7.0 PROPOSED ENVIRONMENTAL MONITORING AND FOLLOW-UP PROGRAMS

NOVA SCOTIA Environment Office of the Minister. PO Box 442, Halifax, Nova Scotia, Canada B3J 2P8

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

South Landfill Annual Cover Rate Screening Criteria Checklist

ENVIRONMENTAL ASSESSMENT REPORT (CLASS 2 UNDERTAKING) APPENDICES GOLDBORO LNG PROJECT - NATURAL GAS LIQUEFACTION PLANT AND MARINE TERMINAL

Environmental Guideline for Saskatchewan Asphalt Plants

T a b l e o f C o n t e n t s

SECTION 4.0 REGULATORY ENVIRONMENT

to Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street, 1 st Floor Quebec, Quebec G1K 3X2

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING

FINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REPORT FOR THE ALBERTA SULPHUR TERMINALS SULPHUR FORMING AND SHIPPING FACILITY

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening

TERMS OF REFERENCE FOR THE PREPARATION OF A FOCUS REPORT. Regarding the Goldboro Gold Project Proposed by Anaconda Mining Inc.

Goffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION

SECTION 8.0 ASSESSMENT METHODOLOGY AND VALUED ENVIRONMENTAL COMPONENT (VEC) SELECTION

Draft Environmental Impact Statement Guidelines for the Environmental Assessment of the Sydney Tar Ponds and Coke Ovens Sites Remediation Project

LNG Canada Development Inc.

LNG Canada submitted a formal update as per Condition 11.2 of the CEAA Decision Statement on June 30, 2017:

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

Environmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Westridge Marine Terminal Environmental Protection Plan

TABLE OF CONTENTS. Page

Activities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process.

Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS

APPENDIX D EA Conditions Review D-1: Federal EA Conditions Review D-2: Provincial EA Conditions Review

Comparative Evaluation Option #1 & Option #2

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Project proponent Pieridae Energy Canada, a Canadian energy infrastructure development company.

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

SUMMARY THE PROJECT - 1 -

Factor Potential Effects Mitigation Measures

Canada. Record of Proceedings, Including Reasons for Decision. Cameco Corp_o_ra_ti_o_n. Proponent

SUMMARY OF COMMENTS/RECOMMENDATIONS

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Methylmercury Monitoring Plan. For Surface Water Quality. Muskrat Falls Reservoir, Churchill River and Lake Melville

APPENDIX M COMMUNITY ENGAGEMENT

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

V: PROJECT SCOPING & METHODOLOGY

Manitoba llot. May 5, Reid Persoage Facility Manager Nexeo Solutions Canada Corp Dugald Road Winnipeg, MB R2J OH3. Dear Mr.

AIR MANAGEMENT IN ALBERTA

APPROVAL TO OPERATE I-9723 ARBEC FOREST PRODUCTS INC. PRODUITS FORESTIERS ARBEC INC. Miramichi Oriented Strand Board Manufacturing Facility

Environmental Regulation & Mine Permitting in Ontario

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

SUMMARY OF COMMENTS/RECOMMENDATIONS

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

City of Mississauga Environmental Impact Studies Terms of Reference 2002

The Cumulative Effects Assessment Practitioners Guide (the Agency, 1999) defines cumulative effects as:

TERMS AND CONDITIONS OF APPROVAL. Nova Scotia Environment. Approval

A Proponent s Guide to Environmental Assessment

The Halifax Harbour Solutions Project Provision of Sewage Treatment

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Appendix 1. Air Quality Management Plan

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

What is the Terms of Reference?

F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

South Canoe Wind Project: Environmental Fact Sheet

ENVIRONMENTAL SCREENING REPORT

Fraser Valley Regional District Highlights of Air Quality and Emissions Trends ( )

Guidelines for the preparation of a Comprehensive Study Report Perth-Andover to Woodstock Twinning of Route 2 Trans Canada Highway, New Brunswick

Client File No.: November 1, Dallas Mowat Target Products Ltd Bradner Road Abbotsford B.C. V4X 1H3. Dear Mr.

