Quality Manual Revision: C Effective: 03/01/10

Similar documents
Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

QUALITY SYSTEM MANUAL

Machined Integrations, LLC

Brumund Foundry Inc.

ISO 9001:2000 Revision G

25 D.L. Martin Drive Mercersburg, PA (717)

Quality Manual ISO 9001:2008 ISO 9001:2015

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

ISO9001 QUALITY POLICY MANUAL

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

AS 9100 Rev C Quality Systems Manual AS-050C-QM

ISO9001:2008. Quality Manual. Hyundai Heavy Industries South Huron Drive Santa Ana, CA USA. Quality Manual QM001 Revision A Page 1

Quality Assurance Manual, Revision F Page 1 of 20

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

Odyssey Electronics, Inc Fairlane Livonia, MI 48150

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

UPGRADE ASSESSMENT CHECKLIST

Quality Commitment. Quality Management System Manual

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

ISO 9001:2015. Quality Management System. Manual

BELDEN QUALITY SYSTEM OVERVIEW

Awareness to ISO 9001:2000

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

OPERATIONS MANUAL ISO 9001 Quality Management System

0. 0 TABLE OF CONTENTS

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Texas International Oilfield Tools, Ltd.

CORPORATE QUALITY MANUAL

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

SUPPLIER SURVEY FORM Instructions

4. Quality Management System 4.1 GENERAL REQUIREMENTS

Continental Steel & Tube Co. Quality Manual

INTERNATIONAL STANDARD

UR Startup Inc. ISO Audit Checklist. conducted for. Conducted on (Date and Time) 02 Aug :06 PM. Inspected by Andy Dion

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

CAPITAL AVIONICS, INC. Quality Manual

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Quality System Manual - Section 00

1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY

Quality Manual. AARD Spring & Stamping Quality Manual

Medical QMS Quality Manual

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

Railroad Friction Products Corporation

ISO 9001:2000 The International Quality Management Business System

Quality Systems Manual Rev. NC Issued July 9 / 2018

ISO 9001:2008 Quality Management System QMS Manual

Quality Management System Manual

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

Eagle Machining, Inc.

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

Sensor Scientific, Inc.

PRINTED COPY IS NOT CONTROLLED

Beaver Machine. Quality Manual

Quality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

Quality System Manual

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Quality Assurance Policy and Procedures

UNCONTROLLED DOCUMENT

RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS

SUPPLIER QUALITY SYSTEM SURVEY

QUALITY POLICY MANUAL

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

Reliance Aerospace Solutions

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc.

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

Quality Manual. Manasota Optics, Inc & 1749 Northgate Boulevard Sarasota, FL Issue # 7 dated 05/10/2018

QUALITY MANUAL. This document defines the requirements, processes, structure and documentation for the Teledyne DGO Quality Management System.

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

FO-5 PR-1, FO-1,2 PR-1 EM-6 PR-1, FE-1, NA-1 FO-10 FO-7, EM-2 EM-2. ISO Environmental Management Systems - Specification Yes.

Webster - Hoff Corporation. Quality Manual

QHSEM. Quality, Environmental & Occupational Health and Safety Manual

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

PRODUCTS AND SERVICES:

The Skyworks Quality Management System strives to:

Reference Paragraphs. Appendix B AQS Auditor Handbook

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005

IBS Electronics, Inc.

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM

CERTIFICATE OF REGISTRATION

INTERNATIONAL STANDARD

Everest Engineering Works ISO REVISION DATE ISSUE

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

Transcription:

TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL 4.1 4 DOCUMENTATION REQUIREMENTS 4.2 4 CONTROL OF DOCUMENTS 4.3 5 CONTROL OF RECORDS 4.4 5 MANAGEMENT RESPONSIBILITY 5.0 5 MANAGEMENT COMMITMENT 5.1 5 CUSTOMER FOCUS 5.2 6 QUALITY POLICY 5.3 6 QUALITY PLANNING 5.4 6 RESPONSIBILITY, AUTHORITY AND COMMUNICATION 5.5 6-7 MANAGEMENT REVIEW 5.6 7-8 RESOURCE MANAGEMENT 6.0 8 PROVISION OF RESOURCES 6.1 8 HUMAN RESOURCES 6.2 8 INFRASTRUCTURE 6.3 8 WORK ENVIRONMENT 6.4 8 PRODUCT REALIZATION 7.0 9 PLANNING OF PRODUCT REALIZATION 7.1 9 CUSTOMER PROCESSES 7.2 9-10 DESIGN CONTROL Not Applicable See Section 2.2 7.3 10 PURCHASING 7.4 10 PRODUCTION CONTROL 7.5 11-12 CONTROL OF MONITORING AND MEASURING EQUIPMENT 7.6 12 MEASUREMENT, ANALYSIS AND IMPROVEMENT 8.0 12 GENERAL 8.1 12 MONITORING AND MEASUREMENT 8.2 12-13 CONTROL OF NON-CONFORMING PRODUCT 8.3 13 ANALYSIS OF DATA 8.4 13 IMPROVEMENT 8.5 13-14 Controlled Copy- Do not duplicate Page 1 of 15

