City of Rohnert Park When Permits are Required

COMMERCIAL BUILDING HANDBOOK 2015 International Building Code (IBC)

Chapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE

BUILDING CONSTRUCTION

ORDINANCE NO BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF MANHATTAN, KANSAS: Section Adoption of the International Building Code.

Development Services Department. Building Division Handout San Pablo, CA Ph: (510)

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

Uniform Construction Code

EXHIBIT A PERMIT FEE SCHEDULE EFFECTIVE DATE: July 1, 2003

Michigan Truss Design Drawing Submittals at Time of Permit Application Two-Step Market

b. Nonfixed and movable fixtures, cases, racks, counters and partitions not over five (5) feet nine (9) inches high.

BILL NO ORDINANCE NO Sponsored by: Mayor Hennessy

COUNTY OF NEVADA BUILDING DEPARTMENT POLICIES

Homeowners Building Permit Guide

California Residential Code (CRC) Summary of Town of Tiburon Amendments

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Person:

PLEASE FOLLOW INSTRUCTIONS ON PAGE FIVE

TOWN OF FRANCESTOWN BUILDING/CODE ENFORCEMENT 27 MAIN STREET P.O. BOX 5 FRANCESTOWN, NEW HAMPSHIRE Building Permit Application Guide

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

AMENDMENTS TO THE 2006 INTERNATIONAL RESIDENTIAL CODE (Effective August 1, 2010)

Short title. This chapter may be cited as the "Kern County Building Code."

City of Tacoma Planning and Development Services

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

City Of Mendota, Illinois Information Regarding Building Construction, Renovations, and Permitting.

Town of Pawling Residential Building Permit Application

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

City of Eagle Point BUILDING DEPARTMENT FREQUENTLY ASKED QUESTIONS

Citizens Guide to Residential Building Permits

A BILL FOR AN ORDINANCE

Title 15 BUILDINGS AND CONSTRUCTION

Town of Pawling Residential Building Permit Application

RESIDENTIAL BUILDING PERMIT APPLICATION TOWN OF EASTON Easton Valley Road Easton, NH Phone: Revised May 2016

Commercial Remodel Permit

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

City of Centerville Building, Zoning & Code Enforcement Department

ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department. [ NMAC - Rp,

CITY ORDINANCE - CHAPTER 12 Part II. INTERNATIONAL RESIDENTIAL CODE, 2009 (Adopted 12/04/ eff. 01/01/2018)

SUBSTANTIAL IMPROVEMENT

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

REQUIRED RESIDENTIAL PERMITS

Building Permits A Guide for Homeowners

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS

Village of Corrales Planning and Zoning Department

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions

PREFACE. The Erosion and Sediment Control Ordinance and its requirements can be found at:

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

COMMERCIAL PROJECT INFORMATION

KENT COUNTY SUPPLEMENT TO THE INTERNATIONAL BUILDING CODE/2012 INTERNATIONAL RESIDENTIAL CODE/2012

THIS IS NOT A PERMIT DO NOT START CONSTRUCTION. City of Pell City. Residential Building Permit Application

PIKES PEAK REGIONAL BUILDING DEPARTMENT

RESIDENTIAL PROJECT INFORMATION

Elko County Building & Safety Division

CHAPTER 6 INTERNATIONAL RESIDENTIAL CODE

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

BUILDING CODES & DESIGN CRITERIA

BUILDING PERMIT SUBMISSION CHECKLIST NEW SINGLE-FAMILY RESIDENCE NEW TWO-FAMILY RESIDENCE NEW MULTIPLE SINGLE FAMILY (TOWNHOUSE)

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

Town of Grantham, NH Building Permit Application Procedures

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

Single Family Residential Building Permit Questions & Answers

Residential Miscellaneous Permits

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

EXHIBIT A TO ORDINANCE and RESOLUTION

District of Ucluelet Building Permit Guide

OWNER-BUILDER? A HOMEOWNER S GUIDE TO BUILDING PERMITS AND INSPECTIONS FOR PROJECTS IN ARROYO GRANDE, CALIFORNIA

TOWN OF ASHLAND, NEW HAMPSHIRE BUILDING REGULATIONS

City of Galax BUILDING PERMIT APPLICATION

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

Application for Commercial Plan Review and Building Permit. Address:

WHEN DO I NEED A PERMIT? HOW DO I SUBMIT MY APPLICATION? HOW DO I CALCULATE THE FEES?

