Waste-to-Energy Projects on the Maldives Analysis of the Financial Feasibility

Similar documents
Country Analysis Paper. < Maldives>

Decentralised Waste Incineration Plant R.Vandhoo in the North of the Maldives

Maldives: Towards Low- Carbon Growth. Presented by: Akram Waheed, Maldives Energy Authority

City of Sydney Gasification Project

Integrated Waste Management Planning in the Southern Region of Azerbaijan

Effects of climate change on water resource of Maldives EMBASSY OF THE REPUBLIC OF MALDIVES TOKYO, JAPAN

Energy Profile of Maldives

Transformation of Waste Management in Oman ISWA Energy Recovery WG Meeting 25 th May 2016 West Palm Beach, FL.

CSD GAIA Finland OECD. DPSIR THEMA core indicator other DPSIR indicator other core indicator other short term long term

CDIA SAM SON CITY. Pre-feasibility Studies: Sam Son Water Supply and Wastewater Treatment facilities

Waste management in Austria Waste legislation in Austria. Seite

Concentrating solar power in sustainable tourism

EPR The Unintended Consequences Conference on Canadian Stewardship RCA Waste Reduction Conference October 2, 2015

MUNICIPALITY OF VRILISSIA - ATHENS. Waste Management Where we are Steps towards achieving our goals

Relations between waste infrastructure and packaging waste recycling: A case of city of Skopje

Circular Economy Challenges in MENA.

Maldives Rooftop Solar: Lessons from the Sunny Side. World Bank Group February 04, 2019

ı Objective: 45% household waste should be recycled by 2015 in Lyon region

Multilateral Assessment

The Republic of Maldives Renewable Energy Roadmap Final Workshop 17 September 2015, Kurumba Resort, the Maldives

Problem Statements. Past and on Going Efforts

Challenges and future prospects in the sustainable management of waste in the Republic of Moldova

Sanitary Landfills a Key Component of Waste Management in Transition Economies Johann Fellner, David Laner, Jakob Leder & Paul H.

Implementing a Biowaste Strategy in Bulgaria. Walter HAUER Technisches Bür o H A U ER

Development of Integrated Solid Waste Management NAMA in Colombia

EXPERIENCE ON IMPLEMENTATION PROJECT: Pro-poor and sustainable solid waste management in secondary cities and small towns

WORK? WHEN DOES EFW. By James D. Michelsen 44 IFC.ORG/HANDSHAKE

Waste Statistics 2015

Berliner Stadtreinigung (BSR)

Waste Statistics 2016

modern lifestyle and food habit, increase in municipal solid waste. Characteristics of municipal solid waste

ENERGY BALANCE IN THE MALDIVES. Presented by: Fathmath Fizna Yoosuf Engineer Maldives Energy Authority

Land Acquisition and Resettlement Due Diligence Report

Technology for Waste Management/Infrastructure Chiang Mai (Thailand)

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

District heating: learning the hard way. Neil James Environmental Research Institute, UHI

Technical opportunities for the utilisation of biogas in Eastern Europe

Waste and Wealth: Lessons Learned from World Bank Solid Waste Management Projects. Date: March 1 st, 2012

8/4/2015. PHG Energy Means Industrial Grade. Chris Koczaja VP of Engineering and Implementation. Clean Energy Conversion.

SOLID WASTE MANAGEMENT IN SURABAYA. Solid Waste Management Seminar Kitakyushu, September 19-20, 2002

NHSScotland Waste Management Support Programme. Jessica Twemlow Project Manager - NHSScotland Programme of Support

Opportunity of Co-benefits of Climate Change Mitigation Actions from Waste: Experience of Waste Concern in Bangladesh

Country Report on Waste management in Sri Lanka Status, Achievements and Challenges

Project Manager: Hayk N. Tell: GREEN G LTD

, Municipal waste management in Slovakia

Multilateral Assessment: Lithuania

Waste management in Estonia. Taimar Ala Estonian Environmental Board Deputy Director

The Polish National Waste Management Plan 2014

Subsidies for Waterworks and Water Tariff Determination in Japan

ENERGY POLICY UPDATES. MINISTRY OF ENVIRONMENT AND ENERGY Republic of Maldives

TA KHMAO SOLID WASTE MANAGEMENT BASELINE SURVEY

Waste management in the Netherlands. Herman Huisman RWS Environment

Refuse collection performance indicator standings 2013/14 : Family group report. Performance indicator

