Portable Appliance Testing

Similar documents
Portable Appliance Testing

UNIVERSITY OF SHEFFIELD IN-SERVICE INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT POLICY AND GUIDANCE

Guidance note Electrical Wiring Installations in Churches

Guide to testing and tagging portable electrical equipment and residual current devices at workplaces

Electrical Safety (Scotland) University Health & Safety Policy

Policy and Procedure: PAT Testing

TEST AND TAG PROCEDURE

Health and Safety Audit

The Legal Obligations of Employers to Maintain all Portable Electric Equipment in a Safe Condition

Action Hampshire ACTION HAMPSHIRE HEALTH AND SAFETY POLICY

MC/10/61. Homeworking Policy for Methodist Council Staff. Basic Information. Contact Name and Details

Local Rule: Engaging External Service Providers

ELECTRICAL SAFETY POLICY LV (LOW VOLTAGE)

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

CHAS Assessment Standards

The following is a description of the type of work that our Company undertakes:

PICS Health and Safety Policy and Arrangements

Electrical Safety Policy

administered by Risk control briefing note 2: The use of electrical extension leads and adaptors

Health and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG

Electrical Safety Policy V2.0

ELECTRICS IN CHURCHES

GUIDELINES ON SAFETY REQUIREMENTS FOR PURCHASE, RECEIPT, DONATION AND SUPPLY OF WORK EQUIPMENT

Contractor safety for schools and services. Guidance

SEMEM SQA Unit Code H2AR 04 Carrying out maintenance activities on electrical equipment

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

Corporate. Emergency Standby Generator SOP. Document Control Summary

BOWIE STATE UNIVERSITY ASSET MANAGEMENT POLICY & PROCEDURES MANUAL

Health and Safety Policy

Health Safety and Welfare Policy & Arrangements For Fullbrook School

Field Service Engineer

Contractors Code of Practice

HEALTH & SAFETY POLICY TABLE OF CONTENTS RESPONSIBILITIES

Electrical Safety Management Plan (ESMP)

Kingsmead Testing Services - Your Trusted Testing Partner

Print Policy. Table of Contents

Health & Safety Policy

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes

University of Birmingham

Procurement and Asset Management

Health & Safety Policy & Management Systems. Guidance Note 13

Grounding Conductor & GFCI Employee Protection Program

Asbestos Register for

DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

Part 2 - Servicing Specification

Health, Safety and Environmental Policy

HEALTH AND SAFETY POLICY AND PROCEDURES

Electricity at Work Regulations, Amendment 1 to BS 7671 and the in-service inspection and testing of electrical equipment

Argentina Certification Guidelines for Electrical & Electronics Products.

HEALTH & SAFETY POLICY

C60 Standby UPS. 800VA Models. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

CODE OF PRACTICE ON THE USE OF DISPLAY SCREEN EQUIPMENT

A BARBOUR GUIDE. Benefits Gained from Implementation of OHSAS18001

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015)

Health and Safety Policy Tom Devonport, Health and Safety Manager

Employee Summary of Company Safety Arrangements SAFETY ARRANGEMENTS

Health & Safety Policy

Safety Statement Including Risk Assessment

ESSENTIAL SAFETY MEASURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE

HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF:

Constraints on how the Contractor Provides the Works

Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises 2011

CHILDRENS HOSPICE S ACROSS SCOTLAND. Maintenance Team Leader Job Family: Support Services - Hospice. Responsible to:

Health & Safety Policy Statement Organisation & Responsibilities

Asbestos Management Policy

Installation, Inspection and Maintenance of Dry Type Transformers

Mobile Device Management (MDM)

HEALTH AND SAFETY POLICY

Health and Safety Policy

Health and Safety at Work Act etc 1974 Health and Safety Policy

Thorough examination and testing of lifts

HEALTH & SAFETY POLICY OF:

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

OCCUPATIONAL HEALTH & SAFETY POLICY

Title: Lockout/Tagout Policy. University Division/Department: Environmental Health & Safety Effective Date : May, 1996 Revised: July, 2017

Page1. Asbestos (Health & Safety) Policy. Issue Date 07/03/2017 Issue 1 Document No: 010 Uncontrolled when copied

Construction & Trades Testing and Tagging Requirements

APPRENTICE ELECTRICIAN REF: MC31

Head of HSE. Group Services, Risk

M.B. Power Services (Essex) Ltd

Records Retention & Disposal Schedule

Managing Contractors (Scotland)

2.0 Management of the Commission s Environmental Responsibilities

Before you begin. Introduction Complete workplace orientation and induction procedures 1

Asbestos Policy. October Also available in large print (16pt) and electronic format. Ask Student Services for details.

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

Management of sources of ionising radiation

Job Description. Gas and multi-trade workforce, apprentices and subcontractors as allocated to the post holder.

Facilities Controller Job Description

Unit 037 Maintaining electrical equipment/systems 1

Roles and Responsibilities

Unit Standard 497 Demonstrate knowledge of workplace health and safety requirements Version 7 Level 1 3 Credits. Student Checklist & Instructions

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS

Bryant University s Energy Guidelines for Sustainability

MASTER SERVICE LEVEL AGREEMENT (MSLA)

INSTRUCTION MANUAL WARNING: BEFORE USING THE MACHINE READ THE INSTRUCTION MANUAL CAREFULLY!

