WOOD POLE SPAN WIRE SIGNAL SYSTEMS

Similar documents
UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

All RED text must be removed from the special provisions prior to the special provisions being submitted for project letting.

CHAPTER 13 GROUNDING AND BONDING

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS

Section 7: Specifications

Electric Service Requirements & Guidelines

CITY OF UNION, OREGON TECHNICAL SPECIFICATIONS SECTION 9 UNDERGROUND UTILITIES

Huntsville Utilities Underground Residential Service Requirements

OVERHEAD SERVICES - SECONDARY

Douglas County Traffic Signal Installation Guidelines (January 2013)

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

6. Temporary Construction Service

Metering Installations for Mobile Homes or Mobile Home Parks:

GARDEN CITY STNANDARD REVISIONS FOR ISPWC DIVISION 1102 STREETLIGHTS

SPECIAL SPECIFICATION 7191 Illumination

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

PRIMARY LINE EXTENSION

CS-21 STREET STRUCTURES TABLE OF CONTENTS

DIVISION 1100 TRAFFIC

GABIONS AND REVET MATTRESSES

12/21/2018 WHAT S NEW SINCE What's New Since SPEC BOOK 2018 SPEC BOOK 2018 SPEC BOOK WHAT S NEW SINCE 2014

DUPLEX INSTALLATION. Customer provides single service lateral attachment point in trough.

Please check with your local inspection authority for any additional requirements before installation.

GABIONS - Galvanized

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

Post Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)

SECTION EXCAVATION AND FILL

(Condensed from National Electric Code)

C. Foundation stabilization for pipe and utility structures.

TEMPORARY FACILITIES

SECTION 1208 CHAIN LINK FENCING DESCRIPTION

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Temporary Wiring. Low-Voltage Electrical Safety Orders

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

1/5/2018 WHAT S NEW SINCE B & B QUALIFICATION OF WORKERS. What's New Since SPEC BOOK 2018 SPEC BOOK 2018 SPEC BOOK

An altered service that is moved, upgraded (ex., 200 to 400 amp) or changed to meet today's standards for electric service.

Customer Requirements Conduit Installations, High Voltage

Technical Data Sheet NEC/GRAN/95:01

GABIONS PVC Coated. Product Standard Specifications Installation Instructions Method of Measurement and Payment. Update: May 1999

CONSTRUCTION SPECIFICATION FOR GROUNDING

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

Basic Service. This Section provides information regarding a. Introduction

SECTION STORM SEWER PIPE

CONSTRUCTION STANDARDS SECTION CS 15 STREET LIGHTING

STREET LIGHTING GENERAL INFORMATION

SPECIAL SPECIFICATION 1924 Neighborhood Friendly High Mast Illumination System

UNDERGROUND SERVICES SECONDARY

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES

SECTION MECHANICALLY STABILIZED EARTHEN SLOPES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

Public Works Division Lighting District Supplemental Specifications For Solar School Flashing Beacon Installation March 2007

CITY OF OCEANSIDE. Electrical Lines, Plumbing and Mechanical Burial & Support Requirements. Informational Bulletin

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

Tucson Electric Power Company Rules and Regulations

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

RESIDENTIAL QUICK REFERENCE

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

If a new residence s electrical service is not located within 200 feet of existing

CHAPTER 12 HANDHOLES, PULLING VAULTS, AND JUNCTION BOXES

Building Attachments and Services

METERING INSTALLATION

New Construction Units. a. Includes the furnishing of all labor and equipment for the installation of new construction units.

Specifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums

TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED

HEKAPLAST. PE-HD twin wall cable ducts and cable protection pipes for underground installation. Corrugated and Twin Wall Pipes of Plastics

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES

CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

Welcome to Douglas County PUD

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3


SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SPECIAL SPECIFICATION 7441 Remove Components of Existing Traffic Management System

CEILING MOUNTED ARTICULATING JIB CRANE

CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST

CITY OF LODI ELECTRIC UTILITY DEPARTMENT RULE AND REGULATION NO. 16 SERVICE CONNECTIONS AND FACILITIES ON CUSTOMER'S PREMISES

SMALL CELL DESIGN GUIDELINES

General Symbols, Ducts and Cables

General Symbols, Ducts and Cables

CHAPTER 10 FOUNDATIONS AND EQUIPMENT PADS

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year

Section 820. TRAFFIC SIGNALS

c. Sprinkler layout. Sprinkler layout may be modified to adjust for field conditions provided it complies with part

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

400 watt, high pressure sodium. Type C watt, high pressure sodium Collector Street Light Units

ROAD COMMISSION FOR OAKLAND COUNTY. SPECIAL PROVISION FOR GABION WALL RCOC/DESIGN: AB Page 1 of 8 RCOC12SP706F 10/28/2013

LABOR AND MATERIAL PROPOSAL

Transcription:

7 A wood pole span wire traffic control signal system differs from a mast arm steel pole traffic control signal system in that it uses wood poles and span wires to place the signal indications in the driver s line of sight. In most cases this kind of traffic control signal system is meant to be in place only for a short period of time during a construction phase. Most are used as intersection traffic control during construction. They provide great flexibility in signal head placement to accommodate traffic switches associated with construction. They are significantly less expensive to install because they have very little underground conduit as most of the electrical cables and conductors are attached to the span wire and conduit attached to the wood poles. If properly laid out they present few conflicts for road construction. When a 5-Section vehicle signal head is required on a MnDOT span wire traffic control signal system a 5-Section Cluster Head (Dog House) must be used for that type of installation. 27-1

When installing span wire traffic control signal systems it is very important to install the S-Hook breakaway device at the signal head as shown below. If the 1/4 inch bottom span wire stabilizer is snagged the bottom cable assemblies will fall clear of the intersection. When it is necessary to completely remove an existing traffic control signal system is often desirable to construct a span wire traffic control signal system so the intersection can remain signalized while the new traffic control signal system is being constructed. The components of the new traffic control signal system must be staked before the wood pole system can be staked to prevent any conflict with the construction of the permanent traffic control signal system. Wood pole traffic control signal systems can be easily removed at a low cost when the new traffic control signal system is completed. 27-2

Materials used for span wire traffic control signal systems are subject to MnDOT specifications and inspection. All electrical cables and conductors installed above ground, except where attached to overhead span wire, must be installed in conduit attached to wood poles, metal poles, cabinets or other structures or must be run inside these devices. 27-3

Conduit must be securely fastened to wood poles with appropriate type conduit 2-hole straps that meet the current edition of the National Electrical Code (NEC). Wood poles must be placed in the ground to a depth of approximately 20 percent of the pole s total length. See 2565.3N Excavation must be approximately 8 inches larger than the diameter of the base of the pole and free of loose material to allow room for compaction. 27-4

The pole must be hoisted into place, without damage, and plumbed or raked as directed by the Engineer. Backfill material must be selected earth or sand and free from rocks, organic material and placed, moistened, and thoroughly compacted in 8 inch lifts. The wood pole must not display a void area between the pole and the backfill when placed under load. Electrical cable and conductors installed overhead in conjunction with span wire must be attached to the span wire using either metal or UV resistant black nylon straps. The nylon straps must have a minimum loop tensile strength of 250 pounds. Straps must be spaced a maximum of 18 inches apart or by lacing. The ends of the straps must be bent around the cable and cut off to present a neat appearing installation. See 2565.3J.5 Where electrical cables and conductors are to be installed overhead, unsupported and spanned between wood poles or supports, sufficient slack must be provided (generally 5% of the span length). 27-5

Specific details for constructing wood pole traffic control signal systems, such as department furnished materials, Contractor furnished materials, and installation requirements, can be found in the Contract Documents for your project and must be carefully read and understood. The MnDOT District Traffic Office will stake pole locations and other traffic control signal system components. 27-6