Bonnie Doon Grade Separation

Similar documents
ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Factor Potential Effects Mitigation Measures

Transportation Master Plan Introduction

1. Replace Section 6 in A Parking Policy Framework for Calgary (TP017) in its entirety with the contents in Attachment 2.

Chapter 2 Transportation Element Goals, Objectives and Policies

Valley Line LRT. Project Update & Citizen Working Groups Overview Public At Large Recruitment Meeting Citizen Working Group B River Valley

Kathleen Marie Lacey, Chief Comprehensive Planner Boise City Planning and Development Services Department. State Street Memorandum of Understanding

3. STATION SPACING AND SITING GUIDELINES

Frequently Asked Questions Connecting Palo Alto

Environmental Analysis, Chapter 4 Consequences, and Mitigation

King of Prussia Rail Project Frequently Asked Questions - Archive Version: Summer 2018

Markham Centre Transportation Study Update

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

Overview of City of Dallas and DART Interlocal Agreements

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF APRIL 11, 2018

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address.

2.2. The intent of the Surface Transportation Noise Policy is to provide the following: The responsibility for providing noise attenuation.

Federal Way Transit Center to Tacoma Dome Light Rail

11 Joint Development Regulatory Context and Methodology

TSM/TDM (Transit and Roadway Efficiency) Concept - Analysis and Results

Evaluation of Alternatives

Join the Conversation!

Executive Summary October 2017

HAMILTON B LINE LRT EVALUATION OF PHASING SCENARIOS TECHNICAL REPORT

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

SR 710 Environmental Study

12 Evaluation of Alternatives

Consequences of Sprawl

Sound Transit Transit-Oriented Development (TOD) Policy

CHAPTER 5: TRANSPORTATION

Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013

Appendix O Level of Service Standard and Measurements

Appendix F 2008 Travel Demand Modeling

Future Build Alternative Traffic Forecasts and Level of Service Analysis

Livability 2050 Regional Transportation Plan Update. Transportation Policy Board (TPB) August 23, 2018

South Sounder Capital Improvements Program

Traffic Impact Study Guidelines. City of Guelph

407 TRANSITWAY. Planning & Preliminary Design

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 945

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences

Clair-Maltby. Mobility Study Work Plan. Prepared by: BA Group. Transform. Connect. Community.

MONITORING IMPLEMENTATION AND PERFORMANCE

West Seattle and Ballard Link Extensions. Stakeholder Advisory Group March 14, 2018

Supports Item No. 3 T&T Committee Agenda February 17, 2009

ACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Washington Boulevard and Kirkwood Road Special General Land Use Plan (GLUP) Study Plus. Agenda Item #43

Chapter 4: Transportation and Land Use

Lynnwood Link Extension 2013 Draft EIS Comments and Responses. Page 216

CHAPTER 7 EVALUATION OF ALTERNATIVES

RESOLUTION NO

Guidelines for the Submission of a Transportation Study Level 2

Subarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements

TRAFFIC STUDY GUIDELINES

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1

Pottstown Pike Congestion Mitigation Feasibility Study

10. PROJECT DEVELOPMENT, LEADERSHIP, AND OVERSIGHT GUIDELINES

TRANSPORTATION MOBILITY PLAN GUIDELINES

Drainage Servicing Report - Terms of Reference

INTEGRATED MOBILITY PLAN

Town of Tecumseh. Town of Tecumseh Council Chambers June 26, Town of Tecumseh.

Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs)

Revenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015.

6.1 Integrated Land Use and Transportation Planning Approach

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

BAYSHORE MULTI-MODAL FACILITY STUDY

Southwest Corridor Plan Project Update. June 11, 2013

Valparaiso Transit Center

Land Use Amendment in East Shepard Industrial (Ward 12) at multiple addresses, LOC

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

CHAPTER 4. Existing Roadway Conditions. Highway Element. Kanawha County Putnam County

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Recommend to Board. Final Action

3 Documentation of Alternatives

2004 FEASIBILITY STUDY UPDATE

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

City of Brantford Chapter 3 TABLE OF CONTENTS

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

Transit Service Guidelines

I-74 Final Design Request For Proposal

VISION STATEMENT, MISSION STATEMENT, AND GOALS AND OBJECTIVES

Northeast Sector Area Transit Plan. Phase 1: Issues and Opportunities Summary

Cumulative and Secondary Impacts

CHAPTER 3 THE BUILDING BLOCKS POLICIES AND SUPPORTIVE STRATEGIES REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

Chapter 10 Goals, Objectives + Policies

CHAPTER 8 TRANSPORTATION ELEMENT

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017

EXECUTIVE SUMMARY ORGANIZATION OF REPORT

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

CONNECTING LAND USE AND TRANSPORTATION PLANNING THE LINKAGE MODEL FOR METROPOLITAN PLANNING ORGANIZATIONS

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA

Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland

Transcription:

