Dam Safety Inspection Checklist

Similar documents
Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information

DTE Energy Monroe Power Plant

DTE Energy St. Clair Power Plant

Visual Inspection Checklist

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

Dam Safety Surveillance. Templates for very low, low consequence category dams

OPERATIONS AND MAINTENANCE MANUAL. Project: STORMWATER CONTROL STRUCTURE Wet Detention Pond. Cary, NC. Owners: Prepared By: Date:

LAKE CHEMUNG DAM LOCATION MAP

CCR Rule Annual Inspection Report 2

SAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

AMERICAN ELECTRIC POWER (SWEPCO)

Types of Inspections

Types of Inspections. Prior to Inspection. Types of Inspections. Typical Inspection Equipment. Embankment Dams

2018 Annual Dam and Dike Inspection Report

Concrete is an inexpensive, durable, strong and

2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016

Water Control Structures Selected Design Guidelines Alberta Environment Page 13-1

VICINITY MAP AND SITE MAP. Page 1 of 9

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

LOS ANGELES RIVER/COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

4.4.6 Underground Detention

2017 Annual Dam and Dike Inspection Report

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

Field Assessment of Construction Components for Wetland Restorations

Limited Visual Dam Safety Inspections OA Wahiawa Dam. Oahu, Hawaii

Appendix D Index. SWM/BMP Facility Site Photographs. Subshed 440 Facility Photo #

LOS ANGELES RIVER/COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER/COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES AND ORANGE COUNTIES, CALIFORNIA NLD SYSTEM ID #

AMERICAN ELECTRIC POWER (SWEPCO)

ARKANSAS & LOUISIANA LEVEE AND DRAINAGE DISTRICTS MEETINGS

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill Annual Inspection Report

Naughton Power Plant

SAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES AND ORANGE COUNTIES, CALIFORNIA NLD SYSTEM ID #

Flood Damage Reduction Segment / System Inspection Report

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report

LOS ANGELES RIVER/ COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

Flood Damage Reduction Segment / System Inspection Report

Dry Swale Wet Swale Grass Channel Dry Well Permeable Pavement Bioretention DESIGN ELEMENTS

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

Construction Inspection Checklists

Brush layering construction

Packwood Hydroelectric Project. Summary of Engineering Needs for Roads Preliminary Results

The inspection report evaluates potential Path 1. The hydraulic analysis report evaluates potential Path 2.

Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1

Water Control Structures Selected Design Guidelines Alberta Environment Page 14-1

Chapter 5.5 Inlets, Outlets, and Flow Control

11.1 INTRODUCTION 11.2 SLOPE MANAGEMENT SYSTEM 11.1 GEOTECHNICAL AND SLOPE STABILITY

McElroy s Run Impoundment Coal Combustion Residual Annual Report

LONG LAKE LEVEL CONTROL STRUCTURE PART 307 INSPECTION

SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

Irrigation System. BWCDD Zanjero Training 2/13/2008

COYOTE CREEK 4 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD ID #

SC-01 Surface Outlet and Baffle Sediment Basin

2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio

TVA Colbert Fossil Facility Ash Disposal Pond 4

APPENDIX G Stormwater Control Operations and Maintenance Requirements

2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA. June 2015

LOS ANGELES RIVER 7 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

Jim Bridger Power Plant

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania

Inspection and Maintenance of Stormwater Control Measures: Helping Protect Greensboro s s Water Quality and Water-Supply

Travers Reservoir Rehabilitation Project Irrigation Technical Conference Lethbridge, AB June 2, 2010

2016 DAM AND DIKE INSPECTION REPORT CCR PONDS COMPLEX

2017 ANNUAL DAM AND DIKE INSPECTION REPORT

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

2016 Annual Dam and Dike Inspection Report

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

Coal Combustion Residuals Unit Structural Stability Assessment


NAUGHTON FGD POND 4 STRUCTURAL STABILITY ASSESSMENT

York County STORMWATER LUNCH & LEARN

Chapter 10. Conduit Outlet Structures Introduction General Layout Information

Tips with Creation of your Erosion and Sediment Control Plan

FORM B: DAMMING AND DIVERSION OF WATER

VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID #

Cast in place concrete parapet and Ministry standard sidewalk railing.

