Clean Cooking Madagascar: EMD. Invitation to Propose for a 2,000 5,000 liter per day Ethanol Micro- Distillery (EMD) with Sugarcane Feedstock

Similar documents
Clean Cooking Madagascar EMD

CO 2. Recovery AND PRODUCTION

«Company» «Address1» «Address2» «City» Sub.: Purchase of Capsule Polishing Machine. 01 No. Detailed Specifications as given below.

# 3: KMI Pulp Moulding System # KMI

PONDICHERRY UNIVERSITY SCHOOL OF LIFE SCIENCES DEPARTMENT OF BIOCHEMISTRY & MOLECULAR BIOLOGY (R.V.NAGAR, KALAPET, PUDUCHERRY

NOTICE INVITING TENDER. Limited tender for Two years in Single-Bid System for Pin Gear Pulley (Dowel Pin)

Crest Biotech Pvt. Ltd.

PONDICHERRY UNIVERSITY

PONDICHERRY UNIVERSITY (A

PRODUCT, BY-PRODUCT, RAW MATERIAL

Ethanol distillery plant

E-SUPPLIER PORTAL. Inquiry Management

E-SUPPLIER PORTAL. Inquiry Management

Fuel your Ethanol with Maguin s Technology: Get a smart Spirit. Get a smart Spirit. for your Plant OUR PROCESS YOUR SUCCESS

Gadsden City Schools

No Query Received Response

Detailed technical specifications for Isothermal Titration Calorimetry (ITC)

PROCUREMENT DEFINITION

PONDICHERRY UNIVERSITY CENTRAL ANIMAL HOUSE FACILITY

PURCHASING AGENT 1 GENERAL

Prefeasibility Report

Equipped for success. Putting it all together with the right process equipment.

Date: November 30, Company: THE UNIVERSITY OF SOUTHERN MISSISSIPPI is considering the purchase of the following item(s). We ask that you submit

Laboratory Set-up Market Analysis in the Framework of Project SAMRS/2013/AFG/01/04. Call for Offers

SCOPE OF WORKS COOLING TOWER & CWTP PACKAGE (PLOT PLAN & WATER) SCOPE OF WORKS BEARING COOLING TOWER & CWTP PACKAGE

Afghanistan. 19 September Dear Sir/Madam. Reference: UNDP/AFG/2013/080

PRASAR BHARATI (Broadcasting Corporation of India) DOORDARSHAN KENDRA : THIRUVANANTHAPURAM 43. :: :: No. 11(1) /DKT/STORES/ Dated, 21/08/2012

INVITATION TO BID CITY OF HOPKINSVILLE

Energy Efficient Bioethanol Production

KLM Technology Group Solutions, Standards and Software. KLM Technology Group. Solutions, Standards and Software

One One Ton Regular Cab 4x4 2 Door Truck Transportation, Infrastructure & Energy

CO₂ purification and liquefaction. Adding value through standardisation and modularisation.

Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at. CREST, Hosakote. Indian Institute of Astrophysics

Process Pumps for Bioethanol Production

SCOOTERS INDIA LIMITED SAROJINI NAGAR,

Request For Quotation (RFQ) for goods/services. Supply of Anaesthesia Equipment in Liberia RFQ No: (RFQ-LBR )

Islamic Republic of Iran Ministry of Petroleum Vendor Evaluation Questionnaire

(RE-ADVERTISEMENT) Afghanistan. Reference: UNDP/AFG/2013/080

PUR-1241 ADDENDUM NO. 2 INVITATION TO BID GREENSAND FILTER SYSTEM AT ELK RIDGE WATER TREATMENT PLANT

Tender #: Cisco Enterprise Licensing Agreement Release Date: February 15, 2018 Closing Deadline: March 1, :00pm Newfoundland Time

INDUSTRIAL WASTEWATER SYSTEMS

TM Series Induced Draft Cooling Tower Specifications

EXPERTISE BIOMASS PRETREATMENT

SLOP / VINASSE CONCENTRATION AND INCINERATION

June 1, 2018 ADDENDUM NO. 1 SPECIFICATION NO FOR. Comprehensive Landscape Services Region VII Specification No

GENERAL REQUIREMENTS. S - Standard C2 - Small Customization C1 - Large Customization U - Unavailable

PAN AMERICAN ENTERPRISES, INC. PAN AMERICAN ENTERPRISES GROUP. Summary Presentation

EXPERTISE BIOMASS PRETREATMENT BIOMASS PRETREATMENT BIOCATALYSIS FERMENTATION GREEN CHEMISTRY PRODUCT RECOVERY AND PURIFICATION

INVITATION TO BID. (This is not an order.)