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study

REPORT AND RECOMMENDATIONS TO THE NOVA SCOTIA MINISTER OF ENVIRONMENT FROM THE NOVA SCOTIA ENVIRONMENTAL ASSESSMENT REVIEW PANEL FOR THE REVIEW OF THE

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

PROJECT AGREEMENT FOR THE BLACK POINT GRANITE QUARRY IN NOVA SCOTIA

Information Requirements Table for Liquid Waste

Manitoba lot Conservation

PROVINCE OF SASKATCHEWAN MINISTRY OF ENVIRONMENT MINISTERIAL CHANGE APPROVAL PURSUANT TO SECTION 16(2)(a) THE ENVIRONMENTAL ASSESSMENT ACT

July 22, Robert Cyr Cyr Construction 1998 Ltd. Box 24, Group 525, RR 5 Winnipeg MB R2C 2Z2. Dear Mr. Cyr:

24.0 FOLLOW-UP MONITORING AND ENVIRONMENTAL MANAGEMENT PLANS

1 CC ;#( t Conservation and Water Stewardship

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

APPENDIX 10. Supplemental Air Quality Information

Facilities Environmental Protection Plan: Burnaby Terminal

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

Scoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey

Alberta Transportation The City of Edmonton The City of Calgary

APPROVAL TO OPERATE I Connors Bros. Clover Leaf Seafoods Company. Blacks Harbour Fish Plant No. 10 and Fishmeal Plant No. 21

F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report

Category Environmental Item Main Check Items Confirmation of Environmental Considerations

Potential Impacts and Mitigations from a Saline Discharge into Marine Environment

DRAFT Type B Water Licence G18L8-001 NWT Energy Corporation (03) Ltd. Inuvik Wind Project

Town of Perth Landfill Expansion Environmental Screening

SUMMARY OF COMMENTS/RECOMMENDATIONS

5 JULY 2018 COMPLETION OF AUTHIER ENVIRONMENTAL STUDIES AND PERMITTING UPDATE

407 TRANSITWAY. Planning & Preliminary Design

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

Transcription:

APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval

Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic Petrochemicals Inc., Proponent Goldboro, Nova Scotia The Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Project (the Undertaking ), proposed by Keltic Petrochemicals Inc. (the Proponent ), in Goldboro, Nova Scotia is approved pursuant to Section 26. This Approval is subject to the following conditions and obtaining all other necessary approvals, permits or authorizations required by municipal, provincial and federal acts, regulations, by-laws, guidelines, policies or standards before commencing work on the Undertaking. It is the responsibility of the Proponent to ensure that all such approvals, permits or authorizations are obtained before commencing work on the Undertaking. This Approval is based upon the review of the conceptual design, environmental baseline information, impact predictions, and mitigation presented in the Environmental Impact Assessment, as well as the findings and recommendations of the Board. Terms and Conditions for Approval 1.0 Phase I - Studies, Inventory & Analysis Prior to application for Part V approval under the Environment Act the Proponent must provide for review and approval: 1.1 a Sustainable Development Plan for the project. The plan shall include but not be limited to the following components: A study to re-assess possible water supplies for the project (including Meadow lake) from an environmental effects and sustainability perspective. An Air Emissions Management Plan for the project. The plan will include an accounting of all anticipated air emissions, monitoring and reporting protocols, emissions management and reduction targets over the life of the project, and plans for the use of best management practices. A Pollution Prevention Plan which includes measures including, but not limited to chemical recycling, reduced chemical use over time, and waste management. Approval page 1