12 Bizerte-Gabès-Sousse Waste Management

Pipeline of PPP projects in Tunisia 12 Bizerte-Gabès-Sousse Waste Management

Recycling Policy and Activities. Ministry of Environment Republic of Korea

Renewable energy application from waste and biomass: European case study

Structure of Presentation

SOLID WASTE DISPOSAL A BURNING PROBLEM TO BE RESOLVED

Developing an Organics Management Program

WASTE IS VALUE SUSTAINABLE WASTE AND RESOURCE MANAGEMENT IN DENMARK

WASTE IS VALUE SUSTAINABLE WASTE AND RESOURCE MANAGEMENT IN DENMARK

Northern Rockies Regional Municipality Solid Waste Management Plan Stage 2 Fort Nelson, British Columbia

Chris Koczaja Chief Operating Officer

Resource efficiency goals and targets in national policies: Latvia. Erika Lagzdina Senior expert Environmental Protection Department

DECENTRALIZED INTEGRATED ORGANIC WASTE MANAGEMENT FOR URBAN AREAS IN THE DEVELOPING WORLD

Introduction to Integrated Resource Recovery Center (IRRC) Approach

NATIONAL TECHNICAL UNIVERSITY OF ATHENS UNIT OF ENVIRONMENTAL SCIENCE & TECHNOLOGY

RECYCLING TECHNICAL ASSISTANCE Project #548 FINAL REPORT

STRATEGIES FOR SUSTAINABLE WASTE MANAGEMENT Ministerial round table Commission for Sustainable Development (CSD-18) United Nations, New York May 2010

Waste Statistics 2017

Waste Management in Building and Construction Projects

Sustainable Energy Roadmap & Implementation Plan (SERIP) Alexander Ochs Senior Director of Climate and Energy

Status of Waste Management and Future Policy Directions for Renewable Energy From Waste and Biomass in Thailand

Renewable Energy from Organic Household Waste

Reaching 100% Renewable Electricity Generation on Ovalau and Taveuni Islands in Fiji

Director OECD Environment Directorate

Climate Change Mitigation Potential in the Solid Waste Management Sector in Developing countries: Case study in Hanoi city, Vietnam

Municipal waste management in Slovenia

Modern Business Concept of Mixed Municipal Solid Waste (MSW) Treatment

Waste Statistics in the Emairte of Abu Dhabi 2011

Circular Economy: spinning the wheel of fortune. Jorge DIAZ DEL CASTILLO European Commission DG Environment

Session Waste 8: Waste statistics

ECONOMIC AND FINANCIAL ANALYSIS

World Bank Team s response to the concerns of Uzbek Experts communicated through the Ministry of Economy

Contarina Spa Integrated waste management. Marco Mattiello International Relations Manager Alphen aan den Rijn, (The Netherlands) May 26, 2016

PART. The Solid Waste Management Master Plan

THE STUDY ON REGIONAL SOLID WASTE MANAGEMENT FOR ADANA-MERSIN IN THE REPUBLIC OF TURKEY

Meris Zheng, John D. Orbell and Robert J. Fairclough College of Engineering & Science Victoria University Melbourne, Australia

Solid waste management in Papua New Guinea

Developing a Green Waste Management System for Brunei Darussalam - What is required? Jerry Leonard

Reference case for the Region of Western Macedonia

SGS, LLC s mission is to market, build, implement, and operate or sell waste-to-energy systems in the USA and other worldwide locations based on

Green Rural Communities

TOWARDS CARBON NEUTRALITY Developing a Renewable Energy Investment Plan for the Maldives

Recuwatt Conference Recycling and Energy

EU Green Capital Competition 2015

A FEASIBILITY STUDY CARRIED OUT FOR THE ISLAND OF HYDRA GREECE

IMPLICATIONS OF RECYCLING ACTIVITIES ON SUSTAINABILITY OF SOLID WASTE MANAGEMENT IN THAILAND

ATINER's Conference Paper Series ENV Recent Patterns and Trends of Hazardous Waste Management: A Case Study

Transcription:

Waste-to-Energy Projects on the Maldives Analysis of the Financial Feasibility Andreas Bockermann 24th INFORUM Conference Osnabrück, 31.08.2016 Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 1

Photos from Catchment Area 1: Upper North Region or Kulhudhufushi Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 2

Contents 1. Introduction and background 2. General Aspects of a Feasibility Study 3. Possible outputs from waste incineration 4. Aspects of this Feasibility Study 5. Project target: What variant is feasible? 6. Financial Aspects of this Feasibility Study 7. Financial Analysis - Model Overview 8. Waste composition 9. Results for Catchment area 1 10. Results for the three areas 11. Challenges and open questions Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 3

Introduction and background Republic of Maldives Population: about 400 000 inhabitants Amount of islands: 1196 thereof 199 inhabited North-South Dimension: 800 km East-West Dimension: 130 km Capital: Malé with ~150 000 inhabitants on 3 islands on 5.8 km² (~ 2.4 km x 2.4 km) Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 4

