SECTION 3 SERVICE ENTRANCE SECTION UNDERGROUND

Similar documents
UNDERGROUND SERVICES SECONDARY

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

(Condensed from National Electric Code)

METERING INSTALLATION

a) Line and load compartments must be separated by a stable barrier.

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

NORTHEASTERN REMC ELECTRIC STANDARDS MANUAL

OPERATING PROCEDURE NO. 310

Please check with your local inspection authority for any additional requirements before installation.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

OVERHEAD SERVICE. Table of Contents - Section 400

SECTION GROUNDING

RESIDENTIAL QUICK REFERENCE

OVERHEAD SERVICES - SECONDARY

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

CONTENTS. B. System Design and Performance Requirements

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Welcome to Douglas County PUD

Section 7: Specifications

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

Huntsville Utilities Underground Residential Service Requirements

Electric Service Requirements. Residential Overhead. Engineering Specification T002. February

TEMPORARY METER POLE INSTALLATION

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

Electric Service Standards

Specifications for Residential Overhead Electric Service Installation

Specifications for Residential Underground Electric Service Installation

ANY SPECIFICATION DRAWINGS OR DATED PRIOR TO SEPTEMBER 2015 WILL NOT BE HONORED.

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. TRENCHING SECONDARY (120/240 volts)...

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

Electric Service Standards

PRIMARY LINE EXTENSION

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

SALEM CITY POWER ELECTRICAL REQUIREMENTS & STANDARDS MANUAL

ELECTRIC METERING GENERAL

Basic Service. This Section provides information regarding a. Introduction

Residential Electric Policy

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

SECTION 8 METERING CONTENTS

Specifications for Residential Overhead Electric Service Installation

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Electric Service Requirements (Service Assembly Guide)

Section 2: Underground

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

VOLUME 15 Section 6: Gas Metering Guidelines

Indianapolis Power & Light Company

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

METERING INSTALLATIONS (GENERAL REQUIREMENTS)

Central Lincoln PUD Commercial Service Guidelines & Standards

Metering Requirements 750 Volts or Less

For more information contact: Engineering Department (800) Ext RURAL RESIDENTIAL SERVICE INSTALLATION GUIDE.

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

CONDUITS AND FITTINGS

Electric Service Handbook

SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL

8. REVENUE METERING. Operational Excellence Model. 8.1 Introduction

TEMPORARY FACILITIES

Electric Service Requirements Service Assembly Guide. Homer Electric Association, Inc Lake St. Homer, AK

SECTION GROUNDING AND BONDING

INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS

Electric Engineering Division RESIDENTIAL CONDUIT RULES AND REGULATION. S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies

COMMERCIAL CONDUIT RULES AND REGULATIONS

City of Santa Monica Building and Safety Division

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

1. Contractor shall obtain a valid electrical permit from the Town of Perinton.

CHAPTER 11 CONDUITS AND FITTINGS

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

Metering Installations for Mobile Homes or Mobile Home Parks:

Youngstown State University

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION

SECTION CONDUITS AND BOXES

B. Provide a complete conduit system with associated couplings, connectors, and fittings.

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

SECTION SECONDARY UNIT SUBSTATIONS

Metering Requirements 750 Volts or Less

CHAPTER 13 GROUNDING AND BONDING

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

2015 Code Rollout Meeting Q & A

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

Post Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

GLENWOOD PLACE 2 MAR 2015

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

Commercial Electric Policy

A. Product Data shall be provided for each type of product indicated.

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

ELECTRICAL SAFETY Information Bulletin

Transcription:

SECTION 3 SEVICE ENTANCE SECTION UNDEGOUND DESCIPTION PAGE Service iser equirements... 3-1 Temporary Service, Underground, 225 Amps Maximum... 3-2 Permanent Underground Section Used for Early Power, 320 Amps Max. esidential, 200 Amps Max. Commercial... 3-3 Permanent esidential Section Used for Early Power 320 Class Maximum... 3-5 Permanent Apartment House Section Connection and Socket/Tap Location... 3-6 General Information for Underground Installation... 3-7 Service Entrance Section, 225 Amps Max. on Equipment Mounting Structure... 3-8 Meter Posts, 200 Amps Maximum Total Service... 3-9 Meter Posts, Special 2-Wire Applications Only, 30 Amps Maximum... 3-11 Meter Post Installation, 30 Amps and 200 Amps Maximum... 3-12 Service and Meter Pedestal, Commercial Application Only, 200 Amps Maximum... 3-13 Service and Meter Pedestal, Commercial Application Only, 200 Amps Maximum (Installation Details)... 3-15 All-In-One, Semi-Flush, 225 Amps Maximum... 3-16 All-In-One, 225 Amps Maximum... 3-17 Overhead to Underground Modification... 3-19 esidential Underground/Overhead, 1Ø Only, 400 Amps Max., Class 320 Only... 3-20 Meter Box Installation, 400 600 Amps Maximum... 3-21 Typical Multiple Meter Installation... 3-22 SEVICE ENTANCE SECTION UNDEGOUND ISSUE DATE: 11/09/12 EV. DATE: 03/21/16 APPOVAL: D. Carter 3-i ESS Index-3.doc

SECTION 3 SEVICE ENTANCE SECTION UNDEGOUND DESCIPTION PAGE Typical Meter Installation, 0 800 Amps, Landing Terminals in Gutter... 3-23 esidential Multiple Occupancy Service, Six Meters, 600 Amps Max., 120 240V Underground, 1Ø, 3-Wire... 3-24 400 Amps Maximum Meter Installation... 3-25 SEVICE ENTANCE SECTION UNDEGOUND 3-ii ISSUE DATE: 11/09/12 EV. DATE: 03/21/16 APPOVAL: D. Carter ESS Index-3.doc