Delaware Street

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

RESIDENTIAL BUILDING REQUIREMENTS

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE

Application Requirements for obtaining a Building Permit

Residential Building Plans

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Milford, Connecticut Information Regarding Permits

BUILDING CODE ORDINANCE OF BANNOCK COUNTY, IDAHO ORDINANCE NO

CITY OF GLEN COVE Building Department

Westtown Township Building Permit Application Instructions Notes:

meters (16 Inches) Transportation (T)

City of Donnelly. Permit Application Information and Instructions

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

Commercial Submittal Packet

RESIDENTIAL CONSTRUCTION PERMIT FEES

Building Department Permit Application. Part I: General Information

CHAPTER 6 BUILDING REGULATIONS ARTICLE I - BUILDING CODES

Transcription:

City of Colville Building Department The Building Department is responsible for the issuance of permits for commercial and residential construction projects within the city. This responsibility includes routing permit application information to other city departments, plan review and all related field inspections. Besides processing building permits, the Building Department also processes mechanical permits, plumbing permits, fire sprinkler permits, sign permits and miscellaneous construction related permits. Overall, the Building Department s focus is to promote awareness of codes relative to fire safety and life safety and enforce those codes. The department staff is available to answer all your questions Monday through Friday, 8 a.m. to 5 p.m. We are located at 170 S. Oak Street, in City Hall. You can contact us at: Dave Harper, Building Official (509) 684-5096 bldgofcl@colville.wa.us Susan Davis, Administrative Secretary (509) 684-5096 admnsecy@colville.wa.us A building permit gives you legal permission to start construction of a building project in accordance with approved drawings and specifications. Building permits are very beneficial to you and your community. By working with an expert code official, you will benefit from their knowledge of the building codes to ensure your construction project is built right, will be safe, and will last. Safe construction practices help protect you, your family, your friends, and your investment. Be sure to get your local code official involved with your project, because the building department is on your side.

When do I need a building permit? The best way to find out if you need a permit is to call the City of Colville Building Department. The staff is available to serve the public by providing information about safety and understanding of local building codes. Be sure to discuss your plans with the Building Official before you begin construction to determine whether you need a permit. If a permit is not needed, the Building Official will answer your construction questions and provide valuable advice. Permits are usually required for the following: New buildings Additions (bedrooms, bathrooms, family rooms, etc.) Residential work (decks, garages, fireplaces, pools, water heaters, etc.) Renovations (garage conversions, basement furnishings, kitchen expansions, re-roofing, etc.) Plumbing systems HVAC (heating, ventilating and air-conditioning) systems Electrical systems are permitted through the Department of Labor & Industries. They are located at 901 N. Monroe Street, Suite 100, Spokane, WA 99201. Phone: 1-800-509-8847. What are the benefits of having a building permit? Increased value Your home or business is an investment. If your construction project does not comply with the codes adopted by your community, the value of your investment could be reduced. Property insurers may not cover work done without permits and inspections. If you decide to sell a home or building that has had modifications without a permit, you may be required to remove any additions, leave it unoccupied or do costly repairs. Projects A property owner who can show that code requirements were strictly and consistently met, as demonstrated by the Building & Planning Department records, has a strong ally if something happens to trigger a potentially destructive lawsuit. Ensures Safety Your permit also allows the Building Official to protect the public by reducing the potential hazards of unsafe construction and ensuring public health, safety and welfare. By following code guidelines, your completed project will meet minimum Standards of safety and will be less likely to cause injury to you, your family, your friends or future owners. How can I obtain a building permit?

1. Talk to your local Building Official Your Building Official wants your project to be a success and will help you avoid potential problems that could cost you time and money. You will be asked some basic questions (What are you planning to do? Where?), advised of any requirements and, if necessary, referred to other departments for their review. The Building Official will provide you with the resources and information needed for compliance with the applicable building codes. You will then receive an application for a building permit. 2. Submit Application At this stage you will document the who, what, where, when, and how of the job along with any sketches or plans of the proposed work. Separate permits are required for electrical, plumbing, and heating or air-conditioning work. In a brief amount of time, the Building Official will review your plans and determine if your project is in compliance with local requirements. If your plans meet these requirements, a permit is issued. If not, the Building Official may suggest solutions to help correct the problem. 3. Receive Permit Now that you have been approved for a permit, you have legal permission to start construction. A fee, based on the valuation of the job, is collected to cover the cost of the application, the review, and the inspection process. An experienced Building Official is available to you should you have any questions concerning your project. You should consider your Building Official as an ally who will help you make your project a success. 4. Job-site Visits On-site inspections will be required to make certain the work conforms to the permit, local codes, and plans. Again, you will have access to the expertise of the Building Official to help you with questions or concerns regarding the project and how to ward off potentially costly mistakes. The Building Official will let you know approximately how many inspections may be needed for your project. Usually, a one- or two-day notice is needed when requesting inspections. 5. Receive Final Approval The Building Official will provide documentation when construction is complete and code compliance is determined. Building Permits

