B-500 / B-600 SERIES

Similar documents
B500-VRC / B600-VRC SERIES INSTRUCTIONS DETAILS RS-500-VRC INSTALLATION

INSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP

INSTRUCTIONS FOR ABOVE GROUND RETROFIT RS-VRC-R

INSTALLATION INSTRUCTIONS B407-PP SERIES SINGLEWALL TANK SUMP

B-600 Commercial Series

INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP

INSTALLATION INSTRUCTIONS RC-SERIES SNAP-LOCK RETROFIT FOR FIBERGLASS CONTAINMENT SUMPS

BRAVO F-SERIES AMERON LCX

BRAVO F-SERIES AMERON LCX

FPE-SERIES RETROFIT INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS BRAVO FIBERGLASS SD-AB SERIES FOR DOUBLE WALL FRP SUMPS ONLY FOR RETROFITTING ALL FLEXIBLE ENTRY BOOTS

INSTALLATION INSTRUCTIONS BRAVO FIBERGLASS RETROFIT-S SERIES FOR SINGLE WALL FRP SUMPS ONLY FOR RETROFITTING ALL FLEXIBLE ENTRY BOOTS

INSTALLATION INSTRUCTIONS F-SERIES D-INR-S SPLIT RETROFIT FOR REPLACING BOLTED FLEXIBLE ENTRY FITTINGS FOR FIBERGLASS PIPE AND STEEL CONDUIT ONLY

INSTALLATION INSTRUCTIONS FOR SOLID DOUBLEWALL TANK SUMPS

RETROFIT-SD-AB INSTALLATION INSTRUCTIONS

SECTION 39 - MANHOLES TABLE OF CONTENTS

assembly and installation guide

DLB-23 Shower Enclosure Installation and User s guide

BioPrism Solid Surface

BioPrism Solid Surface

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Underground Exhaust System

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TRENCH AND ACCESS COVER TSA/ACA-X-250 W/O LINER FOR CAST-IN-PLACE INSTALLATION

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Installation Instructions

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

Installation Instructions

NOVELLA. Installation Instructions for Wall Mount Lavatory with Corner Cabinet and Storage System INTRODUCTION

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL

CYPRUS STONEX SHOWER FLOORS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TRENCH GRATES MR-X-P

FORMWORK 66 x 40 x 24 Lithic Freestanding or Alcove Box Bathtub Installation Guidelines. STYLE No. CAUTION: BATHTUB IS EXTREMELY HEAVY

Multi-Institutional Academic Health Science & Research Center Evansville, IN

PRAXIS TWO AND THREE PIECE INSTALLATION INSTRUCTIONS

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

Rytec Corporation One Cedar Parkway Jackson, WI GO-RYTEC (262)

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

19 East Ave. Mullica Hill, N.J Phone: Fax: ARCHITECTURAL FOAM FABRICATORS, LLC.

Made in U.S.A. Wave Style Bike Rack Submittal Sheet. Materials: 1.5 Schedule 40 Steel Pipe (1.

WALK-IN SHOWER BASE INSTALLATION GUIDE FOR CONCRETE FLOORS

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

SECTION 07530CP EPDM MEMBRANE ROOFING

Made in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

Wastewater Capital Projects Management Standard Construction Specification

SERVICE PEDESTAL FLOOR-MOUNTED SERVICE PEDESTAL. Installation Manual

Pedestrian Flood Door

INSTALLATION MANUAL RECTANGULAR COLUMN

Installation and Care Guide

Shower Column SHCM Installation Guide

INSTALLATION INSTRUCTIONS FOR BALCO, INC. DURAFLEX TM FS SERIES - FLEX SEAL EXPANSION JOINT SYSTEMS

University of New Hampshire Scholars' Repository

PRELUDE K-8266T/K-8267T/K-8268T/K-8269T K-8270T/K-8271T/K-8273T/K-8275T QUIETUDE K-8262T/K-8263T

Diffused Aeration Piping Equipment

MODEL SJ10. Installation Manual. SumpJet TM - Water Powered Backup System C IMPORTANT: MODEL SERIAL

Made in U.S.A. Sunrise Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks:

Encapsulated, Sealed & Closed Crawlspace Installation Manual

SECTION FACILITY SANITARY SEWERS

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

SV24. Submittal Special Precautions Specifications Installation. 12½" (31.8 cm) 12½" (31.8 cm) 12" (30.5 cm) 12" (30.5 cm) 12" (30.

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

4-PIECE SHOWER & TUB/SHOWER w/ E-Z Pin INSTALLATION

Natura Series White Matte Undermount Bathroom Sink

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Plumbing Installation Recommendations

Installation Manual. LIFETIME LIMITED WARRANTY Warranty applies to select Residential faucets only. Pressure Balance Valve TSPVR & TSPTR

Installation Instructions

FS-TRIO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.