24" ISE QUADANT LOCATION CUSTOME S STUCTUE 24" N SEVICE ENTANCE W POLE E SECTION NOTE 9 MINIMUM 1/4" AI SPACE EQUIED 225 AMPS AND BELOW HAND-DIG ONLY WITHIN 24" OF POLE LOCATION S NOTE 1 ISE POLE NOTE 2 NOTE 4 NOTE 3 18" 6" 5-0" " PEFEED 4-0 " 6-3" MAX. 3 X 3 UNOBSTUCTED, FLAT, LEVEL WOKING & STANDING SPACE, NOTE 9. CONDUIT SECUED TO POLE WITH NON-METALLIC TAPE. FLAT PULL TAPE (NOTE 1). FOM SES TIED TO CONDUIT PLUG, SEE PAGE 11-16. STAIGHT FINAL GADE CONDUIT 4" 18" DEPTH 36" SECONDAY ON PIVATE POPETY 48" IN PUE O OAD IGHT OF WAY WELL TAMPED BACKFILL 5" COUPLING 24" HAND-DIG ONLY 24" HAND-DIG ONLY NOTE 6 NOTE 5 CUSTOME CONDUIT SP WIE INSTALLED 2-1/2" CONDUIT FO A 200A SES O 3" CONDUIT FO CLASS 320 (400A) SES DB-120 O SCHEDULE 40 PVC CONDUIT 36" ADIUS» 90 DO NOT DISTUB (BELOW GADE) SOIL IN THIS AEA COUPLINGS: 2 1/2" SOCKET DEPTH EACH END. ALL CONDUIT DIAMETES. MINIMUM I.D. NOT LESS THAN I.D. OF CONDUIT. SEE PAGE 6-2, COUPLINGS. NOTES 1. Customer to install approved 2,500 pound, continuous (no tied pieces), non-conductive, pre-lubricated, flat pull tape. Pull tape shall be free moving and not glued to conduit. Approved suppliers are listed in Section 11 - Contractor-Supplied Material. 2. Service riser and nipples shall be bonded unless self-bonding hubs are used. 3. iser to be plumb and fastened securely using threaded fasteners and clamps designed for the purpose. Back of clamp shall be flush mounted to wall or wall projection. Clamps fastened to wood post with 3/8" minimum through bolts or studs (frame type) and/or masonry (block type) walls with threaded fasteners, size 1/4" X 2" lag screws (sheet rock screws are not acceptable). 4. iser conduit diameter shall match Customer conduit, and be rigid steel, intermediate metal conduit, or approved fiberglass. Metal conduits installed underground shall be wrapped with a UL-approved PVC tape overlapped a minimum half the tape width to at least 6" above finished grade. Shall comply with NEC 230.50 "Protection Against Physical Damage". 5. The service conduit riser shall be continuous rigid steel or intermediate conduit (no EMT). If a coupling is necessary, it shall be a threaded coupling only; compression couplings shall not be used. 6. Sweeps and bends shall be 36" radius. 7. iser transition coupling shall be threaded PVC for steel risers or PVC slip couplings for fiberglass risers. 8. No type of reducer is allowed except at the pull section of the meter panel. efer to page 6-3, educer at Pull Section. 9. efer to page 5-2, Joint Trench with Gas. 10. See page 9-1 for meter accessibility and location requirements. See page 5-15 for meter workspace requirements. EV. ADDED NOTE TO NOTE #3 ISSUE DATE: 11/16/10 SEVICE ISE EQUIEMENTS EV. DATE: 01/04/18 APPOVAL: N.SABBAH 3-1 8509E314.DGN

6"X 6" LUMBE (MINIMUM) WOOD POST ALL-IN-ONE EQUIPMENT EQUIED SECUELY FASTEN TO POLE USING THU-BOLTS, NO LAGS O SCEWS. 60" PEFEED 4 0" -6 3" MAX. ADDESS TAG: POP IVET TO FIXED METE PANEL GOUNDING PE LOCAL MUNICIPAL CODE POLE MUST BE STABILIZED, NOTE 3 FINAL GADE NOTE 7 GEATE OF 36" O 10% POLE LENGTH PLUS 2 NOTES 1. Customer (or Customer s electrical contractor) shall install a temporary SES, as directed by the Distribution Design. 2. Maintain 36" radial clearance, as illustrated on page 5-15, from side of electrical equipment to nearest gas facility vent. 3. Greater depth may be required to stabilize pole. 4. Conduit installed in public utility easement and OW. Conduit at 4 minimum cover. 5. Continuous, non-conductive, flat, 2,500 lb, pre-lubricated tape (free moving and not glued to conduit) shall be installed in conduit - string or rope is not acceptable. 6. SP will provide, install and remove temporary service conductors. temporary service must be removed from conduit prior to installation of permanent service. 7. All requirements on page 3-1, Service iser equirements, apply. 8. For meter post type installations, see page 3-9, Meter Posts. 9. For other types, contact SP s Distribution Design department. TEMPOAY SEVICE, UNDEGOUND ISSUE DATE: EV. DATE: 09/15/86 10/23/12 225 AMPS MAXIMUM APPOVAL: W.LAAMIE 3-2 8509E8.DGN

PEMANENT UNDEGOUND SECTION USED FO EALY POWE 320 AMPS MAX. ESIDENTIAL, 200 AMPS MAX. COMMECIAL An underground section, which will be the permanent section supplying power to a future house or house panel, may be used for early power at a residential subdivision or custom home jobsite prior to the walls being built on the foundation. A commercial underground section, which will be the permanent section house panel, may be used for early power at an apartment complex. An AHJ inspection is required. Not all municipalities allow this. I. equirements A. SP transformer(s) must be energized. B. House stem wall and/or slab must be complete. C. Main breaker must be installed. D. SES must pass municipal and SP inspection. Contact the regional Distribution Design office for verification of the municipal clearance. All requirements for permanent service (heights, distance from front corner, fastening requirements, conduit and 2,500 lb. continuous, non-conductive, flat pull tape, etc.) will apply. E. Site address must be visible at all times or permanently attached to SES. For clarification, see Section 9 Metering & SES, Service Entrance Section, Addressing and Identification. F. esidential Customer Services, New Construction (see Contact Information) must receive a signed contract prior to accepting an order. G. For Early Power at an apartment complex, the following requirements must be met: 1. The panel shall not be fed from the multi-meter SES but fed directly from the SP transformer, and therefore isolated so that only the house panel is energized. 2. The house panel contains the required safety socket. 3. The receptacle or tap for early power must be located on the Customer's side of the SES and NOT at the bottom of SP's sealed safety socket. 4. The house panel shall be located within 5 or less of the multi-meter socket and panel shall NOT be attached to the multi-meter socket panel. 5. Disconnects shall be clearly labeled for both the house panel and the multi-meter panel. II. Process A. Customer must meet all requirements prior to initiating the request for service. B. Customer to call SP esidential Customer Services (see Contact Information): 1. equest service. 2. Specify the address. 3. Specify the party to be billed for electric service. SES UNDEGOUND PEMANENT SECTION USED FO EALY POWE, 320 AMPS MAX. ESIDENTIAL, 200 AMPS MAX. COMMECIAL Page 1 of 3 ISSUE DATE: 06/30/08 EV. DATE: 01/21/16 APPOVAL: N. Sabbah 3-3 ESS3-03to3-04.doc