1.0 INTRODUCTION We provide contract manufacturing services relating to medical, hard disc drive, automotive, consumer electronics and similar related industries. 1.1 APPROVALS This Quality Manual represents our management policies. Management requires and directs their departments, associates, managers and contractors to comply with the policies and requirements stipulated in this document with diligence and willful attention. Steve Gasparrelli-President Bill Stout- Quality Director (Management Representative) 1.2 AMENDMENT RECORD The Management Representative will process all authorized changes into the official distribution copies and ensure that all obsolete copies are withdrawn from use and disposed of to prevent unintentional usage. Release Date: 6/04/08 Revision Section(s) Affected Description of Changes New Replaces 4.2.3 A NC Added permanent retention to records. Revision: B Release Date: 8/01/08 Section(s) Affected Description of Changes 3.0 Replaced Corporate Policy (non-value added) with Left Intentionally Blank statement to keep QAM numbering consistent with ISO. 4.2.3 Added documents of Internal & External Origin to further clarify. 5.6.1, 8.5.2 & 8.5.3 Added Justification for non-action will be documented statement 7.1 Added Risk Management covered by OP 5.1 to further clarify. 8.2.1 Added Customer Feedback per Op 7.2 to further clarify. 8.5.1 Added Feedback to further clarify. 4.2.2 Added Figure 1 reference & Figure 1 to final page. 5.2 Added converting industry to Quality Policy lead in statement. Revision: C Release Date: 03/01/10 Section(s) Affected Description of Changes Various Changed ISO 9001:2000 to ISO 9001:2008 throughout 2.0, 4.1, 5.5.2, 6.1, 7.4.2 Added statutory &/or regulatory in alignment with ISO 9001:2008 4.2.2 Changed wording from defines to outlines 5.5.2 & 5.5.3 Mandated that MR must be member of Management per ISO 9001:2008 & listed Quality Director as MR 7.1 Simplified the Risk Management statement. 7.5 & 7.6 Changed Measurement Devices to Equipment in alignment with ISO 9001:2008 1.1 Revised COO title to President Controlled Copy- Do not duplicate Page 2 of 15

2.0 SCOPE This Quality Manual was developed in accordance with ISO 9001:2008 and ISO 13485:2003 and is relevant to our organization, Customer, statutory and regulatory requirements. The objectives of this manual are to provide our company personnel and Customers with a single source of information regarding our policies for assuring and controlling product quality, maintaining the effectiveness of the Quality Management System and the continual improvement of the Quality Management System. 2.1 EXCLUSIONS Requirements of the ISO 9001:2008 and ISO 13485:2003 standards that do not apply and are excluded from the scope of our Quality Management System are: SECTION 7.3- DESIGN AND/OR DEVELOPMENT DESIGN CONTROLS We do not design or develop products. Our Customers specify product characteristics. SECTION 7.5 & 7.5.1.2.3 - SERVICING We do not service products. Section 7.5.1.2.2 INSTALLATION ACTIVITIES We do not install products. Section 7.5.1.3 REQUIREMENTS FOR STERILE MEDICAL DEVICES We do not sterilize products. Section 7.5.3.2.2 & 8.2.4.2 REQUIREMENTS FOR IMPLANTABLE MEDICAL DEVICES We do not provide implantable medical devices. SECTION 7.5.2- VALIDATION OF PROCESSES FOR PRODUCTION AND SERVICE PROVISION We have no processes that subsequent monitoring or measurement cannot verify resulting output. 3.0 THIS SECTION LEFT INTENTIONALLY BLANK Controlled Copy- Do not duplicate Page 3 of 15

