IMPACTS OF TUNNELS IN THE UK. Non-technical summary

Similar documents
D7: TUNNEL CONSTRUCTION AND METHODOLOGY

This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One.

A2: FUTURE TRAIN SERVICE PATTERNS ON THE WEST COAST MAIN LINE CORRIDOR

E21: CONTROL OF GROUND-BORNE NOISE AND VIBRATION FROM THE OPERATION OF TEMPORARY AND PERMANENT RAILWAYS

D9: MAINTENANCE OF PUBLIC UTILITIES

E3: EXCAVATED MATERIAL AND WASTE MANAGEMENT

B6: RAILWAY POWERS IN THE HYBRID BILL

D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS

This paper outlines the proposed community relations strategy to be used by the nominated undertaker during construction of Phase One of HS2.

F2: INFRASTRUCTURE MAINTENANCE DEPOT STRATEGY

E9: CLIMATE CHANGE: ADAPTATION AND RESILIENCE

It will be of particular interest to those potentially affected by the Government s proposals for high speed rail.

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October

Promoters Tunnel Presentation

Draft Code of Construction Practice

Tunnel Presentation. Tim Smart 27 th June 2016 P1509 (1) HOL/10014/0002

B1: THE MAIN PROVISIONS OF THE PLANNING REGIME

Hybrid Bill process. Version 1.0

Boletín Geotécnico Artículo

Crossrail Environmental Statement Volume 1

C11: REGENERATION, COMPULSORY PURCHASE POLICY AND OVER SITE DEVELOPMENT

HS2 PHASE ONE SAFEGUARDING DIRECTIONS. With guidance notes for local planning authorities

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION

FEBRUARY 2015 MONITORING

Delivering Projects in Urban Environments Noise Control. Andrew Bird Colin Cobbing

E7: LAND QUALITY (CONTAMINATION)

This paper outlines the policy on ground settlement proposed for HS2 Phase One.

In Your Area 1 Primrose Hill to Old Oak Common

Excavated Material and Waste Management

Delivering a Sustainable Railway. Summary

G4: APPROACH TO TRAINING AND EMPLOYMENT

CROSSRAIL INFORMATION PAPER D24 TUNNELLING DURATION AND CONSTRUCTION STRATEGY

CROSSRAIL INFORMATION PAPER D10 GROUNDBORNE NOISE AND VIBRATION

HS2 SUPPLIER GUIDE.

HIGH SPEED TWO (HS2) LIMITED

Consultation response. February 2014

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY

EXHIBIT LIST No Exhibit Name Page 1 P6 Tunnel Presentation.pdf (P6) 2-25

HS2. Beth West Commercial Director, HS2 Ltd

Concrete Pipe Jacking

The Hansford Review. Questionnaire Your Views

3 rd Floor 55 Victoria Street London SW1H 0EU Tel: March 2011 REQUEST FOR INFORMATION FOI REQUEST FOI10/144.

Settlement assessment of running tunnels a generic approach

In Title Your Area 4: Denham to Amersham

Transport Select Committee Rail Infrastructure Investment Inquiry

WIDER PAN-REGIONAL RESPONSE TO THE CREWE HUB CONSULTATION

HS1 Link The View from London

Foundation and pile testing specialists. The stability of a structure starts with a strong foundation.

High Speed Rail (London- West Midlands)

Stoke and Staffordshire can be key HS2 beneficiaries as well as Crewe

TravelWatch NORTHWEST

In Your Area 2: North Acton to Northolt

Rugby Gateway is located at the heart of the Logistics. Golden Triangle and offers bespoke design & build facilities

Tunnel. Immersed Tunnels

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

Paper 2. Changing Economic World 3

GEOTECHNICAL SERVICES

Noise and Vibration Solutions Rail, Infrastructure and Tunnelling. SRL Technical Services 1

Guideline Leaflet PC03: Five Year Inspection Reports Church Buildings

The London Land-Use and Transport Interaction Model (LonLUTI)

The Network Rail Hope Valley Capacity Scheme Frequently Asked Questions February 2015

HUDSON TUNNEL PROJECT

Presentation structure

Department for Transport Consultation on the National Policy Statement for National Networks (NN NPS) Written Evidence from GB Railfreight

HIGH SPEED 2 BLIGHT STUDY

Crossrail and our international tunnelling expertise

Infrastructures and Geotechnics

Environmental Statement Non Technical Summary

Lord Adonis Minister of State for Transport Department for Transport Great Minster House 76 Marsham Street London SW1P 4DR. 13 th February 2009,