PEMANENT UNDEGOUND SECTION USED FO EALY POWE 320 AMPS MAX. ESIDENTIAL, 200 AMPS MAX. COMMECIAL C. The SP Distribution New Business Division will coordinate installation initiated by esidential Customer Services. D. Customer to advise SP when the residential account is to be transferred. III. Additional Information A. A mobilization fee will be assessed to the Customer if, upon a second attempt, the electric service crew cannot install service. Check with the Distribution New Business Division for current fees. B. A fee will be assessed the Customer if the meter is damaged during use. Check with esidential Customer Services for current fees. C. SP will not be liable for any malfunction of, or damage to, the Customer s equipment resulting from failure of SP s equipment. D. The load-side bus will be energized upon setting the meter if clearance from AHJ has been obtained. E. When SP installs the meter, a warning decal will be placed on the interior breaker panel cover of the service section and a lock installed on the breaker panel. When Customer removes this lock, the Customer assumes all responsibility for the service section. F. Contact esidential Customer Services if there are any questions concerning this process. SES UNDEGOUND PEMANENT SECTION USED FO EALY POWE, 320 AMPS MAX. ESIDENTIAL, 200 AMPS MAX. COMMECIAL Page 2 of 3 ISSUE DATE: 06/30/08 EV. DATE: 01/21/16 APPOVAL: N. Sabbah 3-4 ESS3-03to3-04.doc

HOUSE SLAB STEM WALL CONDUIT ISE ALL EQUIEMENTS ON PAGE 3-1, SEVICE ISE EQUIEMENTS APPLY. STEEL STUD SET AT 18" BELOW FINISHED STEM. ALL-IN-ONE 1/2" FOAM 20 GAUGE STEEL PANEL BACKING, APPLIED OVE FOAM, FASTENED TO STUDS PAGE 3 OF 3 PEMANENT ESIDENTIAL SECTION USED FO EALY POWE 320 CLASS MAXIMUM ISSUE DATE: 11/01/07 EV. DATE: 03/21/16 APPOVAL: N.SABBAH 3-5 8509E297.DGN

APPOVED METHOD PULL SECTION M M M M M M M HOUSE PANEL L I N E L O A D L I N E L O A D L I N E L O A D CUSTOME SECTION NEUTAL NOTE 1 FONT VIEW NOTE 1. Early power socket/tap shall be located on Customer side of the service section. PEMANENT APATMENT HOUSE SECTION CONNECTION AND SOCKET/TAP LOCATION ISSUE DATE: 03/21/16 EV. DATE: 0 APPOVAL: N.SABBAH 3-6 8509E297.DGN

GENEAL INFOMATION FO UNDEGOUND INSTALLATION I. The Customer installs, owns and maintains the SES and riser in accordance with SP s applicable rates and extension rules and requirements there are no exceptions. Facilities beyond the POD must comply with all local, city and/or NEC. SP utilizes the EUSEC specifications for SES. II. III. IV. Prior to the installation of the service conduit, the Customer shall obtain SP approval of the SES location. The Customer installs service conduit from an SP-approved POD to the Customer s SES equipment. The Customer is responsible for the conduit system until service conductors are installed. The SP service lateral will be installed only after SP and the AHJ approve the installation. Trenching and conduit must be inspected prior to backfill. No meter may be installed until an application for service is made. V. Customer-Owned Service A. The POD for a Customer-owned service is usually the secondary bushings of the transformer. The Customer assumes all responsibility to supply, install, own and maintain these cables. Cables, conduits and support facilities located on the load side of the POD must comply with the requirements of the AHJ. 1. Because the service cables are Customer-owned, installed and maintained, the ESS requirements relating to access to the pull section are waived, however access requirements to the transformer and all other requirements for meter rooms apply. 2. SP can supply and install the cable connectors at the POD provided the cables are 750 MCM aluminum or copper using concentric or compressed stranding. Any other wire size will require the Customer to supply and install standard NEMA two-hole connectors. An SP representative must be present when cable connectors are installed to verify height and orientation to the transformer secondary bushings. 3. The proposed size and number of cables are to be reviewed and approved for ampacity under the anticipated operating conditions encountered in a desert environment by the AHJ. VI. VII. VIII. Excavations A. Contact SP Design for trenching requirements. B. See page 6-4 for Customer excavation limits. Conduit and iser equirements See page 6-1 for conduit and riser requirements. Clearance equirements See Section 5 for clearance requirements. SES UNDEGOUND GENEAL INFOMATION FO UNDEGOUND INSTALLATION ISSUE DATE: 03/23/01 EV. DATE: 08/14/12 APPOVAL: W. Laramie 3-7 ESS3-07.doc

ALL IN ONE EQUIPMENT EQUIED SEVICE ENTANCE PE PAGES 3-16 & 3-17 (SECUELY FASTENED USING THOUGH-BOLTS) 60" PEFEED 4 0" -6 3" MAX. GOUNDING PE LOCAL MUNICIPAL CODE FINAL GADE SEE NOTE E. ALL EQUIEMENTS ON PAGE 3-1, SEVICE ISE EQUIEMENTS, APPLY GEATE OF 36" O 10% POLE LENGTH PLUS 2 CONDUIT NOTES 1. General equirements A. SP reserves the right to determine the Customer s service pole location, and only authorized SP personnel of the Distribution Design department will determine this location. B. Do not mount SES and Customer attachments on SP facilities (see page 2-1). C. Maintain a minimum 36" radial separation from the side of the SES to the nearest gas facility vent. D. Grounding shall comply with the NEC or local inspection agency. E. All detached services require an address tag. efer to page 9-10 & 11 for I.D. tags. 2. SES equirements A. The height to the center of the meter is preferred to be 5 (4 min, 6-3" max.). SEVICE ENTANCE SECTION 225 AMPS MAX. ISSUE DATE: 03/06/01 EV. DATE: 03/22/13 ON EQUIPMENT MOUNTING STUCTUE APPOVAL: W.LAAMIE 3-8 8509E341.DGN