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

Complying with Dam Safety Regulations The Sleepy Hollow Lake Story

Inspection and Maintenance Checklist Catch Basin Inserts

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Annual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

APPENDIX A MAINTENANCE REQUIREMENTS FOR FLOW CONTROL, CONVEYANCE, AND WQ FACILITIES

LEVEE DEFICIENCY CORRECTION PROCEDURES

WITCHES WOODS LAKE DAM CT DEEP #16907

Chapter 11 Culverts and Bridges

2017 Annual Landfill Inspection Report

VISUAL SITE INSPECTION REPORT

Stormwater Management Training for MS4 Municipal Employees

Transcription:

Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing information (Pre -inspection) Owner=s Name(s): Address: City: State: Zip (+4): Telephone (Home): Contact Person: Designed By: Constructed By: Year Completed: Purpose of dam: Interview with Owner (at the site): Owner/Representative present: (Yes, No) Telephone (Work): Telephone: Plans Available (Yes, No) (location): Name(s): Double check address, telephone #, purpose (check ->) G How long have you owned dam - previous name/owner? EAP/OM&I: up-dated-(yes, no) & location: Operate lake drain (times per year, accessibility): Mowing (times per year): Prior problems (wet areas, erosion, slides): Repair or modification (what & when): Failure/Incident/Breach (max. pool): Downstream hazard status (recent changes): Do you know the in-depth details of the construction of your dam? (If yes - ask next three questions, if no - go to Field Information Section) Core trench material and location: Volume of fill (earth or rock) in dam: Foundation (earth or rock) of dam: Field Information (while at site) Pool Elevation (during inspection): Time: (a.m. p.m.) Site Conditions(temp., weather, ground moisture): Inspection Party: Maximum Height: Normal Pool Surface Area: (measured or inventory appears correct) (measured or inventory appears correct)

UPSTREAM SLOPE Gradient: Horizontal: Vertical: (est, meas.) VEGETATION [no problem] Trees: Quantity: ( <5, sparse, dense) Diameter: ( <6", 6-12", >12") (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Brush: Quantity: (sparse, dense) (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Ground Cover: Type: (grass, crown vetch) Other: Quantity: (bare, sparse, adequate, dense) Appearance: (too tall, too short, good) SLOPE PROTECTION [no problem, could not inspect thoroughly] Riprap: Average Diameter: (adequate, sparse, displaced, weathered, vegetation) (bedding/fabric noted - yes, no) Wave Berm: Vegetation: (adequate, bare, sparse, improper vegetation) Concrete Slabs: (cracked, settlement, undermined, voids, deteriorated, vegetation) Other: EROSION [no problem, could not inspect thoroughly] Wave Erosion (Beaching): Scarp: Length: Height: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Runoff Erosion (Gullies): Quantity: Depth: Width: Length: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) INSTABILITIES [no problem, could not inspect thoroughly] Slides: Transverse Length: Longitudinal Length: Scarp: Width: Length: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Crack: Width: Notes/Causes Depth: Cracks: Transverse Longitudinal Other Quantity: Length: Width: Depth: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway, Lake Drain}

Cracks: Transverse Longitudinal Other Quantity: Length: Width: Depth: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Bulges Depressions Hummocky Size: Height: Depth: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Bulges Depressions Hummocky Size: Height: Depth: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) OTHER [no problem, could not inspect thoroughly] Rodent Burrows: (few, numerous) (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Ruts: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Depth: Width Length: (truck/auto, motorcycle, ATV, animals, pedestrian) Other: CREST Length: Width: (est, meas.) VEGETATION [no problem] Trees: Quantity: ( <5, sparse, dense) Diameter: ( <6", 6-12", >12") (adj. to structure, entire crest, lt end, rt end, middle, see dwg) Brush: Quantity: (sparse, dense) (adj. to structure, entire crest, lt end, rt end, middle, see dwg) Ground Cover: Type: (grass, crown vetch) Other: Quantity: (bare, sparse, adequate, dense) Appearance: (too tall, too short, good) EROSION [no problem, could not inspect thoroughly] Runoff Erosion (Gullies): Quantity: Depth: Width: Length: (adj. to structure, entire crest, lt end, rt end, middle, see dwg) {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway, Lake Drain}

