Tajikistan Asian Development Bank (ADB)

Similar documents
FP075: Institutional Development of the State Agency for Hydrometeorology of Tajikistan. Tajikistan Asian Development Bank (ADB) Decision B.

Nauru Solar Power Development Project under the Pacific Islands Renewable Energy Investment Program. Asian Development Bank Nauru

Summary - Project/Program Concept Note for the Use of Additional PPCR Resources. XPCRTJ040A SPCR endorsement date: 10 November 2010

Proposed additional financing to the Kingdom of Cambodia for the Tonle Sap Poverty Reduction and Smallholder Development Project

Extract from TAJIKISTAN SPCR October Building Climate Resilience in the Pyani River Basin. Title

FP014: Climate Adaptation and Mitigation Program for the Aral Sea Basin (CAMP4ASB) Tajikistan and Uzbekistan The World Bank Group Decision B.

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE AND NATURAL RESOURCES

Western Uzbekistan Water Supply System Development Project. Uzbekistan Asian Development Bank (ADB)

Component 1: Building Climate Resilience of Watersheds in Mountain Eco-Regions

Pilot Program for Climate Resilience THE KYRGYZ REPUBLIC CLIMATE INVESTMENT PROGRAMME (CIP)

Tajikistan United Nations World Food Programme (WFP)

Report on project ideas FOR ADAPTATION TECHNOLOGIES

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

Enhancing Climate Resilience in the Third Pole. Afghanistan, Bangladesh, Bhutan, Myanmar, Nepal World Meteorological Organization (WMO)

Climate Risk Assessment at The Community Level: THE PYANJ RIVER BASIN

Flood Protection Bamako. Mali Kreditanstalt für Wiederaufbau (KfW)

Agro-livestock Sector Adaptation to Climate Change and Variability. Colombia Corporación Andina de Fomento (CAF)

Solar Plus: Diversified Low-Carbon Systems to Improve Energy Supply and Climate Resilience. Islamic Republic of Afghanistan Asian Development Bank

Energy Sector Priorities Asian Development Bank. David C. Elzinga, Senior Energy Specialist

TERMS OF REFERENCE FOR CONSULTANTS

UNDP-Spain MDG Achievement Fund. Terms of Reference for Thematic Window on Environment and Climate Change

Summary of Project/Program. Summary - Project Approval Request. Amount (USD):USD 1 1 million Date: June 29 th, 2011

Tonga Renewable Energy Project (TREP), under the Pacific Islands Renewable Energy Investment Program. Kingdom of Tonga Asian Development Bank (ADB)

Report and Recommendation of the President to the Board of Directors

Technology Needs Assessment for Climate Change Adaptation in Mongolia

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB2622 Kenya Adaptation to Climate Change in Arid Lands (KACCAL) Project Region

TERMS OF REFERENCE (TOR)

ASSESSMENT OF PUBLIC SECTOR MANAGEMENT

Low Emissions, Efficient Transport with a Focus on the Co- benefits of Enhanced Air Quality. Kenya National Environment Management Authority (NEMA)

Technical Assistance Report

BUILDING CLIMATE RESILIENCE IN URBAN SYSTEMS

DETAILED TERMS OF REFERENCE FOR CONSULTANTS

Building. Climate Change. ACCCRN Intervention Project Criteria, Process & Progress

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

Climate smart transformation of land use practices: community driven mitigation via adaptive and sustainable management of forests and pastures

SECTOR ASSESSMENT (SUMMARY): ENERGY

Climate Financing Mechanisms. Sustainable Land Management and Ecosystembased Adaptation for the Green Climate Fund

Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): IRRIGATION. 1. Sector Performance, Problems, and Opportunities

CLEAN TECHNOLOGY FUND INVESTMENT CRITERIA FOR PUBLIC SECTOR OPERATIONS 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Project Name

ASIAN DEVELOPMENT BANK

People s Republic of Bangladesh: Supporting Education and Skills Development Investment Programs

Water in Central Asia. International partnership for better water cooperation and management in Central Asia

CLIMATE CHANGE AND THE ENVIRONMENT IN TURKMENISTAN. World Bank August 6, Outline. Facts Impacts Response Strategic support

Meeting of the PPCR Sub-Committee. January 27-28, Washington, D.C.