A Greenhouse Gas (GHG) Management Plan for the project. The plan will include an accounting of all anticipated GHG emissions, GHG monitoring and reporting protocols, GHG management and reduction targets over the life of the project, and plans for the use of best management practices. 1.2 details of the impacts to wetlands, methods and plans for avoidance, mitigation and/or compensation, developed in consultation with NSEL and NSDNR. The Proponent must not construct or operate within 30 metres of any wetland or watercourse unless otherwise approved in writing by NSEL. 1.3 results of a project Traffic Impact Study developed in consultation with NSTPW and the Municipality of the District of Guysborough. The results of the study shall be considered in the development of a transportation management plan for the project. 1.4 the following air emissions data for NSEL review prior to submission of the project air monitoring program: chemical characterization of Sable Offshore Energy Inc. (SOEI) gas plant particulates and SO x emission anticipated emissions data from the proposed petrochemical plant for SO x, O 3, known specific VOCs, and other air emissions as appropriate, based on relevant Alberta and Ontario data anticipated emissions data for the proposed incinerator, including emission compounds, concentrations and incinerator hours of operation two seasons of meteorological data on the site, to identify variances with data used in the existing air quality dispersion model. results of an air quality dispersion modelling exercise using site specific meteorlogical data. The model will be used to produce maximum and annual concentration contour maps for air quality components to be determined by NSEL. The contour maps will cover a radius of 25 km from the Goldboro project site. 1.5 a plan to mitigate the human health and environmental impacts of contaminated mine tailings and/or soils and sediments on the Project site, via remediation or risk management. This plan shall be consistent with the Nova Scotia Guidelines for the Management of Contaminated Sites. The Remedial Action Plan and/or Risk Management Plan shall be approved prior to commencement of construction. Upon completion of the remediation or risk management work, including any required monitoring, the Proponent shall submit a Certificate of Compliance to Approval page 2

NSEL to demonstrate that the remediation work has been completed and/ or the Risk Management Plan is effective. The CoC shall be submitted no later than 3 years after completion of construction of the land-based components of the Project. 1.6 a proposed lighting plan which incorporates a program to monitor impacts to birds. The plan must be submitted to NSDNR, Canadian Wildlife Service (CWS), and Transport Canada (TC) for review and approval. Based on the results of the monitoring programs, the Proponent must make necessary modifications to mitigation plans and/or operations to prevent any unacceptable environmental effects, to the satisfaction of NSEL, based on consultation with NSDNR and CWS. 1.7 results of a study to determine potential impacts of the Meadow Lake alterations on the salmon migration corridor. The scope of the study shall be developed in consultation with DFO, NSEL, and NSF&A. Results of the study shall also be submitted to these agencies for review, and the proponent shall develop mitigation measures as required to prevent any identified salmon migration impacts. 1.8 results of a phosphorus modelling exercise for Meadow Lake, using NSEL s standard lake phosphorus model, detailing the assessment of present and predicted trophic states of the lake; and results of a receiving water assimilative capacity study for Betty s Cove Brook and any other freshwaters receiving runoff or effluent from the project site. 1.9 an assessment of impacts associated with dam location at Meadow Lake, including but not limited to consideration of alternatives, and dam failure with associated impacts including but not limited to flooding, the movement of contaminants, and loss or damage to property. 1.10 to NSEL and Environment Canada for review and approval: modelling to predict the assimilative capacity of all receiving environments for all relevant chemical parameters which are expected to enter the environment as a result of Project activities. Such modelling shall include prediction of the potential for bioaccumulation in organisms of any persistent compounds either emitted by the Project or re-mobilized by Project activities; and provide an evaluation of the potential effects, including both acute and chronic (long term) impacts. Effects evaluation shall focus in particular on any potential impacts on human health and/or on organisms. baseline data collection for all relevant chemical parameters which Approval page 3