9 9" 11 1 10 GOUND BUS NEUTAL BUS CONNECT GOUND AND NEUTAL BUS 4" 5 METALLIC WATE SYSTEM 3 8 6 24" 4 7 6 2 48" 54" MAX. 2" FINAL GADE APPOVED GOUNDING ELECTODE 24" 48" 54" MAX. 2" CONDUIT AEA FINAL GADE SINGLE METE POST DOUBLE METE POST 100 AMP MAX. PE SIDE LEGEND 1. Outside finish of a single meter post shall be corrosion resistant. See Section 9-Metering & SES, Pre-Approved Meter Pedestals. 2. Customer shall provide and install a 2-1/2" elbow (36" radius) and conduit. If SP conductor will both enter and exit the post, install two 3", 36" elbows (36" radius) and conduit (as needed). A 2,500 lb. continuous non-conductive flat pulling tape is required in conduit (free moving and not glued to conduit). 3. UL-listed copper or aluminum double landing lugs, mounted a minimum of 18" and a maximum of 48" above top of pour panel (see drawing item 8). Landing lugs must accommodate #2 through 350 MCM conductor. Lugs may be in-line or staggered. Meter socket and service lateral conductors shall be independently connected at the landing lugs. 4. Copper grounding conductor shall be continuous to ground bus landing block in breaker panel. See page 8-1 and 8-2 for size. 5. Grounding clamp shall comply with local municipality requirements. PAGE 1 of 4 METE POSTS ISSUE DATE: EV. DATE: 04/15/86 08/15/12 200 AMPS MAXIMUM TOTAL SEVICE APPOVAL: W.LAAMIE 3-9 8509E7.DGN

LEGEND (cont d) 6. Ground provided by: A. Metallic water pipe extending a minimum of 10 in the ground. B. Grounding electrode per NEC. C. equirements established by inspecting municipality. Grounding electrodes must not be installed in trench area unless they are installed prior to wire installation. They may then be used for post location staking. If looped copper wire grounding is used, it must be installed in the trench prior to wire installation. The stubbed-up grounding wire may then be used for post location staking. 7. Form poured concrete pad shall be 24" x 24" x 4", with the top 2" above final grade. PLAN VIEW METE POST CONDUIT SEVICE WIE 4" 7 1/2" 8. The minimum inside dimension of the meter post shall be 4" x 7 1/2". on the open (meter) side, a fixed pour panel shall extend 2"to 6" above the top of the concrete pad and 18" minimum below the top of the pad. 9. Each meter location must be identified with the permanent space number. This identification shall be per pages 9-9 & 9-10 and the tag shall be attached to a permanent part of the post - not to removable cover or lid. 10. Main circuit breakers must be installed prior to inspection. Contact Distribution Design to obtain the short circuit interrupting rating of the breakers and service equipment. 11. SP shall approve all double meter posts; 100 amps maximum per side. Outside finish shall be corrosion resistant. NOTES 1. Posts shall be factory-wired from the service terminating lugs to the meter socket in a separate or barriered raceway. Posts shall have a minimum rating of 100 amps (refer to EUSEC manual). 2. Any modification must be approved by Distribution Design and the AHJ. No modification is allowed for temporary service. 3. The pulling and terminating section shall be accessible from the front and rear. A 3 minimum clearance is required in each direction per page 5-16. 4. The meter panel shall be provided with a sealing ring and the socket shall be rigidly mounted on a support and attached to the meter panel. All panels shall be sealable. 5. For special application only (120 volt, 2 wire, 30 amp): Service requirements are the same as listed here and the total ampacity of the breakers is not to exceed 30 amps, with no more than two breakers. no other breakers, switches or receptacles are allowed in the breaker panel (see page 3-11). 6. The radial clearance, as illustrated on page 5-15, from the side of electric service to the nearest gas facility vent is 36". 7. See meter post installation page 3-12. PAGE 2 of 4 ISSUE DATE: 04/15/86 METE POSTS EV. DATE: 11/13/12 200 AMPS MAXIMUM TOTAL SEVICE APPOVAL: W.LAAMIE 3-10 8509E326.DGN

WIING DIAGAM FO 120 VOLT 2-WIE SEVICE MAX. 2 BEAKES WITH MAX. TOTAL OF 30 AMP ATING, TO BE LOCATED ON SIDE WITH HOT LEAD ATTACHED TO 120 VOLT LOAD FOM SP SOUCE OF POWE HOT NEUTAL SEE NOTE 3 FO SPECIAL APPLICATIONS ONLY (120 VOLT, 2-WIE, 30 AMP TOTAL MAX.) NOTES 1. Service requirements are the same as listed on page 3-9 & 3-10. The maximum rating of an individual breaker, or the sum of two max. breakers, shall not exceed 30 amps. No other breakers, switches, or receptacles will be allowed in the breaker panel. 2. SP may specify use of a meter post as described on page 3-13 through 3-15 for areas where protection from water or vandalism is needed, as determined by SP. 3. SP will install the neutral jumper. METE POSTS SPECIAL 2-WIE APPLICATIONS ONLY, 30 AMPS MAX. 3-11 PAGE 3 of 4 ISSUE DATE: 04/15/86 EV. DATE: 11/13/12 APPOVAL: W.LAAMIE 8509E115.DGN