ECONOMIC ANALYSIS. A. Introduction

GAPS IN EXISTING INSTITUTIONAL ARRANGEMENTS WITHIN AND OUTSIDE OF THE CONVENTION TO ADDRESS LOSS AND DAMAGE

GFDRR on Hydromet US$30. $2 billion

Capacity Building on Climate Finance

Pilot Program for Climate Resilience Cover Page for Project/Program Approval Request. USD 4.8 million 1. Amount (USD): USD 0.

Tajikistan experience in mainstreaming climate resilience into development planning PPCR programmatic approach

Introduction to the Green Climate Fund. Stéphanie CAPDEVILLE, Regional Advisor Africa

Heat THE CLIMATE CHALLENGE FOR CENTRAL ASIA. Turn Down. the. Confronting the New Climate Normal KAZAKHSTAN KYRGYZ REPUBLIC TURKMENISTAN UZBEKISTAN

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities

COMMITTEE ON FORESTRY

Water and Climate Change in Central Asia

Overview of Climate Finance for Adaptation

Cover Page for Project/Program Approval Request. Cover Page for Project/Program Approval Request

ASIAN DEVELOPMENT BANK TAR: INO 32359

1. Country Level Performance

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1

People s Republic of China: Daguhe Groundwater Rehabilitation and Protection

Briefing Note: Checklist on Law and Disaster Risk Reduction IFRC-UNDP Project (updated 22 October 2014)

Guyana s Nationally Determined Contribution. Office of Climate Change Ministry of the Presidency September 8, 2016

Road to 2030 Consultation Paper: Considerations for ADB s New Strategy

National Adaptation Planning for Agriculture sectors

The views expressed herein are those of the consultant and do not necessarily represent those of ADB s

Adaptation in the Post-2012 Climate Regime: Some Perspectives from Asia

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. RY-Second Vocational Training Project

Investment Days 17 December 2013

TECHNICAL ASSISTANCE RAJASTHAN RENEWABLE ENERGY CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

DESIGN DOCUMENT FOR THE PROGRAM ON SCALING-UP RENEWABLE ENERGY IN LOW INCOME COUNTRIES (SREP), A TARGETED PROGRAM UNDER THE STRATEGIC CLIMATE FUND

VALUING NATURAL CAPITAL IN WEALTH ACCOUNTING IN MADAGASCAR

Green Climate Fund. GCF Portfolio 43 projects/programmes with USD 2.2 billion of GCF funding. Strategic pipeline development in land use sector

Identifying and Appraising Adaptation Projects Experiences of NABARD

Technical Assistance Report

Cambodia: Irrigated Agriculture Improvement Project Cofinanced by Project Readiness Improvement Trust Fund

GLOBAL ALLIANCE FOR CLIMATE-SMART AGRICULTURE (GACSA) FRAMEWORK DOCUMENT. Version 01 :: 1 September 2014

Climate Change and Health in Small Island Developing States:

MEMORANDUM OF UNDERSTANDING COOPERATION IN THE FIELD OF CLIMATE CHANGE VULNERABILITY, RISK ASSESSMENT, ADAPTATION AND MITIGATION.