6. 2 Bonnie Doon Grade Separation Recommendation: That the April 18, 2017, Integrated Infrastructure Services report CR_4461, be received for information. Report Summary This report provides information regarding the option of changing a portion of the Valley Line at-grade trackway to an elevated guideway and station. Report Background The Valley Line - Stage 1 project represents the biggest single infrastructure investment in Edmonton s history. The Valley Line will help shape the City through its vision of an urban LRT system by promoting mixed use development along the corridor and encouraging transit ridership, while minimizing negative community impacts. The low-floor system specified for Valley Line is designed to integrate into city streets and neighbourhoods with a reduced infrastructure footprint. This vision of an urban LRT system was developed over a number of years and included considerable public discussion and engagement. It has been incorporated into City policy through the Transportation Master Plan - The Way We Move. As a result, grade separations, overpasses, and separated right-of-ways along the Valley Line have been minimized wherever possible to reduce property acquisition, infrastructure costs, and negative impacts to local neighbourhoods. The planning process for the Valley Line utilized Council-approved LRT Route Planning and Route Evaluation criteria reflecting the City s strategic goals. Planning was further guided by principles to reflect a balanced consideration of integration with the existing system, as well as a shift to a more contemporary philosophy that emphasizes urban integration. The principles were: maximize cost-effectiveness maximize the use of existing transportation corridors provide opportunities for future system expansion increasing transit system effectiveness respect neighbourhoods respect parkland, the river valley, and ravines promote economic development and redevelopment Through recent discussions with Council the principle of maximizing cost-effectiveness ROUTING - Executive Committee DELEGATION - A. Laughlin/G. Boston. April 18, 2017 Integrated Infrastructure Services CR_4461 Page 1 of 9

is still important; however, LRT expansion should balance maximizing costeffectiveness with considerations of the broader transportation network performance, specifically the consideration of separating the LRT from key transportation corridors. To support this evaluation a more fulsome and rigorous process to assess grade separation along LRT corridors will be developed, similar to the LRT Route Planning and Route Evaluation criteria that was approved by Council in December 2008. These criteria can then be applied to the current and future planned corridors. Following the award of the P3 contract to TransEd Partners ( TransEd ) in February 2016, and using the principles above, TransEd and Administration initiated an informal review to examine the potential benefits and implications of an elevated guideway through the Holyrood/Bonnie Doon area of the corridor. TransEd and Administration have examined impacts related to urban LRT design, land and project coordination, project schedule, P3 agreement, and traffic. The limits of a potential elevated guideway are from north of 90 Avenue to south of 82 Avenue, with an elevated station at Bonnie Doon, and eliminates LRT-vehicle interaction at five signalized intersections: 85 Street/83 Street/90 Avenue/Connors Road 83 Street/Future Dermott District Park 83 Street/86 Avenue 83 Street/84 Avenue 83 Street/82 Avenue Urban LRT Design Impacts The elevated guideway option would utilize the same design and construction requirements of the elevated guideway to be constructed at the Davies Station, which is located in an industrial area (75 Street and Wagner Road). Renderings of a proposed design for the Holyrood and Bonnie Doon elevated guideway are presented in Attachment 1. An elevated guideway would have significant aesthetic and urban design impacts. An elevated station, fences, gates, crossing arms, and other associated infrastructure would hinder integration of the Valley Line into the fabric of the neighbourhood. The value of adjacent properties may drop compared to the value with an at-grade design, and demand for redevelopment adjacent to grade-separated LRT may slow due to the additional architectural costs and complexity (e.g. bridge structures to tie in with elevated stations). A change of this nature would trigger a need for renewed stakeholder engagement. To date, Administration has not completed any engagement on this alternative design. Page 2 of 9

