Application of Accelerated Bridge Construction for Local Agencies

Similar documents
Accelerated Bridge Construction (ABC) National Status

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge

Accelerated and Innovative Bridge Construction In Washington State

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

RESILIENT INFRASTRUCTURE June 1 4, 2016

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

Accelerated Bridge Construction Award

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Get In, Get Out, Stay Out!

Accelerated Bridge Construction Research, Design and Practice

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC

Experiences and Practices: Bridge Moves. Presentation Outline

An Overview of the SIBC Process and Projects. Presented By: Rebecca Nix, SE Michael Arens, SE Michael Baker International February 2015

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

Fairfax Bridge Rehabilitation Program - Bridge Preventive Maintenance Program. January 29, 2014

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No

Jeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C

BRIDGE CONSTRUCTION APPROACHES

Every Day Counts Market Ready Options

Oatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No MO MMO T C

MODULAR STEEL SUPERSTRUCTURES FOR ACCELERATED BRIDGE CONSTRUCTION - IOWA DOT CASE STUDIES

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

ABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017

American Society of Civil Engineers

Grade Separation Systems. Single-Span Rail Bridge Construction Procedure. An innovation from art engineering inc.

The FHWA Long-Term Bridge Performance Program

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

Review of Plans and Specs from a Constructability Perspective

CASE STUDY. Amish Sawmill Bridge: An Innovative Steel Solution for Short Span Bridge Design

New Development in Accelerated Bridge Design and Construction in WA

Contractor Experience with Precast Bridge Elements in Utah. Eric Wells. Granite Construction

Conceptual Design Report

Cost Implications of Rapid Renewal Projects

Accelerated Bridge Construction in USA

Precast Concrete Pavement (R05)

Automated Machine Guidance

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

Boeing North Bridge in Washington State

Opens Possibilities by Kevin Harper, California Department of Transportation

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

7 Bridges in 74 Days. NC 12 Detour

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Russell Street Design STPU M 8105(8) UPN

SOUTH MEDFORD INTERCHANGE BRIDGES

I-70 over SR 121 Bridge Slide Construction and Engineering

West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation

PRECAST CONCRETE GIRDER ERECTION

ACCELERATED BRIDGE CONSTRUCTION IN NEW ZEALAND THE DESIGN PROCEDURE

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

Construction Coordination & Management Planning MassDOT-Highway/MBTA. 495/MetroWest Partnership Briefing July 11, 2018

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

Economical Design / Case Studies

Lessons Learned Meeting Notes

PUBLIC INFORMATION MEETING June 24, 2015

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction

ABC Technology and Steel Bridges

I-94 Advanced Bridge Replacement

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No:

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1

Carpinteria Avenue Bridge Replacement Project Description Introduction

Short Span Steel Bridges

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE

COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland

2009 Domestic Scan of Accelerated Construction Practices

ABC MODULAR BRIDGE DEMONSTRATION PROJECT DESIGN AND CONSTRUCTION

ABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future. Nevada Department of Transportation

Michael Lewis Director, Rhode Island Department of Transportation

In Service Replacement of Box Girder Bottom Slab

STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE

Presenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer

Maryland Transportation Authority (MDTA)

STRUCTURAL CONCRETE - LIGHTWEIGHT

March 24, 2015; 11:00am-noon (MST)

Ironton Russell Bridge Project

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation

Ironton Russell Bridge Project

SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE

Ironton Russell Bridge Project

Railway Bridge: Design and Detailing for Construction

ACCELERATED BRIDGE CONSTRUCTION: TECHNIQUES. Kevin Pruski TxDOT Bridge Division 2018 Transportation Planning Conference

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Contract Administration Section

Transcription:

Application of Accelerated Bridge Construction for Local Agencies APWA Public Works Conference November 9, 2017 Dorie Mellon Senior Bridge Engineer, Caltrans Matt Randall Senior Engineer, County of Placer

www.fhwa.dot.gov/innovation/stic/ Accelerated deployment of innovation that meets customers needs and increase efficiency of project delivery Accelerated Bridge Construction Workgroup: Gary Antonucci - Moffatt & Nichol/ACEC Dorie Mellon - Caltrans - Structure Policy & Innovation Ryan Moore - City of Sacramento Linda Newton - Caltrans - Local Assistance Matt Randall - Placer County

Accelerated Bridge Construction (ABC) ABC uses the most efficient combination of innovative planning, design, materials and construction to significantly reduce construction related impacts by reducing the number of onsite construction days and/or minimizing traffic disruption. Minimize Construction Impacts Project Goals & Constraints 3

FHWA Every Day Counts (EDC) FHWA set of initiatives to deploy innovation aimed at: Shorten the project delivery process Enhanced roadway safety Reduced congestion Improve environmental sustainability

Elements of a Bridge from Foundation to Superstructure ABUTMENT SUPERSTRUCTURE Bent 2 Bent 3 COLUMN BENT CAP Bent 4 Abutment 1 PILING FOOTING Abutment 5 A bridge is a structure that spans an opening greater than 20 feet.