Intended Nationally Determined Contribution Ethiopia September 23-24,2015 Entebbe,Uganda

CRITERIA FOR SELECTING COUNTRY AND REGIONAL PILOTS UNDER THE FOREST INVESTMENT PROGRAM

Public Disclosure Copy

People s Republic of China: Research on Innovative Mechanism for Open Agricultural Investment

ENDING THE CYCLE OF FAMINE IN THE HORN OF AFRICA, RAISING AGRICULTURAL PRODUCTIVITY, AND PROMOTING RURAL DEVELOPMENT IN FOOD INSECURE COUNTRIES

ASIAN DEVELOPMENT BANK SUSTAINABILITY REPORT INVESTING FOR AN ASIA AND THE PACIFIC FREE OF POVERTY

Technical Assistance Report. People s Republic of Bangladesh: Support to Primary Education Development

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT PREPARATORY TECHNICAL ASSISTANCE

FRAMEWORK FOR ECOSYSTEM-BASED ADAPTATION(EBA) AT SUBNATIONAL LEVEL FOR THE GMS- IMPLEMENTATION AND MAINSTREAMING RAJI DHITAL

National Action Plan on Climate Change

Structure for submissions from Parties and organisations on adaptation approaches, strategies, practices and technologies for adaptation

Overall Planning and Preparation Process. BAU Business as Usual NAMA Nationally Appropriate Mitigation Actions

UGANDA Strategic Program for Climate Resilience. Mr. Maikut Chebet PPCR Focal Point, Uganda December 8, 2016

Stakeholder Consultation Workshop Report: Ethiopia, Ghana and Tanzania Identifying and prioritizing constraints and opportunities

GENDER MAINSTREAMING IN THE BUILDING CLIMATE RESILIENCE IN THE PYANJ RIVER BASIN PROJECT

Transcription:

Water Resources Management in the Pyanj River Basin (Additional Financing) - Institutional Development of the State Agency for Hydrometeorology of Tajikistan Tajikistan Asian Development Bank (ADB) 07 June 2017

Project/Programme Title: Water Resources Management in the Pyanj River Basin (Additional Finance) Institutional Development of the State Agency for Hydrometeorology of Tajikistan Country/Region: Tajikistan Accredited Entity: Asian Development Bank National Designated Authority: Mr. K. Ibodzoda, Chairman, Committee on Environmental Protection

GREEN CLIMATE FUND PAGE 1 OF 5 A. Project / Programme Information A.1. Project / programme title A.2. Project or programme A.3. Country (ies) / region A.4. National designated authority(ies) A.5. Accredited entity A.6. Executing entity / beneficiary Water Resources Management in the Pyanj River Basin (Additional Finance) Institutional Development of the State Agency for Hydrometeorology of Tajikistan Project Tajikistan Mr. K. Ibodzoda, Chairman, Committee on Environmental Protection Asian Development Bank Executing Entity: State Agency for Hydrometeorology A.7. Access modality Direct International A.8. Project size category (total investment, million USD) A.9. Mitigation / adaptation focus A.10. Public or private Micro ( 10) Small (10<x 50) Medium (50<x 250) Large (>250) Mitigation Adaptation Cross-cutting public Which of the following targeted results areas does the proposed project/programme address? A.11. Results areas (mark all that apply) Reduced emissions from: Energy access and power generation (E.g. on-grid, micro-grid or off-grid solar, wind, geothermal, etc.) Low emission transport (E.g. high-speed rail, rapid bus system, etc.) Buildings, cities, industries and appliances (E.g. new and retrofitted energy-efficient buildings, energy-efficient equipment for companies and supply chain management, etc.) Forestry and land use (E.g. forest conservation and management, agroforestry, agricultural irrigation, water treatment and management, etc.) Increased resilience of: Most vulnerable people and communities (E.g. mitigation of operational risk associated with climate change diversification of supply sources and supply chain management, relocation of manufacturing facilities and warehouses, etc.) Health and well-being, and food and water security (E.g. climate-resilient crops, efficient irrigation systems, etc.) Infrastructure and built environment (E.g. sea walls, resilient road networks, etc.) Ecosystems and ecosystem services (E.g. ecosystem conservation and management, ecotourism, etc.) A.12. Project / programme life span A.13. Estimated implementation start and end date 20 years Start: Q1 2018 End: Q1 2023