LEICESTERSHIRE COUNTY COUNCIL HEALTH, SAFETY & WELLBEING POLICY. July 2011 To be reviewed: July 2014

GRUNDFOS AND THE ENVIRONMENT

Transcription:

Portable Appliance Testing 1. PURPOSE 1.1 The purpose of this procedure is to provide a standardised system for the inspection and testing of portable electrical appliances throughout the University, to give guidance to departments and consequently to ensure the University is meeting its legal obligations. 2. SCOPE 2.1 This procedure applies from 1st March 2015 and controls the use of portable electrical appliances: on all of our campuses provided by the university to be used off-campus. bought with research funding. brought on to one of our campuses by staff, students, contractors etc. leased electrical portable and transportable equipment. Please contact Health and Safety Services if you have queries regarding any aspect of this procedure. 3. DEFINITIONS Portable Appliance Competent Person Electrical equipment that is intended to be connected to a generator or a fixed installation by means of a flexible cable and either a plug and socket or a spur box, or similar means Is a person who is employed or contracted by the University who has received suitable and sufficient training in Portable Electrical Appliance Inspection and Testing, e.g. City and Guilds 2377-32 for Line Managers and 2377-22 for tester. 1

4. RESPONSIBILITIES Vice- Chancellor 4.1 On behalf of the Council the Vice-Chancellor has executive responsibility to ensure, that the requirements of the health and safety legislation and the University health and safety policy are complied with. The Vice- Chancellor will ensure that responsibility for health and safety is properly assigned and accepted at all levels within the University. Heads of Functional Areas 4.2 Heads of Functional Areas are responsible for ensuring that :- A schedule for testing the portable electrical equipment is prepared that takes account of how often the equipment is used, who uses it, the environment it is used it, what it is used for etc. The equipment is tested according to the schedule. Funds and/or staff time is made available to test and inspect all the equipment Arrangements are made to ensure that failed, damaged or otherwise unsafe equipment is made unavailable and controlled until such times as it can be repaired or disposed of in an appropriate manner. Appropriate staff (e.g. line manager/ health and safety co-ordinator) are designated to ensure the schedule is followed and all equipment is made available, tested and where necessary taken out of use, quarantined or repaired. rmally, a register of equipment that requires maintenance and/or testing is created and maintained 2

Designated Staff 4.3 Staff nominated by the Head of Functional area are responsible: Ensuring items are made available for testing in accordance with the schedule and appropriate records maintained Ensuring that failed, damaged or otherwise unsafe equipment is taken out of use and controlled until such times as it can be repaired or disposed of in an appropriate manner Advising students and staff regarding personal items Creating and maintaining an equipment register as required 4.4 Where relevant, staff responsible must visually check equipment, cable, plug or socket before issuing equipment to a student or another member of staff. All Staff 4.5 Staff are advised not to bring any personal electrical appliances such as radios, heaters, fans etc. into the University without the permission of their manager. If they do, they are responsible for the safety of that appliance and ensuring it is included in the departmental list of portable appliances and tested in accordance with this procedure. If such an appliance fails it must be immediately removed from the premises and repaired or disposed of at the owner's expense 4.6 Staff and students should visually check each piece of equipment, including, where appropriate, the cable, plug or socket before and during use. 5. INSPECTION AND TESTING 5.1 There are three main types of checks required to ensure effective maintenance of portable electrical equipment. These are User Checks, Formal Visual Inspection and Combined Inspection and Testing (PAT). 3

User Checks 5.2 The person issuing or using the equipment should examine it before use and check for signs that it may not be in sound condition, for example: damage (e.g. cracked plug, frayed/cut cable), signs of overheating, loose parts, etc. 5.3 These checks also apply to extension leads, plugs and sockets. A user check should be made when the equipment is issued, taken into use and during use. Any faults should be reported to the relevant person for their area, e.g. the line manager or Health and Safety Co-ordinator, and the equipment immediately taken out of use and controlled until such times as it can be repaired or disposed of in an appropriate manner 5.4 In addition to this, it is the responsibility of all users to visually check the electrical appliances they use for any signs of damage or wear. If there is any damage e.g. cracked plug, frayed/cut cable, etc. the appliance must be taken out of use and either repaired or disposed of. Formal Visual Inspection 5.5 These inspections can help to control the risks and to monitor the user checks. A competent person should carry out regular inspections that include checks similar to the User Checks but undertaken in a more formal and systematic manner. 5.6 As part of the visual inspection, you should also consider whether: The electrical equipment is being used in accordance with the manufacturer s instructions; The equipment is suitable for the job; There has been any change of circumstances; The user has reported any issues. 4