ALIGNMENT [no problem, could not inspect thoroughly] Vertical: Low Area: (adj. to structure, entire crest, lt end, rt end, middle, see dwg) Elevation Difference: Length: Horizontal: WIDTH [no problem] Too Narrow (adj. to structure, entire crest, lt end, rt end, middle, see dwg) INSTABILITIES [no problem, could not inspect thoroughly] Cracks: Transverse Longitudinal Other Quantity: Length: Width: Depth: (adj. to structure, entire crest, lt end, rt end, middle, see dwg) Cracks: Transverse Longitudinal Other Quantity: Length: Width: Depth: (adj. to structure, entire crest, lt end, rt end, middle, see dwg) Bulges Depressions Hummocky Size: Height: Depth: (adj. to structure, entire crest, lt end, rt end, middle, see dwg) Bulges Depressions Hummocky Size: Height: Depth: (adj. to structure, entire crest, lt end, rt end, middle, see dwg) OTHER [no problem, could not inspect thoroughly] Rodent Burrows: (few, numerous) (adj. to structure, entire crest, lt end, rt end, middle, see dwg) Ruts: (adj. to structure, entire crest, lt end, rt end, middle, see dwg) Depth: Width Length: (truck/auto, motorcycle, ATV, animals, pedestrian) Other: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway, Lake Drain}

DOWNSTREAM SLOPE Gradient: Horizontal: Vertical: (est, meas.) VEGETATION [no problem] Trees: Quantity: ( <5, sparse, dense) Diameter: ( <6", 6-12", >12") (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Brush: Quantity: (sparse, dense) (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Ground Cover: Type: (grass, crown vetch) Other: Quantity: (bare, sparse, adequate, dense) Appearance: (too tall, too short, good) EROSION [no problem, could not inspect thoroughly] Runoff Erosion (Gullies): Quantity: Depth: Width: Length: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) INSTABILITIES [no problem, could not inspect thoroughly] Slides: Transverse Length: Longitudinal Length: Scarp: Width: Length: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Crack: Width: Notes/Causes Depth: Cracks: Transverse Longitudinal Other Quantity: Length: Width: Depth: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Cracks: Transverse Longitudinal Other Quantity: Length: Width: Depth: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Bulges Depressions Hummocky Size: Height: Depth: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Bulges Depressions Hummocky Size: Height: Depth: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway, Lake Drain}

OTHER [no problem, could not inspect thoroughly] Rodent Burrows: (few, numerous) (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Ruts: (adj. to structure, entire slope, lt end, rt end, middle, see dwg) Depth: Width Length: (truck/auto, motorcycle, ATV, animals, pedestrian) Other: SEEPAGE [no problem, could not inspect thoroughly] Wet Area Flow Boil Sinkhole Flow Rate Aquatic Vegetation Rust Colored Deposits Sediment in Flow Other: Wet Area Flow Boil Sinkhole Flow Rate Aquatic Vegetation Rust Colored Deposits Sediment in Flow Other: Size: Size: EMBANKMENT DRAINS [none, none found, no problem, could not inspect thoroughly] Type: Toe Drain Relief Wells Other: Flow Rate: Size: Number: MONITORING INSTRUMENTATION [none, none found, no problem, could not inspect thoroughly] Found Piezometers Weirs/Flumes Other Periodic Inspections by: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway, Lake Drain}

PRINCIPAL SPILLWAY GENERAL INLET [no problem, could not inspect thoroughly] Anti-Vortex Plate [] Dimensions: (adequate, too small,) Type: (steel, concrete, aluminum, stainless steel, corrugated metal wood, other): Deterioration: (missing sections, rusted, collapsed) Flash Boards [] Type: (metal, wood): Deterioration: Trashrack [] Opening Size: (adequate, too small, too large) Type: (metal bars, fence, screen, concrete, baffle, other): Deterioration: (broken bars, missing sections, rusted, collapsed) INLET OBSTRUCTION [no problem, could not inspect thoroughly] Debris: (leaves, trash, logs, branches, ice) Trees: Quantity: ( <5, sparse, dense) Diameter: ( <6", 6-12", >12") (entire inlet, lt side, rt side, middle, see dwg) Brush: Quantity: (sparse, dense) (entire inlet, lt side, rt side, middle, see dwg) Other:(beaver activity, trashrack opening too small, partially/completely blocked, i.e.) INLET MATERIALS [no problem, could not inspect thoroughly] Metal (loss of coating/paint, surface rust, corrosion (pitting, scaling), rusted out, pipe deformation ) Dimensions: Concrete Dimensions/ Dimensions/ Plastic (deterioration, cracking, deformation ) Dimensions: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway-Inlet, Emergency Spillway, Lake Drain}