GREEN CLIMATE FUND PAGE 2 OF 5 B. Project/Programme Details The Fund requires the following preliminary information in order to promptly assess the eligibility of project/programme investment. These requirements may vary depending on the nature of the project/programme. Project Objective and Outcome The Project will support the development of the State Agency of Hydrometeorology of Tajikistan (Hydromet) into a sustainable and well-resourced institution, which produces timely and accurate climate and weather analysis and forecasts. The Project outcome will be reduced damage and mortality in Tajikistan from extreme climate change-related weather events. Rationale Tajikistan is one of the wellsprings of Central Asia; the Syr and Amu Rivers, originating in Tajikistan and Kyrgyz Republic and flowing into Turkmenistan, Uzbekistan, and Kazakhstan, comprise 90% of the water resources in the region. It is also is Central Asia s poorest country and among the countries most vulnerable to climate change. Roughly 70% of the population lives in rural areas and rely on agriculture as a primary source of income. Their livelihoods are thus directly dependent on the country s water resources and exposed to the prevailing climatic conditions and weather events. This vulnerability is particularly acute in the districts along the Pyanj River, the primary tributary to the Amu River in the south of the country, which are among the country s poorest and comprise a wide range of geographical and climatic conditions. B.1. Project / programme description (including objectives) These communities already face recurring disasters such as drought, avalanches, landslides, floods, and mudflows. Such disasters are estimated to cost the country approximately 1% of GDP per year. Climate change is expected to exacerbate these adverse events and their impacts. Higher temperatures and changes in precipitation patterns are expected to cause earlier and faster snowmelt and recession of glaciers and a decline in overall water availability. Water stress conditions are likely to become more common, and flooding and landslides are likely to become more frequent and damaging 1. A key institution in support of Tajikistan s climate change and disaster resilience is Hydromet, the country s climate and weather agency. It has a mandate to (i) ensure protection of vital interests of the individual, society and state from hazardous effects, (ii) satisfy the needs of public authorities, sectors of the economy and population for hydrometeorological information as well as information about the state of the environment and its pollution, and (iii) ensure functioning of the state monitoring network and the system for collection, processing and dissemination of hydrometeorological information. This includes providing warnings for extreme climate change-related weather events. The organization is also Tajikistan s focal point for the United National Framework Convention on Climate Change (UNFCCC), representing the country in international climate change conferences and responsible for regular reporting to the UNFCCC. Hydromet has a 90-year history, but suffers many of the common problems facing institutions in post-soviet countries. It is fully financed from the state budget, but due to the country s broader constraints it receives a very limited budget in proportion to its size. As a result, Hydromet s infrastructure and buildings are poor and decaying, staff retention is low due to uncompetitive salaries, and there is insufficient operation and maintenance (O&M) budget. As a result, Hydromet s is hindered in its ability to achieve its public service mandate to warn and protect the public, and to develop as an institution over time. Several recent and ongoing donor technical assistance and investment projects (including that of World Bank and ADB, see Part B.2 below) have improved 1 Punkari et al. 2014. Climate Change and Sustainable Water Management in Central Asia. ADB Central and West Asia Working Paper Series No. 5. Asian Development Bank. Manila.