METE POST INSTALLATION 30 AMPS AND 200 AMPS MAXIMUM I. Installation Procedures and Instructions for Single-Meter Installations A. The Customer is responsible for the installation of the meter post, located per SP design. The installation shall be in accordance with the AHJ. B. After the municipal clearance has been received by SP and the final SP SES inspection has been completed, SP will install the necessary conductors and related equipment to energize the service entrance. A meter will be furnished and installed by SP at this time. The main breaker must be installed before SP will set a meter. II. Installation Procedure and Instructions for Meter Posts A. Customers or Developers are responsible for installing the meter post(s) and conduit located per SP design. The conduit will extend out of the ground at the point where the service and meter post is to be set. B. Clearances between meter post and other utilities shall conform to applicable codes and/or regulations. C. The developer or their contractor will then: 1. Install the conduit to extend 2" - 6" above concrete pad but not above the top of the fixed pour panel. Install electrical meter post in place over the conduit (See page 3-9 and 3-10, Legend #8). 2. Install and connect a No. 4 AWG minimum copper grounding conductor from a metallic system water pipe or grounding electrode to the grounding lug per applicable code. 3. Backfill around the post to provide good support, plumb and level the post and pour the concrete island (24" X 24" X 4"). The final grade or ground line should be approximately 2" below the top of the concrete pad. 4. Install 2,500 lb. continuous non-conductive flat pull (free moving and not glued to conduit) tape in conduit. String or rope is not acceptable. D. SP will install and connect the service lateral conductors to the landing lugs in the meter post, install and seal the pull section panel, and blank off and seal the meter socket ring. E. SP will set the meter when the request for service is submitted, all code requirements have been met and approval clearance issued. All meter posts, fed from the same transformer, must be installed before energizing any individual meter post. F. The main breaker must be installed before the SES will pass an inspection, clearance or before SP will set a meter. PAGE 4 of 4 ISSUE DATE: 04/15/86 METE POST INSTALLATION EV. DATE: 08/20/12 30 AMPS AND 200 AMPS MAXIMUM APPOVAL: W.LAAMIE 3-12 8509E170.DGN

10" 10" I.D. PLATE A ENCLOSING 11" 6" MAX. METE ENCLOSUE COVE DEMAND ESET COVE (SEE DETAIL A) TEST-BYPASS COVE & FACILITIES (SEE PAGES 9-35 & 9-36) TEST BYPASS SUPPOT HANDLE METE SECTION BAIE TO EXTEND TO EDGE OF TEST BLOCK BAIE 3" 3" HANDLE 2" CUSTOME SECTION 75" MAX. 36" FINAL GADE WIEWAY PULL SECTION & COVE (SEE DETAIL B) POTECTIVE METALLIC BAIE 2" GADE LOAD LINE 17" LANDING LUGS & FACTOY CONDUCTOS (FINAL) FIGUE 1 FONT VIEW FIGUE 2 SIDE VIEW BASE INSTALLATION SEE PAGE 3-15 3/4" 1 1/2" (TYP.) NOTE: ALL DIMENSIONS AE MINIMUM. 3" VIEWING WINDOW 2" 6" 17" 2" 5" MAX. 4" 6" W DETAIL A DETAIL B DEMAND ESET COVE WIEWAY PULL SECTION PAGE 1 OF 3 ISSUE DATE: 04/15/86 SEVICE AND METE PEDESTAL COMMECIAL APPLICATION ONLY EV. DATE: 08/22/12 200 AMPS MAXIMUM APPOVAL: W.LAAMIE 3-13 8509E54.DGN

Minimum Dimensions Service 1 3 "W" 10 1/2" 12 1/2" "A" 20" 20" NOTES 1. Meter pedestal must be SP approved. The complete enclosing cover shall not exceed 25 lbs. 2. The meter shall be enclosed and the enclosing cover shall meet the following conditions: The cover shall be hinged (allowing the top and front to be rotated up and back exposing the metering compartment) and have a handle. When the metering compartment side panels are attached to and lift back with the hinged cover, the "A" dimension does not apply. The lifting force required to open the cover shall not exceed 25 lbs. 3. All utility compartments (meter cover, demand reset cover, test-bypass cover and pull section) shall be sealable. 4. Circuit breakers shall be rated for the available fault current. Contact SP Distribution Design for available fault current. Circuit breakers must be installed prior to meter installation. 5. Service conductors are to be terminated on pressure-type CU-AL listed lugs sized for #6-250 MCM cable. Insulated cable or bus shall be installed between landing lugs and test-bypass. 6. The meter panel shall be provided with a sealing ring and the socket shall be rigidly mounted on a support and attached to the meter panel. 7. Internal equipment shall be secured in place. Any exposed fasteners shall be tamper resistant. 8. A protective metal barrier (16 gauge minimum) shall be installed between the utility wireway and Customer distribution section. A minimum 1/4" clearance shall be maintained between the protective barrier and the Customer section. 9. Test-bypass blocks with rigid insulating barriers shall be furnished, installed, and wired or bussed to the meter socket. Connection sequence is line-load left to right. Each line and load position shall be clearly identified at 3/4" minimum block letter labeling. 10. See page 3-15 for installation procedure. 11. You may have to order this type of pedestal - check with your electrical supplier. 12. GAS LINE CLEAANCE: Maintain a 36" minimum radial clearance, as illustrated on page 5-15, between electric service equipment and any gas vent. PAGE 2 OF 3 SEVICE AND METE PEDESTAL COMMECIAL APPLICATION ONLY 200 AMPS MAXIMUM ISSUE DATE: 04/15/86 EV. DATE: 04/04/17 APPOVAL: W.LAAMIE 3-14 8509E332.DGN