PRE-FEASIBILITY REPORT

REQUEST FOR BID. PURCHASE AND INSTALL OF 3 GATE OPERATORS AND GATES FOR THE NORTHWEST ARKANSAS REGIONAL AIRPORT February 18, 2019

TABLE OF CONTENTS II. MISSION VISION & OBJECTIVES... 4 III. SERVICES ) INDUSTRIAL AUTOMATION SOLUTIONS... 5 I.

Talwandi Sabo Power Limited Tender document for Design & Engineering, Supply and Erection of Slurry pumping system from Plant to Ash Dyke

Detailed technical specifications for x-ray powder diffractometer with Option for Stress and Texture measurements

2.0 Pest Control at CI/MP Pricing

Process Integration Case Study for the Second Generation Ethanol Production

Proposition of alternative configurations of the distillation columns for bioethanol production using vacuum extractive fermentation process

Quotation deadline:

CO₂ purification and liquefaction. Adding value through standardization and modularization.

BELLARY THERMAL POWER PROJECT PROJECT INFORMATION

ters them into a hammermill at a constant feedrate. The hammermill reduces the kernels to a powder that has the consistency of cornmeal. This discharg

Details of Material. Quantity. 100 Kg. As per SIL. 30 Liters As per SIL. 500 Nos. As per SIL. 200 Nos. As per SIL. 30 Nos.

A New Method of Producing Bio-Energy by Using Sugar- Beets

DESCRIPTION. BID Gasoline and Diesel Fuels

HINDUSTAN AERONAUTICS LIMITED AIRCRAFT DIVISION BANGALORE COMPLEX TELEPHONE : POST BAG NO BANGALORE INDIA

Gullfoss International LLP

INVITATION FOR BIDS For a Forklift (CIP# AEQ1902)

Please include a business card with updated contact information in the packet.

Township of Algonquin Highlands

Event Summary - Team and Leadership Workshop Training. Bid and Evaluation. Visibility and Communication. Commodity Codes.

INVITATION TO BID PURCHASING DEPARTMENT P. O. BOX E. CENTRAL AVENUE VALDOSTA, GEORGIA GREG BROWN, CPPB, CPPO PURCHASING AGENT

Reliability through Experience

Tender #: VMWare Licensing and Support Release Date: February 28, 2018 Closing Deadline: March 9, :00pm Newfoundland Time

Tender #: SAP Business Objects Licenses and Support Release Date: February 26, 2018 Closing Deadline: March 9, :00pm Newfoundland Time

Tender Document. Procurement of Overhead Book Scanner-A1 size Flat Surface with Book Cradle and Glass 2 Units. File No.: 10/02/2016-SD/CIL

Corporate Policy and Procedure

Invitation for Bid No Package Contents

If the due date of tender opening happens to be a holiday, the tenders will be opened on the next working day.

BIOENERGY OPPORTUNITIES AT GAY & ROBINSON. E. Alan Kennett President, Gay & Robinson, Inc.

Supply of Digital Rebound Hammer at College of Engineering Pune

INVITATION TO BID. (This is not an order.)

Tender Submitted Under the Scheme of. Vision Group of Science and Technology (VGST) /

BREWERY PROJECTS REVIEW 28KM

WUPRPM Regulations and Procedures Effective: November 11, 2005 R. Purchasing and Financial Obligations Revision Date: July 1, 2015.

Turbine Air Systems. The Industry Leader in Turbine Inlet Chilling. economic. clean. energy.

ASSISTANT SECRETARY OF ENERGY FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY MEMORANDUM OF DECISION

INVITATION TO BID. (This is not an order.)

Your Partner for Your Projects related to the Agro-Industry

Energy Saving Bioethanol Distillation Process with Self-heat Recuperation Technology

F DTU/213/01-04/14-15/

Cruzan Rum Evaporative Waste Water Treatment Plant St. Croix, USVI Construction Management Plan Progress Report #16 July 31, 2011 Submitted to

INVITATION TO BID. (This is not an order.)