GREEN CLIMATE FUND PAGE 3 OF 5 Hydromet s capacity in data collection, analysis, and forecasting through technical training and modernization of equipment. However, the sustainability of these interventions is at risk due to Hydromet s abovementioned underlying barriers and institutional weaknesses. Notably, these projects have not sought to address Hydromet s poor infrastructure and buildings, insufficient staff salaries and poor retention. Furthermore, without increased budget each additional purchase of equipment puts added strain on the institution s already stretched O&M budget. As such, the sustainability of these investments is at risk, and Hydromet may not see improvement in the medium-term over the current situation. Project Components The Project is an institutional development of Hydromet, which will seek to (i) overcome underlying barriers and weaknesses that hinder its functioning and growth as a high quality and sustainable institution, and (ii) develop Hydromet s capacity in supporting climate change and disaster resilience in Tajikistan. The Project will focus its capacity building activities towards disaster risk reduction in the vulnerable communities in the Pyanj River basin, but will the institutional development will provide benefits to Hydromet s delivery of its broader services and thus benefit the country as a whole. The Project comprises four components: 1. Transformation of Hydromet into a semi-autonomous government agency able to seek and retain additional entrepreneurial sources of revenue. In its current legal status as State Agency, Hydromet s budget, organizational structure, and salary levels must be approved by Government. During Project implementation, Hydromet s will be given independent legal status within government to allow it to (i) supplement its core state funding with new sources of income 2, and (ii) flexibly reorganize, control their budget, and raise staff salaries to encourage staff retention. A board of directors will be established to provide oversight over Hydromet s management and strategy. 2. Upgrading of the Hydromet campus and associated facilities. The Project will undertake infrastructure investment to upgrade Hydromet s campus and associated facilities. Without this upgrading, Hydromet will be unable to securely install and operate its equipment, and the capacity building programs will not be sustainable. The Government has planned for Hydromet to be relocated from their existing location in Dushanbe to a new modern campus across the city. However the relocation has stalled; Hydromet s prospective new office building remains unfinished for several years due to lack of budget. The Project will complete the main office building and construct associated facilities including laboratory and warehouse. The project will also construct a dormitory building next to the office tower to provide subsidised housing to core Hydromet staff, thereby providing additional staff incentives and ensuring staff can report quickly to work during emergency situations. Under Hydromet s new legal status, it will have sole control and use of the buildings. 3. Institutional development and implementation of business model. Under the Project, Hydromet s strategy, management, and organisation will be restructured in light of its new independent legal status, with the intention of seeking additional entrepreneurial resources. It is anticipated that the Hydromet s supplemental income will arise from (i) rental of office space and facilities including conference room, (ii) sale of fee-based information services, and (iii) consulting assignments. Hydromet s work program, organizational structure, and staffing will be consolidated in line with recommendations from a needs assessment undertaken during feasibility 2 ADB will ensure increased entrepreneurial measures are not offset by decreased core state funding through among others grant covenants.

GREEN CLIMATE FUND PAGE 4 OF 5 study. Training and coaching for management, marketing, and business development will be provided to key staff. 4. Institutional capacity building for improved forecasting and warning of climate change-related extreme weather events. The Project will undertake capacity development for Hydromet comprising (i) improved information dissemination systems including early warning and fee-based services, (ii) improved forecasting of extreme weather event such as hail, frost, and precipitation, and (iii) improved forecasting of flood events. The capacity building will comprise training as well as upgrading of equipment such as ground-based monitoring and radar. The Project is additional finance for ADB s Water Resources Management in the Pyanj River Basin project (2017-2021). This project improves institutional and physical capacities of water resources management (WRM) system in the Pyanj River basin (PRB) of southern Tajikistan, and will: (i) establish a PRB organization, council, and Joint PRB committee, and develop a PRB management plan; (ii) modernize and climate-proof the Chubek Irrigation System (CIS); and (iii) improve farm and water use management capacities. The subject Project requesting GCF funding for Hydromet institutional transformation and capacity development will enhance the outputs with respect to water resource monitoring and management, and climate resilience. B.2. Background information on project/programme sponsor B.3. Market overview B.4. Regulation, taxation and insurance B.5. Implementation arrangements Tajikistan became a member country of ADB in 1998, and since then cumulative lending, grant, and technical assistance to the country for Agriculture, Natural Resources, and Rural Development has totalled approximately $170 million and for Public Sector Management has totalled approximately $200 million. These represent roughly 11% and 14% of ADB s approvals in the country to date. ADB has longstanding experience in Tajikistan in supporting climate change and disaster resilience, notably in the Pyanj River basin. Under the Tajikistan Pilot Program for Climate Resilience funded by the Climate Investment Funds, ADB is currently administering one technical assistance ( Building Capacity for Climate Resilience ) and one investment project ( Building Climate Resilience in the Pyanj River Basin ). Hydromet is an executing agency for the technical assistance, which is developing Hydromet s capacity for modelling climate change and impacts in the country. Hydromet is a State Agency with approximately 800 staff including approximately 300 professional staff. In addition to the abovementioned ADB technical assistance, Hydromet is implementing the World Bank Central Asian Hydromet Modernization Project to improve Hydromet s monitoring and weather forecasting capacity. A Project Management Unit (PMU) has been established within Hydromet, with responsibility for implementing the World Bank project. Not applicable. The government is expected to finance all taxes and duties for the Project (other than those required by the government under specific consulting service or procurement contracts). Consulting firms and contractors to be contracted by Hydromet are expected to purchase the necessary insurance policies as required by the relevant government laws and/or policies. Hydromet will be required to follow all relevant ADB policies including Procurement Guidelines and the Safeguard Policy Statement. Hydromet will be the Executing Agency of the project. A PMU will be established within Hydromet to be responsible for project implementation. The Project will also recruit consultants to support project implementation including capacity building, procurement, construction supervision, and safeguards.

