Geothermal Power Plant

Similar documents
Geothermal Power Plant

Hachijo-jima Geothermal Power Plant

Scaling Protection Technology for Hachijyo-Jima Geothermal Power Plant

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

The Geothermal Power Plant at Hellisheiði, Iceland

Rotokawa geothermal combined-cycle power plant

Geothermal Steam Turbines for Various Purposes

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

Energy Optimization Modeling of Geothermal Power Plant (Case Study: Darajat Geothermal

WELLHEAD POWER PLANTS

Recent Rehabilitation Technology for Aging Thermal Power Generation Equipment

GEOTHERMAL POWER PROFILE

NGAWHA GEOTHERMAL FIELD EXPANSION PROJECT. GEOTHERMAL FLUID CONVEYANCE SYSTEM

GEOTHERMAL POWER PROFILE

CO-GENERATION PLANT KUSHA INDUSTRY CO.

THE GEOTHERMAL POWER PLANT AT SANJACINTO-TIZATE

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

Electricity Generation from Waste Heat

Steam Power Station (Thermal Station)

Clean Power Solutions Alstom s Geothermal Offering

Performance Improvement of Single-Flash Geothermal Power Plant Applying Three Cases Development Scenarios Using Thermodynamic Methods

GEOTHERMAL POWER PLANTS FOR MEDIUM AND HIGH TEMPERATURE STEAM AND AN OVERVIEW OF WELLHEAD POWER PLANTS

Recent Technology of Geothermal Steam Turbines

VVER-440/213 - The reactor core

Turbine Island. Nhan Huynh Project Manager, Turbine and its auxiliary systems

Products II 1 VERTICAL LINE SHAFT PRODUCT AND OIL LUBRICATED PUMPS II 2 SUBMERSIBLE PUMPS II 3 MIX FLOW PRODUCT AND OIL LUBRICATED PUMPS

Utilizing Vertical Discharge Tests as an Effective Means for Well Decision Making at the Darajat Geothermal Field, Indonesia

GEOTHERMAL POWER PLANTS

Water Dependency of Geothermal Power Generation Systems

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Bringing Untapped Hydropower to Reality

COOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan, Golam Mainuddin, Abu Sadat Mohammad Sayem, Nadeem Nafis

Benefits. Reduced transportation time and cost. Limited on-site inventory. Minimal installation time. Efficient commissioning

7. Electrical Facility Ratings

FRENIC4800VM5, a Water-Cooled High Capacity, High Voltage Inverter

Your partner for the right solution

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

Equipment Design. Detailed Plant Conceptual Design. Version 7.0

Electric Power Generation Systems

2. TECHNICAL DESCRIPTION OF THE PROJECT

STOCKAGE HYDRO. 7 decembre 2018

STEAM TURBINE-GENERATOR & AUXILLIARY SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017

Electric Power Systems An Overview

Water headers are made of reinforced plastic and the design of the spray tree ensures uniform water distribution.

GATE SOLUTIONS. From ( ) Office : F-126, (Lower Basement), Katwaria Sarai, New Delhi Phone :

N N O V A T I O N E F F I C I E N C Y Q U A L I T Y SWP. Self Priming Pump

BASIC CONCEPTS. Yahia Baghzouz Electrical & Computer Engineering Department

MEC-MOS-E-2004 Gas Turbine Maintenance Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Explanation of JCM Feasibility Study in Thailand & Applicable Low CO2 Emission Technology

RESPONSE OF OLKARIA EAST FIELD RESERVOIR TO PRODUCTION

Pre-Qualification Certificate

Application of Steam Turbine Driven Chillers in CHP/DES System

GEOTHERMAL POWER SOLUTIONS

STEAM-FIELD DESIGN OVERVIEW OF THE ULUBELU GEOTHERMAL PROJECT, INDONESIA

Elliott Turbine Generator Sets PRODUCT

Eurammon Symposium Ammonia Absorption Refrigeration. Colibri b.v.

