2nd Commuter Rail Munich A large scale project for Munich and the surrounding region

Similar documents
Full-text paper MAGLEV REQUIREMENTS FOR TUNNELS

SEMMERING BASE TUNNEL LOGISTIC CHALLENGES

Risk Management of the Restoration of Shanghai Metro Line 4

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

COMPETITIVENESS OF PIPE-JACKING TUNNEL LININGS

Public Transport in Greater Munich

ENLARGEMENT OF THE METRO STATION MARIEN- PLATZ A COMPLEX TUNNEL PROJECT BENEATH THE MUNICH CITY HALL

UIC Digital Technology and Railway Security Workshop Washington 4-5 May 2016 THREATS AND CONSTRAINTS CRIME SCENE CYBERSPACE AT DB GROUP

On track for the future focused on customers and the environment. Annual Results Press Conference Deutsche Bahn AG DB Mobility Logistics AG

Building the present, creating the future

Mobility and Logistics: Deutsche Bahn

Rowa Customer Day. Interceptor Belgrad. GC Order for Construction Site Logistics

SELECTION OF CONSTRUCTION METHODS IN ROCK TUNNELING

Qatar Rail Doha Metro

Tunnel. Immersed Tunnels

Developments in the Hamburg system and coordination of transport in the Hamburg urban area

Rail-Agenda 21 For Sustainable Development of Deutsche Bahn AG

Urban railway line Wehrhahn route, batch 1 Foundation engineering works Düsseldorf, Germany

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

rapid tunnelling thanks to efficient SePArAtion. Low-impact mechanized tunnelling: Integrated solutions.

Semmering Base Tunnel Large Caverns in Challenging Conditions

Liberalization of the European rail market a success story from the view of the operator?

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY

Deutsche Bahn AG An international mobility and logistics service provider

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

Underground Waste Depositing at Odda, Norway

Senior Geotechnical Ing. Lars Mørk

Preliminary Planning Study. New Railway Line Dresden Prague. Task 2 Route Optimization

Building Information Modeling Lake Constance 5D-Conference. DB Netz AG Heinz Ehrbar Major Projects Management Konstanz 25./26.10.

HUDSON TUNNEL PROJECT

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

INTERNATIONAL DESIGN & CONSTRUCTION

The project. The Follo Line Project is currently the largest transport

Operations at DB Netz: the network control centre Integrate. Dovetail. Connect. DB Netz AG I.NPB 3(N) 18 September 2017

IAC Presentation, August 17, 2017 Ground Movement Impact Assessment. Trevor O Shannessy

LUCOEX Conference Oskarshamn, June F. Chauvet & al. CIGEO/

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

SETTLEMENT PREDICTIONS AND SURVEILLANCE DURING THE ENLARGEMENT OF THE METROSTATION MARIENPLATZ IN MUNICH

NO DIG BERLIN 2015 Symposium and Exhibition March. Paper 5-3. Increasing requirements move boundaries in Pipe Jacking

Hardrock Tunnel Boring Machines

Challenges in designing a complex urban tunnel in Tehran metropolitan (Arash-Esfandiar-Niayesh) Islamic Republic of Iran

Boletín Geotécnico Artículo

Intelligent building creates connections.

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS

Design and construction of NATM underground station tunnel by using the forepoling method in difficult conditions for Athens Metro

TBM rescue projects using shafts and ground freezing

Appendix 2-3. Subway Design Standards and Construction Methods

Prof. Eng. Daniele PEILA

The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump

DESIGN AND CONSTRUCTION OF LARGE LAINZER TUNNEL PROJECT. Josef Daller, ic consulenten, Vienna - Austria

Working together for better quality, more customer focus and greater success 2016 Interim Results Press Conference

Transport development between Helsinki-Tallinn twin cities

Contract No. NE/2016/01 Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site

01 Location. 1,500 m to the Autobahn interchange Schkeuditz. A9 Autobahn PUNCTUM

PROFILE STRABAG TUNNELLING

Prof. Dipl.-Ing. H. Quick Ingenieure und Geologen GmbH provides geotechnical engineering services e. g. for high-rise buildings in Germany and abroad.

Selection of alignment and tunnelling methods in urban settings

Pipe Jacking. Progress is built on ideas.

