Standard Specifications for Ship Repair and Alteration Committee SSRAC

Similar documents
ELEC / ELEX COMMITTEE Fiber Optic Component; remove, relocate, repair, and install Electronic Equipment; repair Rotating

NAVSEA STANDARD ITEM NUMERICAL INDEX

NAVSEA STANDARD ITEM. 1.1 Title: Interference; remove and install LP , Submarine Safety (SUBSAFE) Requirements Manual

NAVSEA STANDARD ITEM

NAVSEA STANDARD ITEM

STANDARD PHRASEOLOGY SECTION A

NAVSEA STANDARD ITEM. 1.1 Title: Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

NAVAL SEA SYSTEMS COMMAND JOINT FLEET MAINTENANCE MANUAL (JFMM) VOLUME VII CHAPTER 4 CONTRACT SPECIFICATION DEVELOPMENT APPENDIX E

1.1 Title: Hazardous Waste Produced on Naval Vessels; control U.S.C. 5103, Federal Hazardous Materials Transportation Act

NAVSEA STANDARD ITEM. 1.1 Title: Piping System Cleanliness Restoration (Non-Nuclear); accomplish

NAVAL SEA SYSTEMS COMMAND JOINT FLEET MAINTENANCE MANUAL (JFMM) VOLUME VII CHAPTER 4 CONTRACT SPECIFICATION DEVELOPMENT APPENDIX E

NAVAL SEA SYSTEMS COMMAND JOINT FLEET MAINTENANCE MANUAL (JFMM) VOLUME VII CHAPTER 4 CONTRACT SPECIFICATION DEVELOPMENT APPENDIX E

NAVSEA STANDARD ITEM. 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

NAVAL SEA SYSTEMS COMMAND JOINT FLEET MAINTENANCE MANUAL (JFMM) VOLUME VII CHAPTER 4 CONTRACT SPECIFICATION DEVELOPMENT APPENDIX E

CHAPTER 17. HAZARDOUS MATERIALS AND WASTE

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Hazardous Energy Control

NAVSEA STANDARD ITEM. 1.1 Title: Piping System Cleanliness (Non-Nuclear); accomplish

SECTION VII INSTRUCTIONS FOR PREPARATION AND UTILIZATION OF WORK ITEMS

Subj: WEIGHT HANDLING EQUIPMENT THIRD PARTY CERTIFICATIONS; PREPARATION FOR

Chapter 9 Contract Administration Quality Assurance Program (CAQAP)

Chapter 10 Testing, Trials and Delivery

NAVSEA STANDARD ITEM

ESSENTIAL SAFETY RESOURCES

Environmental Requirement Review Checklist and Certification

SECTION VII INSTRUCTIONS FOR PREPARATION AND UTILIZATION OF WORK ITEMS

NAVSEA STANDARD ITEM. 1.1 Title: Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

Business Case Basis for Modifying/Improving SSRAC Standard Item Change Process

Title: Lockout / Tagout Effective Date: 11/28/2014 Control Number: THG_0008 Revision Number: 1 Date: 10/8/2015 Annual Review Completed: 5/13/2015

STANDARD PHRASEOLOGY SECTION B. 1. This section of standard phraseology is for general use in all disciplines.

BIOFOULING MANAGEMENT PLANS

Dalian Shipbuilding Industry Co. Ltd -- Guan Yinghua

Expanded Adhesive Outfitting Applications Ship Design and Material Technology Panel Meeting

NORTHWEST REGIONAL MAINTENANCE CENTER LOCAL STANDARD ITEM

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Paint Tracking Requirements

LOCKOUT / TAGOUT PROGRAM

Owners List of Known Workplace Hazards CONTRACT TITLE LIBRARY SQUARE ELEVATORS #10-#11 MODERNIZATION (OCT20/16)

LOCKOUT TAGOUT SAFETY PROGRAM

Safety, Health, and Environmental Standard

Partial Blast of Ultra High Solids Coatings on Navy Ships

USE OF PRE-CONSTRUCTION PRIMERS IN MARINE CONSTRUCTION. J. Peter Ault, P.E. Elzly Technology Corporation

Nuclear Aircraft Carrier Inactivation Approach for Waste Management and Exposure Reduction 14201

INVENTORY OF HAZARDOUS MATERIALS

Utilities GIS Development

NORTHWEST REGIONAL MAINTENANCE CENTER LOCAL STANDARD ITEM

DIVISION 02 EXISTING CONDITIONS 2010 Edition, Published January 1, 2010; Document Revision Date: February 7, 2017

TABLE OF CONTENTS. How To Use... 5

Model Safety Program

SCHEDULE 8 CITY PRE-CONTRACT HAZARD ASSESSMENT FORM

SECTION REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

Lockout Tagout Program

B. Sections and all references contained therein form a part of this Section of the Specifications.

MANAGEMENT OF ASBESTOS FREE MATERIALS AND SPARES ON COMPANY SHIPS

RDSI Quality Assurance Manual Rev (C)

STANDARD PHRASEOLOGY SECTION F. 1. This section of standard phraseology is for general use in electronic and electrical disciplines.