SARULLA GEOTHERMAL PROJECT

NITIN CORPORATION. 402, 4 th Floor, Bezzola Commercial Complex, V.N. Purav Marg, Sion Trombay Road, Chembur, Mumbai , India.

MAINTENANCE OF OLKARIA 1 ADDITIONAL UNITS (AU) POWER PLANT

Elliott Turbine Generator Sets PRODUCT

Numerical Simulation for Natural State of Two- Phase Liquid Dominated Geothermal Reservoir with Steam Cap Underlying Brine Reservoir

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

A. the temperature of the steam at the turbine exhaust increases. B. additional moisture is removed from the steam entering the turbine.

Eng Thermodynamics I - Examples 1

ORC Binary solutions for high enthalpy resources. Daniel Jira - GIM Joseph Bonafin Turboden Mitsubishi Heavy Industries

NATIONAL CERTIFICATION EXAMINATION 2004 FOR ENERGY MANAGERS

ORGANIC RANKINE CYCLE TECHNOLOGY PRODUCTS AND APPLICATIONS APRIL 2013 EAR 99 - NLR

Natural gas saving opportunities in gas supply system of Iran. 22 April 2014

End-to-end electrical solutions for the biggest challenges involved with connecting wind energy to the grid. Solutions for Wind Energy Integration

Preface to the First Edition Preface to the Second Edition. Acknowledgment

LOW-ENTHALPY POWER GENERATION WITH ORC-TURBOGENERATOR THE ALTHEIM PROJECT, UPPER AUSTRIA

TransPacific Energy Advantage: Case Studies

DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

GATE SOLUTIONS. From ( ) Office : F-126, (Lower Basement), Katwaria Sarai, New Delhi Phone :

Overview of Kashima Thermal Power Station. 1. Summary of power station (1) Location 9, Touwada, Kamisu city, Ibaraki prefecture, Japan

THE PREPARATORY SURVEY ON TONSEALAMA HYDROPOWER STATION REHABILITATION PROJECT IN THE REPUBLIC OF INDONESIA PREPARATORY SURVEY REPORT (2)

New Process Control Systems in the Energy Sector

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

Report on Industrial Visit To

GEOTHERMAL EXPANSION PROJECT

DEVELOPMENT OF DOWNHOLE PUMP FOR BINARY CYCLE POWER GENERATION USING GEOTHERMAL WATER

compact efficient reliable

Power cycle development

B. System Design and Performance Requirements

KINGS COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK

Eng Thermodynamics I - Examples 1

Plant Project, Muara Tawar Gas Fired Power Plant Extension Project and South Sumatra-West Java Gas Pipeline Project.

Sustainable use of Water and Energy. Produced Water Treatment and Recycling Power Generation from Waste Heat

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

WASTE TYRE RECYCLING PLANT

Field Performance Evaluation of the Largest Geothermal Organic Rankine Cycle Plant

Fuji Electric s Medium-capacity Steam Turbines FET Series

PRODUCT DESCRIPTION PARAMETERS

PROJECTS AND CHALENGES STRASBOURG 2006 ORMAT

GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY

Applied Thermodynamics - II

THE ALL-IN-ONE INLET AIR COOLING AND FILTRATION SOLUTION USING YOUR WASTE HEAT FREUDENBERG FILTRATION TECHNOLOGIES

GEOTHERMAL POWER SOLUTIONS

Transcription:

Geothermal Power Plant Star Energy Geothermal (Wayang Windu) Ltd., Indonesia Wayang Windu Geothermal Power Plant 1 110MW and 1 117MW 01A3-E-0020