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways

H e a v y R a i l T r. Pandrol CDM Track - Right on track. a m H I g h S p e e d M e. t r o F r e i g h t L i g h t R a i. l S u b w a y D e p o t s

1. How and Why has this Research been Conducted?

Transport Select Committee Inquiry into the National Policy Statement (NPS) for National Networks Written Evidence from GB Railfreight

Long Term Rail Strategy Key Messages. Based on updated draft strategy January 2018

Review of the Technical Specification for High Speed Rail in the UK. A report to Government by HS2 Ltd

Use of ISO measurement uncertainty guidelines to determine uncertainties in noise & vibration predictions and design risks

ROAD TO GROWTH. The areas of research are acceptable but the conclusions drawn are unconvincing.

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

High Speed Rail: Investing in Britain s Future Decisions and Next Steps

The Digital Railway Programme

The Effect of mixed foundations on the response of some buildings to excavation

Executive Summary. Introduction

Concrete Pipe Jacking

UNDERPINNING A CRANE FOUNDATION

Mineral Products in London. Safeguarding London s Wharves and Rail Depots for future Prosperity and Sustainability

The Infrastructure Decade

UK Road Pricing Feasibility Study: Modelling the Impacts Elizabeth Cox 1 UK

Strategic Transport Plan Position Statement. June 2017

An introduction to HS2 Ltd s approach to managing noise. Community Forums, Sept 2012

Paving the way for increased safety. MULTIRAIL Technology. Measuring, checking, monitoring and sand filling.

In-combination and Cumulative Effects Assessment

OPPORTUNITY KNOCKS. Delivering the UK s infrastructure pipeline CONTACT. Arcadis United Kingdom

Surface Transport Master Plan Addendum 3 Transit Corridor Safeguarding Basis of Design. Revision A

CC1602 Microtunneling

Ching Guan Kee ABSTRACT

VIBRATION CONTROL SYSTEMS FOR TRACKBEDS AND BUILDINGS USING COIL STEEL SPRINGS

RHEDA MRT The ballastless track for underground and surface commuter transit

Vibrating Wire Concrete Stress Cell User Manual

Westside Subway Extension Combined Presentation: Alignments from Beverly Hills-Century City-Westwood/UCLA Presented in Westwood: May 18, 2010

Transcription:

IMPACTS OF TUNNELS IN THE UK Non-technical summary September 2013

IMPACTS OF TUNNELS IN THE UK Non-technical summary September 2013

High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone: 020 7944 4908 General email enquiries: HS2enquiries@hs2.org.uk Website: www.hs2.org.uk This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. Product code: PR28 Printed in Great Britain on paper containing at least 75% recycled fibre.

Contents 1 Introduction 5 1.1 Why we need HS2 5 2 Managing the effects of tunnelling 6 2.1 Identifying effects 6 3 Ground movement 7 3.1 Controlling ground movement 7 3.2 How buildings are affected by ground movement 8 3.3 Tolerance of structures 8 3.4 Reducing impacts on buildings 9 4 Noise and vibration from railways in tunnel 10 4.1 Impacts and improvements in practice 10 5 Requesting further information 11 5.1 Tunnelling in more detail 11 List of figures Figure 1 Proposed High Speed Two (HS2) rail network 4 Figure 2 Crossrail TBM Elizabeth is lowered into the main shaft, 25 October 2012 5 Figure 3 Tunnel settlement trough 7 Figure 4 Settlement assessment process 8 Figure 5 Paths for noise and vibration 10 Figure 6 Typical details for resilient support to rails 11 List of tables Table 1 Historical values of volume loss 8 Table 2 Settlement impact classification (developed for brickwork / blockwork / stone masonry buildings) 9 3

Impacts of tunnels in the UK Introduction HS2 Station HS2 destination served by HS2 classic compatible services Core high speed network (Phases One and Two) HS2 connection to existing rail network Classic compatible services Existing lines with potential for future connection to HS2 Figure 1 Proposed High Speed Two (HS2) rail network 4

