FAQ SHEET - REGULATORY REQUIREMENTS AND EXPECTATIONS FOR PHA REVALIDATION

Similar documents
FAQ SHEET CHEMICAL FACILITIES PSM NATIONAL EMPHASIS PROGRAM (NEP) OSHA DIRECTIVE CPL , NOVEMBER 29, 2011

FAQ SHEET PSM COVERED CHEMICAL FACILITIES NATIONAL EMPHASIS PROGRAM (NEP) OSHA DIRECTIVE (CPL 02), JULY 27, 2009

FAQ SHEET - MAJOR HAZARD ANALYSIS / DIRECT HAZARD ANALYSIS (MHA / DHA)

Lessons Learned from PSM Audits

Process Safety Management of Highly Hazardous & Explosive Chemicals 29 CFR

LAYERS OF PROTECTION ANALYSIS FOR HUMAN FACTORS (LOPA-HF): AN IMPROVED METHOD FOR ADDRESSING HUMAN FAILURES IN PROCESS HAZARD ANALYSIS

Process Safety Management of Highly Hazardous & Explosive Chemicals. EPA Clean Air Act - CAA 112 (r) Risk Management Plans

Janice T. DeVelasco, P.E.

Lessons Learned from PSM Auditing

Compliance with Proposed Regulatory Requirements on Damage Mechanisms

CalARP/RMP/PSM. Program Upkeep Requirements & Common Program Deficiencies. Ken Hufford. 949/ Risk Management Professionals

Process Safety Code Orientation/Starter Kit

PROCESS SAFETY, ENVIRONMENTAL, AND QUALITY CONSIDERATIONS

PSM Covered Chemical Facilities National Emphasis Program The Chem NEP. Area Director Houston South Area Office

Recommendations from CCPS & others

Title Slide. Nigel James March 2016

LAYERS OF PROTECTION ANALYSIS FOR HUMAN FACTORS (LOPA-HF) by Paul Baybutt Primatech Inc., 50 Northwoods Blvd., Columbus, OH

API Comments on OSHA Guidance Document on Process Safety Management Guidelines for Small Business Compliance September 29, 2016

2012 ISA Safety and Security Division Symposium

Process Safety Management (PSM)

PSM/RMP C HSE

Qualitative & Quantitative Hazard Analysis

Tools for Process Safety for Upstream and Offshore Applications. Authors: Robert J. Weber, P.E. Sonny Sachdeva, PhD Date: 03-May-2016

SPECIFIC PROVISIONS FOR THE ACCREDITATION OF CERTIFICATION BODIES IN THE FIELD OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS (ISO 45001)

26 PROCESS SAFETY MANAGEMENT

CalARP/RMP/PSM Webinar Series

Process Safety Management (PSM) Program. General Company Policy

Environmental Enforcement Trends in the Midwest

Introduction Audience

RMP/PSM WEBINAR SERIES

Workplace HSE & Process Safety Consultancy

APPOLO 2 PROJECT RISK ASSESSMENT OF CAMAÇARI INDUSTRIAL COMPLEX

TECHNICAL PAPER. Selection of HAZOP or PHR for Retrospective Hazard Reviews (RHRs)

Management of Change (MOC) Bob Braun

Are You Being Honest With Yourself Regarding IPL Integrity?

AUDIT QUALITY ASSURANCE WORKSHOP Tuesday 20 th March Presentation by: CPA Hesbon Omollo Bon&Drew Associates-CPA-K

Recommendations from CCPS & others

Process Safety Management of Highly Hazardous & Explosive Chemicals. Incident Investigation, Compliance Audits & Trade Secrets

CHAPTER 1: GENERAL APPLICABILITY

Workshop CC. Best Management Practices ISO 14001:2015 Revving Up Management Support. Wednesday, March 22, :00 a.m. to 9:15 p.m.

