PRINCE2 - Quality Management Strategy

Similar documents
PRINCE2 - Configuration Management Strategy

PRINCE2 - Project Initiation Documentation

PRINCE2 - Product Description

PRINCE2 - Plan. Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Plan template

PRINCE2 - Highlight Report

PRINCE2 - Project Brief

PRINCE2 - End Stage Report

PRINCE2 - End Project Report

When the template is complete, the whole Configuration Management Strategy document can be printed and approved.

Quality Manual ISO 9001:2015 Quality Management System

Quality Manual ISO 9001:2015 Quality Management System

PPMP 20010: Executing and Closing Projects Lecture 7 Project Audit

Supplier Audit Checklist. System & Process Compliance Auditing

CENTRE (Common Enterprise Resource)

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Sampler For the PMBOK Guide 5 th Edition. Summary Edition For the PMBOK Guide Fourth Edition

When the template is complete, the whole Plan can be printed and approved.

ISO 9001:2015 GAP ANALYSIS CHECKLIST

Standards Development and Modification

Annual Surveillance Audit Report

Chapter 2: Project Methodologies and Processes

ISO 13485:2016 The Final Countdown

INTERNATIONAL STANDARD ON AUDITING 402 AUDIT CONSIDERATIONS RELATING TO ENTITIES USING SERVICE ORGANIZATIONS CONTENTS

9001:2015, ISO 14001:2015 & ISO

SFHGEN23 - SQA Code HD45 04 Monitor your own work practices

CONFIGURATION MANAGEMENT PLAN TEMPLATE

ISO 9001:2015. Quality Manual Template.

INTEGRATING ISO 9000 METHODOLOGIES WITH PROJECT QUALITY MANAGEMENT

SAFETY ASSESSMENTS FOR LOCAL TRANSPORTATION FACILITIES IN NEW YORK STATE

COSVR709 - SQA Unit Code H6AR 04 Control work against agreed quality standards

PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Enwon (Australia) Pty Ltd

Quality Management. Fundamentals of Project Management For the Acting PM. Jonathan Blake, PMP. NYS Forum Project Management Workgroup.

When the template is complete, the whole Work Package document can be printed and approved. Saving the Work Package document under its own name

SharePoint. The next eqms solution. Shaun Pitt

Software Project & Risk Management Courses Offered by The Westfall Team

Retail & Foodservice Sustainability Charter Version 4

17/12/1437. Lecture. Project Scope Management. Lecture 4. Project Management Knowledge Areas Section 3 Chapter 5. Project Scope Management.

Control of Internal Auditing

APPENDIX A - CAO-A-1307

This document is to be applied from January 2003; prior to this date refer to the set of documents covered by and procedures

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Project Quality Management

NATO REQUIREMENTS FOR DELIVERABLE QUALITY PLANS

Quality Assurance Manual Sample Company

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

Feasibility Analysis Workbook

ISO 9001 Auditing Practices Group. Aligning the QMS with the achievement of organizational and business success

IMPORTANCE OF AUDITING ISO 9001: 2015

RELATIONSHIP CLIENT IMPROVEMENT LEADERSHIP PROCESSES INFORMATION PEOPLE

INTRODUCTION ULYSSES INVESTIGATION (RCA) MODULE

Project Management based on the Project Management book of knowledge

To control the design and development of new products. This procedure applies to new product as well as changes and improvements of existing product.

Centerwide System Level Work Instruction

NEPCon Impartiality Policy

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Supplier Quality Assurance Requirements

What is SQA? Software Quality Assurance. Quality Concepts. Quality Concept (cont.)

Connoisseur Solutions Project Scope Management

RISQS Audit Protocol. Safe Work planning. Document no.: RISQS-AP-003. Safe Work Planning

AUDIT COMMITTEE REPORTING: TRENDS & BEST PRACTICES Timothy Etoori Head of Internal Audit UGAFODE Microfinance

ISO 9000 Solutions, Inc. Free Download

Competence as a primary tool in the safety toolkit

Risk Based Testing. -Why we need RBT? -Types of risks -Managing risks -Methods of evaluation & risk analysis -Costs and benefits

Implementation Guide 2000

Validation Planning SOP

The Components of the SW Quality Assurance System - Overview. 08/09/2006 SE7161 Software Quality Assurance Slide 1

When the template is complete, the Highlight Report document can be printed and approved. Saving the Highlight Report document under its own name

3.2 Direction, Management, Implementation and Review

7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK

Audit Quality Assurance workshop Audit Planning by: CPA Steve Obock Associate Director- KPMG Kenya March 2017

Content of the ITIL 2011 Process Library light

Regulatory Overview Annex 11 and Part 11. Sion Wyn Conformity +[44] (0)

ISO 14001:2015. EMS Manual.