I. Installation Procedure and Instructions A. The customer or developer will be responsible for the installation of the meter pedestal and conduit, per SP design. B. The Customer will install conduit: 1. Conduit shall be 2 1/2" diameter PVC. 2. Sweeps and bends shall be 36" radius. 3. PVC conduit shall extend 2" minimum above pad. C. Clearances between meter pedestal and other utilities shall conform to applicable codes and/or regulations. D. The developer or their contractors will then: 1. Backfill around the conduit, with the pedestal base in place, pour the concrete pad as specified by the manufacturer (but not to be less than 24" x 24" x 6"). see base detail below. the final grade or ground line should be approximately 2" below the top of the pad. 2. Install and connect a copper grounding conductor, #4 AWG minimum, from a metallic system water pipe or grounding electrode to the grounding lug per applicable code. 3. Anchor the meter pedestal to the pad and place address identification per pages 9-9 & 9-10. 17.25" 12.25" ECOMMENDED GOUND OD LOCATION. 36" 6" MINIMUM CLEAANCE EQ D. PE NEC 110-16, TYPICAL FONT AND BACK. ECOMMENDED SEVICE ENTANCE CONDUIT LOCATION. 3" 7" 2" 14.375" 18.750" SLOTS FO BASE INSTALLATION 17.25" 10" ECOMMENDED SIDE CLEAANCE. 3" BOTTOM VIEW PLAN VIEW SIDE VIEW NO COMPONENTS SHOWN 1/2-13 O 5/8-18 BOLTS SUPPLIED WITH BASE. TOP OF SES BASE PLATE SHALL BE SAME GADE AS THE TOP OF FOUNDATION. FOUNDATION DIMENSIONS AND DEPTH PE JOB SPECIFICATIONS. CONCETE 1/2" O 5/8" ANCHO BOLTS AS EQUIED. FONT VIEW BASE DETAIL PAGE 3 OF 3 ISSUE DATE: 04/15/86 SEVICE AND METE PEDESTAL COMMECIAL APPLICATION ONLY EV. DATE: 10/23/12 200 AMPS MAXIMUM (INSTALLATION DETAILS) APPOVAL: W.LAAMIE 3-15 8509E333.DGN

BUILDING WALL PLASTE ING (SEE NOTE 6 BELOW) C LANDING LUG (TYP.) 1 1/2" N N MAIN DISCONNECT BUSSES SHALL BE POPELY SUPPOTED 1/2" LANDING LUGS "X""N" 6 1/2" OPENING N 5-0" PEFEED 4 0" 6 3" MAX. PULL SECTION SEALABLE FOM FONT "Y" NOTE 4 MAXIMUM AMPACITY 125 225 MINIMUM DIMENSIONS "X" "N" "Y" 8" 11" 6" 8 1/2" 4" 5 1/2" FINAL GADE NOTE 5 NOTES 1. Distribution Design shall determine the SES location. There must be 36" radial clearance, as illustrated on page 5-15, from side of electrical equipment to nearest gas facility vent. 2. See page 9-11 through 9-15 for meter socket clip arrangement. 3. Service entrance to be installed per page 3-17 & 3-18. 4. All requirements on page 3-1, Service iser equirements, apply. 5. Customer shall provide SP-approved plastic conduit from the end of the riser conduit to the location specified by SP. 6. Only factory manufactured service entrance equipment with plaster ring will be approved. No field alterations of service entrance equipment will be accepted. 7. Install service equipment to allow removal of front panels without damage to this equipment or the building. 8. Not for overhead use. ALL-IN-ONE, SEMI-FLUSH 225 AMPS MAXIMUM 3-16 ISSUE DATE: 04/15/86 EV. DATE: 11/14/12 APPOVAL: W.LAAMIE 8509E9.DGN

LANDING LUG (TYP) 1 1/2 " N N MAIN DISCONNECT BUSSES SHALL BE POPELY SUPPOTED 1/2 " LANDING LUGS "" X "" N 6 1/2 " OPENING LABEL (SEE NOTE 6) N PULL SECTION SEALABLE FOM FONT "Y" MINIMUM 1/4" AI SPACE EQUIED 5-0" PEFEED 4-0" 6-3" MAX. FINAL GADE WELL TAMPED BACKFILL ALL-IN-ONE 225 AMPS MAXIMUM PAGE 1 OF 2 ISSUE DATE: 04/15/86 EV. DATE: 08/09/12 APPOVAL: W.LAAMIE 3-17 8509E10.DGN

ALL-IN-ONE 225 AMPS MAXIMUM Maximum Ampacity Minimum Dimensions "X" "N" Y 125 8" 6" 4" 225 11" 8 1/2" 5" NOTES 1. All-in-one equipment shall be utilized for all new installations. EXCEPTIONS: An existing 2-piece SES (separate meter section and load center) may be replaced like-for-like, provided the SES is not being relocated, there is no change in ampacity, character of service and no load is being added. A 2-piece meter section may also be utilized when converting from an overhead to underground service. Service conductors entering from the top of the SES shall be terminated on the top lugs. Service conductors entering from the bottom of the SES shall be terminated on an extended bus below the meter socket. 2. All requirements on page 3-1, Service iser equirements, apply. 3. Landing lugs in pull section shall be CU/AL rated. 4. Neutral may be on side, middle or staggered, but not more than 2 ½ below hot bus terminals. If insulated from enclosure, provide a bonding screw or jumper. 5. A minimum radial clearance of 1 ½ shall be provided between hot bus terminals and ground or neutral surfaces. 6. Service lateral conductors shall be connected to the line side of meter socket by SP. Service conductors shall be terminated on an extended bus below the meter socket. EXCEPTION: For 2-piece SES, service conductors may be terminated at the top if the line side lugs are located at the top of the meter section. 7. This equipment may be constructed for overhead, underground or a combination of both applications. When constructed as an overhead/underground device, a yellow caution label (2" x 3" minimum) that reads, "CAUTION: BUS ENEGIZED AT ALL TIMES" shall be installed below the terminations in the pull section. 8. Service riser conduit shall enter the bottom of pull section. 9. The Customer shall provide SP approved conduit to J-box or source of feed as specified by SP. Customer should also check with telephone and cable companies for their requirements (see page 5-2). 10. Bonding, per code, shall be installed prior to installation of underground service conductors. 11. There must be 36" radial clearance, as illustrated on page 5-15, from side of electrical equipment to nearest gas facility vent. 12. See pages 9-11 through 9-15 for meter socket arrangement. SES UNDEGOUND ALL-IN-ONE 225 AMPS MAXIMUM Page 2 of 2 ISSUE DATE: 04/15/86 EV. DATE: 10/27/16 APPOVAL: S. Duran 3-18 ESS3-18.doc