EHS Specialist, SW Hub Manager, EHS VP & General Manager REVISION HISTORY

EPA GUIDANCE ON RISK MANAGEMENT PROGRAMS GENERAL DUTY

527 CMR Hazardous Material Processing Part Two: Are You Ready?

Process Safety Implementation in a Greenfield Refinery Project in Alberta

05/05/ th Environmental and Energy Symposium 1

Protective Systems Lifecycle Management and IPL Data Repository A database solution

Comments On The AICPA s Omnibus Proposal From The Professional Ethics Executive Committee (Released June 29, 2012)

The definition of a deficiency is also set forth in the attached Appendix I.

What are CalARP Program 4 & CalOSHA , and Why Should I Care?

Dallas AIChE Meeting April 24, 2012 Don Abrahamson Process Safety Consultant Abrahamson Consulting LLC Phone:

The Hard Elements of PSM/RMP. WITT O BRIEN S Process Safety Compliance Workshop Houston, Texas October 23, 2018

Improved Integration of LOPA with HAZOP Analyses

TRAINING COURSE CATALOG

SSARS NO. 22: COMPILATION OF PRO FORMA FINANCIAL INFORMATION

DIRECTIVE NUMBER: CPL EFFECTIVE DATE: June 7, 2007 ABSTRACT

GAO. HOMELAND SECURITY Federal and Industry Efforts Are Addressing Security Issues at Chemical Facilities, but Additional Action Is Needed

HOW TO OSHA-PROOF YOUR PHAs

OCTC Ohio Chemistry Technology Council

AcuTech Training Institute

Planning an Audit of Financial Statements

Re: Proposed Statement on Standards for Attestation Engagements, Attestation Standards: Clarification and Recodification

PSM REGULATORY UPDATE OSHA MARCH 2016

Process Safety Information (PSI) Standard

EPA ISSUES FINAL GREENHOUSE GAS MONITORING

Risk Management Program (RMP) Rule

Amount of waste generated from industry 2011

122 Norwegian Oil and Gas Recommended Guidelines for the Management of Life Extension

EFFICIENT COMPLIANCE AUDITS BALANCING TIME AND RESOURCES

Planning an Audit of Financial Statements

COMPARISON OF PROCESS HAZARD ANALYSIS (PHA) METHODS

Process Safety Management: Understand The Elements Of (PSM) 29CFR READ ONLINE. By David Pope

Knowledge, Certification, Networking. PROCESS SAFETY MANAGEMENT. Certified Practicing Safety Professional. CPSP Training Module

AN INTRODUCTION TO RISK BASED PROCESS SAFETY. Bob Wasileski January 6 th, REEF MEETING-

Process Safety Management 2008 Update & Review. As if there were safety in stupidity alone. Thoreau

Hot Topics in CAA 112(r) Federal Program Update

New Developments in Measuring Low Silicon in Process Piping Using Handheld X-ray Fluorescence (XRF)

Process Safety Management Enforcement Trends and Best Practices

RAGAGEP OSHA Wants Me to Do What??

e. inadequacy or ineffectiveness of the internal audit program and other monitoring activities;

PROCESS SAFETY MANAGEMENT PROGRAM UNIPAR CARBOCLORO

Process Safety Training. Preventing Industrial. Disasters. through. Leadership, Process Safety. Education.

What s On The Horizon: Possible Changes to OSHA s PSM and EPA s RMP Requirements

PSM RMP CalARP Regulatory Framework Update & Implementation Strategies with Focus on Oil and Gas Facilities

EVALUATION AND ESTIMATION OF COBALT INTRODUCTION INTO SYSTEMS BY VALVES

GET READY GET SET GO HAZARD COMMUNICATION STANDARD ENFORCEMENT BEGINS JUNE 1, 2015

SMS. Sƒfety Mƒnƒgement Services. Explosives Safety Training

The use of the work of specialists in our current practice

Achieving Regulatory Chemical Compliance: Strategies & Approaches that Reduce Risk & Lower Costs

Guideline Regarding Non-Containment Management on Fujitsu Group Specified Chemical Substances

City of St. Joseph, MO, Water Protection Division Industrial Wastewater Survey Questionnaire - Long Form (page 1 of 6)

Internal Audit Report - Contract Compliance Cycle Audit Department of Technology Services: SHI International Corporation Contract Number