Introduction and background Catchment area 1 : Upper North Region Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 5

Introduction and background Name of the project: Preparing Outer Island Waste-to-Energy Projects -Preparation of the Accelerating Sustainable Private Investment in Renewable Energy Projects Client: Ministry of Environment and Energy of the Republic of Maldives Financier of study: World Bank Financier of the proposed project: unknown, maybe World Bank Carried out by Kocks Consult GmbH Financial analysis carried out by Plejades GmbH Economics Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 6

General Aspects of the Feasibility Study Treatment Collection Recycling Social beneftis Logistics/ Transport Technical Feasibility Legal requirement Policy& Strategy ISWM Waste to Energy Environmental Central vs. Decentral Regional aspects Economic Financial & commercial Affordability Technology ISWM = Integrated solid waste management Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 7

Possible outputs from waste incineration Incinerator (grate): heat recovery Water desalination Grate incinerator Cold water production with ARP* Electricity production Electricity production & water desalination *ARP = Adsorption Refrigeration Plant Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 8

Aspects of this Feasibility Study Analysed areas and options Regions / Catchment areas: CA1: Upper North Province with site on Kulhudhuffushi CA2: North Province with site on R.Vandhoo(uninhabited) CA3: South Province with site on Addu City / Hithadhoo Waste-to-energy variants: Sea water withdrawal and desalination plant Adsorption refrigeration plant & distribution Electricity production (Steam boiler, steam engine) Electricity production and thermal desalination Additional necessary components for each option: Collection and transport by trucks and vessels Sanitary landfill Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 9

Project target: What variant is feasible? Variant 0 Variant 1 Variant 2 Variant 3 Variant 4 Incineration + landfill Desalination ARP Electricity Electricity + Desalination Upper North Province / Kulhudhuffushi North Province / R.Vandhoo South Province / Addu City Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 10

Financial Aspects of this Feasibility Study Main Questions: - Are the proposed investments sustainable? - Are the operators viable? - What are the best investments? - Tariffs? Technical inputs: - Catchment area, related population, tourist resorts - Waste quantities per capita and waste compositions - General technologies esp. incineration technologies Financial and technical parts: - Investments - O&M costs - Revenues Prices: All calculations are made in prices of 2014, no price increases Page 11

Financial Analysis - Model Overview Waste amounts Investments Waste management services Replace -ments O&M costs Tariffs Revenues Revenues from energy sales Revenues from recyclables Operational surplus / deficit Financing operational subsidies Financing investments (Grants, loans) Annual Cash flow negative/positive Target: Positive cumulated cash flow In the last years of the forecast Page 12

Assumed waste composition households Waste composition % Trend Organics 70% constant Garden waste 30% Kitchen waste 30% other organics 10% Paper & cardboard 7% constant Glass 3% decrease by 1% Plastics 5% increase in the next years probably by 2-3 % Metals 4% constant Hazardous wastes (including clinical) 2% constant Other (inert & dust)/mixed waste 9% decrease Total 100% Waste per person: Between 0.8 kg and 1.0 kg per day and capita Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 13

Assumed waste composition tourist resorts Waste composition % Trend Organics 74% constant Garden waste 19% Kitchen waste 45% other organics 10% Paper & cardboard 9% constant Glass 5% constant Plastics 5% constant Metals 2% constant Hazardous wastes (including clinical) 0,5% constant Other (inert & dust)/mixed waste 4,5% constant Total 100% Waste in tourist resorts: Between 3.0 kg per day and bed Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 14

Results for Catchment Area 1: Upper North Region Investments: Initial investments and replacements in USD Collection and Transport Bins Lifetime 2015 120 l bins 5 278 123 240 l bins 5 0 660 l bins 5 0 Subtotal, bins 278 123 Island Waste Management Centres (IWMC) IWMC construction 20 700 000 Plastic shredders 10 42 054 Wood Chipper 10 78 221 Can crusher 10 201 860 Glass crusher 10 63 081 Subtotal, Island Waste Management Centres 1 085 216 Transport system Vessels 60'' feet 10 1 000 000 Subtotal, Transport system 1 000 000 Subtotal Collection and Transport 2 363 340 Variant 3 Incinerator Civil works 20 60 000 M&E equipment 12 4 050 000 Subtotal, incinerator 4 110 000 Landfill Civil works 20 620 000 M&E equipment / wheel loader 12 200 000 Vehicles and prefabricated buildings 0 0 Subtotal, landfill 820 000 Electricity production / Steam boiler, steam engine Civil works 20 50 000 M&E equipment 12 2 700 000 Subtotal, Electricity production / Steam boiler, steam engine 2 750 000 Subtotal Variant 3 7 680 000 Total investments and replacements 10 043 340 12 000 000 10 000 000 8 000 000 6 000 000 4 000 000 2 000 000 0 EL production Landfill Incinerator Transport system Island waste management centres 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 Total for the period from 2015 to 2044 19491 050 Residual value in 2044-5034 813 Total minus residual value 14456 237 Bins Page 15