Land and Project Coordination Impacts The elevated guideway option would require additional land from Dermott District Park, Bonnie Doon Mall, and six residential properties south of 82 Avenue. The cost estimate includes land acquisition based on market value. Adjacent landowners and developers have started planning for redevelopment along the Valley Line corridor based on the vision for at-grade, urban style, integrated LRT. Land use planning due to a change to elevated guideway from urban at-grade LRT may require additional engagement sessions with adjacent property owners and developers and subsequent revisions to their development plans. Neighbourhood renewal has work planned in Strathearn with the area north of 95 Avenue scheduled for 2017 and the area south of 95 Avenue scheduled for 2018, and in Bonnie Doon, which is scheduled for completion in 2017. These projects have been coordinated on the basis of the current at-grade LRT design. If the LRT was to be grade separated this may require rework in the adjacent areas depending on the final design of the elevated guideway. Project Schedule Impacts The elevated guideway option anticipates a delay to Service Commencement of at minimum six months. It is likely that this delay could be exceeded due to a number of risks including delayed approvals from funding partners or TransEd s lenders, land acquisition delays, additional utility relocation work, additional public engagement requirements, or other unforeseen technical issues. Traffic Impacts Traffic engineering has been an integral part of the design of the Valley Line, linking the integration of traffic, trains, and pedestrians along the urban roadways. To understand the impact of LRT before and after construction, an integrated traffic and LRT model was developed during planning and design of Valley Line for peak hours to represent existing conditions and the opening year. TransEd completed a preliminary traffic assessment comparing LRT at-grade with the elevated guideway option for peak hours representing the opening year and final year of the TransEd operation and maintenance period. This assessment concluded that there are incremental potential benefits to average vehicle delay at intersections in both AM and PM peak periods. The benefits to vehicle travel time predicted by TransEd may be optimistic given the following factors: TransEd traffic analysis considered intersection geometry only and did not consider effects/impacts of the surrounding transportation network. TransEd traffic analysis was based on the same traffic demand for both the LRT at-grade and elevated guideway scenarios, but traffic demand would likely Page 3 of 9

increase if the corridor was less constrained due to LRT being elevated. The results of TransEd s traffic assessment comparison are summarized below: 82 Avenue and 83 Street Intersection Year and Peak Vehicle Delay LRT At-Grade Vehicle Delay LRT Elevated Avg Vehicle Time Saving for Elevated 2020 AM Peak 30-60 20-50 20-30 2050 AM Peak 40-100 20-50 30-40 2020 PM Peak 30-60 20-50 10-20 2050 PM Peak 30-60 30-50 10-20 90 Avenue, Connors Road and 85 Street Intersection Year and Peak Vehicle Delay LRT At-Grade 1 Vehicle Delay LRT Elevated 2 Avg Vehicle Time Saving for Elevated 2020 AM Peak 30-40 0-10 30-40 2050 AM Peak 30-40 0-10 30-40 2020 PM Peak 30-40 0-10 30-40 2050 PM Peak 30-40 0-10 30-40 1 4-legged signalized intersection as per Valley Line design 2 Intersection maintained as 5-legged traffic circle TransEd s report also notes general benefits in traffic safety, LRT reliability, and LRT travel times due to reduction of conflicts with vehicular and pedestrian traffic. TransEd has predicted a reduction in end-to-end LRT travel times (Mill Woods Stop to 102 Street Stop) from 27-30 minutes to 26-29 minutes, which represents a time savings of 1-2 minutes for LRT passengers. Conclusion and Next Steps The option of an elevated LRT guideway in the Holyrood and Bonnie Doon neighbourhoods has the following advantages and disadvantages: Page 4 of 9

Advantages Improves AM vehicle travel time at 83 Street & 82 Avenue intersection by 20-30 seconds on average in 2020 and 30-40 seconds on average in 2050 Improves all directional vehicle travel time at existing Bonnie Doon traffic circle by 30-40 seconds on average in both 2020 and 2050 Reduces end-to-end LRT travel time by 1-2 minutes Disadvantages Order of magnitude cost estimate of $125-220 million Delays LRT opening by at least six months Negative aesthetic and urban design impact Acts as a physical barrier in the community Impacts the potential for adjacent Transit Oriented Development Not consistent with the overall vision for an urban-style LRT May require additional funding approval from the P3 partner Requires additional public engagement At the time that the corridor and concept plan were developed in 2010 and 2011, traffic impacts were understood as being unavoidable due to the placement of the Valley Line within the existing road corridor at-grade. The approved concept plan includes a reduction in vehicle travel lanes on these corridors, and at-grade LRT crossings. While this represents a short-term and localized impact on travel patterns, in the longer term the Valley Line, coupled with improvements to the broader transportation network, is anticipated to accommodate growth while maintaining goods and people movement along appropriate corridors utilizing a range of travel modes. Long term planning has identified network improvements, including upgrades to adjacent arterial road corridors such as 75 Street, are required to support traffic flow through the LRT corridor area. Administration continues to assess potential improvements which will be considered as a part of the capital project planning process. Policy Transportation Master Plan The Way We Move Corporate Outcomes This report supports the corporate outcome that Edmonton is attractive and compact by considering, as a part of Administration s recommendation, how grade separation at Bonnie Doon impacts the physical landscape in that area. This report supports the corporate outcome that the City of Edmonton has sustainable and accessible infrastructure by providing a recommendation in Page 5 of 9