WEATHEPOOF SEALABLE GUTTE,MINIMUM SIZE 6 MUST " BE ACCESSIBLE FOM TOP O FONT. EXISTING OVEHEAD ISE TO BE EMOVED. 6 " CLEAANCE ABOVE GUTTE WILL BE: 36" FO 600 AMP 24" FO 400 AMP & 12" FO 225 AMP O LESS. THE TOTAL HEIGHT FO WOKING CLEAANCES SHALL BE NO LESS THAN 6-6". EXISTING METE BOX 4 " MAIN DISCONNECT 5-0" PEFEED 4-0" " 6-3" MAX. 10" MAX. MINIMUM 2 1/2" IGID STEEL O INTEMEDIATE METAL CONDUIT (SEE PAGE 3-1) FINAL GADE WELL TAMPED BACKFILL NOTES 1. The Customer shall be responsible for modification of the service entrance from overhead to underground, as shown on this drawing and as approved by the AHJ. 2. All requirements on page 3-1, Service iser equirements, apply. 3. Maintain 36" of radial clearance from side of electrical equipment to nearest gas facility vent. See page 5-15 for example showing gas line clearance. OVEHEAD TO UNDEGOUND MODIFICATION ISSUE DATE: 04/15/86 EV. DATE: 11/15/12 APPOVAL: W.LAAMIE 3-19 8509E11.DGN

8 1/2" METE SOCKET 3 1/4" 1 1/2" 1 3/4" CABLE 1 1/2" ENCLOSUE FO 1 1/2" TEMINATING FACILITIES 4" 1" 22" UNDEGOUND SEVICE TEMINATION 10 1/2" CUSTOME SECTION (LOCATION LEFT O IGHT) POVISIONS FO 2 1/2",4" MAX.CONDUIT IN THE CENTE POSITION SEALING STUDS 6" FONT VIEW SIDE VIEW EFEENCE EUSE C DAWING 302A SEVICE TEMINATIONS PE PAGE 9-58, FIG. 1 SINGLE POSITION NOTES (eference EUSEC Drawing 302A) 1. This drawing is for combination equipment for service termination, metering and distribution feeder breakers. 2. The meter socket to be listed by UL under UL standard 414 for the acceptance of a class 320 self-contained meter. The sealable cover for the service termination and meter mounting device shall be of the ring type having a padlock provision. 3. Customer-owned wiring extended from the distribution section (branch circuits) shall not pass through any section sealed by SP. 4. See page 9-60 and 9-61 for minimum clearances for terminations and for bus and bolt details, as shown above. 5. The pull section/meter cover shall be independent of any service equipment cover. 6. Pull section covers shall be removable, sealable, and provided with two lifting handles and limited to a maximum size of nine square feet in area. Sealing provisions shall consist of two drilled stud and wing nut assemblies at the bottom of the pull section. 7. This type of service is applicable only for residential 1 service. 8. Submit electronic copies of the plans (PDF format preferred) for all proposed SES, 400 amp or larger, to shopdraw@srpnet.com for approval prior to construction of the service section. Drawings must be labeled with the customer s name, job address, SP job number or account number, and contractors name and contact number. ESIDENTIAL UNDEGOUND/ OVEHEAD 1 ONLY, 400 AMPS MAXIMUM CLASS 320 ONLY 3-20 ISSUE DATE: 04/15/86 EV. DATE: 10/23/12 APPOVAL: W.LAAMIE 8509E103.DGN

(3 4W AND CUSTOME WIING SHOWN) APPLICATION: INSULATED DOUBLE LAY-IN LUG FO NEUTAL. 120/240 V. 1 3 W 120/240 V. 3 4 W 120/208 V. 3 4 W 277/480 V. 3 4 W THIS AEA ESTICTED FO C.T. METEING ONLY. NO CUSTOME HADWAE PEMITTED. PULL SECTION TEST SWITCH PECH PE EUSEC DAWING 314 ISE CONDUIT(S) TO MAIN SWITCH WHICH MUST BE INSTALLED BEFOE SP WILL INSTALL A METE NOTES 1. Service entrance shall be installed in accordance with pages 3-17 & 3-18. 2. Neutral shall be of code size and extend into metering enclosure pull section by 24" for connection by SP. 3. No connections shall be made in the instrument transformer box to supply any other meter, and not more than one load circut shall leave the tranformer box. 4. Line and load conductors shall not be located in the same pull section. 5. Service entrance conductors shall enter top of current transformer compartment. Load conductors must exit below the load terminals of the current transformer. 6. All requirements on page 3-1, Service iser equirements, apply. 7. SP furnishes and installs the current transformers and test switch. 8. Current transformer mounting base and test switch perch must be per EUSEC drawing 314. 9. Cabinet shall have a sealable cover with two lifting handles and a plate reading "DO NOT BEAK SEALS, NO FUSES INSIDE." 10. For metering enclosure dimensions see EUSEC drawing 314 for 400 to 600 amps. 11. efer to page 6-1 to determine service riser conduit size. 12. this type service section must be surface mounted. 13. Submit electronic copies of the plans (PDF format preferred) to shopdraw@srpnet.com for approval prior to construction of the service section. Drawings must be labeled with the customer s name, job address, SP job number or account number, and contractor s name and contact phone number. METE BOX INSTALLATION ISSUE DATE: 04/15/86 EV. DATE: 08/09/12 400-600 AMPS MAXIMUM APPOVAL: W.LAAMIE 3-21 8509E101.DGN