4.0 QUALITY MANAGEMENT SYSTEM 4.1 GENERAL Our Quality Management System is documented per ISO 9001:2008, ISO 13485:2003 and our own stated policies to ensure that products provided meet or exceed Customer requirements, statutory and regulatory requirements. 4.2 DOCUMENTATION 4.2.1 The Quality Management System consists of 4 levels: Level 1 - Quality Manual Level 2 - Operational Procedures Level 3 - Work Instructions and Forms Level 4 Records Level 1 - QUALITY MANUAL Our policies with regards to the requirements of ISO 9001:2008 and ISO 13485:2003. Level 2 - OPERATIONAL PROCEDURES Established to ensure the effective planning, operation and control of processes defined in the Quality Manual. Level 3 - WORK INSTRUCTIONS AND FORMS Detailed instructions as to how specific tasks defined in Operational Procedures are performed. Level 4 - RECORDS Capture information or pertinent data resulting from the realization of Operational Procedures or Work Instructions. 4.2.2 QUALITY MANUAL This Quality Manual outlines our Quality Management System. Details of and justification for exclusions are defined in Section 2.1. Sections were numbered to correspond with the sections of ISO 9001:2008 and ISO 13485:2003. The sequence and interaction of processes is illustrated in Figure 1. Controlled Copy- Do not duplicate Page 4 of 15

4.2.3 CONTROL OF DOCUMENTS Documents of internal & external origin required for the Quality Management System are controlled as defined in OP 4.1- Document and Data Control. Documents are: Reviewed for adequacy and completeness and approved prior to issue Updated, re-reviewed and re-approved prior to issue by the same authorizations and approvals as the original Legible, readily identifiable and retrievable Identified as to the current revision status of each document to preclude the unintended use of obsolete documents Readily available to personnel Permanently maintained in the Paperless File system Promptly removed from all points of issue or use when they become obsolete Controlled as Reference Only when retained for the purposes of legal and/or knowledge-preservation 4.2.4 CONTROL OF RECORDS Records prepared for or required by the Quality Management System that provide evidence of conformity to Customer requirements and effectiveness of the Quality Management System are legible, readily identifiable and retrievable. The methodology to be used and the personnel responsible for the identification, storage, protection, retrieval and disposition of Records are defined in OP 4.2- Control of Records. 5.0 MANAGEMENT RESPONSIBILITY 5.1 MANAGEMENT COMMITMENT The Management Team is committed to the development, maintenance and continual improvement of the effectiveness of Quality Management System. To reinforce this commitment, Management will ensure that: The importance of meeting Customer, statutory and regulatory requirements as applicable is effectively and consistently communicated throughout the organization The quality policy continues to remain consistent with organizational policies Objectives are identified for Quality Management System processes and where required Management review of the Quality Management System are conducted All necessary resources to implement, maintain and improve the Quality Management System processes are made available 5.2 CUSTOMER FOCUS Management ensures that Customer requirements are identified and satisfied through the implementation of the Quality Management System. Controlled Copy- Do not duplicate Page 5 of 15

5.3 QUALITY POLICY We are dedicated to achieving Customer satisfaction and attaining market leadership in the converting industry. Towards that end we are committed to the following Quality Policy: We will Monitor and Strive to Improve: Customer Satisfaction Our Quality Management System 5.4 PLANNING 5.4.1 OBJECTIVES Objectives are established for each Quality Management System process and are consistent with the Quality Policy as defined in OP 5.1- Quality Planning. 5.4.2 QUALITY MANAGEMENT SYSTEM PLANNING Management ensures that the planning of the Quality Management System is carried out and that objectives are achieved as defined in OP 5.2- Management Review. Changes to the Quality Management System are reviewed and approved by the Management Team to ensure Quality Management System integrity is maintained. 5.5 RESPONSIBILITY, AUTHORITY AND COMMUNICATION 5.5.1 RESPONSIBILITY AND AUTHORITY The Organizational Chart defines the reporting structure of functional units. Responsibility and authority for Quality Management System processes is defined in each Operational Procedure and each Process Diagram. 5.5.2 MANAGEMENT REPRESENTATIVE The Management Representative must be a member of Management. The Quality Director is the Management Representative and has responsibility and authority to: Ensure the establishment, implementation and maintenance of the processes needed for the Quality Management System Report to top management on the performance of the Quality Management System including needs for improvement Promote awareness of Customer, statutory & regulatory requirements throughout the organization Controlled Copy- Do not duplicate Page 6 of 15

