Minimum Standards for Building Occupancy. Safety Resources

Similar documents
Application for Certificate of Occupancy Procedure for Existing Commercial & Residential 4 (+) Family Buildings

Attachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone #

Building Permit Application

Temporary Construction Heating Equipment

Policy for Application for Certificate of Occupancy

Form 9: Infection Control Preventive Measures Level 4

Requirements for Manufacturing, Transporting, Siting, Commissioning and preparation of Park Home Bases

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT)

ASSESSMENT, CLEANING & RESTORATION OF HVAC SYSTEMS (ACR-2002)

Facility Decommissioning Standard. Safety Resources

Webinar Project Close Out. December 14, 2017 / 10:00 - Noon

City Of Mendota Construction Procedures

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

Read Health Canada s Tools for schools Action Kit s Introduction, Backgrounder and pages 14-3 to

Cannabis Related Occupancies Commercial Building Permit Application Submittal Requirements

2) These Standards are available on the University s website at:

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP)

APPLICABILITY/ACCOUNTABILITY:

Guide to the Letters of Assurance in the B.C. Building Code 2006 December, 2010 Edition 5

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) x507

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

Temporary Use Packet Permit Information

City of Millbrae 2016 CALIFORNIA GREEN BUILDING CODE CHECKLIST FOR NEW NONRESIDENTIAL BUILDINGS

City of South Pasadena COMMUNITY IMPROVEMENT

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

SCHWENKSVILLE BOROUGH CONSTRUCTION PERMIT APPLICATION FOR NEW CONSTRUCTION, DEMOLITION, PLUMBING, HVAC OR ELECRICAL

DATE. January 25, 2016

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE ST. HELENS, OREGON PHONE (503) CODE SUMMARY REQUIREMENTS

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

Code Compliance Alternatives for Historic Buildings

DCPS CODE ENFORCEMENT STANDARD OPERATING PROCEDURES Updated September 2015

Certification Number: NAT Lead Renovation, Repair and Painting Program

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

UCC CONSTRUCTION PERMIT APPLICATION INSTRUCTIONS

How to Prepare Your LSE Report

HOUSES OTHER CONSTRUCTION TYPE PRODUCTS A C D E H F G J L ON-SITE CONSTRUCTION. Park Model. Recreational. Panelized Homes.

Application for a Building Permit Commercial Work Building Commissioner 37 Main Street Charlton, MA

GUELPH WATER RECLAMATION HEALTH, SAFETY AND SECTION GUELPH, ON. EMERGENCY PROCEDURES PAGE 1 PROJECT NO

Section 111 Certificate of occupancy

LEAD HAZARD CONTROL PROGRAM

Indoor Air Quality Program

RESPONSE: No. Original Bid due date and time will remain.

BUILDING/FIRE/ZONING PERMIT GUIDE

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

DATE ISSUED: 7/17/ of 11 UPDATE 111 CS(LEGAL)-P

Application for Certificate of Acceptance

CONTRACTOR REGULATIONS AND GUIDELINES Harbor Building 333 S. Beaudry Ave. Los Angeles, CA 90017

BBS MEMO. Ohio Board of Building Standards August 3, Tussing Road, P.O. Box 4009, Reynoldsburg, Ohio

Certificate of Occupancy Checklist:

LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS PERFORMED IN PRE-1978 HOUSING AND CHILD-OCCUPIED FACILITIES

CALGREEN NON-RESIDENTIAL BUILDING Checklist

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters

OPERATIONAL PERMIT STORAGE, USE, AND DISPENSING OF LPG

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)

Plains Township Building Permit Application

A. The extent of Selective Demolition Work is that Work necessary, and required to facilitate the new construction indicated.

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES

GENERAL SPECIFICATION FOR WEIGHING OF MATERIALS

APPENDIX A CHECK-LIST FOR SCIENCE SAFETY REQUIREMENTS. (Required Minimums for Approval by the N.C. Board of Education)

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS

General Building Information

PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY INSPECTION

COMMERCIAL BUILDING PERMIT

Fire Inspector I Task Book

CHECKLIST REMODELING, RENOVATIONS, CONSTRUCTION, AND REPAIRS. Sign and return the Ilikai Marina Renovation Policies agreement

Residential Rental Property Self-Certification Checklist Rental property municipal address Rental Property number Office Use Only License No.