GREEN CLIMATE FUND PAGE 5 OF 5 C. Financing / Cost Information C.1. Description of financial elements of the project / programme Total project financing (a) = (b) + (c) Category Estimated Cost ($) 1. Civil works 6,400,000 2. Equipment 700,000 3. Survey and design 100,000 4. Consulting services 2,000,000 5. Training, seminars, workshops 400,000 6. Staff, admin, and audit 500,000 7. Operation and maintenance 400,000 8. Contingency 500,000 Total 11,000,000 Note: Cost estimate does not include licensing and permits required for implementing and operating the project, applicable taxes, foreign exchange regulations and insurance policies. Detailed information and analysis (including the financial model) will be provided as part of full proposal. Financial Amount Currency Tenor Pricing Instrument 11 million USD ($) C.2. Project financing information (b) Requested GCF amount (i) Senior Loans (ii) Subordinated Loans (iii) Equity (iv) Guarantees (v) Reimbursable grants * (vi) Grants * 6 million USD ($) Government has requested grant funding only for the project. Grant resources available from ADB are limited and insufficient to cover the needed intervention. ( ) years ( ) years ( ) % ( ) % ( ) % IRR Total Requested (i+ii+iii+iv+v+vi) 6 million USD ($) Financial Instrument Amount Currency Name of Institution Seniority (c) Cofinancing Grant 5 million USD ($) ADB pari passu Lead financing institution: ADB

GREEN CLIMATE FUND PAGE 6 OF 5 (d) Covenants (e) Conditions precedent to disbursement Discussion with the government on the covenants will be held in separate during loan negotiations based on project feasibility study and risk assessment results. Discussion with the government on the conditions precedent to disbursement will be held in separate during loan negotiations based on project risk assessment results. D. Expected Performance against Investment Criteria Please explain the potential of the Project/Programme to achieve the Fund s six investment criteria as listed below. D.1. Climate impact potential The Project will support the climate change and disaster resilience of vulnerable communities in the Pyanj River basin and throughout Tajikistan through improved data, analysis, forecasting, and warning of extreme climate change-related weather events. Literature survey indicates that investments in hydrometeorological services offer high benefit to cost ratios. A detailed analysis of project benefits will be undertaken during feasibility study. D.2. Paradigm shift potential D.3. Sustainable development potential The Project will represent a significant paradigm shift in the funding and provision of hydrometeorological services in Tajikistan and Central Asia. These services provide significant but un-priced and thus undervalued benefits, leading to chronic underinvestment by governments. The Project s institutional transformation of Hydromet is thus novel for a country with a substantial legacy of Soviet-era institutions and weak investment climate for entrepreneurs. The model is replicable in other hydrometeorological agencies in other countries in Central Asia, and scalable to a broader array of services from Hydromet including agrometeorology. Economic co-benefits Establishment of well-paying, attractive jobs within Hydromet. Improved productivity and operation in agriculture, water resource management, transport including aviation, and power generation through provision of improved information and forecasts. Social co-benefits Improved health and safety among vulnerable communities. Empowerment of communities through improved information. Facilitation of cross-border collaboration on water resources and hydrometeorological monitoring. D.4. Needs of recipient As described in Part B.1 above: Tajikistan one of most vulnerable countries to climate change. The Government s budgetary support for Hydromet is heavily constrained. Overall institutional capacity of Hydromet is low, and most fundamentally has underlying institutional barriers and weaknesses that prevent it from achieving its mandate and hinder sustainable improvments in institutional capacity. Without the project, Hydromet is unlikely to develop and grow its capacity beyond its current situation, and recent and ongoing donor interventions are unlikely to be sustainable.