NOTE 1 D C 7 1/2" B A C BEAKE* 8 1/2" 9" MAX. METE SOCKET A UNDEGOUND SIDE VIEW PULL SECTION DETAIL *Alternate Breaker Position Below Meter Socket See Side View Detail For Clearance Dimension D A 0.3125" Min.ad. 3.66" Min.ad. (eference EUSEC Drawing 353) DIMENSIONS - INCHES» "A" (Protrusions) "B" Min. "C" Min. "D" Min. FIG.1 0 (no protrusion) Greater than 0" to 1 1/8" 3 3/4" 4 1/4" 4" 4" 4 3/4" 4 3/4" METE CUTOUT DETAIL Greater than 1 1/8" to 2" 4 1/4" 4 1/4" 6 1/4" Greater than 2" to 4" 6 1/4" 4 1/4" 8" Greater than 4" to 11" Max. 6 1/4" 10" 8" NOTES 1. Where an adjustment wall or other obstruction extends more than 11" perpendicular from the face of the meter panel, provide a 10" minimum dimension to the meter socket axis. For obstructions extending 11" or less from the meter panel, the side clearance shall conform to that of Dimension B. 2. Panel cover shall be removable to provide access to the Customer s equipment with the utility s meter and tamper proof sealing rings in place. When there is more than one meter socket per panel, the minimum meter cutout opening shall apply (See Fig. 1). Do not place more than two sockets on any removable cover. 3. Dimension B shall be increased by the amount that the main switch door, including operating handle, reduces the» clearance when opened 4. emovable pull section covers shall not exceed six square feet in area. 5. Separate distribution conductors from metering compartment with a barrier. 6. Grounding shall comply with NEC or AHJ. 7. Main breaker(s) shall be installed before SP will install meters. 8. Main disconnect is required if exceeding six meters and/or disconnects. 9. All meters shall adhere to a height range of 4 to 6-3". 10. SUBMIT ELECTONIC COPIES OF THE PLANS (PDF FOMAT PEFEED) FO ALL POPOSED SES TO shopdraw@srpnet.com FO APPOVAL PIO TO CONSTUCTION OF THE SEVICE SECTION. Drawings must be labeled with the Customer s name, job address, SP job number or account number, and contractor s name and contact number. TYPICAL MULTIPLE METEING INSTALLATION ISSUE DATE: 09/30/90 EV. DATE: 10/23/12 APPOVAL: W.LAAMIE 3-22 8509E78.DGN

LANDING TEMINAL P P P N GUTTE GOUND BUS 10" N (SEE NOTE 8) PULL SECTION APPOVED GOUND NOTES 1. All requirements on page 3-1, Service iser equirements, apply. 2. Neutral terminal must be insulated from enclosure. 3. Bonding (per code), shall be installed prior to installation of underground service conductors. 4. Service neutral shall be connected to uninsulated ground bus in auxiliary gutter with main bonding jumper supplied by manufacturer. SEC. NEC. 384.60 (C) 5. All meters and disconnects shall be 6" above or below gutter. iser shall not extend beyond gutter. 6. Only one neutral conductor and only one ground conductor shall terminate in the gutter from each meter service switch. 7. Terminate branch circuit neutral conductors and branch circuit ground conductors in each service switch box. 8. This area of the pull section is for SP service conductors. Pull box and gutters shall be sealed by SP. 9. A minimum of one meter must be installed at the time service is energized. The main breaker must be installed before SP will set a meter. 10. Submit electronic copies of the plans (PDF format preferred) for all proposed SES to shopdraw@srpnet.com for approval prior to construction of the service section. Drawings must be labeled with the Customer s name, job address, SP job number or account number, and contractor s name and contact number. 11. The service equipment shall be braced for the total available fault current. 12. A main disconnect is required if exceeding six meters and/or disconnects. 13. See page 6-1, 9-60 and 9-61 for number and size of conduits and terminating positions. Depth of the pull section must accommodate the required conduits. 14. All meters shall adhere to a height range of 4 to 6-3". ISSUE DATE: 04/15/86 TYPICAL METE INSTALLATION, 0-800 AMPS EV. DATE: 11/15/12 LANDING TEMINALS IN GUTTE APPOVAL: W.LAAMIE 3-23 8509E104.DGN

SEE NOTE 1 A "X" "W" DEPTH 6" BACK TO COVE "X" "W" 4" SEVICE TEMINATION SECTION B SEALABLE COVE BAIE FIG. 1 FIG. 2 A SEC. A-A SEE NOTE 1 0.3125" Min.ad. "W" "X" 6" 3/4" 3/4" 3.66" Min.ad. 90 W B FIG. 3 SEC. B-B FIG. 4 TOP VIEW FIG. 5 METE CUTOUT DETAIL EQUIPMENT ATING "X" DIMENSION SEVICE "W" DIMENSION 0-200 AMPS 18" 3 WIE 10 1/2" 201-600 AMPS 22" NOTES 1. efer to pages 6-1, 9-60 and 9-61 for size of service supply conduits and type of lugs. The depth of the section shall be such that it will accommodate the required conduits. 2. Provide a minimum radial clearance of 1 1/2" between hot bus terminals and grounded or neutral surfaces. 3. The pull section cover shall be independent of any service equipment other than the pull section. 4. Provide two lifting handles on pull section covers. 5. Pull section covers shall be sealable, consisting of two drilled stud and wing nut assemblies on opposite sides of the panel. All securing screws shall be captive. 6. Submit electronic copies of the plans (pdf format preferred) for all proposed SES to shopdraw @srpnet.com for approval prior to construction of the service section. Drawings must be labeled with Customer s name, job address, SP job number or account number, and contractor s name and contact number. 7. Service supply conductors may cross over horizontal busing provided the horizontal busing is (a) barriered, or (b) fully insulated. The shaded space (shown on drawing) which has dimension "X" high by "W" wide is maintained for service supply conductors only. 8. Grounding shall comply with NEC or the AHJ. 9. All meters shall adhere to a height range of 4 to 6-3". ESIDENTIAL MULTIPLE OCCUPANCY SEVICE SIX METES, 600 AMPS MAX, 120-240V UNDEGOUND, 1 3-WIE 3-24 ISSUE DATE: 09/18/90 EV. DATE: 11/15/12 APPOVAL: W.LAAMIE 8509E79.DGN

TOP VIEW METE HEIGHT (SEE PG. 5-16) 3/8" CHANNEL MOUNTING HADWAE 1 5/8" DEPTH CHANNEL 24" 3/8" HADWAE THU UPIGHT FINAL GADE 1" CAP PIPE CLAMP PE CONDUIT SIZE 1 5/8" DEPTH CHANNEL 2.5" DIA. GALVANIZED SCH 40 STUCTUAL STEEL PIPE 3 MIN METAL CONDUIT INSTALLED UNDEGOUND SHALL BE WAPPED WITH A UL APPOVED PVC TAPE, MINIMUM 1/2" OVELAP, TO AT LEAST 6" ABOVE FINAL GADE. SEE "SES-UNDEGOUND, SEVICE ISE EQUIEMENTS" PAGE 3-1 2500 PSI STENGTH O CLASS C CONCETE PE MAG SECTION 725 400 AMPS MAX METE INSTALLATION ISSUE DATE: 03/27/03 EV. DATE: 11/19/12 APPOVAL: W.LAAMIE 3-25 8509E150.DGN