Conventional Construction Falsework TYP FW SYSTEM

Conventional Construction Reinforcing Steel (Rebar)

Conventional Construction Cast-in-Place Concrete

ABC Methods Prefabricated Large Bridge Move Slide-In Launch

ABC Prefabricated Bridge Elements & Systems Bridge elements are manufactured at an off site facility and assembled at the project location

Ultra-high Performance Concrete (UHPC) connections for prefabricated bridge elements PROPERTIES Strong Flexible Durable Excellent Bonding Self Consolidating ADVANTAGES Robust connections Simplified construction Better long term performance 11

Slide-In Bridge Construction The new bridge is constructed next to the old bridge and then slid into place overnight or during off peak hours Nevada I-15 Bridge Hartford I-91 Bridge Replacement, Vermont

Large Bridge Move Self Propelled Modular Transporters Bridges or large portions of bridges are built off site and moved in to place with self propelled modular transporters (SPMT s) Space Shuttle SPMT move through downtown LA I-215 Highgrove Underpass San Bernardino County 4500 South Bridge, Utah 2007

ABC Incremental Launching Bridge superstructure is assembled at one end of the bridge and launched across to the other end of the bridge.

Pfeiffer Canyon Bridge Launch

ABC Advantage - Time Minimize construction impacts by reducing the amount of construction time. Traffic impacts reduced from years to months and from months to days. Saving time while minimizing headaches for motorists.

ABC Advantage - Safety (Fewer Construction Days = Increased Safety) ABC technologies help improve motorist and worker safety by shortening lane restrictions and by performing construction away from traffic. Each year approximately 600 fatal crashes occur in USA work zones. On average 1000 CT vehicles are struck each year.

ABC Advantage - Mobility Conventional construction typically leads to heavy congestion and long travel delays ABC dramatically reduces mobility impacts Minimize Lane closures Duration of onsite construction activities Need for detours Realizes savings in user costs to the public Local businesses Transportation of goods Air quality Noise

ABC Advantage - Constructability Less sensitive to weather conditions More likely to deliver single season construction Effectively addresses unique and challenging site conditions

ABC Advantage - Environment Reduced Environmental Impact Reduced construction time allows scheduling around crucial times for plant growth and animal life. Eliminating falsework keeps construction activities out of the stream. Conduct construction activities offsite Reduce wetland mitigation

Cost Considerations ABC can be the most cost effective means of construction when considering total project cost. Maintenance of traffic Project Administration Environmental Compliance Lowered vertical profile Environmental Mitigation 21

Case Study: MassDot Fast14 Replaced 14 bridges in 10 weekend closures along Interstate 93 through the city of Medford Project was completed on budget and ahead of schedule The I-93 Fast 14 project proves that America is ready, willing, and able to dream big and build big. US Secretary of Transportation Ray LaHood

Case Study: Nevada I-15 Bridge ABC saved $10M and 6 months COST MORE, SAVE MORE As stated by the contractor who proposed the use of ABC: "We knew that ABC would cost more, but we could make up the difference saving on lane rentals, building the crossovers, limiting excavation and reducing time and overhead."

San Mateo Bridge Replacement Project 2016 Caltrain track parallel to Route 82 Replace four 100 year old structures over 4 weekends Bridges assembled near the site and moved into place by SPMT during 16 hour track closure

Poplar Avenue Improve vertical clearance and road width below bridge Original Structure 1903 Replacement Structure 2016

Construction Sequencing Beyond the bridge (typ) Existing Abutment Stage I Activities Stage Complete Stage II IV Activities VI Activities Structure Stage Stage III V Activities Track is raised to final elevation prior to 1. Install Build Roll Install in roll-out crash new bridge. beams temporary and restraining roll-in (not supporting shown) system system where 1. 2. change Lift over temporary (by PCJPB). restraining system. excavation (prior Finish Remove and to backfilling roll change existing out central taking over). bents behind span. and the supporting abutmens system. with soilcement Complete mix. existing roadworks place. 2. All Construct Crane utilities lift existing abutment relocated. end walls. spans. 2. 3. Complete Remove footing track. including side walks. construction. 3. 4. Place precast Excavate Complete Open to road behind pile trackwork. traffic abutment installation. seat units and secure in the for walls. optimum use. place. 4. Disengage Test run. existing bridge. 4. 5. Backfill Open to behind traffic. the abutments with soil-cement mix.