GREEN CLIMATE FUND PAGE 7 OF 5 D.5. Country ownership D.6. Effectiveness and efficiency The Tajikistan Nationally Determined Contribution (NDC) to the UNFCCC Paris Agreement prioritizes improvement and modernization of hydrometeorological services as a key climate change adaptation. Institutional capacity building of Hydromet was identified as a priority climate change adaptation investment during ADB s consultation with government and non-governmental (NGO) stakeholders under the ADB technical assistance projects TA8090-TAJ: Building Capacity for Climate Resilience and TA8119-REG:Economics of Climate Change in Central and West Asia. Hydromet will be responsible for the overall project implementation. Hydromet will work with disaster risk management committees and water user associations in the Pyanj River basin area to improve the provision of information. Proposed GCF co-financing ration is 55%. As noted in D.1. above, returns to hydrometeorological investments have been shown to have high benefit to cost ratios. E. Brief Rationale for GCF Involvement and Exit Strategy Without the project, Hydromet is unlikely to develop and grow its capacity beyond its current situation, and recent and ongoing donor interventions are unlikely to be sustainable. The Project is predicated on the climate change vulnerabilities and risks in Tajikistan, and will provide significant benefit to the country s climate change and disaster resilience. The government has requested ADB s support for the Project, but has indicated that it should be financed only with additional grant funds. $5 million has been allocated to the Project from ADB s Asian Development Fund Disaster Risk Reduction Funding, and an additional $6 million is sought from the GCF. The Project will support a sustainable and well-resourced Hydromet, supported by core state funding and supplementary entrepreneurial income, which is capable of fulfilling its mandate and continuing to develop its capacity in the future. Further analysis will be provided in full proposal. F. Risk Analysis A financial management assessment and procurement capacity assessment of Hydromet is underway as part of feasibility study, to identify risks and mitigation measures. The upgrading of the Hydromet campus will take place on existing and permitted government land. There are no substantial environmental and social risks expected. However, a risk assessment will be undertaken during feasibility study, and mitigation measures put in place in line with ADB and country requirements. G. Multi-Stakeholder Engagement Stakeholder consultation will be held as part of feasibility study to inform project design. H. Status of Project/Programme 1) A pre-feasibility study is expected to be completed at this stage. Please provide the report in section J. 2) Please indicate whether a feasibility study and/or environmental and social impact assessment has been conducted for the proposed project/programme: Yes No

GREEN CLIMATE FUND PAGE 8 OF 5 3) Will the proposed project/programme be developed as an extension of a previous project (e.g. subsequent phase), or based on a previous project/programme (e.g. scale up or replication)? Yes No (If yes, please provide an evaluation report of the previous project in section J, if available.) I. Remarks Background study of Hydromet, including an initial (pre-feasibility) concept for institutional transformation of Hydromet is attached. The Report and Recommendations of the President of main project (L3434-TAJ:Water Resources Management of the Pyanj River Basin) is attached. The investment in Hydromet had been envisaged at the time of original project design (see para. 14). J. Supporting Documents for Concept Note Map indicating the location of the project/programme Financial Model Pre-feasibility Study Feasibility Study (if applicable) Environmental and Social Impact Assessment (if applicable) Evaluation Report (if applicable)