Benefits from Generation and Storage on the Distribution System

Similar documents
PJM Strawman Proposal

Distributed Energy Resources

Key Issues and Consideration in Market Design, Operational and Oversight

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014

PJM Straw Proposal: Ancillary Services for Net Excess DER Behind a Customer Meter

BTM:NG Initiative Energy Market Design Concepts

Revision: 67. Prepared by

An Introduction to PJM: Focus on its Markets and Opportunities for Demand Resources OHA Annual Energy & Sustainability Conference

Contracts and Communication

Relevant changes will be made to corresponding sections of OA and RAA.

ENERGY STORAGE: FERC S TECHNICAL CONFERENCE AND NOPR

PJM Fixed Transmission Rights (FTRs)

Fixed / Price Sensitive Demand Bids, Load Response, Virtual Bidding & Pump Storage Optimizer in the Day Ahead Market

CUSTOMER GUIDE TO PJM BILLING

Overview Of PJM Demand Response and Energy Efficiency. Issues September 22, Susan Covino, Senior Consultant Market Strategy

5.1 Transmission Congestion Charge Calculation Calculation by Office of the Interconnection.

Behind the Meter Net Generation Initiative: Energy Supplier Participation Requirements

SECTION 6 - ANCILLARY SERVICE MARKETS

Integrating DER in PJM Transmission Operations and Planning

Wholesale DER Interconnections

Committed Offer: Offer on which a resource was scheduled by the Office of the Interconnection for a particular clock hour for the Operating Day.

Market Settlements - Advanced

Energy Uplift (Operating Reserves)

Price Responsive Demand education. DRS May 11 th, 2017

Market Monitor Report

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Exploring a University Based Microgrid

Two Settlement PJM /06/2016

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures

3.2 Market Settlements.

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

Recent Development in Reliable Energy Market in the US and Singapore

Current Language Proposed Revisions Rationale

FERC Order 841 Electric Storage Resource Compliance Straw Proposal Overview

Storage Charging Energy

Demand Response Availability Data Systems Definitions

Competitive Markets 1

Definitions O - P. Open Access Same-Time Information System (OASIS) or PJM Open Access Same-time Information System:

Regulation Energy Management Market Simulation. June 14, 2011

Competitive Markets. Facilitated Dialogue: Market Restructuring & Renewable Energy. June 10-12, 2013 Mexico City, Mexico. Hisham Choueiki, Ph.D., P.E.

3.2 Market Buyers Spot Market Energy Charges.

Energy Markets - The Basics

Energy Uplift (Operating Reserves)

PJM Organization and Markets. Saudi Delegation Columbus Ohio May 22, 2012

Shortage Pricing Penalty Factors and the Offer Cap (Corrected September 9, 2015)

STANDARD CONTRACT RIDERS - (Continued) RIDER NO. 9 DAY-AHEAD HOURLY PRICE SERVICE

Ancillary Service Markets

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Capacity Performance Training. June 24, 2015

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit

Demand Response. Overview. Recommendations

What You Need to Know Before Requesting Interconnection

Virtual Workshop on PJM ARR and FTR Market 2017/2018

Roundtable I: Energy Markets: The Rise of Community and Institutional Scale Resources

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Policy and Regulatory Approaches to Grid Integration of Renewable Energy in the US

PJM Manual 14A: New Services Request Process Revision: 20 Effective Date: October 1, Prepared by Interconnection Planning Department

Demand Response. Mathangi Srinivasan. New York Market Orientation Course (NYMOC) Senior Market Trainer, NYISO. March 20-23, 2018 Rensselaer, NY 12144

LOAD SERVING ENTITIES PJM REGION

Energy Marketplace. Nicolé K. Grottoli. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, 2018 Rensselaer, NY 12144

Demand Response in Wholesale Electricity Markets

IPPTF August Providing for Beneficial Electrification

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

PJM Manual 29: Billing Revision: 28 Effective Date: April 1, Prepared by Market Settlements Department

Concepts for Behind-the- Meter Net Generation

PJM Manual 29: Billing Revision: 28 Effective Date: April 1, Prepared by Market Settlements Department

Energy Storage and Distributed Energy Resources Phase 3 ( ESDER 3 ) Issue Paper

DER: NYISO Operations Perspective

Regional Impact of Renewables: ERCOT

Energy Efficiency in RPM. Adam Keech Director, Market Operations PJM January 13, 2015

Price Formation. PJM Market Participants February 14, Joe Bowring Catherine Tyler

A Market Solution to the Duck Curve

Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement

Package and Design Component Non-Binding Poll Results

PJM Manual 29: Billing. Revision: 23 Effective Date: January 1, Prepared by Strategic Market Services Department

Ancillary Service Markets

Section 5: Network Integration Transmission Service Accounting. 5.1 Network Integration Transmission Service Accounting Overview

Financial Transmission Rights

The Year to Date in PJM: Operations and Markets

Behind-the-Meter Generation Project Rules

Capacity Performance Training. March 16, 2015

RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011

Energy & Reserve Pricing Solution Overview PJM 2014

FERC Docket EL Fast-Start Resources

Energy & Ancillary Services Market Operations Scheduling Operations. PJM Manual 11: Revision: Effective Date: June 23, 2010January 01, 2010