Combined Inspection and Testing (PAT) The checks and inspections above should reveal most potentially dangerous faults. However, some faults can only be reliably detected by a combined visual inspection and test. This should be carried out in accordance with the schedule to back up the checks and inspections and is likely to be justified: whenever there is reason to suppose the equipment may be defective and this cannot be confirmed by visual examination; after any repair, modification or similar work; or at periods appropriate to the equipment, the manner and frequency of use and the environment (see below) In higher risk working environments e.g. labs and workshops 5.7 When equipment is Routinely plugged and unplugged during use, (e.g. floor cleaning equipment, electric drills, extension leads etc.), or Is regularly used in wet or dusty conditions, or In an environment where mechanical damage is more likely (such as hand held power tools in workshops), or Used by students, or Used by staff who are unfamiliar with the equipment Used for heating, e.g. toasters, heaters, water baths, etc. Then a local risk assessment should be carried out which will specify the frequency of the inspection and test programme required - for example every 6 months. In some circumstances equipment may also have to be inspected and tested more frequently due to faults occurring or repairs being necessary. 5.8 In higher risk working environments the assessment may also indicate a range of additional measures to reduce electrical and fire risks such as Using cordless hand held power tools instead of tools with a fixed lead e.g. jig saws Residual Current Devices (RCD s) can help protect from electric shock in potentially dangerous areas such use of pressure washers Using reduced voltage equipment and tools, i.e. 110 volt equipment Correct selection of equipment for use outdoors 5

5.9 The table in Appendix 1 may be used to help decide the appropriate inspection and test programme In lower risk working environments e.g. offices 5.10 The table in Appendix 1 should be used to devise a schedule for portable electrical equipment in lower risk working environments. 5.11 Managers can seek advice form Health and Safety Services regarding all aspects of portable appliance testing. 6. RECORDING OF INSPECTION AND TEST RESULTS 6.1 Each Faculty / Department will be responsible for making its own inspection and testing arrangements. Some departments will have the technical resources to carry out these arrangements. Others departments should use the contractor as currently advised by Procurement Office. Each area should however establish and maintain a register of all of their portable appliances. 6.2 In areas with significant amounts of electrical equipment a maintenance log, including faults found during inspection, may be appropriate and can inform testing schedules. In all cases the inspection and test results must be kept in an easily accessible format and recorded to allow for future comparison, for written identification of defects to be remedied and to provide information for an assessment of risk. 6.3 Functional areas should keep the results centrally, as the enforcing authorities (e.g. the HSENI) or the University insurers may wish to inspect them. PAT test schedules and records are part of the documentation required during the University Internal Health and Safety Audit process. 6.4 Equipment subject to a combined inspection and test (PAT) should be labelled to indicate that it has been tested satisfactorily, i.e. has been passed as safe, and when it was tested. Such labels should not have a next test due date on it. 6

7. REMEDIAL ACTION 7.1 If inspection and testing show the appliance is faulty, it is UNSAFE. Unless remedial action is immediate and the equipment then passes the re-inspection and test, the equipment MUST BE IMMEDIATELY TAKEN OUT OF SERVICE e.g. by removing the plug and a failed label attached to the appliance. Hand held and portable items should be immediately removed from the area and placed in quarantine. Larger items should be isolated from the electrical supply and labelled appropriately. 7.2 If the item is to be disposed of then the requirements under the Waste Electrical and Electronic Equipment (WEEE) Regulations must be complied with. REFERENCE DOCUMENTS 1. Maintaining portable electrical equipment. HSG107. HSE Books 2. The Health and Safety at Work (rthern Ireland) Order 3. Electricity at Work Regulations (rthern Ireland) 4. Provision and Use of Work Equipment Regulations (rthern Ireland) 5. Management of Health and Safety at Work Regulations (rthern Ireland) 6. The Waste Electrical and Electronic Equipment (WEEE) Regulations 7

APPENDIX 1 Equipment / Environment User Check Formal Visual Inspection Equipment hire / loan Battery operated equipment (less than 40 V) Extra low voltage (less than 50 V ac), telephone equipment, lowvoltage desk lights Construction / 110V equipment Maintenance Activity 230V equipment Fixed RCDs Equipment site offices Heavy industrial/high risk of equipment damage (not construction) Light industrial Desk Computers Photo-copiers, fax machines and rarely moved printers and scanners Double insulated (Class II) equipment: t hand held; moved occasionally e.g. fans and table lamps, microwaves Double insulated (Class II) equipment: Hand held e.g. some kitchen equipment Earthed equipment (Class I) Electric kettles, some kitchen equipment Cables, (leads and plugs connected to the above) and mains voltage extension leads and battery charging equipment for laptops, ipads, mobile phones N/A Before issue /after return Combined Inspection and Testing Before issue, weekly, daily/every shift, daily/every shift, monthly, monthly, weekly, weekly, 6-monthly, before first use on site then 3-monthly, before first use on site then monthly, before first use on site then 3-monthly (portable RCDs monthly), before first use on site then yearly, daily, weekly, 6 12 months, before initial use then 6-monthly 2-4 Years 2-4 Years 2-4 Years 6 months 1 Year 6 months 1 Year 6 months 4 Years depending on the type of equipment it is connected to., 6 12 months, if double insulated, otherwise up to 5 years, if double insulated, otherwise up to 5 years 1-2 Years 1-5 Years depending on the type of equipment it is connected to. 8

9