Balanced and Integrated Fabrication Facility for Metric tons per year Modified Boron and Fluorine free E-Glass (E-CR) Fiberglass

INDUSTRIAL WASTEWATER SYSTEMS

Procurement Procedures for Food Service. PASBO December 15, 2016

Request for Quotation (RFQ) Amended #1. Solicitation of Document for Supply and installation of two set Battery Banker (Power Back-up)

KBK REFERENCE LIST-MAJOR PROJECTS ONLY

Schedule of Tender. For. Nitrogen Parallel Seam Sealer

Broad Scope Document

Invitation for Bid (IFB)

Transcription:

Clean Cooking Madagascar: EMD Call for quotations Invitation to Propose for a 2,000 5,000 liter per day Ethanol Micro- Distillery (EMD) with Sugarcane Feedstock Issued by: Clean Cooking Madagascar Lot VE 21 B, Antananarivo 101 Madagascar Phone +261 (0) 3417 555 00 This document invites ethanol distillery manufacturers to submit detailed quotations for the procurement of one ethanol micro distillery (EMD) capable of producing 2,000 5,000 liters per day of hydrous ethanol at 94 96.4% v/v based on sugarcane feedstock and of the goods and services associated. This Call for Quotations must be considered as part of the bidding documents for the EMD, which contain, apart from the Call for Quotations hereby expressed, the Template for Quotations and the Evaluation Criteria to be used for the selection of the contractor. This document contains general information regarding the project, instructions to bidders for submitting quotations and a proposed description of equipment, goods and services that the bidder is required to supply or for which the bidder may propose alternative solutions. The bidder is to provide price quotations for the equipment, goods and services as well as equipment specifications, bidder s responsibilities, and project schedule, as outlined in the following pages. 01/23/17 Page 1 of 7

Project Description Clean Cooking Madagascar (CCM) is implementing a national Ethanol Stove Program in Madagascar. The program includes installation of a pilot EMD to serve as a proving and training facility that will encourage the installation of additional EMDs in Madagascar. The EMD will be a joint venture between CCM and a local business implementing partner. CCM will own a majority share of the EMD for five (5) years. After this time, the local implementing partner will have the opportunity to buy out CCM s interest at a discounted price. EMD suppliers are encouraged to consider entering into the joint venture with CCM and the local business by owning a share of the EMD for one (1) to five (5) years. Now, CCM seeks to procure an EMD with a production capacity of between 2,000 and 5,000 liters per day. The distillery must be able to produce ethanol of hydrous or industrial grade quality at 94-96.4% v/v using sugarcane feedstock. Instructions to Bidders As already stated, this call for quotations must be considered as part of the bidding documents for the EMD Madagascar. In this document the bidder will find a detailed description of the equipment, goods and services required by the Purchaser, which must be the subject of the quotation. The actual quotation must be elaborated by the bidder following the instructions and the structure outlined in the Template for Quotations, keeping in mind the Evaluation Criteria that will be used to evaluate the quotations and select the contractor. In order to present the quotation for evaluation, the bidder must send the quotation via email with the following format: To: Narim@MadagascarEthanolStoveProgram.org Cc: alex.k.milano@projectgaia.com Subject: Quotation for EMD Madagascar The final quotation must be received by 1 st of March, 2017 before 17:00 Antananarivo time (UTC +3). The quotation must be received as a PDF file enclosed to the email. The PDF file must be created strictly following the instructions contained in the Template for Quotations. Quotations received after the deadline will not be considered. The bidder will receive confirmation of receipt of the quotation within 3 working days of its receipt. 01/23/17 Page 2 of 7

If you have any questions regarding this call for quotations or the bidding documents, please send an email to Narim@MadagascarEthanolStoveProgram.org putting in copy alex.k.milano@projectgaia.com. Project Specifications Ethanol Micro Distillery to produce 2,000 5,000 liters per day of Hydrous and Industrial Grade Ethanol at 94 96.4 % v/v based on Sugarcane. Ethanol will be used for stove fuel and must be low in impurities, especially fusel oils and other higher- order alcohols. Requirement / Specifications: Provided here is a suggested specification. Bidders may provide an equivalent or better specification, if so desired, of a different model that has a proof of technical performance. 1) Plant Capacity: 2,000 5,000 liters per day capacity (24 Hours/Day) 1 2) Desired Product: Hydrous Ethanol at 94 96.4 % by v/v strength 3) Raw material: Sugarcane Feedstock 4) Technology: Sugarcane Crushing Unit Batch or Continuous Fermentation/Distillation 3 stages Distillation System (Mash Column and Rectifier) Degasser and Aldehydes column Fusel Oil separation Heat Integration and Energy Efficiency Lower Spent Wash production 5) Days of operation: 330 days a year non- stop operation (24 hours/day) 6) Design codes: ASME / TEMA / ANSI / ISA / API 7) Fuel and Boiler: Boiler based on biomass as a fuel 8) Electricity: Renewable Powered Electricity Generator capable to run the EMD 9) Instrumentation: PLC based controls/digital Panel for the Parameters with an overvoltage protection system 10) Juice storage: Juice storage tank 1 Performance Guarantee is defined as 2 000 5000 liters per 24 hour period containing 94-96.4% (v/v) by volume hydrous ethanol. Selected bidder will be required to meet the performance criteria for a period of seven (7) continuous days (Performance Run). All remedies required to meet the Performance Guarantee are the responsibility of the bidder. 01/23/17 Page 3 of 7