are expected to enter the environment or be remobilized as a result of Project activities in all receiving environments, including those which may impact on human health and/or on organisms; 1.11 to NSEL and NSTPW, a Transportation Management Plan which shall include, but not be limited to : the identification of primary and secondary transportation routes; details of all required road realignments and upgrades transportation schedules; dust management measures; safety management measures; methods to ensure contractor compliance; monitoring measures; and, communication policies. 1.12 a project Environmental Management Plan (EMP) to be submitted to NSEL for review and approval. Any proposed modifications to the EMP and associated component plans throughout the duration of the project must be submitted to NSEL for review and approval. 2.0 Phase II - Monitoring Plans The Proponent, as part of the application for Part V Approval under the Environment Act, must provide for review and approval a project Environmental Effects Monitoring Plan that will include, but not be limited to: 2.1 a detailed sampling, analysis and quality assurance plan. 2.2 a noise monitoring program, including the anticipated noise levels associated with the project, to be reviewed and approved by NSEL. Based on the results of the monitoring program, the Proponent must make necessary modifications to mitigation plans and/or operations to prevent any unacceptable environmental effects, to the satisfaction of NSEL. 2.3 a project air monitoring program. The Air Monitoring Program shall be developed in consultation with NSEL, Environment Canada, and other agencies as determined by NSEL. Based on the results of the monitoring program, the Proponent must make necessary modifications to mitigation plans and/or operations to prevent any unacceptable environmental effects, to the satisfaction of NSEL. The program, shall include an incinerator monitoring plan. The Air Monitoring Program shall be based upon consideration of one Approval page 4

complete year of baseline data for ambient and peak concentrations of gases and aerosols that may be released from the proposed project, including nitrogen oxides (NO x ), sulfur oxides (SO x ), carbon monoxide (CO), ozone (O 3 ), volatile organic compounds (VOCs), total suspended particulate (TSP), particulate matter less than 2.5 micrometres in diameter (PM 2.5 ), and particulate matter less than 10 micrometres in diameter (PM 10 )]. 2.4 a detailed erosion and sedimentation control (ESC) plan, including a monitoring program for site runoff, to be reviewed and approved by NSEL. Based on the results of the monitoring program, the Proponent must make necessary modifications to ESC plans and/or operations to prevent any unacceptable environmental effects, to the satisfaction of NSEL. 2.5 a program to monitor surface waters, including monitoring location and parameters. Based on the results of the monitoring program, the Proponent must make necessary modifications to mitigation plans and/or operations to prevent any unacceptable environmental effects, to the satisfaction of NSEL. 2.6 a groundwater monitoring program including location of monitoring wells and parameters. The program must be designed to evaluate potential impacts to both groundwater levels and groundwater quality. Based on the results of the monitoring program, the Proponent must make necessary modifications to mitigation plans and/or operations to prevent any unacceptable environmental effects, to the satisfaction of NSEL. 2.7 a wildlife and vegetation monitoring plan, developed in consultation with NSDNR and CWS. As part of the wildlife and vegetation monitoring plan, the Proponent must provide details of a bird monitoring program, to the standards as defined by NSDNR and CWS. Based on the results of the monitoring program, the Proponent must make necessary modifications to mitigation plans and/or operations to prevent any unacceptable environmental effects, to the satisfaction of NSEL. 2.8 details of a monitoring program to determine the potential for and extent of sulphide bearing material and a plan to manage any exposed acid generating material and associated drainage, in consultation with NSEL. 2.9 a Public Reporting and Communication Protocol which shall include, but not be limited to: report on project activities/status how results get reported which results get reported Approval page 5

when results get reported; and, details of the communication methods for reporting to the public and other stakeholders. 2.10 a plan for monitoring for environmental effects for all relevant chemical and biological parameters which are expected to enter the environment or be remobilized as a result of Project activities in all receiving environments, including those which may impact human health and/or organisms. 3.0 Phase III - Mitigation/ Contingency Plans The Proponent, as part of the application for Part V Approval under the Environment Act, must provide for review and approval: 3.1 a project Environmental Protection Plan which shall include, but not be limited to an overall: mitigative measures plan; mitigation monitoring plan that will describe how planned mitigation measures will be evaluated during all phases of the project; quality assurance / quality control measures plan for all construction and site management activities at the site(s); project sedimentation control plan; dust control plan wastewater management plan; 3.2 a Contingency Plan developed in accordance with NSEL s Contingency Planning Guidelines that addresses: fires or other emergencies; and discharge, emissions, escapes, leaks or spills of dangerous goods or waste dangerous goods. The plan shall be developed in consultation with local fire and emergency service providers, and demonstrate compliance with Federal and Provincial regulatory requirements. 3.3 a mitigation plan to address degradation, reduction, or loss of water quality or quantity of residential water supplies and a contingency plan to address any well interference effects and/or well complaints. If the mining operation causes water quality or quantity problems at existing water wells, the Proponent must rectify the problem to the satisfaction of NSEL. 3.4 a proposed aquaculture compensation plan to be implemented in the event that any project related adverse effects on aquaculture are Approval page 6