5.5.3 INTERNAL COMMUNICATION The Management Representative is responsible for ensuring that the effectiveness of the Quality Management System processes and accomplishment towards objectives are properly communicated to the organization through team briefings, departmental meetings, postings, quality training sessions and any other methods as required. 5.6 MANAGEMENT REVIEW 5.6.1 GENERAL The Management Team reviews the Quality Management System to ensure its continuing suitability, adequacy and effectiveness. These reviews include a review of the Quality Policy. The methodology to be used to review the Quality Management System and the personnel who make up the Management Team are defined in OP 5.2 Management Review. Justification for non-action will be documented as applicable. 5.6.2 REVIEW INPUT Inputs to Management Reviews will include the following sources of information: Audit data (internal and external) Customer feedback Process performance data Product performance data Supplier performance data Preventive and corrective action data Previous Management Review data Changes that could affect the Quality Management System Potential opportunities for improvement New or revised statutory or regulatory requirements 5.6.3 REVIEW OUTPUT Outputs from Management Reviews will be documented in Management Review Minutes and will include decisions made and actions taken related to: Maintain/improve the effectiveness of the Quality Management System Objective generation and/or revision Improvement of product/processes related to Customer requirements Determination and allocation of additional resource needs Controlled Copy- Do not duplicate Page 7 of 15

6.0 RESOURCE MANAGEMENT 6.1 PROVISION OF RESOURCES The Management Team provides, evaluates and monitors the resources needed to: Implement, maintain the effectiveness of and continually improve the Quality Management System Enhance Customer satisfaction by meeting Customer, statutory and regulatory requirements Methodologies and responsibility for the provision of resources is defined in OP 6.1 Personnel Competency, OP 6.2- Preventive Maintenance and OP 7.1- Product Planning. 6.2 HUMAN RESOURCES 6.2.1 GENERAL We select Personnel on the basis of appropriate education, training, skills and experience, as individually applicable. 6.2.2 COMPETENCY, AWARENESS AND TRAINING The competency needs for personnel are defined in Job Descriptions. Employees are evaluated to determine competency. Identified gaps will be identified and corrected. Methodologies and responsibility for identifying competency gaps and coordinating training for personnel are defined in OP 6.1- Personnel Competency. 6.3 INFRASTRUCTURE The Management Team determines, provides, reviews and maintains infrastructure as required to ensure effective operations as defined in OP 5.2- Management Review. 6.4 WORK ENVIRONMENT Work environment requirements are determined as defined in OP 7.2- Customer Processes and OP 7.1- Product Planning. Work environments are controlled to ensure effective operations as defined in OP 6.2- Preventive Maintenance and OP 7.5- Production Control. 7.0 PRODUCT REALIZATION 7.1 PRODUCT PLANNING Processes are planned to ensure product conformance throughout the manufacturing cycle. The methodology to be used and the personnel responsible for product planning are defined in OP 7.1 Product Planning. Risk management activities are defined in OP 5.1- Quality Planning. Controlled Copy- Do not duplicate Page 8 of 15

7.2 CUSTOMER PROCESSES 7.2.1 DETERMINATION OF PRODUCT REQUIREMENTS Upon receipt of a Customer's request for quotation, Customer requirements will be determined as defined in OP 7.2- Customer Processes with consideration given to: Customer-specific product requirements Requirements for delivery and post-delivery activities Product requirements not specified by the Customer but, considered essential for intended or specified use, where known What process development activities are involved If any statutory or regulatory requirements would apply What personnel, materials, costs and facilities are required to perform the work What lead time is necessary to ensure on-time delivery That we have the ability to meet the requirements specified Any additional requirement determined relevant 7.2.2 REVIEW OF PRODUCT REQUIREMENTS Customer Request for Quotes/ Orders are evaluated and reviewed as defined in OP 7.2- Customer Processes to determine: That product requirements are defined That no differences exist between the quote and the order received 7.2.2.1 CONTRACT OR ORDER AMENDMENTS Changes to orders initiated internally or by Customers are reviewed and approved as defined in OP 7.2- Customer Processes. Customers will be advised of any cost or schedule impact and documented approval of these changes from the Customer will be obtained prior to acceptance and implementation. 7.2.3 CUSTOMER COMMUNICATION The identification of requirements for communication with Customers is defined in OP 7.2- Customer Processes relating to: Product information Inquiries, contracts or order handling, including amendments Customer feedback, including Customer complaints Advisory notices (as applicable). 7.3 DESIGN AND DEVELOPMENT Not applicable. We do not design products. See Section 2.1 for exclusion statement. Controlled Copy- Do not duplicate Page 9 of 15