Bridge Construction Substructure Strengthening Prior to Track Shutdown Bridge Demolition 5 AM Installation of Abutments 11 AM SPMT bridge move 2 PM 16 Hour Construction Window

ABC in California

Programmatic Approach ABC Evaluated for Every Bridge Project ABC Decision Making Guidance (2015) Construction Time Environmental User Costs and Delays Site Conditions Risk Management Economy of Scale The evaluation of ABC is triggered during preliminary project development when adjustments to funding, right of way requirements and the environmental document can be accomplished with relative ease.

Working Days (ABC vs Conventional) Construction Completion Time (CCT): Estimate of the number of total onsite construction working days required for the bridge construction work. Construction Impact Time (CIT): Estimate of the number of working days that a construction activity will affect a specified impact such as traffic or environmental constraints.

Choosing the right ABC solution Early consideration of ABC Identify project goals, constraints, and resources Communicate with stakeholders Do the benefits balance the costs? Improving delivery through Innovation

ABC Single Span Programmed Projects Hardscrabble Creek Slide-In Craig Creek Prefabricated North Fork Mill Creek Prefabricated ABC methods delivered: One season construction Significantly reduced environmental impact Minimal traffic disruption Well suited to streambed restoration

Fort Goff Creek Bridge Siskiyou County Route 96 Streambed Restoration Project GOALS: Restore Fish Passage Single Season Construction Reduce Environmental Impacts Quality Concrete in Remote Location SOLUTION: Prefabricated Design

Fort Goff Construction: Prefabricated Bridge 02-SIS-096-56.0 Bridge No. 02-0200

Hardscrabble Creek Lateral Slide 2008 1-DN-199 GOAL: Reduce Construction to a Single Season Reduce Traffic Disruption from months to hours SOLUTION: Lateral Slide WHAT SUPPORTED THE SOLUTION?: Room Adjacent to Route for Construction Additional $ for Bridge Construction

Caltrans Multi-Span Precast Pilot Projects 2 projects under construction D4 Laurel Street OC D6 Route 46/99 Sep Focus on connections & constructability Gather lessons learned Improve efficiency & reduce risk Educate project development staff, construction staff and contractors 36

Laurel Street Overcrossing Pilot Project Vallejo CA, Route 780 Precast columns and cap were set in 3 hours under full night closure of 780

Laurel Street Overcrossing Pilot Project Vallejo CA, Route 780 Rapid strength concrete deck. Concrete cures in 4 hours Precast Wide Flange Girders set in 2 nights

UHPC connection mock up

ABC Impact on Cost CAPITAL & SUPPORT COSTS Maintenance of traffic Wetland mitigation Storm water Contract administration Construction inspection Temporary right of way USER COSTS Traffic delays Access to essential services Impact to local business Air quality Noise Transportation of goods

User Cost Consideration CONVENTIONAL METHODS ABC METHODS Lengthy detours and traffic delays Long term frontage business impacts Reduced detours and delays Reduced time of business impact Negative public perception of lengthy construction duration Positive perception of speedy construction Environmental impacts over multiple seasons of construction Reduced environmental impacts due to single season construction (plants, animals, air quality, water quality, noise)

Full Road Closure for Work Zone Operations Accelerate construction Cost savings (MOT, more efficient work area) Improve quality (full access to roadway results in higher standards in efficiency and quality) Enhance safety (separate construction activities from through traffic) Increase favorable public sentiment

Public Outreach for ABC BENEFITS Traffic avoidance Increased awareness Decreasing impatient behavior Building trust Project buy-in METHODS Signage Project specific websites Local newspaper & radio Social media* Mobile apps* Town hall meetings*

Keys to ABC success Embrace Innovation Define project goals Early consideration Total Project Cost Identify user cost benefits Include in initial HBP application when appropriate Communicate with stakeholders

ABC Resources FHWA Center for Accelerating Innovation: https://www.fhwa.dot.gov/innovation/ Every Day Counts STIC Network AID Demonstration Resources FHWA ABC: https://www.fhwa.dot.gov/innovation/everydaycounts/edc- 2/abc.cfm ABC University Transportation Center: https://abc-utc.fiu.edu/ STIC ABC: http://www.dot.ca.gov/hq/localprograms/hbrr99/hbrr99a.htm Coming Soon: AASHTO Guide Specification for ABC