detected. 4.0 Community Involvement & Archaeological/Heritage Resources 4.1 Prior to construction, the Proponent shall prepare a Local Economic and Community Benefits Plan that includes: a Local Employment Strategy a Local Supply and Procurement Strategy an Equal Opportunities Employment Strategy an Education and Training Strategy to support local employment an Employee/Community Recreation Strategy The Plan shall be developed in consultation with the Municipality of the District of Guysborough, Nova Scotia Economic Development, and other stakeholders as required by NSEL. 4.2 Prior to construction, the Proponent must submit to NSEL for review and approval, a plan for the formation and operation of a representative community liaison committee (CLC) for the project, including a terms of reference (refer to the NSEL Guidelines for the Formation of a Community Liaison Committee). 4.3 Prior to construction, the Proponent shall develop a Mi kmaq Communication Plan for the project which will include but not be limited to: Processes for communicating project details and seeking input from the Mi kmaq community Plans for Mi kmaq involvement in environmental effects monitoring and other project aspects. The plan shall be developed in cooperation with the Mi kmaq Community. 4.4 Prior to application(s) for Part V Approval under the Environment Act, the Proponent shall take steps to further assess traditional Mi Kmaq use of the project site lands. The Proponent shall develop the proposed steps in cooperation with the Mi'kmaq Community and shall submit the results to NSEL. 4.5 Prior to construction, the Proponent shall submit a complete archaeological assessment of the entire project site for review and approval of the Nova Scotia Museum and NSEL. 4.6 Prior to construction, the Proponent shall submit for review and approval of NSEL, an archaeology and heritage resources monitoring and contingency plan. The plan shall be developed in consultation with Mi kmaq stakeholders, African Nova Scotia Affairs, and the Nova Scotia Museum. Approval page 7

4.7 The Proponent shall halt work and contact the Curator of Archaeology at the Nova Scotia Museum, and the Executive Director of the Union of Nova Scotia Indians immediately upon discovery of an archaeological site or artifact. 4.8 Prior to construction, the Proponent shall enter into an agreement with the Office of African Nova Scotia Affairs for the establishment of a memorial at the Red Head Cemetary site. 4.9 Prior to construction, the Proponent shall submit to NSEL for review and approval, a plan to ensure that project development and operations proceed in a manner which respects the cultural heritage value of the Red Head Cemetary site to the community, and that public access to the site will be maintained. 5.0 General Approval 5.1 This Approval is limited to the scope of the Undertaking as described in the Environmental Impact Assessment, dated July 2006, and subject to the following conditions. Any proposal by the Proponent for expansion, modification or relocation of any aspect of the project from that proposed in the Environmental Impact Assessment must be submitted to the Branch for review and may require an environmental assessment. 5.2 The Proponent must, within two years of the date of issuance of this approval, commence work on the Undertaking unless granted a written extension by the Minister. 5.3 The Proponent must implement all mitigation and commitments in the Environmental Impact Assessment, unless approved otherwise by Nova Scotia Environment & Labour (NSEL). 5.4 The Proponent shall apply the Canadian Chemical Producers Association (CCPA) Responsible Care principles to the design, maintenance, and operation of the petrochemical plant. Original signed by Mark Parent Minister of Environment and Labour Approval page 8