Chembarambakkam Water Treatment Plant Chennai, India

Similar documents
Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Rawal Lake Water Treatment Plant Rawalpindi, Pakistan

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand

There is no sludge treatment process at NWTP. Sludge generated from sedimentation and backwashing is drained directly to the Khan River.

Jungzhina Water Treatment Plant Thimpu, Bhutan

Cau Nguyet Water Treatment Plant Hai Phong, Vietnam

Xi an South-Suburb Water Treatment Plant Shaanxi, China

Siddhipur Water Treatment Plant Lalitpur, Nepal

Kohalpur Small Town Drinking Water Supply Project Kohalpur, Banke, Nepal

Do Son Water Treatment Plant Hai Phong, Vietnam

Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand

No. 8 Water Treatment Plant, Mandalay, Myanmar

Drinking Water Production Using Moving Bed Filtration

Water Treatment and Conveyance System Salem Gammoh, Jordan Ministry of Water and Irrigation

A Study of Water Treatment at the Bhandup Water Treatment Plant, Mumbai.

6.5 Filtration General

EVALUATION OF A WATER TREATMENT PLANT PERFORMANCE CASE STUDY

13. High Rate Filtration Process

Feasibility Report of Proposed ETP cum STP. M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand)

Dukso Water Treatment Plant Namyangju City, South Korea

Zero Liquid Discharge Project Extends Potable Water Supplies

Zero Discharge for Textile Industry

The Comparison of Two Water Treatment Plants operating with different processes in Kandy City, Sri Lanka

DAFF AIR DISPERSION REVAMP. Wes Wilkie. Goulburn Valley Water

OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT. Tony Humphries. Tony Humphries, Operator, SEQ Water

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

ENVIRONMENTAL ENGINEERING LECTURE 3: WATER TREATMENT MISS NOR AIDA YUSOFF

2017 Annual Performance Report

ACTIFLO Process For Drinking Water Treatment WATER TECHNOLOGIES

WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM

Wastewater Treatment. Where does wastewater go when it leaves your house?

Drinking Water Supply and

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc.

Elsham Water Treatment Works (WTW) is located approximately 10km east of Scunthorpe in North Lincolnshire

M Observations for Water Treatment Plant

Drinking Water Audit Report

Trident. Package Water Treatment System

Drinking Water Audit Report

Separations Overview TDRL Seminar

Utility Partner Data Report

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011

J.K. ENGINEERING LTD. CONSULTING * RESEARCH * DEVELOPMENT

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

Lowering The Total Cost Of Operation

Agenda. Pretreatment Background Typical Contaminants Practical Examples Methods of Treatment and References

HIGH PERFORMANCE SLUDGE DEWATERING FOR DRINKING WATER PLANTS WITH THE BUCHER HYDRAULIC FILTER PRESS


Seasonal Source Water Quality and Treatment Challenges Town of Newburgh s Chadwick Lake Filtration Plant

Drinking Water Audit Report

Reuse of Construction Debris as Viable Replacement of Sand Media in Rapid Sand Filtration

Best Practice in Sewage and Effluent Treatment Technologies

WATER TREATMENT PLANT. Gral. San Martín

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Waste Water Treatment Equipment

WEF Collection Systems Conference Evaluation of High ph Infiltration Water and Recycled Bedding Material

U. S. Army Corps of Engineers Metals Precipitation Checklist

EPB Introduction to Surface Water Treatment

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Drinking Water Treatment Overview Filtration and Disinfection


Utility Partner Data Report

City of Topeka Utilities Department

Drinking Water Audit Report

Tampa Bay Water (TBW) is a regional

REPORT TREATABILITY STUDIES, FEASIBILITY REPORT FOR TREATMENT OF WASTE WATER FOR. M/s DEEPAK NITRITE LTD., MIDC Taloja

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

OPERATORS PERSPECTIVE : OPTIMISATION OF A NEW PACKAGE WATER TREATMENT PLANT. Melina Entwistle. North East Water Authority

USING PARTICLE COUNTERS TO OPTIMISE WATER TREATMENT PLANTS. Michelle Colwell. Michelle Colwell, Water Treatment Technologist.