1 Introduction 1.1 Why we need HS2 Impacts of tunnels in the UK Introduction 1.1.1 The number of people travelling by train has doubled over the last 15 years. Demand for inter-city journeys, commuting and freight rail transport is rising and is expected to continue to do so in the future. This means that Britain s railways are already overstretched and will get more and more overcrowded over the next 10 to 20 years. 1.1.2 High Speed Two (HS2) will tackle this problem by providing a new railway line the first line north of London for 120 years. Phase One will run between London and Birmingham and tackle the congestion and overcrowding on the West Coast Main Line. Phase Two will do the same for the East Coast and Midland Main Lines from Birmingham to Manchester and Leeds. 1.1.3 HS2 will not only provide capacity for inter-city passenger services, but better connections between our major towns and cities. This improvement will make our railways fit for the next 50 years and beyond. It will also release capacity on the existing railway network for new regional, commuter and freight services. 1.1.4 With HS2, journeys will be shorter, our towns and cities will be closer together, there will be more regular and reliable services, our economy will benefit, and industry will get a boost from the construction of the new railway. 1.1.5 HS2 Ltd is the company responsible for developing a high speed rail route alignment to deliver the capacity we require, while also addressing the impacts of such a scheme on people, property and the environment. The proposed HS2 route connects London with the West Midlands and runs lines on to Manchester, Leeds and beyond. It would link much of the economic heart of England in an integrated, high speed rail network of 330 route miles (figure 1), connecting with the East and West Coast Main Lines to serve Liverpool, the North East and Scotland. 1.1.6 The requirements of the vertical alignment of railway lines in undulating ground often dictate that tunnels are necessary, and this is also the case for HS2. Additionally, some tunnels have been introduced for environmental reasons, especially to pass beneath built-up areas where disruption at the surface would be severe. 1.1.7 As part of the public consultation process, HS2 Ltd made a commitment to provide guidance on the likely effects on people and property from tunnel construction and from trains running in tunnels. Figure 2 Crossrail TBM Elizabeth is lowered into the main shaft, 25 October 2012. Photo: Crossrail Ltd. This document provides a summary of HS2 s main report Impacts of tunnels in the UK which can be found at www.hs2.org.uk. 5

Impacts of tunnels in the UK Managing the effects of tunnelling 1.1.8 Engineers have been constructing rail tunnels in the UK for over 150 years. From measuring settlement and recording noise and vibration levels on previous projects, they have a wealth of experience and technical understanding of the subject, which has been used to improve designs and construction methods. HS2 Ltd is using data from past and current tunnel projects to predict and mitigate the likely effects of tunnel construction and operation. This document (along with the main report) explains how people and property located over a tunnel are unlikely to be affected in any significant way. 1.1.9 In practice, modern technology and management ensure that the effects of tunnelling are generally small and typically go unnoticed. They are also well understood by engineers. As more tunnelled infrastructure is designed, built and operated, the knowledge of the likely effects increases further. This greater understanding, resulting from careful measurement and observation from projects, coupled with improvements in technology and practice, means that underground railways can be constructed and operated with less impact on people and buildings than ever before. 1.1.10 The vast majority of tunnelling projects are successful. The British Tunnelling Society (BTS), a learned society of the British Institution of Civil Engineers (ICE), produces guidance documents which are used internationally as standard, including methods for the control of ground settlement and ground stability during tunnelling, as well as a rigorous risk management approach in underground design and construction. Their guidance will be adopted by HS2 Ltd as the project develops and we are grateful for their and other experts comments on this evidence-based review of UK expertise, which constitutes the latest step of this ongoing process. 2 Managing the effects of tunnelling 2.1 Identifying effects 2.1.1 This document explains the causes of ground movement from tunnelling. It provides information on how buildings are affected by settlement, how damage is categorised and how it can be mitigated. It also explains the various sources of noise and vibration from tunnel construction and operation and how these can be reduced. 2.1.2 Putting a railway into a tunnel is one way to remove any direct impact of running it at the surface. However, tunnelling can have associated effects, principally: 6 settlement (the movement of ground above and around the tunnel, generated during its construction); and noise and vibration generated by trains during operation, which can sometimes be perceptible at the surface, and can also be generated for short periods of time during construction. People and buildings can be affected, but the impacts are small and often go unnoticed. 2.1.3 Most tunnel case histories investigated in the UK show that settlement did not cause any significant issues during tunnelling. Once tunnel construction is completed, some soils such as clays or fine silts can undergo further ground movement. This is termed consolidation settlement. Movements can sometimes be similar in