Earthen Ground Cover: Type: (grass, crown vetch) Other: Quantity: (bare, sparse, adequate, dense) Appearance: (too tall, too short, good) Erosion: (wave, surface runoff) Description (height/depth/length/etc): Ruts: (entire inlet, lt side, rt side, middle, see dwg) Depth: Width Length: (truck/auto, motorcycle, ATV, animals, pedestrian) Riprap: Average Diameter: (adequate, sparse, displaced, weathered, vegetation) (bedding/fabric noted - yes, no) Rock-Cut (weathered, erosion) Description: Other: OTHER INLET PROBLEMS [no problem, could not inspect thoroughly] Mis-Alignment:(pipe, chute, sidewall, headwall) Pipe Deformation Separated Joint Loss of Joint Material Undermining: Other: OPEN CHANNEL CONTROL SECTION [no problem, could not inspect] Width (est., ms.) Brdth (est., ms.) OUTLET OBSTRUCTION [no problem, could not inspect thoroughly] Debris: (leaves, trash, logs, branches, ice) Trees: Quantity: ( <5, sparse, dense) Diameter: ( <6", 6-12", >12") (entire outlet, lt side, rt side, middle, see dwg) Brush: Quantity: (sparse, dense) (entire outlet, lt side, rt side, middle, see dwg) Other:(beaver activity, partially/completely blocked, i.e.) {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway-Inlet/Outlet, Emergency Spillway, Lake Drain}

OUTLET MATERIALS [no problem, could not inspect thoroughly] Metal (loss of coating/paint, surface rust, corrosion (pitting, scaling), rusted out, pipe deformation ) Dimensions: Concrete Dimensions/ Dimensions/ Plastic (deterioration, cracking, deformation ) Dimensions: Earthen Ground Cover: Type: (grass, crown vetch) Other: Quantity: (bare, sparse, adequate, dense) Appearance: (too tall, too short, good) Erosion: (other, surface runoff) Description (width/depth/length/etc): Ruts: (entire inlet, lt side, rt side, middle, see dwg) Depth: Width Length: (truck/auto, motorcycle, ATV, animals, pedestrian) Riprap: Average Diameter: (adequate, sparse, displaced, weathered, vegetation) (bedding/fabric noted - yes, no) Rock-Cut (weathered, erosion) Description/ Other: OTHER OUTLET PROBLEMS [no problem, could not inspect thoroughly] Mis-Alignment:(pipe, chute, sidewall, headwall) Pipe Deformation Separated Joint Loss of Joint Material Undermining: Other: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway-Outlet, Emergency Spillway, Lake Drain}

OUTLET EROSION CONTROL STRUCTURE (Stilling Basins) (endwall/headwall, plunge pool, impact basin, flip bucket, USBR, baffled chute, rock lined channel) Components (baffle blocks, chute blocks, endsill) MATERIAL [no problem, could not inspect thoroughly] Riprap: Average Diameter: (adequate, sparse, displaced, weathered, vegetation) (bedding/fabric noted - yes, no) Concrete Dimensions/ Dimensions/ OTHER [no problem, could not inspect thoroughly] Mis-Alignment:( sidewall, headwall, entire struct.) Description: Separated Joint Loss of Joint Material Description: Undermining: Description: Other: DRAINS [none, none found, no problem, could not inspect thoroughly] (See SEEPAGE Section for Toe Drains & Relief Wells) Type: Weep Holes Relief Drains Other: Flow Rate: Size: Number: Type: Weep Holes Relief Drains Other: Flow Rate: Size: Number: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway-Outlet Erosion Control Structure, Emergency Spillway, Lake Drain}