SPECIFICATIONS: Architectural Aluminum Railings

SECTION SINGLE-PLY ROOFING SYSTEM

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

Groundwater Seepage. Causes of Basement Seepage and Leaks Hydrostatic Pressure

Tub/Shower Module TS Alcove Style (Flanged) Bath Module TO-2954

MODEL NUMBER: 1419 SERIES

S8-390 & S INSTALLATION INSTRUCTIONS

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

MTI BATHS BOUTIQUE COLLECTION ENGINEERED SOLID STONE SHOWER BASES OWNER S MANUAL INSTALLATION GUIDE EFFECTIVE JANUARY 1, 2013

Bottom Hinged Flood Barrier Operation & Maintenance Manual

INSTALLATION INSTRUCTIONS

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

Strong-Seal Sealant Specification, a permanent method of sealing the interior of the chimney and casting in manholes and catch basins.

Multi-Piece EasyStep Product Installation Instructions

QUAD Rectangular Hinged Door Shower Enclosure Installation Instructions

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

To Contact PS DOORS:

One-Piece Barrier-Free Tub/Shower Installations

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

1.02 DESCRIPTION A. This Section specifies furnishing and installing Surface Applied Detectable/Tactile Warning Surface Tiles where indicated.

Student Services & Classroom Addition. A. This Section includes the following sanitary drainage piping specialties:

Union County Vocational - Technical Schools Scotch Plains, New Jersey. A. This Section includes the following sanitary drainage piping specialties:

Low-Profile Multi-Piece Shower with blue, high-density polyurethane bottom

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

RAY-CORE Structural Insulated Roof and Wall Panels

Transcription:

B-500 / B-600 SERIES VAPOR VENT TRANSITION INSTALLATION GUIDE SINGLE WALL VENT TRANSITION SUMPS B-500 VENT TRANSITION SINGLEWALL SERIES SHOWN WITH WATERSPLASH LID, AND SUPPORT FOR 5 VENT LINES. B-500 SINGLEWALL VENT SHOWN 3 VENT LINES & RACK SYSTEM. B-600 VENT TRANSITION SINGLEWALL SERIES SHOWN WITH WALKOVER DIAMOND PLATE LID, AND SUPPORT FOR 3 VENT LINES. S. Bravo Systems, Inc. 2929 Vail Ave. - Commerce, CA 90040 (323) 888-4133 - FAX: (323) 888-4123 Info@SBravo.com - www.sbravo.com

The B-500/600 SingleWall Vent/Piping Transition Sump Series from S. Bravo Systems, Inc. MUST be installed by, and only by, Bravo Certified Installation Contractors. Details can be found at www.sbravo.com/cert.htm READ THESE INSTRUCTIONS - KEEP FOR FUTURE REFERENCE TABLE OF CONTENTS A) Positioning the Vent Box... p. 3 B) Penetration Fittings... p. 3 C) Water Testing Transition Sump / Fittings... p. 4 D) Repairing Leaks / Field Damage... p. 4 E) Water drainage lines... p. 5 F) Backfill, Concrete & Rack Installation Instructions... p. 6 REQUIRED TOOLS (NOT PROVIDED) Power/air Sanders. Acetone to clean up tools/applicators. Power Cutting Tools. RECOMMENDED T-FS-SAND-KIT 5/8 sanding disc backs and centralizers for all Bravo Systems Fittings - Closely adhere to all directions and warnings indicated on the product or contained in these instructions. - Warranty is void if there is any evidence of modification, abuse, tampering, negligence or improper installation. - For assistance please call Bravo for technical support at (800) 28-BRAVO. SAFETY FIRST! S. Bravo Systems, Inc. urges you to carefully adhere to the normal safety procedures and precautions followed by your company. Please follow the mandates and compliances decreed by OSHA, local, State and federal regulations regarding the use of this product. WARRANTY All containment systems sold by S. Bravo Systems, Inc. are warranted to be free from defects in material and workmanship for a period of one year from date of purchase. This warranty will be limited to the repair and replacement of Bravo parts only and will exclude all claims for labor or consequential damage. No other express warranties given and no affirmation of S. Bravo Systems, Inc., or its agents and/or representatives, by words or action, will constitute a warranty. IT IS EXPRESSLY AGREED THAT THIS WARRANTY WILL BE IN LIEU OF ALL WARRANTIES OF FITNESS AND IN LIEU OF THE WARRANTY OF MERCHANTABILITY. This warranty is void if there is any evidence of modification, abuse, negligence, or improper installation. If any fittings or components, other than S. Bravo Systems approved fittings or components, are used in conjunction with any S. Bravo Systems product, the warranty pertaining to these products is immediately void. 2