Impacts of tunnels in the UK Ground movement magnitude to those experienced from tunnel construction. However, consolidation occurs uniformly, over a longer period and a greater area; hence its effect on buildings and utilities is minimal see section 3 for more details. 2.1.4 Rail technology has improved and modern railways produce far less noise and vibration than older systems. Recent projects, such as the Jubilee line extension and HS1, have shown that modern railways can run under large residential areas without noise and vibration affecting the people who live there or disturbing other highly sensitive non-residential land uses see section 4 for more details. 3 Ground movement 3.1 Controlling ground movement 3.1.1 The majority of ground movements occur during tunnel excavation or shortly afterwards, but these ground movements can be controlled and managed. Excavating the tunnel causes a shallow depression or settlement trough at the surface along the line of the tunnel (figure 3). The depth of this trough is termed the maximum settlement, and is dependent on: tunnel diameter and shape; depth of the tunnel; tunnel construction method; ground properties; and man-made structures. 3.1.2 The volume of the settlement trough can be expressed as a Figure 3 Tunnel settlement trough percentage of the excavated volume of the tunnel this is termed the volume loss. There are well-documented case histories and research projects relating to tunnel construction and how ground has settled. Observed settlements have generally been lower than predicted maximum values, and have typically ranged between 5mm and 25mm, depending on the above factors. 3.1.3 Over the past few decades, ground movements have become smaller as tunnelling methods, equipment and engineering understanding have improved. The volume loss has reduced from values of between 2% and 3% in the 1990s to generally less than 1% today for tunnels constructed using modern tunnel boring machines (table 1). 7

Impacts of tunnels in the UK Ground movement Construction date Tunnel project Typical range of volume loss 1995-99 Jubilee line extension (soft ground) 0.4%-3.0% 2000-05 Heathrow rail tunnels (soft ground) 0.2%-2.0% 2004-09 High Speed One (HS1) London tunnels (soft ground) 0.2%-0.8% 2004-09 HS1 North Downs tunnel (rock) 0.1%-0.5% 2001-06 Dublin Port tunnel (soft ground) 0.5%-0.7% Dublin Port tunnel (rock) 0.1% 2013- Crossrail (soft ground) 0.4%-0.9% 2012- National Grid London power tunnels (soft ground) 0.2%-1.5% 2012- Lee tunnel (rock) 0.1%-0.5% Table 1 Historical values of volume loss 3.1.4 Other tunnel case studies namely Ramsgate Harbour tunnel, Abbey sewer, Southwick Hill tunnel, Bristol relief sewer, and Airdrie and Coatbridge sewer tunnel show that settlement did not create significant issues during tunnelling. 3.2 How buildings are affected by ground movement 3.2.1 Buildings of different structural forms respond to ground movement in different ways and often this response goes unnoticed. This is because most buildings are generally good at tolerating small ground movements of the magnitude produced by modern tunnelling. The effect on a building depends on the amount of ground movement, the difference in this movement across the building and the building structure itself. For example, visible cracks in walls and ceilings may sometimes appear in older properties, and occasionally there may be minor damage, which can be easily repaired. 3.3 Tolerance of structures 3.3.1 In order to determine whether there is a risk of building damage from ground movement, engineers carry out assessments using an established three-stage process (figure 4). 3.3.2 Stage 1 is the most basic level of assessment, where a greenfield settlement is calculated for the area influenced by tunnelling. This allows predicted ground Stage 1 Preliminary greenfield assessment No further assessment if settlement less than 10mm; ground slope <1:500 Stage 2 Building potential damage assessment Figure 4 Settlement assessment process No further assessment for Categories 0, 1 or 2 Stage 3 Detailed evaluation Iterative process to define protective measures movement to be conservatively calculated, without taking into account the building s stiffness or behaviour. Where the predicted settlement is less than 10mm (or where the predicted ground slope is less than 1:500), experience shows that buildings and structures generally are not affected. Many buildings undergo similar magnitudes of movement as a result of seasonal ground variations. 8

Impacts of tunnels in the UK Ground movement Category Severity Description 0 Negligible Hairline cracks (<0.1mm) 1 Very slight Fine cracks covered by decoration (0.1mm to 1mm) 2 Slight Cracks easily filled (1mm to 5mm) 3 Moderate Cracks need opening up and repairing by mason (5mm to 15mm) 4 Severe Extensive repair (15mm to 25mm) 5 Very severe Rebuilding required (>25mm) Table 2 Settlement impact classification (developed for brickwork / blockwork / stone masonry buildings) 3.3.3 Stage 2 involves carrying out potential damage assessments for buildings where: settlements are predicted to be greater than 10mm; the building is particularly sensitive or of historic significance; or the predicted ground slope is greater than 1:500. 3.3.4 The assessment allows buildings to be categorised on a scale of damage severity from zero to 5 (table 2). The construction of the London Underground Jubilee line extension and HS1 each required thousands of buildings and structures in London to be assessed. For the vast majority, damage was classified in the zero category, meaning there was a negligible risk of building damage from tunnelling. 3.3.5 Stage 3 requires detailed evaluations to be carried out for buildings in Category 3 or above. This process uses more detailed analysis and, if necessary, helps to determine appropriate protective measures to be employed during construction. Case studies from the Jubilee line extension show that even where actual settlements were close to the predicted values, building damage was in a lower category than the assessment suggested. This indicates that buildings are generally better at accommodating ground movements than the analysis suggests, leading to lower overall levels of damage. 3.4 Reducing impacts on buildings 3.4.1 A variety of methods can be used to reduce the impact of ground movement on buildings. The first stage is design, where key decisions are made on the tunnel s alignment, depth and construction method. A good understanding of the ground conditions helps engineers to select the most appropriate tunnelling technique. However, it is virtually impossible to have an exact picture of the ground conditions at every point along a tunnel route. Variations in ground properties can be managed by the installation of ground support for the tunnel. 3.4.2 Further measures are available, one of which is the injection of material (usually cement grout) to wholly or partially replace the volume loss caused by tunnelling. By doing this between the tunnel and the foundations of a building, the movements affecting the building are significantly reduced. A notable example of these measures being employed successfully was in tunnelling close to the Big Ben clock tower during the extension of the Jubilee line. 9