14 Outline Wayang Windu Geothermal Power Plant is located about 40km south from Bandung city, West Java in Indonesia. The plant consists of 1 unit of 110MW and 1 unit of 117MW geothermal steam turbines and generators. All equipment and works within the plant boundary as well as the Steamfield Above Ground System (SAGS) were furnished and constructed by Fuji in collaboration with Rekayasa Industri under an EPC (Engineering Procurement Construction) contract including civil and architectural design and construction work. Unit 1 was completed in June 2000, and Unit 2 in February 2009. The plant is owned by Star Energy Geothermal (Wayang Windu) Overall layout 209,500 Limited (SEG) who is an Independent Power Producer (IPP) and operates the plant and sell electricity to Perusahaan Listrik Negara (PLN) for 30 years. The two units utilize world-largest class single cylinder geothermal steam turbines employing the 27" (697mm) last stage blades. SEG developed 6 production wellpads and 3 injection wellpads. Each wellpad has 1 to 5 wells of 2,000m to 3,000m deep for production and 1,500m deep for injection. The geothermal brine from each wellpad is led to the separator station as two-phase flow through about 4km pipeline. Unit : mm Steam s The turbine is the single cylinder, double flow, condensing type. The lubrication oil system for the turbine and the generator is assembled at the shop and delivered to the site as one package. Rated output : Single cylinder, double flow, reaction, condensing : Unit 1; 110,000kW Unit 2; 117,000kW Inlet steam pressure : 10.7bar a (155psi a) Inlet steam flow : 768t/h (1,690klb/h) NCG in steam : 1.5% Exhaust pressure : Unit 1; 0.12bar a (3.54inHg a) Unit 2; 0.11bar a (3.25inHg a) Speed : 3,000r/min No. of stages : 8 2 Length of last stage : 697mm (27") Geothermal steam turbine 1 2 3 4 5 6 7 sectional view 8 9 10 11 12 13 232,200 Gas removal system Control room 196,900 Gas removal system

s : Cylindrical, 3-phase, synchronous, water-to-air cooled (TEWAC) : 137,500kVA : 13.8kV Output Voltage Power factor : Unit 1; 0.8 (lagging) Unit 2; 0.85 (lagging) Excitation : Brushless 137.5MVA generator and turbine Cooling Water System Mechanical draft counter flow type cooling tower is employed. : Mechanical draft counter flow type No. of cells : 8 Capacity : Unit 1; 18,500m 3 /h (81,500GPM) Unit 2; 19,650m 3 /h (86,500GPM) Design wet bulb : Unit 1; 15.5 C (60 F) temperature Unit 2; 17.0 C (63 F) Water : Unit 1; 23.5/44.8 C temperature (74.3/113 F) Unit 2; 22.5/44.2 C (72.5/112 F) Vertical, centrifugal pumps are employed. 2 sets of 50% capacity pumps are installed.

Electrical and Control System The electric power generated by the generator is delivered to the transmission line via generator transformer by which the voltage is stepped up to 230kV. For the plant operation, control and supervising, the DCS system is provided. Self-standing type control cubicle is also provided for the operation of the electric system such as generator circuit breakers on-off and the automatic synchronization. transformer Control room

Steamfield Above Ground System (SAGS) Steamfield Above Ground System (SAGS) including the wellpad equipment, pipelines, separator station and the scrubber station is also constructed under the same contract. There are 6 production wellpads and 3 brine/condensate injection wellpads for the two units. Geothermal steam and fluid from the production wells is piped the separator station. 6 cyclone type separators are used to separate the steam from the two-phase liquid from the production wells. 4 scrubbers of corrugate type are provided just before the power station to eliminate further moisture. Surplus steam will be released to the atmosphere through vent valves in emergency. 4 rock mufflers are provided near the separator station to reduce the noise level of the steam released. Pipeline from wellpad to separator station Separator station N68-441-82 Scrubber station N68-441-38 N68-441-31 Printed on recycled paper Gate City Ohsaki, East Tower, 11-2, Osaki 1-chome, Shinagawa-ku, Tokyo 141-0032, Japan Phone : (03)5435-7111 Internet address : http://www.fujielectric.co.jp 2012-9(I2012/E2000)DE-K/CTP3Ok Printed in Japan