7.4 PURCHASING 7.4.1 PURCHASING PROCESS Purchasing activities are conducted and controlled as defined in OP 7.4- Purchasing. The type and extent of controls exercised over Suppliers and purchased products is dependent upon the effect of the purchased product on subsequent processes, or on the final deliverable to the Customer as defined in OP 7.4- Purchasing. 7.4.1.1 EVALUATION AND SELECTION OF SUPPLIERS Suppliers are selected based on their ability to provide products and/or services to specified requirements. The methodology to be used and the personnel responsible for evaluating and selecting Suppliers is defined in OP 7.4- Purchasing. 7.4.2 PURCHASING INFORMATION Procurement documents for raw material, equipment, parts or services are generated, reviewed and issued as defined in OP 7.4- Purchasing and include or reference any or all of the following as applicable: Requirements for approval of product, processes, personnel or equipment Quality Management System, Customer, statutory and/or regulatory requirements Traceability requirements as applicable Amendments to procurement documents are processed and reviewed in the same manner as the original document. 7.4.3 VERIFICATION OF PURCHASED PRODUCT All procured material and products are verified at receipt and evidence of this verification is as defined in OP 7.4- Purchasing. Controlled Copy- Do not duplicate Page 10 of 15

7.5 PRODUCTION AND SERVICE PROVISION 7.5.1 PRODUCTION CONTROL Production processes are developed as defined in OP 7.1- Product Planning and include information pertaining to product characteristics and acceptance criteria. Production processes are controlled per OP 7.5- Production Control including: Process equipment is maintained as defined in OP 6.2 Preventive Maintenance Valid, calibrated measuring equipment are used to verify production processes and products as defined in OP 7.6- Measuring Equipment. Work in progress is monitored as defined in OP 8.4- Product Measurement Products are inspected as defined in OP 7.5- Production Control Products are inspected and tested during manufacture and prior release as defined in OP 8.4 Product Measurement Product delivery and post-delivery activities is performed and monitored in accordance with OP 7.2- Customer Processes and OP 7.5 Production Control 7.5 & 7.5.1.2.2 Not applicable. We do not service products. 7.5.1.3 Not applicable. We do not sterilize products. See Section 2.1 for exclusion statements. 7.5.2 VALIDATION OF PROCESSES FOR PRODUCTION AND SERVICE PROVISION Not applicable. We have no processes that subsequent monitoring or measurement cannot verify resulting output. See Section 2.1 for exclusion statement. 7.5.3 IDENTIFICATION AND TRACEABILITY Product status, identification and traceability of all products are maintained throughout product realization as defined in OP 7.5 Production Control. 7.5.3.2.2 Not applicable. We do not provide implantable medical devices. See Section 2.1 for exclusion statement. 7.5.4 CUSTOMER PROPERTY Customer furnished property/materials are: Examined for completeness, identification, transit damage and identified as Customer property as defined in OP 7.4 Purchasing Handled and protected in the same manner as internally owned property/material as defined in OP 7.5- Production Control and any applicable contract requirements Inspected in the same manner as internally purchased materials Brought to the immediate attention of the Customer for disposition as defined in OP 8.5 Nonconforming Material Control Controlled Copy- Do not duplicate Page 11 of 15