EMERGENCY SPILLWAY Found GENERAL INLET [no problem, could not inspect thoroughly] Anti-Vortex Plate [] Dimensions: (adequate, too small,) Type: (steel, concrete, aluminum, stainless steel, corrugated metal wood, other): Deterioration: (missing sections, rusted, collapsed) Flash Boards [] Type: (metal, wood): Deterioration: Trashrack [] Opening Size: (adequate, too small, too large) Type: (metal bars, fence, screen, concrete, baffle, other): Deterioration: (broken bars, missing sections, rusted, collapsed) Maint. INLET OBSTRUCTION [no problem, could not inspect thoroughly] Debris: (leaves, trash, logs, branches, ice) Trees: Quantity: ( <5, sparse, dense) Diameter: ( <6", 6-12", >12") (entire inlet, lt side, rt side, middle, see dwg) Brush: Quantity: (sparse, dense) (entire inlet, lt side, rt side, middle, see dwg) Other:(beaver activity, trashrack opening too small, partially/completely blocked, i.e.) INLET MATERIALS [no problem, could not inspect thoroughly] Metal (loss of coating/paint, surface rust, corrosion (pitting, scaling), rusted out, pipe deformation ) Dimensions/ Concrete Dimensions/ Dimensions/ Plastic (deterioration, cracking, deformation ) Dimensions/ {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway-Inlet, Lake Drain}

Earthen Ground Cover: Type: (grass, crown vetch) Other: Quantity: (bare, sparse, adequate, dense) Appearance: (too tall, too short, good) Erosion: (wave, surface runoff) Description (height/depth/length/etc): Ruts: (entire inlet, lt side, rt side, middle, see dwg) Depth: Width Length: (truck/auto, motorcycle, ATV, animals, pedestrian) Riprap: Average Diameter: (adequate, sparse, displaced, weathered, vegetation) (bedding/fabric noted - yes, no) Rock-Cut (weathered, erosion) Description: Other: OTHER INLET PROBLEMS [no problem, could not inspect thoroughly] Mis-Alignment:(channel, chute, sidewall, headwall) Pipe Deformation Separated Joint Loss of Joint Material Undermining: Other: OPEN CHANNEL CONTROL SECTION [no problem, could not inspect] Width (est., ms.) Brdth (est., ms.) OUTLET OBSTRUCTION [no problem, could not inspect thoroughly] Debris: (leaves, trash, logs, branches, ice) Trees: Quantity: ( <5, sparse, dense) Diameter: ( <6", 6-12", >12") (entire outlet, lt side, rt side, middle, see dwg) Brush: Quantity: (sparse, dense) (entire outlet, lt side, rt side, middle, see dwg) Other:(beaver activity, partially/completely blocked, i.e.) {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway-Inlet/Outlet, Lake Drain}

OUTLET MATERIALS [no problem, could not inspect thoroughly] Metal (loss of coating/paint, surface rust, corrosion (pitting, scaling), rusted out, pipe deformation ) Dimensions: Maint. Concrete Dimensions/ Dimensions/ Plastic (deterioration, cracking, deformation ) Dimensions: Earthen Ground Cover: Type: (grass, crown vetch) Other: Quantity: (bare, sparse, adequate, dense) Appearance: (too tall, too short, good) Erosion: (other, surface runoff) Description (width/depth/length/etc): Ruts: (entire inlet, lt side, rt side, middle, see dwg) Depth: Width Length: (truck/auto, motorcycle, ATV, animals, pedestrian) Riprap: Average Diameter: (adequate, sparse, displaced, weathered, vegetation) (bedding/fabric noted - yes, no) Rock-Cut (weathered, erosion) Description: Other: OTHER OUTLET PROBLEMS [no problem, could not inspect thoroughly] Mis-Alignment:(channel, chute, sidewall, headwall) Pipe Deformation Separated Joint Loss of Joint Material Undermining: Other: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway-Outlet, Lake Drain}