Application Submittal Requirements In order for an application for a building permit to be considered complete, an application form containing the information described below, together with other documents and fees, needs to be submitted: Identify and describe the work to be covered by the permits for which the application is made. Describe the land on which the proposed work is to be done by legal description, street address, or similar description that will readily identify and locate the proposed work. Indicate the use or occupancy for which the proposed work is intended. State the valuation of any new building or structure or any addition, remodeling or alteration to an existing building. The applicant s signature or the signature of the applicant s authorized agent. Give such other data and information as may be required by the building official. Permit applications for structures and complex projects need to be accompanied by two (2) complete sets of plans, specifications, engineering calculations, diagrams, soil investigation reports, special inspection and structural observation programs and other data as applicable to the particular project. In addition, commercial applications need to include two (2) additional sets of overall site development plan(s) locating the building(s) or structures on the property and detailing the specifics of the building or structures, landscaping, parking, road approach or drainage facilities or any conditions required by the Zoning Ordinance or conditions imposed during a hearing process, or other site improvements being proposed. Where plans are prepared by Washington State registered design professionals, it is required that at a minimum, the cover sheet of the construction drawings

shall include the original signed seal of the Architectural Engineer of record for the project. Other sheets may also require seals. For those projects not categorically exempt from the State Environmental Policy Act (SEPA), a completed Environmental Checklist and fees are required. Where commercial plan review or SEPA fees are required, they shall be paid at the time of application submittal. Rules and Regulations Various codes and ordinances in effect in Colville that relate to development of properties and the construction of buildings or structures are listed below. It should be noted that these are the primary local codes and ordinances that will influence most proposals and that the listing does not necessarily address all federal, state and local requirements. Building and Code Enforcement ~ Ordinance No. 1497 N.S. The 2012 International Building Code, as adopted and amended by the Washington State Building Code Council, including Appendix E, and the 2012 International Existing Building Code as published by the International Code Council, Inc., and the 2009 ANSI A117.1 Accessibility Code. The 2012 International Residential Code, as adopted and amended by the Washington State Building Code Council, including Appendix F and Appendix G, as published by the International Council, Inc., except that Chapters 11 and 25 through 43 of this code are not adopted. The 2012 International Fire Code, as adopted and amended by the Washington State Building Code Council, Inc., as published by the International Code Council, Inc. The 2012 International Energy Conservation Code Part 1, Residential Provisions, and Part 2, Commercial Provisions, as adopted and amended by the Washington State Building Code Council. The 2012 International Mechanical Code, as adopted and amended by the Washington State Building Code Council, as published by the International Code Council, Inc. (includes adoption of the International Fuel Gas Code, NFPA 54 and NFPA 58).

The 2012 edition of the Uniform Plumbing Code, including Appendices A, B and I, as adopted and amended by the Washington State Building Code Council, as published by the International Association of Plumbing and Mechanical Officials; provided that Chapters 12 and 15 of this code are not adopted, provided further that those requirements of the Uniform Plumbing Code related to venting and combustion air of fuel fire appliances as found in Chapter 5 and those portions of the code addressing building sewers are not adopted. The installation requirements for mobile/manufactured homes, factory built homes, commercial structures, commercial coaches, recreational vehicles, and park trailers, as set forth in WAC Sections 296-150C, 296-150F, 296-150I, 296-150M, 296-150P, and 296-150R. In addition, the fire protection systems (number of fire hydrants and their location) will need to be coordinated with city departments. Building Department FAQ s Questions relative to building issues can be complicated. Each situation should be considered in light of its own circumstances. Answers to some of the more Frequently Asked Questions can be found below. Q. I need to know the specifications for building in the City of Colville. A. Building Structural Design in jurisdiction is subject to the following criteria: Roof Snow Load: 40 pounds/square foot (psf) Wind Speed (mph): 85 mph (3-second gust) Seismic Category: B Subject to Damage from: Weathering Frost: Severe Depth Line: 30 inches Termite: None to slight Decay: None to slight Winter Design Temp: -5º F Ice Shield Underlayment Required: No Flood Hazards: Community Panel #5301870001B, Zone C, Effective 06/05/1985 Air Freezing Index: 1331* Mean Annual Temp: 46.2º F *Information taken from the National Climatic Data Center data table Air Freezing Index USA Method (Base 32º Fahrenheit) at www.noaa.gov/fpsf.html.