Trans Mountain Expansion Project Overview

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

DB2020 guiding us toward the future 2014 Interim Results Press Conference. Deutsche Bahn AG DB Mobility Logistics AG Berlin, July 24, 2014

Regional Connector Transit Project

Tunneling Spring semester Tunneling Course Project: Tunneling Project in the Bakony. Exercise 1- Choice of three possible alignments

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

4D grouting pressure model of a bored tunnel in 3D Tunnel

Field trips 7, 14, 15. Brenner Base Tunnel

Civil Engineering Construction Technology

Assessment of Tunnel Stability with Geotechnical Monitoring

From Colonia Jardín to Cuatro Vientos

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

Background Information

Rowa Customer Day. Niagara Falls - Sir Adam Beck. The worldwide largest open TBM with 14.4m diameter creates great challenges for the back

Prof. Dipl.-Ing. Hubert Quick

Introduction to Tunnel Construction

CROSSRAIL INFORMATION PAPER D24 TUNNELLING DURATION AND CONSTRUCTION STRATEGY

4D grouting pressure model PLAXIS

Tunnel Kennedy Santiago de Chile

FinEst Link Feasibility Study Sub-report Alignment alternatives 12/2017

Optimization of Supports in a Road Tunnel through Conglomerate during Construction

STATUS REPORT On the

THÜRNLHOFSTRASSE/ROCHÈGASSE/TREPULKAGASSE VIENNA 11TH DISTRICT AN EXAMPLE FOR SUSTAINABLE BUILDING PROCESS

Microtunnelling. Building infrastructures and power supply systems underground, while life above continues unaffected.

Parking Space Management in Munich Strategies and instruments

FEATURES & BENEFITS OF ARMTEC TUNNEL LINER PLATE

Tunnel Presentation. Tim Smart 27 th June 2016 P1509 (1) HOL/10014/0002

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018

2015 Interim Results Press Conference Deutsche Bahn AG DB Mobility Logistics AG

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

Urban Mobility Systems: Regulation Across Modes - the View of an Operator

Hallandsås Ridge Tunnel, Sweden

Experts in tunneling with Tunnel Boring Machines

Deutsche Bahn International Operations GmbH Delivering excellence in mobility and transport

The Rendsburg High Bridge across the Kiel Canal

Pump storage hydro power plant (PSKW) Reißeck

Large-diameter bored piles and Large-hole drillings Applications

TBM Performance and Development State in Korea

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October

Urban Freight - Reflections and Thoughts from a Public Authorities Perspective

Pushing the Envelope For 100 Years

Transcription:

2nd Commuter Rail Munich A large scale project for Munich and the surrounding region DB Netz AG - Infozentrum 2. Stammstrecke München 20.11.2017 NETLIPSE

Agenda Deutsche Bahn / DB Netz AG The 2nd Commuter Rail Munich The Tunnels New Stations 2

DB Business units Passenger Transport DB Long Distance Rail passenger Transport (GER) DB Regional Rail passenger Transport (GER) DB Arriva Passenger Transport (EU) Transportation and Logistics DB Cargo European rail freight transport DB Schenker Global logistics services Infrastructure DB Netze Track Rail network DB Netze Stations Traffic Stations DB Netze Energy Traction current 3

DB Business units Publicly mandated services Passenger Transport DB Long Distance Rail passenger Transport (GER) DB Regional Rail passenger Transport (GER) DB Arriva Passenger Transport (EU) Transportation and Logistics DB Cargo European rail freight transport DB Schenker Global logistics services Infrastructure DB Netze Track Rail network DB Netze Stations Traffic Stations DB Netze Energy Traction current 4

DB Netz AG Facts and Figures - 2016 Employees: 40.925 Revenue: 5.509 Mio. Euro Marketing of routes and facilities Gross investments: 6.218 Mio. Euro for the preservation and expansion of rail infrastructure Network length: 33.241 km Switches: 66.454 Bridges: 25.119 Tunnels: 708 Signal boxes: 2.776 5

Agenda Deutsche Bahn / DB Netz AG The 2nd Commuter Rail Munich The Tunnels New Stations 6

Overview: The most important large-scale projects in Germany 7 2. Stammstrecke München

Development of habitation patterns in Germany Growing and shrinking cities Quelle: Focus Online, Freitag, 14.08.2015, 08:20, abgerufen am 22.06.2017 http://www.focus.de/immobilien/wohnen/boom-staedte-frankfurt-und-muenchen-wachsen-staerker-als-berlin-boom-staedte-frankfurt-und-muenchen-wachsen-staerker-als-berlin_id_4879488.html 8 2. Stammstrecke München

Munich: Settlement growth prediction 2015 bis 2035 Quelle: München pro 3. Startbahn, 21.06.2017, 11:08, abgerufen am 23.06.2017; https://www.facebook.com/search/top/?q=m%c3%bcnchen%20pro%203.%20startbahn Gleiche Grafik auch hier: tz Online, 19.09.2017, 11:12, abgerufen am 22.06.2017 https://www.tz.de/muenchen/stadt/muenchen-waechst-diese-viertel-sind-besonders-betroffen-8406190.html 9

Commuting flows to Munich About 368.000 daily commuters to Munich Munich is Germany s commuting capital 66 percent by car 14 Prozent by public transport Commuting by public transport is: healthier more eco-friendly Quelle: Merkur Online, Dienstag, 01.08.2017, abgerufen am 13.09.2017 10 2. Stammstrecke München