11) Product storage: 15 days in Polypropylene or Thermoset Reinforced Fiberglass or lined steel tank(s) with automatic filling 12) Other utilities: Water treatment, cooling tower etc. 13) Safety items: Fire suppression and other safety equipment including design of safety guards around the machinery 14) Water storage: Above ground tank(s) 15) Waste water treatment: Treatment systems for vinasse, bagasse and water. 16) Laboratory and testing: Equipment for laboratory and testing feedstock and product Scope of Supply S/N o Brief Description 1. Feedstock Crushing and handling system: Pre- treatment and handling Dilution/mixing and sterilization 2. Fermentation System: Yeast Propagation System Fermentation System Pumps, etc. Cleaning in place system (CIP) 3. Distillation system: Beer Holding Beer Stripper and rectification tower 01/23/17 Page 4 of 7

Degasser and Aldehyde column Fusel oil separation Reboiler, Pre- Heater and Condenser 4. Boiler/Thermal system: Biomass fired boiler to generate 300 Kg/hour @ 10 bar De- aerator and Condensate recovery system Pressure Reducer 5. Utilities and Peripheral Equipment: 1. Renewably powered electrical generator capable to run the plant, enclosed 2. Explosion proof motors for all pumps in Distillation 3. Air Compressor 4. PLC controls/digital control panel for most of the parameters 5. MCC Panel Bidder s Responsibilities 1. Planning and Engineering (basic and detailed) 2. Site visit for the services as per scope matrix 3. Site visit for installation, commissioning and training (bidder will be in charge of on- site construction and assembly) 4. Hardware and Spares 5. Local sourcing where possible 01/23/17 Page 5 of 7

6. Delivery is to be quoted CIF Toamasina and FOB port of loading. Bidder will play a role in shipping according to the method selected by the buyer 7. Installation oversight (1 full- time person responsible for supervising on- site construction) 8. Operational oversight for 14 days including 7- day Performance Run. 9. Training and remote monitoring for three months (with proposal for two- year extended support) 10. Process documentation and operations, safety and maintenance user manuals 11. Clarify what part of your proposal, if any, is not covered by the bid document. This could include basic facilities that should be prepared at/for the site of the micro distillery prior to installation. Please specify any requirements that must be fulfilled by the Purchaser prior to installation. Project Schedule This is an approximate project schedule with main steps between the signature of the contract and the commissioning of the plant. The Purchaser has outlined only some of these, the remaining must be outlined by the bidder in the quotation, according to their capacity of providing the goods and services required. Time is of the essence in completing the contract. Vendor s selection/contract signing: March 2017 Ground breaking and Kick off: Target shipping date of equipment: Installation and Construction: Deficiencies check and water testing: Commissioning, performance run and start- up: The price should include: A. Planning and engineering costs Price Schedule 01/23/17 Page 6 of 7

B. Supply of plant and machinery C. Installation and supervision costs D. Commissioning and Start- up costs Ethanol Micro Distillery (EMD) Call for Quotations E. Training costs at the purchaser s premises (plant site, Madagascar). Pricing in USD should be itemized so buyer can clearly see equipment costs and service costs. Additionally, the bidder should provide how after- sales services and required spare parts are to be provided. The bidder should be ready to quote price of all bidders spare parts, which should be valid for at least 12 months after the delivery of the distillery. Additional Service and Support (include or propose as add- ons) The Project Partners seek technical services and support including the following: 1. Guidance on site preparation, civil works and utilities, including water 2. Advice on selection and management/utilization of alternative feedstocks (including starch based, such as cassava, cereals, etc.) 3. Advice on fermentation and chemistry of selected feedstocks. Developing written cook book recipes or instructions for handling feedstock, mash, and related biochemical use 4. Advice on co- product and by- product development and utilization 5. Extended 2- year support service, to include up to three on- site visits per year plus remote analysis of production data and monthly telephone or SKYPE meeting with production personnel 6. Advice on preventative maintenance and system optimization 7. Spare parts support 8. Advice on modularization and scale- up to larger capacity 9. Advice on design of fuel hopper or storage area for boiler fuel 10. Advice on construction to resist high winds and monsoon weather 01/23/17 Page 7 of 7