WASTE WATER TREATMENT SYSTEM

The waste water treatment plant will treat

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT

POTABLE WATER COAGULANT TRIALS UTILIZING POLYALUMINIUM CHLORHYDRATE. Michael Dalton. Toowoomba City Council

International Journal of Advance Engineering and Research Development. Hydraulic Design of Water Treatment Plant - A Case study for Srinagar town

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION

Introduction document of KHN package water treatment. plant (flocculation sedimentation and filtration)

Comparing the Leopold Clari-DAF System to Upflow Contact Clarification

WATER SUPPLY SERVICES

Wastewater Treatment Processes

De-watering Activities General

TEAMS Competition 2017 Scenario # 2. Water Treatment. From Potentially Poisonous to Potable through Purification

OPTIMIZING PERFORMANCE OF WATER TREATMENT PLANTS by K.B. Wadhavane Executive Engineer, WTP, MCGM

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 631. PUBLIC WATER SUPPLY OPERATION SUBCHAPTER 1. INTRODUCTION

DISCUSSION PAPER. 1 Objective. 2 Design Flows and Loads. Capital Regional District Core Area Wastewater Management Program

Chapter 2: Description of Treatment Facilities

Meeting Manganese Removal Goals: A Pilot Study

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout )

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 631. PUBLIC WATER SUPPLY OPERATION SUBCHAPTER 1. INTRODUCTION

INFRASTRUCTURE & OPERATION

CHARECTERIZATION OF SEWAGE AND DESIGN OF SEWAGE TREATMENT PLANT

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 631. PUBLIC WATER SUPPLY OPERATION SUBCHAPTER 1. INTRODUCTION

Hybrid RO & Softening Birjand Water Treatment Plant

WWETCO FlexFilter and Bio-FlexFilter

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

CONTRAFAST. High-Rate Thickening Clarifier

Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

TITLE 252. DEPARTMENT OF ENVIRONMENTAL QUALITY CHAPTER 631. PUBLIC WATER SUPPLY OPERATION SUBCHAPTER 1. INTRODUCTION

Drinking Water Audit Report

Transcription:

Chembarambakkam Water Treatment Plant Chennai, India 1. Background information Chennai city, the capital of Tamil Nadu, one of the states of India, is the fourth largest city of India with the total area of 184.88 km 2. It has a population of 7.09 million as per 2011 census. The water demand (which also includes the industrial demand) for Chennai city for the year 2021 is projected to be 1,980,000 m 3 /day. In Chennai organized water supply commenced in 1872 and protected water supply started since 1914. Currently, there are seven water treatment plants (WTP) to treat and supply the water. The raw water sources, the capacity of WTP and the technology is shown in Table 1. Table 1. Details of WTPs of Chennai city S.N Location of WTP Raw water source Capacity of the source (Mm 3 ) Capacity of WTP (m 3 /day) 1 Kilpauk Poondi Reservoir 91 Cholavaram 24 270,000 Redhills Reservoir 93 Technology used Conventional WTP with Rapid Sand filters (RSF) 2 Puzhal Redhills Reservoir 93 Conventional WTP 300,000 with RSF 3 Surapet Redhills Reservoir 93 Conventional WTP 14,000 with RSF 4 Vadakkuthu Veeranam lake 41 Conventional WTP 180,000 with RSF 5 Chembarambakkam Chembarambakkam 103 Pulsator clarifier and 530,000 lake Aquazar V filters 6 Minjur Seawater Desalination plant 100,000 (DP) 7 Nenmeli Seawater 100,000 Desalination plant Total capacity 1,494,000 Chembarambakkam WTP (CWTP) has the capacity of 530,000 m 3 /day and is the India's second largest single stage water treatment facility and is unconventional treatment plant with Pulsator clarifier and Aquzur V- filters. It is located at Nazarathpet, 25 km away from Chennai city and is very close to its raw water source, Chembarambakkam Lake (CL). CL receives rainwater from its own catchment and also from Krishna water source located in the adjacent state of Andhra Pradesh through an open canal. CWTP is owned by Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) and it was constructed in the year 2007 by Degremont company and is being operated and maintained by the company. This plant supplies treated water to southern part of the city.

Table 2 Overall Information of CWTP Constructed Year 2007 Water Source Number of connections Peak operating flow (m 3 /day) Design capacity (m 3 /day) 530,000 Automation Chembarambakkam lake 0.195 million house service connections 265,000 (present) due to non-commissioning of second treated water transmission main Yes Date of access of the source information February 2016 Reference Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) CWTP makes use of state-of-the-art, proven technologies of Pulsator clarifiers and Degremont s patented Aquazur V filters and provides highly efficient treatment with minimal water losses and a small overall footprint. 2. Water treatment process flow The major water treatment unit processes are presented as below (Figure 1): Raw water extraction (Chembarambakkam lake) Raw water pumping Cascade Aerator Pipeline Coagulation tank Distribution Chamber Pulsator Clarifier Aquazur V-filter Disinfection (post-chlorination) Chlorine Contact Tank Clean Water Reservoir Treated water pumping Distribution Sludge treatment: Sludge generated from pulsator clarifier is transferred to the Sludge thickner while the wastewater received from the Aquazur V Filter is primarily recovered through the wastewater recovery tank. The recovered water is channeled to the distribution chamber while the sludge generated from it is transferred to the sludge thickener. The thickened sludge is then dewatered through centrifuge unit. Sludge generated is then used for landfilling purpose at lowlying areas.