Managing Validation. Paperless Recorders

CENTRE (Common Enterprise Resource)

MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar

Voluntary Pilot Meeting Preview: How will CDRH apply assessments in the voluntary program?

The Pen Project A fully documented sample PRINCE2 project

Conducting Quality Audit based on ISO 9001:2015

General Guidance for Developing, Documenting, Implementing, Maintaining, and Auditing an SQF Quality System. Quality Code. SQF Quality Code, Edition 8

Project Plan. Executive Summary. Project Name: Prepared By: Date: Business Need/Problem Identify business need/problem that needs to be solved.

Computer System Validation Perform a Gap Analysis of your CSV Processes

Implementation Guide 1311

ISO 9001:2015 Gap Analysis Check Sheet

QUALITY ADMINISTRATIVE PROCEDURE

Strategies to Revise Quality Policy and Quality Objectives. Eileen Cortes February 22, 2017

INTERNATIONAL STANDARDS FOR THE PROFESSIONAL PRACTICE OF INTERNAL AUDITING

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.

GxP Compliance for Computerized Systems

Comparison Matrix ISO 9001:2015 vs ISO 9001:2008

EQMS Manual & Policy Document

ISO 9001:2015 Expectations

Quality Management System. Manual MASTER COPY

Critical 0 Major 0 Minor 0. Certification Body name and address

OECD Working Group on Good Laboratory Practice. Template for submission of comments on draft GLP Guidance Documents. Instructions for Use

Transcription:

Created/updated 05/11/17 PRINCE2 - Quality Management Strategy Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Quality Management Strategy template Project Name: Date: Release: Draft/Final Author: Owner: Client: Document Number: Note: This document is only valid on the day it was printed Revision History Revision Date Previous Revision Date Summary of Changes Date of next revision: Changes Marked Approvals This document requires the following approvals. A signed copy should be placed in the project files. Name Signature Title Date of Issue Version Distribution This document has been distributed to: Name Title Date of Issue Version page 1 of 5

Created/updated 05/11/17 page 2 of 5

Overview Purpose Contents Advice A Quality Management Strategy is used to define the quality techniques and standards to be applied, and the various responsibilities for achieving the required quality levels, during the project. The Quality Management Strategy should cover the following topics. Introduction... 4 Quality Management Procedure... 4 Tools and Techniques... 5 Records... 5 Reporting... 5 Timing of Quality Management Activities... 5 Roles and Responsibilities... 5 The Quality Management Strategy is derived from the: Project Board; Project Brief, Project management team structure (for roles and responsibilities), Project Product Description (for the customer s quality expectations and acceptance criteria); Organizational standards; Supplier and customer quality management systems; Configuration management requirements; Change control requirements; Corporate or programme strategies; Facilitated workshops and informal discussions. A Quality Management Strategy can take a number of formats, including: Stand-alone document or a section in the Project Initiation Document; Entry in a project management tool. The following quality criteria should be observed: The strategy clearly defines ways in which the customer s quality expectations will be met The defined ways are sufficient to achieve the required quality Responsibilities for quality are defined up to a level that is independent of the project and Project Manager The strategy conforms to the supplier s and customer s quality management systems The strategy conforms to the corporate or programme quality policy The approaches to assuring quality for the project are appropriate in the light of the standards selected. page 3 of 5

Introduction (States the purpose, objectives and scope, and identifies who is responsible for the strategy) Quality Management Procedure (A description of (or reference to) the quality management procedure to be used. Any variance from corporate or programme management quality standards should be highlighted, together with a justification for the variance) The Procedure should cover the following topics: Quality planning Quality control (The project s approach to quality control activities. This may include: Quality standards, Templates and forms to be employed (e.g. Product Description(s), Quality Register), Definitions of types of quality methods (e.g. inspection, pilot), and Metrics to be employed in support of quality control) Quality assurance (The project s approach to quality assurance activities. This may include: Responsibilities of the Project Board, Compliance audits, and Corporate or programme management reviews) page 4 of 5

Tools and Techniques (Refers to any quality management systems or tools to be used, and any preference for techniques which may be used for each step in the quality management procedure) Records (Definition of what quality records will be required and where they will be stored including the composition and format of the Quality Register) Reporting (Describes any quality management reports that are to be produced, their purpose, timing and recipients) Timing of Quality Management Activities (States when formal quality management activities are to be undertaken, for example audits (this may be a reference to the Quality Register)) Roles and Responsibilities (Defines the roles and responsibilities for quality management activities, including those with quality responsibilities from corporate or programme management) page 5 of 5