM Instructions

Supplier Quality Requirements SQR-1.0 Rev. 3

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

Quality Assurance Manual

Self Assessment Checklist

THE BASIC PRINCIPLES OF HACCP

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

U. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems

(More than 130 document files) GMP+ B3 Editable Document kit

BRC Storage and Distribution Quality and Safety Management System

PART III - F PRODUCTION OF FEED. GFSI BENCHMARKING REQUIREMENTS GFSI Guidance Document Version 7.2

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

BRC Food Safety Management System Implementation Workbook

PART III - M PRODUCTION OF FOOD PACKAGING

GFSI BENCHMARKING REQUIREMENTS GFSI GUIDANCE DOCUMENT VERSION 7.2 PART III - EI PROCESSING OF ANIMAL PERISHABLE PRODUCTS

Transcription:

Requirement HACCP audit checklist Prerequisite Program Management Commitment 1. Senior management ensures that the responsibilities and authorities are defined and communicated within the company Internal Communication 1. There is a clear communication and reporting channel between senior management and personnel. Management Review 1. Management review includes: o audit results o customer feedback o process performance and product conformity o status of preventive and corrective action o follow-up action from previous management reviews o planned changes that could affect the quality system o recommendations for improvement Quality Manual 1. A quality manual with appropriate processes and procedures exists Control of Documents 1. Document control procedures are in place including approval for adequacy prior to use, updates and re-approval, identification of the current version, availability, legibility 2. Records are controlled (identifies which records are needed and how long they are kept) 3. The following records are maintained as appropriate to the product (e.g. GMPs, Conformity Y/ N Details

production records, master record file) Internal audit 1. Internal audits are performed on scheduled intervals to assess the effectiveness of the QMS 2. Personnel identified and trained to perform internal audits 3. Documentation that corrective and preventive actions were performed as an outcome of the internal audit Site standards 1. Procedures exist for the review and evaluation of food safety hazards in the event of new or changed facilities 2. Buildings and grounds are adequately and routinely maintained 3. Buildings are maintained in a reasonably clean and orderly manner 4. Buildings are of suitable construction to minimize access to rodents, birds, and other pest 5. Buildings provide adequate space and lighting 6. All equipment maintained in a reasonably and orderly manner 7. All equipment are of suitable size, design, construction, precision, and accuracy for its intended use 8. All equipment is maintained to prevent lubricants and coolants introduction as unsafe additives to food 9. All equipment designed, constructed, and maintained to facilitate inspection and use of cleanout procedures 10. Work areas and equipment used for the manufacture and storage of food are kept separate from chemicals 11. All equipment is properly cleaned to prevent unsafe contamination of food 12. There are procedures in place controlling calibration of equipment 13. There is a master sheet of all equipments Purchasing 1. Evidence that ingredient specifications are provided to suppliers exists

2. Traceability procedures exist to facilitate product recall 3. Established inspection procedures or other inspection activities to ensure that purchased material specifications are in place, including contamination Control of production 1. Master record file is maintained for each product which includes product specifications, formulation, label, and special manufacturing instructions 2. Frequency and number of samples needed during production for each batch 3. Proper identification and date of manufacture are provided 4. Production records are maintained that provide formulation, date of production, date of shipment to facilitate recall procedures 5. Work instructions for proper manufacturing procedures are available to personnel 6. Production records are inspected for accuracy at scheduled intervals 7. Equipment is suitable for manufacturing of product to specification 8. Monitoring devices are available and used Validation of production process 1. Validation procedures are in place and conform to science based performance standards Identification and traceability 1. Finished product is properly packaged and labelled for identification and should include name, product description, net weight (or bulk statement), lot number, shelf life date, and all label regulatory requirements 2. Procedures for product traceability are documented 3. Retained samples are identified for traceability (shelf life) Control of monitoring and measuring devices 1. Monitoring and measuring devices used to manufacture product is properly maintained, calibrated, and recorded 2. Instrumentation and devices used to calibrate monitoring and measuring devices are verified at specified intervals against

Monitoring and measurement of processes 1. Monitoring procedures have been established to evaluate the manufacturing processes, where appropriate 2. Scheduled monitoring activities have been established. Monitoring and measurement of product 1. Procedures are in place to ensure product conforms to requirement Storage of Product 1. Products are properly identified, stored, handled, and controlled to maintain their identity and integrity Customer satisfaction 1. Procedures for recording and evaluating complaints exist. Control of non-conforming product 1. Procedures to control non-conforming product have been established 2. Non-conforming product is properly identified and stored in specified location 3. Documentation of final disposition of non-conforming product, which may include rework and re-verification 4. Procedures have been established for product recall or customer notification if non-conforming product is detected after delivery 5. Procedures to handle returned goods are established 6. Documented procedures that establish requirements for reviewing and preventing non-conformities including customer complaints, determine reason for nonconformity, take action to prevent reoccurrence of nonconformity, records of results of actions taken, and reviewing corrective action taken Training 1. Records are available that demonstrate personnel competence and training 2. Job descriptions are available that include the responsibility and skills required by the employee 3. Personnel are properly trained in personal hygiene where appropriate to avoid contamination