2.1 Details of the Major Units of Treatment Plant Figure 1 Water Treatment Process Table 2 provides the detail of the treatment facilities and units present in the CWTP for the treatment of the raw water. Table 2 Details of the Major Treatment Units Units Number Remark Intake tower with bar screen 1 Raw water pumping station 1 Raw water transmission main (1500 mm dia MS 1 pipes of 3 km long) Cascade Aerator 1

Alum Dosing Tanks 2 Pulsator Distribution Chambers 8 Pulsator Clarifiers 40m x 33.5m x 5.2m size 8 Out of 8 one is standby Aquazur V- Filters 16.3m x 8m x 4m size 22 Out of 22 three are standby Chlorine Contact Tank Cum Treated Water Reservoir 1 Divided into two compartment Treated Water Pumping Station 1 Transmission Pipe Lines of 11Km (each of 2000 mm 2 diameter MS line) Clarifier Sludge Balancing Tank 1 Waste wash water Recovery Tanks 1 Divided into Two compartments Sludge Thickeners 3 Centrifuges 3 2.2 Chemicals used Alum and liquid chlorine are the two main chemicals used at CWTP. The alum solution is prepared by mixing alum blocks (each tank consist of 20 kg s of 200 blocks and gives 5% concentration alum solution) in alum preparation tanks, filled with water and thoroughly mixed with air blower. 2.3 Cascade Aerator Figure 2. Chlorine containers Raw water drawn from the Chembarambakkam Lake is withdrawn through an intake with bar screen and pumped to the WTP. Initially, raw water tumbles through an elevated cascade aerator which reduces the CO 2 and H 2S concentration. Cascade aerator consist of three steps and the fall in each step is 0.5 meter. The intake tower is capable of drawing 675,000 m 3 /day of raw water. After coagulation with alum the water flows first to the distribution chamber and then into the Pulsator clarifiers.

Figure 3. Cascade aerator 2.4 Pulsator Clarifier The Pulsator clarifier (Figure 4) is based on sludge blanket process and consists of the vacuum chamber and flat-bottomed tank with a series of perforated distribution pipes with deflectors at its base to distribute the raw water uniformly over the entire bottom. It also consists clarified water collection channels. Pulsator clarifier with its components is shown in Figure 5. Figure 4. Pulsator clarifier

Figure 5. Cross section of Pulsator clarifier with its components The coagulated water from distribution chamber flows to the upper part of the vacuum chamber. To provide an intermittent supply to the distribution pipes the air is sucked from the top of the vacuum chamber with a blower. As a result, the water level is lifted gradually inside the vacuum chamber. When it reaches a specified level above the water level in the clarifier, the vacuum break valve (Figure 6) gets open which allows atmospheric air into the vacuum chamber. Due to the atmospheric pressure, the water level in the vacuum chamber is lowered and the coagulated water rushes into the distribution pipes with deflectors (baffle plates) at high velocity and correspondingly the level in the vacuum chamber drops. When the water level inside the vacuum chamber reaches the lower set point, the vacuum break valve is closed and the cycle continues. Figure 6. Vacuum break valve

The arrangements of perforated distribution pipes and the deflectors (baffle plates) of Pulsator clarifier are shown in Figures 7 and 8. Figure 7. Distribution pipes of Pulsator clarifier Figure 8. Distribution pipes with deflectors of Pulsator clarifier The water then flows upward through sludge blanket and the clarified water is collected by the clarified water collection channels provided at the top of the Pulsator (Figure 9), to flow evenly and to prevent any velocity irregularities within the tank. Figure 9. Clarified water collection channels of clarifier The sludge blanket in the lower part of the Pulsator clarifier is subjected to alternating vertical motions similar to heart pulsation. It expands during the entry of water at a high velocity for a short time of 10-15 sec., (adjustable) and then contracts during stopping of flow for 30-50 sec, (adjustable). The Pulsator