consideration of how grade separation at Bonnie Doon might impact the surrounding community Risk Assessment Risk Element Risk Description Likelihood Impact Risk Scor e Current Mitigations Potential Future Mitigations Public Engageme nt Stakeholders do not support the change; public engagement requires extra time, Service Commencem ent date affected 4 - Likely 3 - Major 1 Mediu m Not yet started Establish a public engagement plan. Approvals TransEd Lenders or other Funding Partners do not support or approve the scope change Unlikely 3 - Major 6 - Early involvement of TransEd Engage with Funding Partners and TransEd Lenders Land If expropriation is required it could be challenged because we have a feasible alternative; extended land acquisition could impact P3 schedule Unlikely 3 - Major 6 - Review and refine land requirements Engage additional land acquisition and legal resources Page 6 of 9

Adjacent Developm ent Adjacent developers are not supportive of change 3 - Possible Moderat e 6 - Evaluate technical aspects and impacts Work closely with developers to facilitate their plans Traffic Impacts Traffic analysis may not be reliable due to the methodology or data used. Unlikely Moderat e 4 - Utilize TransEd resources for traffic assessment Work with Sustainable Developme nt/transport ation Operations on model developmen t. Technical Challenges Additional land or construction scope required to implement the solution 1 - Rare Moderat e Early decision on scope change Work closely with TransEd to confirm technical requirement s Public Engagement The nature of the proposed change is not consistent with the vision and concept for urban LRT along the Valley Line corridor that was shown to the public previously through open houses and public consultation throughout the concept and planning phases. A proposed change of this nature would require an amendment to the approved Concept Plan for the Valley Line. This would trigger new public consultation and engagement, especially for the Holyrood and Bonnie Doon neighbourhoods, and could re-open many of the issues that had been resolved through the Concept Planning process. Budget/Financial Implications The order of magnitude cost estimate for the elevated guideway option is $125 to $220 million and was not considered in the original project budget. Since the project is being delivered as a P3, TransEd is providing some of the funding for construction, which will be paid back over the 30-year operating term through monthly payments. If grade separation is desired, the City has the option to request Page 7 of 9

that TransEd finance the scope change and likewise increase the monthly payments over the 30-year operating period. If the City does not request TransEd to finance the scope change, or if TransEd is not able to obtain financing, the City will be required to finance the additional costs for the scope change. Legal Implications The addition of further grade separations to the Valley Line will require an amendment to Bylaw 15101 - The City of Edmonton Transportation System Bylaw. Amendments to Bylaw 15101 require statutory public hearings and Ministerial approval. The P3 agreement provides the City with the right to request changes to the project but those changes result in cost and schedule impacts which are to be negotiated with TransEd. Metrics, Targets and Outcomes Metrics Targets Outcomes Valley Line Cost Performance Valley Line Schedule Performance Valley Line Scope Performance Cost Performance is measured by the Cost Performance Index (CPI) based on a calculation of the earned value (budgeted cost of work performed) divided by actual cost. The Target CPI is 0.85-1. Schedule Performance is measured by the Schedule Performance Index (SPI) based on a calculation of the earned schedule divided by actual time. The Target SPI is 0.85-1. Scope Performance is a measure of undesirable scope creep. Scope Performance Index (ScPI) is based on a calculation of the total undesirable scope changes divided by total budget at completion. The Target ScPI is less Projects are delivered on budget Projects are delivered on schedule Project scope is well defined and managed. Page 8 of 9

than or equal to 1.05. Transit Ridership and improved Modal Split Traffic Intersection Performance Transit ridership is expected to to grow from opening day (2020) ridership of 28,000 riders per day to long-term (2050) ridership of 49,000 riders per day 82 Ave & 83 St intersection is expected to operate at an E level of service in the AM peak and at an F level of service in the PM peak Edmontonians use public transit and active modes of transportation Providing LRT Service to supplement existing roadway operations will result in a significant increase in the carrying capacity and overall multimodal level of service between Mill Woods and Downtown. Attachment 1. Bonnie Doon Grade Separation Sample Renderings Others Reviewing this Report T. Burge, Chief Financial Officer and Deputy City Manager, Financial and Corporate Services R. G. Klassen, Deputy City Manager, Sustainable Development C. Campbell, Deputy City Manager, Communications and Engagement D. Jones, Deputy City Manager, City Operations Page 9 of 9