7.5.5 PRESERVATION OF PRODUCT Purchased product are identified, handled, packaged, stored and protected as defined in OP 7.4 Purchasing. Manufactured products are identified, handled, packaged, stored and protected as defined in OP 7.5 Production Control. 7.6 CONTROL OF MEASURING EQUIPMENT Measuring equipment used to determine product conformity are calibrated and controlled as defined in OP 7.6 Measuring Equipment. 8.0 MEASUREMENT, ANALYSIS AND IMPROVEMENT 8.1 GENERAL Activities to assure product conformity, Quality Management System conformity, Customer Satisfaction and the continual improvement of the effectiveness of the Quality Management System are defined within this section of this manual. 8.2 MONITORING AND MEASUREMENT 8.2.1 CUSTOMER SATISFACTION Customer Satisfaction levels are measured and monitored to identify areas for improvement and to determine that Customer requirements have been met as defined in OP 8.1 Customer Satisfaction. Customer feedback is managed as a Customer Process as outlined in section 7.2.3 and as defined in OP 7.2 Customer Processes. Customer satisfaction reports are distributed, reviewed and analyzed during management reviews as defined in OP 5.2 Management Review. 8.2.2 INTERNAL AUDITS Internal auditing of each Quality Management System process is conducted annually at a minimum as defined within OP 8.2 Internal Audits to determine: The effectiveness and continued suitability of the Quality Management System If the Quality Management System conforms to planned arrangements 8.2.3 MONITORING AND MEASUREMENT OF PROCESSES The definition, sequence and interaction of the processes of our Quality Management System are defined in this Quality Manual and in the Operational Procedures. The methodology to be used and the personnel responsible for the monitoring and measurement of processes will be in accordance with OP 8.3 Process Measurement. Corrective action will be taken for processes that are not meeting objectives as defined in OP 8.6 Corrective and Preventive Action. Controlled Copy- Do not duplicate Page 12 of 15

8.2.4 MONITORING AND MEASUREMENT OF PRODUCT Product monitoring, measuring, testing and verification activities required by contract and essential to ensure product conformance are conducted as defined in OP 8.4 Product Measurement. 8.2.4.2 Not applicable. We do not provide implantable medical devices. See Section 2.1 for exclusion statement. 8.3 CONTROL OF NONCONFORMING MATERIAL Materials that do not conform to requirements will be identified as nonconforming and controlled to prevent unintended use or delivery as defined in OP 8.5 Nonconforming Material Control. 8.3.1 REVIEW AND DISPOSITION OF NONCONFORMING PRODUCT As defined in OP 8.5 Nonconforming Material Control: Nonconforming product is dispositioned as rework, scrap, return to vendor or submit to Customer for concession Nonconformances requiring rework are verified and/or retested according to the disposition provided once work has been completed Customers will be notified immediately if a nonconformance is detected and/or suspected after delivery. Disposition will be as directed by the Customer 8.4 ANALYSIS OF DATA Data relating to the performance of processes, products and objectives will be collected as defined in OP 8.3 Process Measurement. Data collected will be reviewed and analyzed as defined in OP 5.2- Management Review. 8.5 IMPROVEMENT 8.5.1 CONTINUAL IMPROVEMENT The Management Team will expend efforts to continually improve the effectiveness of the Quality Management System as defined in OP 5.2 Management Review. Processing, review and implementation of Public Health Advisory Notices and/or regulatory standards when/if applicable is defined in OP 8.7- Advisory Notices. Customer complaints/ feedback unrelated to products will be investigated and addressed as applicable as defined in OP 7.2 Customer Processes and OP 8.6 Corrective and Preventive Action as applicable. Customer Complaints related to defective product will be processed as defined in OP 7.2 Customer Processes, OP 8.5 Nonconforming Material Control and OP 8.6 Corrective and Preventive Action as applicable. Controlled Copy- Do not duplicate Page 13 of 15

8.5.2 CORRECTIVE ACTION Nonconformances and conditions adverse to quality will be investigated in order to: Determine the root cause of the nonconformity Evaluate the need for action to prevent recurrence Determine and implement required corrective action Record and review results of action taken to ensure resolution was achieved The methods to be used and the personnel responsible for determining the steps required for corrective action is defined in OP 8.6 Corrective and Preventive Action. Justification for non-action will be documented as applicable. 8.5.3 PREVENTIVE ACTIONS Potential nonconformities are investigated in order to: Determine the root cause of the potential nonconformity Evaluate the need for action to prevent occurrence Determine and implement required preventive action Record and review results of action taken to ensure risk was nullified The methods to be used and the personnel responsible for determining the steps required for preventive action is defined in OP 8.6 Corrective and Preventive Action. Justification for non-action will be documented as applicable. Controlled Copy- Do not duplicate Page 14 of 15

Controlled Copy- Do not duplicate Page 15 of 15 Quality Manual Revision: C Effective: 03/01/10