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

Section Gas, Chemical, Hazardous Material Storage

HPBS [ HIGH PERFORMANCE BUILDING STANDARD]

Corporate Policy and Procedure

Special Provision No. 199S53 January 2018

b. Building Management must have three to four weeks to review plans. Landlord to be supplied all manuals on all equipment installed.

Special Provision No. 199S66 March For the purpose of this Special Provision, the following definitions apply:

5/9/ Florida Building Code, Existing Building. Chapters Approved Course Title 2010 Existing Building Code Chapters

Business License Application

Modular Unit Rental Route 309 Stockpile, PennDOT Montgomery County Maintenance Statement of Work

STATE UNIVERSITY CONSTRUCTION FUND

Mueller Laboratory Renovation

General Requirements for Mobile Homes

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

RIVER VALE BOARD OF EDUCATION PROPERTY Page 1 of Indoor Air Quality Standards 7421 INDOOR AIR QUALITY STANDARDS

Special Provision No. 199S53 February 2012

INFORMATION BULLETIN

BATCHELOR HALL RENOVATION January 2018

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

3.3 Guidelines for Performing Building Inspections All building inspectors should read and understand the following information:

RENOVATIONS SIMPLE FORM FOR APARTMENT ALTERATIONS

City of Peterborough

Shelter Facilities Tool Kit

8.0 Maintenance Administration

Commercial Submittal Packet

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Transcription:

Minimum Standards for Building Occupancy 2017 Safety Resources

Contents 1 Purpose... 1 2 Applicable To... 1 3 Scope... 1 4 Definitions... 1 5 Training... 2 6 Safety... 2 7 Equipment and Materials... 2 8 Procedure... 2 9 Procedure Review... 3 10 Records... 4 11 References... 4 Application for Occupancy Permit... 5

1 Purpose The procedure herein is intended to ensure that all new and renovated buildings at the University of Saskatchewan meet minimum health and safety standards prior to occupancy. 2 Applicable To This procedure is applicable to: Safety Resources Fire/Contractor Safety Consultant Safety Resources Construction Safety Officer Designated Safety Resources representatives Project Managers Commissioning Coordinators Designated Operations and Maintenance Division (O&M) personnel 3 Scope This procedure applies to all new building construction and renovations to existing buildings at the University of Saskatchewan. Safety Resources is the university authority responsible for ensuring the requirements under this procedure and applicable codes, standards and policies are met. 4 Definitions Renovation: Any work that will effect or change a structure or infrastructure of a University building. This includes electrical, mechanical or safety systems. Occupancy: The safe use of any building or structure for its pre-determined use after prescribed safety and operating conditions have been met and acknowledged by Safety Resources. Occupancy is issued when a building is suitable to occupy from a safety point of view. It is not a statement that all the building work is necessarily fully complete. Occupancy Permit: A form which must be completed and signed by all required parties before occupancy is allowed. Temporary Occupancy: A temporary permit may be issued prior to the completion of the work provided it can be demonstrated that the effected building spaces can be occupied safely. Safety Resources Page 1 of 5