has no mechanical sludge stirring system and it is the sludge blanket, which is constantly in motion expanding and contracting within few seconds when the vacuum system is at operation. This process ensures the complete and rapid formation of the flocs and entrapment of the flocs during the expansion of the sludge blanket. The volume of sludge blanket gradually increases because of the entrapped and settled flocs from the flocculated water. The thickness of the blanket, therefore, rises regularly, and the sludge from the top of the sludge blanket falls into the concentrators, from where the sludge is extracted at regular intervals by to the sludge sump. Pulsator clarifier at the CWTP has the retention time of 2 hours and the suspended solid removal rate is about 80%. 2.5 Filtration Clarified water from the Pulsator clarifier then fed to Aquazur V filters. There are 22 units (19 numbers working and 3 numbers standby) of Aquazur V filters each with the dimension of 16.3m x 8m x 4m, for filtration. The filters have 120 cm of sand media with the effective size of 0.95 mm. The average filtration rate of 158 Lpm/m 2 is normally observed. The Aquazur V filter is a rapid gravity filter system and consists of a rectangular tank that is divided longitudinally into two filtration bays by a central channel. The underdrain system is constructed of perforated 600 mm square precast concrete slabs fitted with long stem plastic air diffuser nozzles as shown in Figure 10 and 11. During the filtering, cycle water drains through the under-drain nozzles into the filtered water plenum and discharges into clear water reservoir where the chlorination is performed. During the backwashing cycle both filtered water and pressurized air travel in a reverse path into the plenum below the slab and escape through the under-drain nozzles into the filter media to clean the filter. The backwashing is normally done once in 3 days and it takes about 10 minutes to finish the backwashing. Figure 10. Floor level of filter with perforated precast RCC slab

Figure 11. Air diffuser nozzle 2.6 Chlorine contact tank and Clean water reservoir The filtered water flows to the chlorine contact tank (CCT). Chlorine is dosed at 2.0 mg/l as disinfectant and the free residual chlorine of 0.5 mg/l is maintained in the CCT of 61.0m x 47 m x 4.6m which has the chlorine contact time of 30 min. Further, lime is also added to maintain the ph of the treated water in between 7 to 8.5. The lime solution dosage is determined by conducting the jar test in the laboratory. Disinfected water is collected in a clear water reservoir and then pumped through 2000 mm transmission main for distribution. 2.7 Wash-water Recovery The dirty backwash water from the filter cleaning is collected in wastewater recovery tank, where suspended solids are allowed to settle. The supernatant is collected and pumped back to cascade aerator and mixed with raw water for treatment. Supernatant has the turbidity of 20 NTU which is twice raw water turbidity. 2.8 Sludge Management The sludge from the concentrator of Pulsator clarifier is drawn by gravity at regular interval into the sludge sump. From there the sludge is pumped to the sludge thickeners. The polyelectrolyte solution is dosed at the dosing chamber to the thickeners. The thickened sludge is pumped by variable speed positive displacement pumps to the centrifuges (30 m 3 /h) to dewater the thickened sludge. The polymer dose is about 5 kg/tonnes of sludge. Lime powder is also added to the dewatered sludge to improve the dryness of the solids before disposal by filling in the low-lying area within WTP site. The recovered water is returned back to the cascade aerator.

Figure 12. Sludge Thickener 3. Aspects of treatment processes posing most difficulty for daily operation Chembarambakkam Lake is prone to water pollution as no regulation and monitoring mechanism exists for controlling the dumping of wastewater in it. Agricultural activity in its catchment also contaminates the lake water due to the runoff of agricultural waste in the lake. In 2007 government has planned to build an industrial park near the Chembarambakkam Lake which can further pollute the source water. Moreover during the rainy season the sewer water gets mixed with the lake water which makes the treatment process expensive. 4. Aspects of water services management in general posing most difficulty at the moment One of the environmental groups has raised a question about the threat from industrial effluents as Tamil Nadu lacks regulation on industrial effluents which could lead to contamination of source water in future 3. Thus, Chembarambakkam Lake could see the rise of persistent organic effluents which could threaten the quality of the treated water in future. The WTP is presently operated at 50% design capacity, since the second 1200 mm dia. clear water pumping main is under construction. During floods, the turbidity increases to about 50 NTU which is higher than the normal level. 5. Measures taken now to cope with 3) and 4) Monitoring of Chembarambakkam Lake for microbiological and physiochemical parameters Alum dose is adjusted based on the result of jar test to cope with the peaked turbidity during the flood.