Passenger numbers from 1972 to today: An increase by 400% Passengers per day 900.000 800.000 700.000 600.000 500.000 400.000 300.000 200.000 100.000 0 + 400% Quelle: MVV 11

The current Munich local train and rapid transit system 12

Rapid Transit System 2026 Current project planning status April 2017 rapid transit system with a 2nd core 13

Project Overview Commuter Rail 2 Key Project Data Hauptbahnhof Marienhof Leuchtenbergring Laim Hauptbahnhof Marienplatz Ostbahnhof Overall track distance: ca. 11 km Tunnel distance: ca. 7 km Max. Depth: ca. 48 m No. of Stations (total): 5 underground: 3 (new) Above ground: 2 (refurbish) Existing commuter rail Communter rail 2 new project Ostbahnhof Laim durchgezogene Linie = oberirdische Trassenführung München Hbf / Central Station Marienhof Future connection Ostbahnhof Munich East Leuchtenbergring 14

Site investigation Western Section of ground conditions Methods Exploration Borings Dynamic Probings Ground Water Monitoring Wells Laboratory Tests Field Tests Literature Research Free groundwater level Fillings Quaternary Main components: gravel / silt Practical Experience Results Geological and Geotechnical Ground Model Tertiary Clay /Silt Hydrogeological Ground Model Characteristic Soil Parameters Tertiary Sand Confined groundwater Parameter Variability 15

Project Overview Commuter Rail 2 Urban integration track & gradient plan innercity section Hauptbahnhof Marienhof Maximilianstrasse - Isar 16

(5) Switchbox Maximiliansanlagen Plan View Bavarian house of parliament Isar River Emergency Exit # 7 Construction Phase 2 Linking point to future connecting lines from the south to then existing commuter rail 2 17

Project Overview Commuter Rail 2 Urban integration track & gradient plan eastern section Isar Max-Weber-Platz Haidenauplatz Ostbahnhof / Leuchtenbergring LH München Sektion 9 S-Bahnhof Leuchtenbergring S-Haltepunkt Ostbahnhof Tief S-Bahnhof Ostbahnhof LH München Gemarkung Berg am Laim 18

Agenda Deutsche Bahn / DB Netz AG The 2nd Commuter Rail Munich The Tunnels New Stations 19

Project Overview Commuter Rail 2 Methods of Construction Shield Drive Construction Pit / cut & cover sections Shotcrete sections Length in km 20

Tunnel Team Tunnel building methods NATM (New Austrian Tunneling Method) Example of excavation in a tunnel under dry condition in soil by scraper and support of bolts and anchors in rockface The immediate outer lining is done by shotcrete and steel girder The average range of progress in these conditions is 3-5m a day depending on size of tunnel 21

Tunnel Team Tunnel building methods TBM Tunnel Boring Machine (TBM, rear end) with all supplementing machines e.g. delivery of tubbing segments to the front, waste and slurry transportation pipes, electrical power, ventilation etc. Head of TBM already inside tunnel portal 22

Tunnel Team Tunnel building methods TBM Worker inside a TBM supervising the installation of tubbing segments into the wall of the just excavated ground Transport vehicle on construction side to deliver tubbing segments the actual delivery the TBM front is done by trains inside the tunnel 23

Agenda Deutsche Bahn / DB Netz AG The 2nd Commuter Rail Munich The Tunnels New Stations 24

The new Munich Central Station Visualization 25 25

The new Munich Central Station Visualization 26

Munich Central Station Current Plan: Plan View Platform hall Underpass U1/U2 Exit Schützenstraße Emergency exit Underpass U4/U5 27

Station design overview Second Cross-City Transit Rapid Train Project Munich Station Sizing platform arrangement 28

Station design overview Second Cross-City Transit Rapid Train Project Munich Station Sizing Track Level 29

Station design overview Second Cross-City Transit Rapid Train Major Project Munich Central station platform egress into main hall 30

Station design overview Second Cross-City Transit Rapid Train Project Munich Central Station main central access hall 31

Station Marienhof Current Plan: Plan View Nationaltheater Frauenkirche Übergang U31/U6 Rathaus 32

Ground Freezing Longitudinal Section of Marienhof Station Monitoring of settlements via water level gauges Schäfflerstraße Grouting area Marienhof Grouting area Monitoring of settlements via water level gauges Buildings along Hofstraße Shield Drive Shotcrete construction (NATM) Construction Pit NATM Shotcrete construction (NATM) Shield Drive Frozen ground a currently investigated option New Austrian Tunneling Method 33

Station design overview Second Cross-City Transit Rapid Train Project Munich Marienhof Station main hall tranfer level 34

Thank you for the attention and your visit. Any Questions? 35

Thank you for your attention If you have further questions please relate to: www.2.stammstrecke-muenchen.de 2sbss@deutschebahn.com Follow us on social media: @2_stammstrecke @2_stammstrecke