Recent Developments in Pulp & Paper PSM

International Standard on Auditing (Ireland) 300. Planning an Audit of Financial Statements

Got Chemicals? The State of Play on Chemical Security Regulations

Qualification of manufacturers of special materials

Applying the OSHA Process Safety Management Standard to Manufacturing Explosives at U.S. Government Facilities

SOURCE HOLDERS FOR RADIATION-BASED MEASUREMENT SOLUTIONS

Industrial Pretreatment Program Industrial User Guide

IS DIGITALIZATION JUST A BUZZ WORD FOR PROCESS SAFETY MANAGEMENT? Pascal Le Gal, PhD IIRSM Meeting, Abu Dhabi, April 4 th 2018

The definition of a deficiency is also set forth in the attached Appendix I.

Transcription:

FAQ SHEET - REGULATORY REQUIREMENTS AND EXPETATIONS FOR PHA REVALIDATION Acronyms and Abbreviations Used FR - ode of Federal Regulations EPA - Environmental Protection Agency MO - Management of hange OSHA - Occupational Health and Safety Administration PHA - Process Hazard Analysis PSI - Process Safety Information P&ID - Piping and Instrumentation Drawing PSM - Process Safety Management What is meant by PHA revalidation? PHA revalidation is the process of examining a PHA to ensure that it adequately addresses process hazards as they currently exist and that it is consistent with the current process. Revalidation accounts for changes to the process, facilities that may affect it, and off-site receptors since the previous PHA and checks to ensure the PHA meets current good engineering practices. What are the regulatory requirements for revalidation? Paragraph 29 FR 1910.119(e)(6) of the OSHA standard states, At least every five (5) years after the completion of the initial PHA, the PHA shall be updated and revalidated by a team meeting the requirements in paragraph (e)(4) of this section, to assure that the PHA is consistent with the current process. (emphasis added). This means addressing changes that have been made to the process. What are the requirements in paragraph (e)(4) for a PHA team? There are three requirements: - At least one member with knowledge in the analysis technique. - At least one member with experience and knowledge specific to the process. 1 opyright 2012, Primatech Inc. All rights reserved

- Team members with expertise in engineering and process operations. Must the PHA be updated every time a change is made to a process? No. OSHA believes that adequate safeguards exist to address potential concerns that might arise between revalidations. OSHA believes that compliance with the requirements of the PSM standard governing changes will provide protection until completion of the next regularly scheduled PHA revalidation (Preamble to 29 FR 1910.119). Does revalidation mean that a new PHA must be performed? No. (June 22, 1998 OSHA letter to Mr. B. A. Fellner, Gibson, Dunn & rutcher, LLP). It is permissible to update the PHA by making revisions to the previous PHA, although if there are many edits to be made it may be easier and preferable to redo the PHA. Must the PHA revalidation be documented? Yes. (June 22, 1998 OSHA letter to Mr. B. A. Fellner, Gibson, Dunn & rutcher, LLP) Are PHA revalidations needed more frequently than every 5 years? Maybe. At least every five years after the completion of the initial PHA" means that a periodic PHA may be required more frequently. (OSHA letter to Ms. S. Tolley, hevron, January 11, 1996). This might arise in such cases as: - A large cumulative number of changes - Major changes - Significant incidents or an unfavorable trend - Knowledge of significant omissions and deficiencies - oncern about the quality of the previous PHA - High risk processes - Reconciliation of PHA approaches after mergers / acquisitions Note that when employers revalidate a PHA before the 5-year deadline, the subsequent revalidation must be completed within the next 5-year period (OSHA letter to Ms. A. M. Schieli, Ebasco Services, October 28, 1992). Are there other regulatory expectations? Yes. Several additional requirements were documented in a June 22, 1998 OSHA letter 2 opyright 2012, Primatech Inc. All rights reserved