NAVSEA STANDARD ITEM. 1.1 Title: Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

NAVSEA STANDARD ITEM. 1.1 Title: Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

Main Building Auditorium

(3) Material identification and procurement. (6) Rip-out and removal of interferences

ASBESTOS ON BOARD. In this folder, we provide an overview of the rules and responsibilities concerning asbestos on ships.

Newport News Shipbuilding

INSPECTION SYSTEM REQUIREMENTS

NAVSEA Documents. Topics. Scope. Learning Outcome. Relevant Documents. NAVSEA Basic Paint Inspector Training: NAVSEA Documents

IAEA Specification, Dismantle & installation of cooling system. Dated 2017/07/19

LNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc.

Safe Operating Procedure

IMPLEMENTING PAPERLESS PAINT NSRP SURFACE PREPARATION AND COATING (SPC) PROJECT. Stephen Cogswell, BAE Systems JSR and Ross Boyd, TruQC

Required Courses $800/$720*

SKF marine solutions. Improving fleet efficiency and predictability in a sustainable way. The Power of Knowledge Engineering

Hull Survey for New Construction

Lockout/Tagout Program

6.0 ENGINEERED SAFETY FEATURES

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN

NAVSEA Basic Paint Inspector Training: Introduction. l Certified paint inspector duties. l Formal inspection responsibilities. l Course objectives

Ship Recycling Convention

SUBJECT: DATED ENGINEERING PRACTICES (EP) STUDY ON POLYIMIDE INSULATIONS USED FOR ELECTRICAL WIRE AND CABLE. PROJECT NUMBER:

STANDARD PHRASEOLOGY SECTION F. 1. This section of standard phraseology is for general use in electronic and electrical disciplines.

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN

Supplier Quality Requirements

SHIP DONATION INSPECTION PROGRAM CHECKLIST. Fair or Better Material Condition corrosion in the worst areas does not have pitting exceeding 25 percent

Dutchess Community College. Control of Hazardous Energy. Lockout Tagout Program

Ship Recycling - IHM Preparation for New Building Ships - November 2010 The Shipbuilders Association of Japan

THERMO-LAG 3000 ARCHITECTURAL SPECIFICATION SUBLIMING FIRE RESISTANT MATERIAL ELECTRICAL RACEWAYS

ABSTRACT INTRODUCTION. J. Peter Ault, P.E. Update on NSRP-US Navy Initiatives to Reduce the Costs of Painting Navy Ships

ADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018

Section 6 Hazard Communication Program

Iranian Classification Society Convention and Legislation Department Code: Tech Contents

Control of Hazardous Energy (Lockout/Tagout) Program. The Department of Environmental Health and Safety

Crane & Derrick Operation Procedures for Construction

General Document or OQE Comments SAT UNSAT

Control of Hazardous Energy. How to comply with new shipyard safety regulations

COMPANIES PREQUALIFICATION APPLICATION

POWER TRANSFORMER INSTALLATION

Ardmore Seaport-e Contract Team Capabilities

PERFORMANCE SPECIFICATION INSULATION BLANKET, THERMAL

NEW GC-16 IN WEST KUWAIT MATERIAL REQUISITION FOR LEVEL GAUGE TABLE OF CONTENTS

*************************************************************************** SECTION F20 SELECTIVE BUILDING DEMOLITION 09/16

LEED Best Practices Save $$$

Transcription:

Standard Specifications for Ship Repair and Alteration Committee SSRAC

History The Standard Specification for Ship Repair and Alteration Program (SSRAC) was established in 1970 to carry out the development, revision, and control of standard specifications for non-nuclear surface ships. The Supervisor of Shipbuilding, Conversion and Repair, USN, Jacksonville, was designated as the Chairman of the SSRAC as assigned by NAVSEAINST 9070.1 Representation on the Committee includes Navy activities involved principally in ship repair and modernization, NAVSEA, Surface Force Type Commanders, Naval Shipyards, and representatives of various private industry ship repair associations

SSRAC Mission To be the provider of choice for technically and contractually sound standards for the Navy's ship repair and alteration community To reduce redundancy, increase proficiency, and provide a centralized database of technical and contractual requirements To provide safety/environmental standards for the Navy's ship repair and alteration community To be a fully integrated team of members from all parts of the ship repair and alteration community working for a common goal of "setting the standards"

Terminology NAVSEA Standard Items (NSIs) - Items that establish uniform methods and standards for routine requirements normally invoked in ship repair Work Items. These items are invoked whenever applicable without modification. NSIs are approved and maintained by the SSRAC. Category I NSIs Are invoked in the IFB/RFP and apply to the entire job order without further reference in the individual work items. Category II NSIs When applicable, shall be invoked in the individual work item. Local Standard Items (LSIs) - Items which meet the criteria of SIs but are approved on a case basis for local area use only. LSIs shall not be used in coast-wide bidding or extended solicitations. LSIs are numbered sequentially in the 099-XX series (i.e., 099-XXSE for a SERMC LSI). Approval of LSIs will be made at the local level.