New pipelines are being laid to expand the distribution network. Thus more water can be produced after the completion of the expansion project. 6. Recent investment made for the plant s improvement No recent improvement has been made as the plants have been recently constructed and are equipped with modern technology. 7. Technologies, facilities or other types of assistance needed to better cope with operational and management difficulties in 3) and 4). No operational difficult is felt. However, the treatment plant has been running at 50% of its capacity and needs a proper distribution network to operate at its full potential. 8. Customer s opinion on water quality and water services in general CMWSSB has clarified that the water quality complies with the drinking water quality and it meets all the standards and is safe for drinking. CSWSSB staffs collect the sample from the various residence and public taps for the field test every day which is then examined at the lab. CMWSSB recently released results of the samples that quantify the supplied water to be of good quality with all the physical, chemical (calcium, magnesium, total hardness, chlorides, sulfates, iron, dissolved oxygen) and bacteriological parameters under the permissible limit. However, regarding the quantity of the water supply, CMWSSB is unable to meet the water demand. In addition, water is distributed through small distribution reservoirs (2 m 3 capacity Sintex tanks with taps) fed by mobile water tankers to the economically weaker section of people, who do not have the affordability for house service connections. People collects this water for their consumptive uses. For other uses, they collect water from groundwater fitted with hand pump/power pump. The distribution pipes in core city are very old and are being replaced in phases. The residual chlorine in the tail end of the distribution system is zero. Hence chlorination is done in the distribution system to increase the residual chlorine level to about 0.2 mg/l. The distribution pipeline for the CWTP is under construction and the completion of this network will relieve the pressure of CSWSSB to some extent. 9. Advanced technology used in this water treatment plant or any points to improve the process, water quality and capacity. Chembarambakkam WTP Plant operation is fully automated and managed using SCADA system with the support of Program Logic Controller (PLC). 10. Other Highlights It is the second largest single WTP in India.

CWTP production process only has 1.5% of water loss and the dewatered water from sludge thickener and backwash water is sent back to the cascade aerator for the treatment process. 11. Water quality data The quality of raw water and treated water are presented in Table 3. The treated water quality is well within the national standard for drinking water of India Table 3 Raw Water and Treated Water Quality Parameter Units Raw water characteristics of Chembrambakkam lake Average quality of Standard of Government Minimum Maximum treated water of India Turbidity NTU 10 100 0 1 ph 7.0 9.0 7.2 7.0 8.5 Alkalinity Total Hardness Total dissolved solids (TDS) 12. References mg/l as CaCo 3 mg/l as CaCo 3 30 200 50 200 20 200 50 200 mg/l 50 150 75 500 1. Chennai Metropolitan Water Supply and Sewerage Board. (2013). Meeting the challenges in water and sanitation, Chennai experience. Retrieved from: http://icrier.org/pdf/chennai_cmwssb_delhi_feb2013.pdf Accessed on 2 May 2016 2. Training Manual, 530000 m 3 /day Chembarambakkam WTP by Degremont, TM O&M, 2014. 3. Water-Technology. Chembarambakkam Water Treatment Plant, India. Retrieved from: http://www.water-technology.net/projects/chembarambakkam/. Accessed on 29 April 2016 4. K. Lakshmi (2016, March 16). More pipelines being laid to improve water supply in Chennai. Retrieved from: http://www.thehindu.com/news/cities/chennai/more-pipelines-being-laid-toimprove-water-supply-in-chennai/article6997382.ece Accessed on 29 April 2016 5. Deccan Chronicle (2016, January 6). Drinking water meets all standards: Metro water. Retrieved from: http://www.deccanchronicle.com/160106/nation-current-affairs/article/drinking-watermeets-all-standards-metro-water Accessed on 2 May 2016

Prepared by: Mr. R.Pannirselvam, Deputy Chief Engineer (Retired), Tamil Nadu Water Supply and Drainage Board; Current: Visiting Faculty, Centre for Environmental Studies, Anna University, Chennai Disclaimer: This report was prepared for the NewTap project, which is funded by the Japan Water Research Center. JWRC assumes no responsibility for the content of the report or for the opinions or statements of fact expressed in it. This report is presented solely for informational purposes. The copyright of this report is reserved by JWRC. For more details about the copyright, please refer to the site policy of the NewTap website. Published on: 14 March 2016 URL: http://www.jwrc-net.or.jp/aswin/en/newtap Email: newtap@jwrc-net.or.jp