Impacts of tunnels in the UK Noise and vibration from railways in tunnel 4 Noise and vibration from railways in tunnel 4.1 Impacts and improvements in practice 4.1.1 Noise and vibration may be perceptible for very short periods during construction, particularly as the tunnel boring machine passes a property. Once the railway is in operation, noise and vibration caused by trains may be perceptible to people living above and close to the tunnel, or may have an unacceptable impact in cases of highly sensitive nonresidential land uses. 4.1.2 Any impact depends on several factors, including: the land use and its sensitivity to noise and vibration; the distance of the observer from the source; and the way in which the soil or the building itself transmits noise or vibration. 4.1.3 Impacts can occur because no matter how smooth a rail is, a steel wheel running along it produces some level of vibration. A proportion of this vibration will be transmitted through the track, the tunnel lining and then the surrounding ground the transmission path where it can cause vibration in buildings (figure 5). Usually, the resulting vibration and noise levels are very low and may not even be noticeable. Where impacts could occur, modern low-vibration track systems are well proven as the principal means to avoid or reduce impacts. 4.1.4 Early rail tunnels often caused noise and vibration in buildings overhead and many of them still do. Since then, however, significant improvements have reduced the impact of noise and vibration. Many of these changes have been driven by the need to improve the running performance of the trains. The main improvements include: improved quality of the track; straighter rail alignments; smoother running surfaces on the rails; resilient rail support; Figure 5 Paths for noise and vibration fewer rail joints, which reduces the dynamic loads and consequently the wear and tear on the rolling stock; and better suspension on the trains, improving passenger comfort and reducing the impact forces on the track. 10

Impacts of tunnels in the UK Requesting further information Resilient pad Concrete block encased in rubber boot Figure 6 Typical details for resilient support to rails 4.1.5 The most substantial improvements have been made over the past 30 years, as the development of proven low-vibration track systems has been combined with a requirement to provide such systems. For new projects, this requirement is created by the need to undertake an Environmental Impact Assessment (EIA) for a proposed scheme and, for HS2, the requirements imposed by decision makers when granting powers to construct and operate the new railway. 4.1.6 For high speed trains, the need for better performance ensures that the track is maintained to a very high level. The process of calculating the noise and vibration from rail tunnels is well understood and the effects can be accurately predicted. Where noise and vibration are considered to be an issue, proven mitigation measures are available. One method is to modify the track system that supports the rails. Such methods typically work by introducing softer supports, such as resilient base plates or booted sleepers between the rails and the track bed (figure 6). This isolates the rail vibration from the structure of the tunnel, and hence the transmission path to the surface. 5 Requesting further information 5.1 Tunnelling in more detail 5.1.1 If you live or work near or above the line of the published HS2 tunnelled route, you may be interested in how tunnel construction and the operation of the railway may affect you. For Phase One, initial information is presented in the project s draft Environmental Statement. Further, more detailed information will be provided in the Environmental Statement that will be included with the hybrid Bill deposited with Parliament before the end of 2013. Initial information for Phase Two is provided in the sustainability summary. An EIA will be undertaken for Phase Two if the Government decides to progress this phase of the project to the next stage. 5.1.2 If you would like further information on this subject, or would like to read the full report on tunnelling in the UK, please visit the HS2 Ltd website at www.hs2.org.uk; or contact our Public Enquiries team by email (hs2enquiries@hs2.org.uk) or telephone (020 7944 4908; Mon-Fri, 9am-5pm). 11