OUTLET EROSION CONTROL STRUCTURE (Stilling Basins) (endwall/headwall, plunge pool, impact basin, flip bucket, USBR, baffled chute, rock lined channel) Maint. Components (baffle blocks, chute blocks, endsill) MATERIAL [no problem, could not inspect thoroughly] Riprap: Average Diameter: (adequate, sparse, displaced, weathered, vegetation) (bedding/fabric noted - yes, no) Concrete Dimensions/ Dimensions/ OTHER [no problem, could not inspect thoroughly] Mis-Alignment:( sidewall, headwall) Description: Separated Joint Loss of Joint Material Description: Undermining: Description: Other: DRAINS [none, none found, no problem, could not inspect thoroughly] Type: Weep Holes Relief Drains (See SEEPAGE Section for Toe Drains & Relief Wells) Other: Flow Rate: Size: Number: Type: Weep Holes Relief Drains Other: Flow Rate: Size: Number: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway-Outlet Erosion Control Structure, Lake Drain}

LAKE DRAIN GENERAL Found Does not have one Type of Lake Drain (isolated control/intake tower, valve vault w/ outlet conduit, valve in riser/drop inlet, siphon) Operated During Inspection (yes, no) Maint. ACCESS TO VALVE/SLUICE GATE [no problem, could not inspect thoroughly] Type (not accessible, from shore, boat, walkway, other) Walkway/Platform: Concrete Deterioration Cracks (platform, piers, end supports, railing) Wood Deterioration Metal Deterioration (minor, moderate, extensive, other) LAKE DRAIN COMPONENTS [no problem, could not inspect thoroughly] Concrete Structure Description: (deterioration, misalignment, cracks): Valve Control (Operating Device) No Operating Device No Stem Bent/Broken Stem Other Notes/Operability: Valve / Sluice Gate Metal Deterioration: (surface rust, minor, moderate, extensive, other) Flow Rate: Misalignment Leakage - Flow Rate: Valve / Sluice Gate Metal Deterioration: (surface rust, minor, moderate, extensive, other) Flow Rate: Misalignment - Leakage - Flow Rate: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway, Lake Drain}

Outlet Conduit Metal:(loss of coating/paint, surface rust, corrosion (pitting, scaling), rusted out) Concrete Dimensions/ Plastic:(deterioration, cracking) Conduit Deformation Mis-Alignment: Separated Joint Loss of Joint Material Undermining: Vegetation (trees, brush) Other: Energy Dissipator Type (endwall, plunge pool, impact basin, stilling basin, rock-lined channel, none) Riprap: Average Diameter: (adequate, sparse, displaced, weathered, vegetation) (bedding/fabric noted - yes, no)) Concrete Dimensions/ Mis-Alignment: Separated Joint Loss of Joint Material Undermining: Other: {Upstream Slope, Crest, Downstream Slope, Seepage, Principal Spillway, Emergency Spillway, Lake Drain}

Name of Project: File Number: Date: Transit: Rod: Other: Sta. BS HI FS Elev. Description Dam Inspection Survey Notes

DAM CLASSIFICATION CHECKLIST Name of Dam: File Number: Permit Number: County: Date: : HEIGHT STORAGE EXEMPT Height of dam as measured = feet Storage volume at top of dam = acre-feet >60' - Class I >5000 acre-feet - Class I Height < 6 feet >40' - Class II > 500 acre-feet - Class II Storage < 15 acre-feet >25' - Class III > 50 acre-feet - Class III 6 feet < Height < 10 feet <25' - Class IV < 50 acre-feet - Class IV & Volume < 50 acre-feet POTENTIAL DOWNSTREAM HAZARD I II III IV X Loss of human life (plausible circumstances envisioned to cause loss of life) A possilble health hazard (loss of public water, wastewater treatment facility) Loss of high-value property (flooding of homes & business, damage to Class I, II & III dams) Damage to interstates & state routes and only access to homes/critical facilities Damage to railroads or public utilities Damage rural bldgs. & not otherwise high-valued property, Class IV dams/levees Damage to local roads (county & township) Losses restricted mainly to the dam and agricultural/rural No hazard to structure noted Distance downstream from dam to affected structure (feet) Vertical distance from streambed to base of affected structure (feet) Horizontal distance from stream to affected structure (feet) Height Class Storage Class Hazard Class Final Class: Exempt I II III IV (circle one) Class Changed (Yes, No)