5 Training Individuals responsible for executing this procedure shall have the following knowledge and training: Understanding of this procedure; Understanding of applicable building and fire codes, bylaws, and university requirements for building occupancy; and Contractor Safety Orientation. 6 Safety All individuals accessing buildings where construction is undertaken must adhere to the particular rules and procedures of the worksite, Saskatchewan Occupational Health and Safety Regulations, and university requirements. Appropriate personal protective equipment shall be employed when accessing any construction site on campus. 7 Equipment and Materials Each building will require specific equipment, materials and tools employed to ensure the building is safe for occupancy. 8 Procedure When a new building, or renovation to an existing building, is deemed complete, or sufficiently complete to allow for occupancy, the Project Manager must complete and submit an Application for Occupancy Permit to Safety Resources. The following requirements must be completed prior to an Occupancy Permit being issued for any new or renovated building: 1. Substantial completion of occupied space as required for university insurance purposes. 2. Air handling systems are functioning, balanced and operating within specifications. 3. Fire separations are in place, as required, including sealing of openings in fire separations. 4. All designed exits are posted and accessible with a clear path for egress. 5. Verification that the fire alarm system is functioning as designed, and is connected to the Heating Plant. 6. Verification of the fire suppression systems (sprinkler, standpipe, suppression, etc.) if new systems were installed, or where there were modifications to existing systems in accordance with the National Fire Code of Canada. 7. Emergency lighting is installed and/or connected as designed with verification of back-up generators, in accordance with the National Fire Code of Canada, and the Canadian Electrical Code. 8. Fire extinguishers are installed in locations in accordance with the National Fire Code of Canada. 9. Smoke control systems, where required by design, are tested and operational. Safety Resources Page 2 of 5

10. Appliances either hardwired or corded utilize Canadian Standards Association (CSA) approved, or an equivalent standard of cable. Certification marks should be visible on the cable. 11. New or adjusted electrical installations in new buildings or renovated spaces are in compliance with the Canadian Electrical Code. Inspection reports and applicable permits shall be provided to demonstrate compliance. 12. Full Commissioning of Laboratories (including flooring, painting, staining, emergency eyewash and showers, certification and approval for use of fume hoods/biosafety cabinets, etc.). Additional information on this subject is available in O&M Design Criteria requirements. Renovations on buildings that continue to have occupancy while work is being conducted will be required to provide additional safety procedures including: 13. Approval for the use of common areas in the building (by Safety Resources and the Project Manager). 14. Properly functioning heating, ventilation and air conditioning (HVAC) for occupants. 15. Occupied spaces must have a functioning and active fire alarm system. 16. Fire evacuation plan that has been communicated to occupants and building contacts. 17. Safe egress must be maintained for all floors and the building. 18. Emergency power must be available. 19. Access to occupied spaces is not through the construction zone. 20. Consultation, Building Notification and approved scheduling of extremely loud construction noise (jack hammering, concrete drilling, etc.). 21. Odours and construction dust must be controlled or vented away from occupied spaces. If unable to comply the work must be scheduled after regular work hours. 22. A designated contact will be in place for the contractor to receive concerns from building contact or representative. The additional requirements will be addressed on a case by case basis in consultation with Safety Resources and O&M. Upon receipt of an Application for Occupancy Permit, Safety Resources will confirm completion of all requirements and an occupancy permit will either be granted or denied. A conditional temporary occupancy permit may be issued provided it can be demonstrated that the effected building spaces can be occupied safely. 9 Procedure Review The Minimum Standards for Building Occupancy procedure shall be reviewed every three years but may be reviewed at any time when required. Revisions to the procedure will be reviewed and approved by the Fire/Contractor Safety Manager being the overall authority over the procedure. Safety Resources Page 3 of 5

10 Records Building Occupancy Permits and associated records shall be maintained by Safety Resources. 11 References Operations and Maintenance Design Criteria Requirements National Building Code of Canada National Fire Code of Canada Canadian Electrical Code Saskatoon Fire Department Saskatchewan Occupational Health and Safety Regulations Safety Resources Page 4 of 5

Application for Occupancy Permit Applicant Name (Project Manager): Signature: Building/Project Name: Proposed Occupancy Date: Type of Construction: New Addition Renovation General Contractor Name: Signature: Company Name: Date: All standards as required for building occupancy have been met with the exception of those items listed below (include date to be completed): 1. Date: 2. Date: 3. Date: Occupancy Permit Permit Type: Permanent Temporary Temporary Permit Expiration Date: Approval: Granted Denied Safety Resources Authorization (name): Signature: Permit Number: Approval Date: Minimum Standards for Building Occupancy Safety Resources