Distributed Energy Resources Roadmap

PJM ARR and FTR Market

PJM Manual 29: Billing. Revision: 26 Effective Date: 11/20/2014. Prepared by Market Settlements Department

Generation Dispatch. PJM State & Member Training Dept. PJM /13/2017

Non-BM Balancing Services Volumes and Expenditure

Demand Response Parity in Wholesale Markets Hinges on FERC 745 Outcome

IMM Marginal Loss Allocation Methodology Recommendation

PURPOSE SECTION I: TERMS

Current Approach to FERC Order on Capacity Markets and Public Policies

New England Power Sector Overview

Joint Workshop on Multiple-Use Applications and Station Power for Energy Storage CPUC Rulemaking and CAISO ESDER 2 Stakeholder Initiative

Summer-Only Demand Response Senior Task Force

Newmarket-Tay Power Distribution Ltd. NT POWER COS Conditions of Service. Issue Date: July, Next Review Date: February, 2015

Transcription:

Benefits from Generation and Storage on the Distribution System Andrew Levitt Senior Market Strategist Emerging Markets Special MRC Meeting DER Aug 24, 2016

Generation/Storage Resource Location and Types PJM Transmission System PJM Gen EDC System PJM Wholesale Load PJM Wholesale Load Muni/Coop System Retail Load ing System = PJM Gen for Injections / Retail for Load* PJM Gen Retail Load Retail Load *May require 2 meters or may not be allowed under state rules 2

PJM Markets Qualified resources can sell in the following PJM markets: Energy Capacity Ancillary services such as Synchronized Reserve and Regulation (Other PJM services like black start, etc are not market-based.) 3

PJM Energy And Capacity Not Mutually Exclusive Selling energy in PJM markets is in parallel with any PJM capacity commitment. 4

PJM Gen ed: Ancillary Services Simultaneous with Energy PJM gen metered resources providing market-based A/S (i.e., synch and reg): Reserve the appropriate MW capability to follow PJM signal; -AND- Produce or consume according to PJM signal. Units get 2 categories of payments: A/S payment based on market clearing price, performance, LOC, etc. as appropriate; Settlement for energy provided at LMP. 10 MW Reg Example: 10:00 11:00 8 MWh Energy 10 MW regulation compensated from regulation market 8 MWh of energy produced in the process of following regulation signal, paid at RT LMP 5

Non-PJM Services from PJM Generation ed Unit Distribution constraint management E.g., EDC transformer is at thermal limit Unit is dispatched in coordination with PJM Energy is provided, and benefit to the EDC also provided simultaneously PJM Transmission System PJM Wholesale Load EDC System PJM Gen 6

Grid-Tied Gen/Storage Services By Column: Can Do All Checks w/ Given MW Over Applicable Time* Service Resource Location Service Jurisdiction Not DR Load ed PJM Generation ed PJM Energy Sales Federal PJM Capacity Sales Federal PJM Ancillary Services Sales Federal Bill Reduction: Consume Less Energy Federal/State DR Transmission Asset Off- Grid Bill Reduction: Capacity Federal/State State Sale/Credit: Inject Energy (including Net ing) Distribution Constraint Management State ** Distribution Voltage Support State Transmission Asset State Emergency Backup for Customer State ** *Subject to constraints on following slides ** Energy Storage may only use energy bought at wholesale for PJM Energy, Capacity and Ancillary Services 7

Applicable Periods Defined Applicable Periods PJM Energy Sales Bill Reduction: Consumer Less Energy State Sale/Credit: Inject Energy PJM Ancillary Services Sales Any PJM Markets: Switching among PJM Generation ed, Non-DR and DR PJM Capacity Sales Bill Reduction: Capacity Transmission Asset 1 hour 1 hour Delivery Year: e.g. June 2018 May 2019 Delivery Year: e.g. June 2018 May 2019 Permanent until no longer qualifying 8

Definitions and Additional Restrictions Demand Response (DR) Unit cannot inject past applicable meter when in market as PJM DR. In practice, each DR MW of capability may participate in Energy or Ancillary Services market in a given hour. DR resources cannot also be PJM Generation ed resources in the same delivery year. In a given delivery year, each MW of capability may participate as a wholesale DR capacity resource or peak shave to reduce retail capacity commitment. PJM Generation ed Unit State Sales: Net ing Bill Reduction: Capacity DR in energy market is compensated for load reductions done specifically for PJM dispatch when it would not have otherwise reduced load. Only generation/storage resources studied as Capacity Resources may provide PJM capacity. Any portion of a resource designated as a Capacity Resource may not net against wholesale load. Eligible resources choosing to be Energy Storage or Capacity Storage Resource under PJM Tariff must be used solely to participate as Market Seller in PJM capacity, energy and/or Ancillary Services markets. Net Energy ing units cannot inject onto the transmission without being compliant with applicable PJM rules. Use of Non-Retail Behind The Generation to net against load for reducing LSE RPM capacity charges is subject to PJM business rules. Non-Retail Behind the Generation cannot inject onto the transmission system. 9