APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site Granite Mining Project, M.L.No. 204/91 2. Location/ site (GPS Co-ordinates) Latitude - 26 47 8.87 N to 26 47 23.35 N Longitude - 76 7 22.69 E to 76 7 26.26 E 3. Size of the Mining Lease (Hectare) 1.0 ha 4. Capacity of Mining Lease (TPA) 1,23,480 TPA ( ROM) 5. Period of Mining Lease 20 year 6. Expected cost of the project 15 Lacs. 7. Contact Information M/s Jamwai Mata Mines C/o Smt. Neha Singh S.M. 77 New Sanganer Byepass Scheme, New Sanganer Road, Jaipur E mail id-jamuvaimata@outlook.com (II) Environmental Sensitivity S.No. Areas Distance in kilometer/ Details 1. Distance of project site from Jhir Railway Station (Approx. 7.0 km. in N direction) nearest rail or road bridge over Jaipur International Airport (Approx. 32.0 km. in the concerned River, Rivulet, WNW direction) Nallah etc. 2. Distance from infrastructural facilities:- Railway line. Jhir Railway Station (Approx. 7.0 km. in N direction
National Highway State Highway Major District Road Any Other Road Electric transmission line pole or tower Canal or check dam or reservoirs or lake or ponds In-take for drinking water pump house Intake for Irrigation canal pumps 3. Areas protected under international conventions, national or legislation for their ecological, landcaps, cultural or other related value. 4. Areas which are important or sensitive for ecological reasons- Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. 5. Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, over wintering, migration. NH-11 Approx-8.0 Kms Towards N. SH-24 Approx-1.0 Kms Towards WSW Jaipur ( Approx 32.0 Km in WNW ) Bassi Approx 9.0 Km towards NW. Not applicable Not applicable Lal Garh RF Approx-1.0 Kms Towards SE Banskho PF Approx-4.0 Kms Towards NNE PF Approx-12.0 Kms Towards NNW Kharli Nadi Approx-12.0 Kms Towards SW
6. Inland, coastal, marine or underground waters 7. State, National boundaries 8. Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas 9. Defense installations 10. Densely populated or built- up area, distance from nearest human habitation 11. Areas occupied by sensitive man-made lands uses (hospitals, schools, places of worship, community facilities) 12. Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 13. Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) 14. Areas susceptible to natural hazard which could cause the project to present environmental standards problems No such area is located within the 15 km radius of the mining lease area. NH-11 Approx-8.0 Kms Towards N SH-24 Approx-1.0 Kms Towards WSW Chitori Approx-6.0 Kms Towards ENE Tunga Approx-4.0 Kms Towards SSE All facilities are available in Tunga (Approx-4.0 Kms Towards SSE ) The area is not subjected to the pollution or environmental damage. No such areas observed The study area lies in Seismic Zone II. However natural hazards due to earthquakes are not anticipated to be a major environmental issue.
(earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) 15. Is proposed mining site located No cover or near fissure / fracture for ground water recharge 16. Whether the proposal involves approval or clearance under the following Regulation or Acts, namely:- All three are not applicable (a) The Forest (Conservation) Act, 1980; (b) The Wildlife (Protection)Act, 1972; (c) The Coastal Regulation Zone Notification, 2011. If yes, details of the same and their status to be given. 17. Forest land involved (hectares) 18. Whether there is any litigation No litigation pending against the project. pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders or directions of the Court, if any, and its relevance with the proposed
project. (Signature of Project Proponent Along with name and address)