4. Training matrix is in place 5. Re-freshing training procedure is in place 6. Training records are available for personnel dealing with CCPs. HACCP 1. The HACCP team has been trained and the training has been recorded a) Include names of the HACCP team and training/job experience which qualifies the individuals in the application of HACCP principles b) The individual developing the hazard analysis, including delineating control measures successfully completed training in the application of HACCP principles. c) The individual developing a HACCP plan that is appropriate for a specific site successfully completed training in the application of HACCP principles. d) The individual verifying and modifying the HACCP plan successfully completed training in the application of HACCP principles. e) The individual performing the record review successfully completed training in the application of HACCP principles. 2. The HACCP plan is specific to the location and site 3. The HACCP plan is specific to the ingredient, food or process 4. If ingredients, food or processes are grouped together in a single plan, evidence exists that they share common hazards 5. The hazard analysis lists all hazards a) The written hazard analysis (which may be in table form) identifies hazards for each process step or includes the statement none identified at this time b) The written hazard evaluation is science-based, considers hazard frequency and severity and has been performed for every identified hazard. c) The control measures for significant hazards have been identified.

d) Prerequisite programs exist for significant hazards and are correctly referenced in the HACCP plan e) The hazard analysis procedure included an evaluation of SOPs and modifications were performed if necessary f) Critical control points exist for significant hazards g) The hazard analysis considers external and internal hazards h) Evidence exist that the HACCP team considered, as a minimum, biological, chemical and physical hazards listed in this section. i) The hazard analysis considered possible sources of adulteration including all process steps including packaging, storage, transportation, intended use, facility and equipment function and design, and plant sanitation including human hygiene. 6. All identified hazards are evaluated for their significance 7. CCPs are assigned for significant hazards 8. If applicable to process flow and hazard evaluation, CCPs are assigned for significant hazards outside the site 9. Critical limits are identified for each CCP 10. Procedures exist for monitoring each CCP 11. Monitoring frequency ensures adherence to the critical limit 12. The HACCP plan includes corrective action plans developed a) The corrective action plan describes steps to be taken and assigns responsibility in response to deviations from the critical limits and: o ensures adulterated product is not distributed or used after the deviation has been identified and before the corrective action has been taken o corrects the deviation b) For deviations that occurs and the site doesn t have a corrective action plan products is segregated and held, tested for acceptability, not used until product is brought into conformance with HACCP plan.

c) For deviations that occurs and the site doesn t have a corrective action plan the cause for the deviation is corrected and verified by a trained individual to determine whether HACCP plan requires modification. d) Records provide evidence that corrective action were performed as described in the HACCP plan 13. The HACCP plan lists validation and verification procedures and their frequency a) Evidence that the site reviews consumer complaints and their relationship to the HACCP plan s performance or are a new hazard b) Verification that key manufacturing equipment are calibrated according to the plan was performed c) Verification of process monitoring equipment calibration was performed d) Verification that the site performs end-product testing if included in the HACCP plan e) Verification (within 7 days) that critical control point monitoring records were completed, signed and documented values were within the critical limits f) Verification (within 7 days) that calibration records for equipment and processing monitoring were performed in accordance with the HACCP plan g) Procedures outlined in section were followed whenever any verification activity establishes the need for corrective actions h) Validation procedures were conducted at specified time intervals and after process modifications by individuals trained and recorded i) Whenever no significant hazards have been identified, a reassessment of the hazard analysis adequacy will be performed annually or after process modification by individuals trained and recorded 14. The HACCP plan includes a recordkeeping system for monitoring CCPs a) Written hazard analysis in place that has identified all significant

biological, chemical and physical hazards b) Written HACCP plan for this location for each type of ingredient c) Monitoring of critical control points and their critical limits d) Calibration of key manufacturing equipment e) Calibration of processing monitory instruments f) Corrective actions including disposition g) Records documenting verification and validation of the HACCP plan h) Records are signed and dated by the most responsible person at the site (acceptance, modifications, verification and validation) i) All records include the name and location j) All records include the date and time of records created k) All records include the signature or initials of the person performing the operation or creating the record l) All records include the identity of the product and if required the production code m) All records include processing observations and other information entered at the time observed. n) Records required are retained for at least 3 years after the date of production (electronic records are acceptable) o) Records required are available for review and copying during certification audit.