Terminology (cont.) Templates - Work Items that can be modified and used for single or multiple ship classes. Standard Work Templates (SWTs) - Work Templates that are prepared for specific repairs, alterations, or to provide support for work frequently occurring in ship repair utilized across ship classes. Class Standard Work Templates (CSWTs) - Work that are prepared for specific repairs, alterations, or to provide support for work frequently occurring in ship repair utilized on a specific class of ship. Local Work Templates (LWTs) - Work templates that are prepared to provide instruction or support for work frequently occurring in ship repair that is unique to a specific geographic location

Category I SIs 009-01 General Criteria; accomplish 009-02 Reporting of Material Usage Requirements for Work at Naval Facilities for Environmental Compliance; accomplish * 009-03 Toxic and Hazardous Substances; control 009-04 Quality System; provide 009-05 Temporary Accesses; provide 009-06 Protection During Contamination-Producing Operations and Maintaining Cleanliness; accomplish 009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish * 009-08 Fire Protection at Contractor's Facility; accomplish * 009-10 Shipboard Asbestos-Containing Material (ACM); control 009-18 Magnetic Material; control * 009-19 Provisioning Technical Documentation (PTD); provide * 009-20 Government Property; control 009-21 Logistics and Technical Data; provide * 009-23 Interferences; remove and install * 009-24 Isolation, Blanking, and Tagging Requirements; accomplish *

Category I SIs (continued) 009-29 Asbestos-Free Pipe Hanger Liner Material; install * 009-34 Fire Protection of Unmanned Craft at Contractor's Facility; provide * 009-35 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish * 009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/Component; provide 009-40 Requirements for Contractor Cranes at Naval Facilities; accomplish * 009-59 Organotin Antifouling Material; control * 009-60 Schedule and Associated Reports; provide and manage * 009-61 Shipboard Use of Fluorocarbons; control 009-64 Synthetic Fire Resistant Hydraulic Fluid; control 009-65 Polychlorinated Biphenyls (PCBs); control 009-67 Integrated Total Ship Testing; manage * 009-69 Heavy Weather Plan; provide 009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Craft; accomplish * 009-72 Physical Security of U.S. Naval Vessels and Crews at Private Contractor's Facility; accomplish *

Category I SIs (continued) 009-73 Shipboard Electrical/Electronic Cable; remove, relocate, repair, and install * 009-77 Cofferdam Requirements;accomplish 009-79 Government Owned Material (GOM); status reporting * 009-80 Ship's Facilities; provide * 009-81 Compartment Closeout Schedule; provide * 009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide 009-83 Wire Rope Fitting Verification; provide * 009-84 Accountability of Temporary Fasteners; provide 009-86 Fluorocarbon and Halon Materials; control * 009-87 Chlorination Procedures; accomplish * 009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping; certify 009-89 Purchase and Inspection Requirements for Contractor Furnished Zinc Anodes; accomplish * 009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

Category I SIs (continued) 009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish * 009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install * 009-97 National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coatings Information; provide 009-99 Ship Departure Report; provide * 009-100 Ship's Stability (PCP); maintain * 009-101 Requirements for Mooring, Entry to, and Departure from the Contractor's Facility; accomplish * 009-102 Alteration Verification; provide * 009-103 Weight and Moment Change Data; provide * 009-106 Work Authorization Form Coordinator (WAFCOR); provide* 009-107 Piping System Cleanliness (Non-Nuclear); accomplish* 009-108 Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor s Facility; accomplish* 009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE Certified Ships; accomplish* 009-110 Special Requirements for Non-Nuclear Work on Nuclear Ships; accomplish* * Invoked depending on Work type/location/customer requirements

Category II SIs (examples) 009-09 Process Control Procedure (PCP); provide and accomplish 009-11 Insulation and Lagging Requirements; accomplish 009-32 Cleaning and Painting Requirements; accomplish 009-71 Testing Requirements for Piping Systems; accomplish 009-75 Circuit Breaker; repair 009-90 Technical Representative; provide 009-104 Vibration Testing and Analysis; accomplish

Latest Change NAVSEAINST 9070.1D (14 Dec 06) Purpose. To establish the use of standard specifications in preparation of work items and specifications for naval ships and craft, including nuclear-powered ships and submarines

Change Proposals http://www.sermc.surfor.navy.mil/ SSRAC1/index.htm Click on SSRAC Meeting information Click on Get a Change Proposal form