to Mr. B. A. Fellner, Gibson, Dunn & rutcher, LLP. OSHA expects: - Existing PHAs to be evaluated using the requirements defined in 29 FR 1910.119(e)(3) of the PSM standard and any necessary revisions made. - hecks to ensure that modifications to processes since the last PHA have gone through MO procedures, or PHAs when required, and those changes are reflected in the PHAs. - An evaluation of process safety information (PSI) to ensure that it is complete, current and accurate. - Verifications to ensure PHA-specified procedures are adequate, up-to-date and are being implemented. - Determinations that existing PHA recommendations have been documented and have been implemented. - A review of all incident investigation reports required by 1910.119(m) to assure that: - All affected PSI, procedures, training, etc., have been updated to reflect recommendations set forth in the subject reports - Appropriate information from those reports has been incorporated into the PHAs - All PSI to be reviewed to ensure that it is complete, current and accurate, not just P&IDs. - A field check is encouraged to assure the accuracy of the existing PHA. What are the requirements of 29 FR 1910.119(e)(3) mentioned above? The PHA shall address: - Hazards of the process - Identification of any previous incidents - Engineering and administrative controls - onsequences of failure of engineering and administrative controls - Facility siting (EPA - stationary source siting) - Human factors - A qualitative evaluation of the failure of controls 3 opyright 2012, Primatech Inc. All rights reserved

an you summarize what a PHA revalidation must address? These items should be covered: - hanges subsequent to the previous PHA. - Identification and correction of PHA omissions and deficiencies. - Ensure that other parts of the PSM program that support PHAs are functioning appropriately and take corrective action. onfirm: - PSI is complete, current and accurate. - Procedures, training, etc. are up-to-date. - New process technology or information since the previous PHA - New requirements since the previous PHA - New or modified regulations How can I get more information? ontact Primatech at: 50 Northwoods Blvd. olumbus, OH 43235 Tel 614-841-9800 Fax 614-841-9805 info@primatech.com 4 opyright 2012, Primatech Inc. All rights reserved

About Primatech Primatech specializes in Process Safety, Security and Risk Management. We offer consulting, training and software to assist our clients in identifying and reducing the risks posed by toxic, flammable, and explosive materials. Emergency Response Program Development and Implementation yber Security Management Process Security Management Security Vulnerability Analysis for Deliberate Acts Including Terrorism Expert Witness Testimony and Litigation Support ompanies in a variety of industries choose Primatech to help them manage the risks posed by such hazardous materials. We help companies reduce the likelihood and consequences of releases, which helps protect employees and the public and prevent damage to equipment and the environment. Reducing these risks also improves productivity and quality. We help companies comply with OSHA's Process Safety Management (PSM) standard, EPA's Risk Management Program (RMP) regulation, and industry guidelines. Our capabilities include: Process Hazard Analysis (PHA) Layers of Protection Analysis (LOPA) Safety Instrumented Systems (SIS) - IE 61511 / ISA 84 SIL Verification ompliance Audits and Program Assessments National Emphasis Program (NEP) Audit Preparation and Assessment PSM and RMP Program Development and Implementation Mechanical Integrity Program Development and Implementation Implementation Mechanical Integrity Program Audits and Assessments Management of hange (MO) for Process Safety Operating and Maintenance Procedures Development Human Factors and Human Error Analysis Facility Siting Analysis Dispersion and onsequence Modeling Probability Modeling Quantitative Risk Assessment Primatech's clients are often Fortune 500 companies but also include medium and smaller sized companies. We specialize in serving the process industries, and have served hundreds of industrial facilities throughout the world. Aerospace Agricultural chemicals Bulk/commodity chemicals old storage warehousing Electronics manufacturing Food processing Hazardous waste treatment Inorganic chemicals Mining Municipal water treatment Oil and gas production and distribution Oil and gas pipelines and terminals Organic chemicals Paints, coatings, resins and adhesives Petrochemicals Petroleum refining Pharmaceuticals Polymers and resins Propane storage and distribution Pulp and paper Rubber and plastics Semiconductors Specialty metals Steel Wastewater treatment Our services and products enable our clients to achieve their risk, safety and security objectives faster and easier. Primatech is an independent company with no vested interests and is seen, therefore, to deliver work recognized as objective and unbiased. opyright 2012, Primatech Inc. All rights reserved