Results for Catchment Area 1: Upper North Region O&M costs // Operation and maintenance costs in USD Collection and transport Bins O&M costs Maintenance, bins 0 Subtotal, bins 0 Island Waste Management Centres (IWMC) Maintenance, IWMC construction 14 000 Maintenance, Plastic shredders 841 Maintenance, Wood Chipper 1 564 Maintenance, Can crusher 4 037 Maintenance, Glass crusher 1 262 Workers, unskilled 675 000 Subtotal, Island Waste Management Centres 696 704 Transport system Maintenance, Vessels 60'' feet 30 000 Labour, captain 9 375 Labour, workers 68 750 Fuel 199 219 Subtotal, Transport system 307 344 Subtotal Collection and Transport 1 004 048 Incinerator Civil works 600 M&E equipment 81 000 Workers, skilled 25 000 Workers, unskilled 21 875 Subtotal, incinerator 128 475 Landfill Maintenance of civil works 6 200 Maintenance of M&E equipment 4 000 Maintenance of vehicles and buildings 0 Fuel 25 565 Subtotal, landfill 35 765 Electricity production / Steam boiler, steam engine Maintenance of civil works 500 Maintenance of M&E equipment 54 000 Electricity 284 705 Chemicals 5 940 Subtotal, Electricity production / Steam boiler, steam engine 345 145 Subtotal Variant 3 509 385 Total operation and maintenance costs 1 513 433 EL production; 345 145 Landfill; 35 765 Incinerator; 128 475 Transport system; 307 344 Bins; 0 Total annual O&M costs: 1.5 million USD per year fuel for transport: 0.2 million USD Island waste management centres; 696 704 Page 16

Results for Catchment Area 1: Upper North Region Revenues in USD Revenues 2025 Paper & cardboards 14 364 Plastics 9 819 Metals 32 004 Electricity sales 566 160 CDM / GHG emission reduction 136 091 Total revenues before tariffs 758 437 Tariffs 2 060 681 Total revenues 2 819 118 3000000 2500000 2000000 1500000 1000000 Tariffs CDM / GHG emission reduction Electricity sales Metals Plastics Paper & cardboards 500 000 0 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 Total O&M costs in 2025: 1.51 million USD Total revenues before tariffs in 2015 0.77 million USD Revenues from tariffs in 2015 2.06 million USD Operational surplus But still need for financing Initial investments and replacements Page 17

Results for Catchment Area 1: Upper North Region Tariffs and affordability Tariff per capita (domestic): about 27 USD per year Fees per bed in tourists resorts: about 270 USD per bed Reason: One bed produces three times more waste than a domestic person People who can afford holidays on the Maldives have also the affordability to pay about 1 USD per night for a waste management system in their holiday area Affordability of the domestic population: Tariff of 27 USD per year is about 0.3% of the GDP per head affordable Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 18

Results for Catchment Area 1: Upper North Region Cash Flow Cash flow statement can be calculated Loan conditions: 3%, grace period 3 years, total 18 years Annual interim financing for cash shortages allowed 6 000 000 4 000 000 Result: 2 000 000 Cash surplus (+)/ deficit (-) (before interim financing) Proposed investment 0 2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 Cumulative Cash Flow (including interim financing) project is financially -2 000 000 feasible -4 000 000-6 000 000-8 000 000 Page 19

Results for the three catchment areas Variant 0 Variant 1 Variant 2 Variant 3 Variant 4 Other variant Incineration + landfill Desalination Adsorption Refrigeration Plant Electricity Electricity + Desalination Other variant CA1: Upper North Province / Kulhudhuffushi financially feasible* proposed / financially feasible CA2: North Province / R.Vandhoo proposed / financially feasible CA3: South Province / Addu City * if pipes system is financed by the customers financially feasible proposed CA3: Waste quantity is (currently) not sufficient for incineration better sorting and composting + rehabilitation of the existing landfill Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 20

Challenges Modelling challenges In the engineering world there exists population growth Minor changes of waste amounts and compositions Growing population has no impacts to O&M costs Other challenges / points for discussion Feasibility analysis of a steam-boot driven with waste as energy input for the steam engine for waste collection from island to island Why no import taxes for packaging? Especially for very small countries this seems to be reasonable. Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 21

Questions Thank you for your attention! Any Questions? Waste-to Energy Projects on the Maldives Analysis of the Financial Feasibility Page 22