Q. Do I need a permit? A. The rule of thumb is, if you have to ask, you probably need to secure a permit. Permits are required for any building or structure which is to be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted, or demolished unless a separate permit for each building or structure has been first obtained from this department. Q. What work, if any, is exempt from a permit? A. There are some types of projects which will be exempt from the permit process. They are: 1. One story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 200 square feet. 2. Fences not over 6 feet high. 3. Oil derricks. 4. Retaining walls which are not over 4 feet in height measured from the bottom of the footing to the top of the wall, unless supporting surcharge or impounding Class I, II, or III-A liquids. 5. Water tanks supported directly upon grade if the capacity does not exceed 5,000 gallons and the ratio of height to diameter or width does not exceed 2:1. 6. Platforms, sidewalks and driveways not more than 30 inches above grade and not over any basement or story below and are not part of an accessible route. 7. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. 8. Temporary motion picture, television and theater stage sets and scenery. 9. Prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches deep, do not exceed 5,000 gallons and are installed entirely above ground. 10. Shade cloth structure constructed for nursery or agricultural purposes, not including service systems. 11. Swings and other playground equipment accessory to detached one- and two-family dwellings. 12. Window awnings supported by an exterior wall that do not project more than 54 inches from the exterior wall and do not require additional support of Group R-3 and U Occupancies. 13. Nonfixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches in height. 14. Minor construction and alteration activities to Group M, Division 1 Occupancies and Group R, Division 3 Occupancies, as determined by the

Building Official, which the total valuation, as determined in Section 304(b) or as documented by the applicant to the satisfaction of the Building Official, does not exceed five hundred dollars ($500) in any twelve-month period: Provided, that the construction and/or alteration activity does not affect any structural components, or reduce existing egress, light, air, and ventilation conditions. This exemption does not include electrical, plumbing, or mechanical activities. The permit exemption shall not otherwise exempt the construction or alteration from the substantive standards of the codes enumerated in RCW 19.27.031, as amended and maintained by the State Building Code Council under RCW 19.27.070. Unless otherwise exempted, separate plumbing and mechanical permits will be required for the above exempted items. Exemption from the permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any laws or ordinances of this jurisdiction. Q. I m planning on building a deck in my back yard off the rear of my house and about six feet above the ground. Do I need to have plans and a permit? A. Yes, the code requires that a deck located more than thirty inches (30 ) above the surrounding grade obtain a building permit. Q. We re painting the exterior of our house. Is a permit required? A. No, a permit is not required for cosmetic improvements such as painting, carpets or other types of flooring material. Q. The trap on my kitchen sink is leaking. Do I need to get a permit to replace it? A. No, a permit is generally required when the work involves moving a fixture, installing new fixtures or installing drain lines or water supply piping. Q. I bought a new water heater at a local hardware store. Is installing it considered a minor repair? A. No, it is a replacement and requires a permit for the installation. Q. My furnace failed and since it was Saturday, I bought a new one exactly like the old one and installed it myself. The weather was cold and my

family needed the heat. Am I going to be fined for installing the furnace without a permit? A. Emergency repairs or replacements can be done immediately. However, if a permit would normally be required then you should obtain the permit as soon after the repair or replacement is accomplished to confirm by inspection that the installation meets the code requirements for the repair or replacement. The Building Department is here to provide a service and we can best provide that service by being available to answer your questions. Call (509) 684-5096 with any question or concern. If we don t have an answer, we will find the answer and call you back. City of Colville Building & Planning Department 170 S. Oak Street Colville, WA 99114 Phone: (509) 684-5096 / 684-5097 Fax: (509) 684-5030