VAPOR VENT INSTALLATION INSTRUCTIONS A - VENT BOX POSITIONING A.1 - Determine the permanent position of the UniVent according to your specs. During positioning, leave the access cover dry-fit to the top of the vent box. Rest the Vent Box lightly on a bed of peagravel while you position it and make it level. Fig. A.2 Finish Floor THE TOP OF ACCESS COVER (WHEN DRY - FIT) NEEDS TO BE: FOR B500 VENT BOX - 2 INCHES ABOVE THE FINISH FLOOR FOR B600 VENT BOX - 1 INCH ABOVE THE FINISH FLOOR A.2 - Using leveling stakes, stake the target area for vent box to be set and frame or scaffold the box into a permanent fixed position allowing access to front end of box for penetration fitting installation and to prevent any shifting or movement prior to pouring of concrete. (Fig. A.2) MAKE SURE VENT BOX IS PLUMB VERTICALLY AND LEVEL FOR CLEAN RACK SYSTEM INSTALlation. B - PENETRATION FITTINGS B.1 - Remove Access Cover from Vent Box, set aside. Install required number of penetration fittings ONLY (Fig. B.1). Install Vapor Pipe Fig. B.3 Install Penetrations Fig. B.1 Fig. B.4 B.2 - Install the required number of electrical penetrations and connections. B.3 - Please refer to your pipe manufacturer s Installation Instructions to install your Primary piping and vent lines. (Fig. B.3) B.4 - The Compression Fittings are Factory Installed. The Compression Gasket is also pre-greased by the factory. When Installing vent risers you must fit the Compression Gasket over the pipe, (Fig. B.4) down onto the Compression Fitting, and thread over the Compression Nut. Use the Bravo Compression nut tool (Part No. WR-3) to torque down the compression nut 1/4 to 1/2 turns past hand-tight. IT IS RECOMMENDED THAT YOU ABRADE THE SUMP WALLS FLAT PER THE T-FS-SAND-KIT INSTALLATION INSTRUCTIONS 3

C - WATER TESTING SUMP / FITTINGS It is recommended that all piping and conduits be connected at this time. Clear all debris & materials from the transition sump. All field installed penetration fittings must be water-leak tested. C.1- To test field installed fittings, add enough backfill under the Transition Sump so its weight is completely supported. Do not allow island supports to hold all the weight. The box will become extremely heavy. C.2- Fill the box with water to 2 inches above the highest fitting. After 3 hours, make a visual inspection of the exterior of the box. If there are no leaks, proceed to remove the water with an appropriate pump. DO NOT DRILL A DRAIN HOLE, and plan to patch the hole. If there ARE leaks, proceed to Step D (below) for repair instructions. D - IF ANY LEAKS ARE FOUND!! A: Locate leak point(s) and mark with marker so you can locate it / monitor it. B: Repair or reinstall penetration fittings according to your penetration fitting manufacturers Installation / Maintenance Instructions. C: Occasionally... Bravo Fiberglass Series Products may suffer mild damage in transit or field installation. Please take a close look at edges and corners. D: FOR FIBERGLASS REPAIRS: Abrade a 3 diameter area centered on the leak point until flow coat is gone and natural resin/fiberglass material can be seen. Dust with shop brush or compressed air and do not use shop towels or acetone. S. Bravo Systems recommends Smith Fibercast Adhesive Kit #8014 to repair and reinforce Bravo Fiberglass products. Make sure area is completely dry and apply resin generously. For anything larger than pinhole leaks you must consult the factory. FOR PENETRATION FITTING LEAKS/REPAIRS: Follow penetration fitting manufacturers repair recommendations in their respective Installation Instructions. DO NOT compromise Bravo Product Integrity. E: Let cure for a minimum of 2 hours @ or above 75 Fahrenheit. 4

E - DRAINAGE LINES FOR B600 SERIES The PVC drainage pipes provided by the factory with your B600 transition sump are to be connected and secured just prior to peagravel backfill. Ensure that the drainage pipes drain to either the sidewalk or to ground on both sides of the transition sump. Also be careful not to clog or otherwise seal the perforated PVC drain pipes with the concrete pour or other construction materials. The drain pipes and the interior drainage channel must be clear of peagravel, cement, dirt and debris. Drainage Pipes can drain in either direction or both. At least one per side of the vent box must drain to either the sidewalk, or to the ground below the concrete pour. 5

F - Backfill and Pouring the Concrete Do not remove Square caps from Rack sleeves until after concrete has been poured and firmly set. F.1 - Prepare site for concrete pouring. Backfill with peagravel around Vent Box, noting the elevations of peagravel around the box. Place your peagravel in such a way that the concrete poured around the Vent Box is even and within the dimensions shown in Fig. F.1. Fig. F.1 BRAVO SYSTEMS STATES INSTALLING PERMANENT BOLLARDS (HEAVY POSTS) IS: HIGHLY RECOMMENDED if Vent Transition Sump is used for Vapor Vent Transition MANDATORY! if Vent Transition Sump is used for Product Transition Fig. F.3 Cross Braces Fasteners F.2 - Level concrete away from Vent Box. If NOT installing rack system, do NOT remove the square caps from the rack sleeves. Use Vulkem to seal the caps to the tops of the rack sleeves to create a barrier for moisture. F.3 - After concrete has set, remove square caps from rack sleeves and assemble rack system. Drop rack system (RS500) into square tubing, or rack sleeves, secure, and seal off rack cross/brace and fasteners with Vulkem Sealant. (Fig. F.3) F.4 - Fasten to vent box. Install vertical riser pipe to appropriate height, according to your local regulatory requirements. Secure pipes using pipe clamps to the rack system. 6