ASPHALT BINDER QUALITY PROGRAM

Similar documents
DMS PIEZOELECTRIC SENSOR SEALANT MATERIALS

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

DMS-8220 Hot Applied Thermoplastic

Asphalt Binder, Cutback Asphalts, and Emulsion Asphalts

Qualification of Highway Product Manufacturers Through the Use of NTPEP Audits

Asphalt Technology Division

08/01/2018 WYOMING DEPARTMENT OF TRANSPORTATION E-140 AUTHORIZED SUPPLIERS PERFORMANCE GRADED ASPHALT BINDER (PGAB) CALUMET-TOOELE, UTAH

SCDOT QUALIFIED PRODUCTS POLICY 2

Appendix 1 SCDOT Aggregate QC/QA Policy

DMS-7370 Steel Bridge Member Fabrication Plant Qualification

NTPEP Evaluation of Plain and Laminated Elastomeric Bridge Bearings

Qualification of Highway Product Manufacturers Through the Use of NTPEP Audits

Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms.

DMS-6400, De-icer/Anti-icer (Magnesium Chloride/Sodium Chloride)

STATE OF OHIO DEPARTMENT OF TRANSPORTATION. SUPPLEMENT 1016 CARBONATE MICRO-FINES CERTIFICATION January 20, 2017

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION. SUPPLEMENT CEMENT CERTIFICATION December 31, 2012

DMS REINFORCED CONCRETE PIPE FABRICATION AND PLANT QUALIFICATION

Asphalt Binder. Sampling and Material Quality Issues

Quality Assurance Program for Design-Build Projects with an Optional 15-Year Capital Maintenance Agreement

AGGREGATE QUALITY MONITORING PROGRAM

Special Provision No. 111F09 December Additional Test Results and Samples for Performance Graded Asphalt Cement (PGAC)

DMS-4300 Traffic Buttons

1995 METRIC CSJ SPECIAL SPECIFICATION ITEM 3014 QUALITY CONTROL/QUALITY ASSURANCE OF ASPHALT BINDERS FOR BITUMINOUS MIXTURES

Evaluation of Polypropylene Drainage Pipe Manufacturers

Evaluation of Chemical Admixtures for Concrete

Make copies of all test results and control charts readily available to the Engineer at the project site.

I. Development, Submittal, and Acceptance of a Quality Management System

OKLAHOMA DEPARTMENT OF TRANSPORTATION APPROVAL PROCEDURE

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

Quality Assurance Program for the Carolina Crossroads Project

150/ G Versus 150/ H Contractor Quality Control Program

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

NTPEP Evaluation of HDPE (High. Pipe. Density Polyethylene) Thermoplastic. Standard Practice for. AASHTO Designation: [Number]

Bureau of Materials Materials Approval Procedures

Evaluation of HDPE (High Density. Drainage Pipe Manufacturers. Polyethylene) Thermoplastic. NTPEP Committee Work Plan for

SECTION COMMUNICATIONS SYSTEMS QUALITY ASSURANCE & TESTING

32.02 RESPONSIBILITIES OF THE TESTING AGENCY

Evaluation of Profile Wall Polyvinyl Chloride Drainage Pipe Manufacturers

ROARING FORK & EAGLE VALLEY (RFEV) SECTION 4 ASPHALT MIXTURE REQUIRMENTS

Chapter 3. Bituminous Patching Materials SECTION ACCEPTANCE OF PRE-MIX PATCH MATERIAL

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PRE-QUALIFIED AGGREGATE SUPPLIER PROGRAM. April 18, 2008

Evaluation of Highway Guardrail Manufacturers

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SUPERPAVE HOT MIX ASPHALT PERCENT WITHIN LIMITS

ICC-ES Requirements for Quality Documentation and Inspection of Manufacturing Facilities

DMS-4650, Hydraulic Cement Concrete Curing Materials and Evaporation Retardants

Supplier Quality Requirements Document (SQRD)

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PREQUALIFIED AGGREGATE SUPPLIER PROGRAM. April 15, 2016

QUALITY ASSURANCE PROGRAM

GLOBAL HEALTH SUPPLY CHAIN QUALITY ASSURANCE QA.APP.GEN-52 Laboratory Commodities and Consumables: Supplier Technical Questionnaire

Pay Adjustment for Performance Graded Asphalt Cement

Table of Contents. Project Agreement Schedule 14

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT CEMENT CERTIFICATION. April 18, 2008

Special Provision No. 335S03 April 2015

SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HMA MIXTURE (WITH SAMPLING BEHIND THE PAVER)

MICHIGAN DEPARTMENT OF TRANSPORTATION

Facilities Planning and Construction (FP&C)

MICHIGAN DEPARTMENT OF TRANSPORTATION

DMS EPOXIES AND ADHESIVES

CONSTRUCTION SPECIFICATION FOR TACK COATING AND JOINT PAINTING

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

INDIANA. So how do you make hot mix asphalt? Basics of HMA Pavement Performance. Basics of a Good Road Hot Mix Asphalt Pavement Materials Selection

INS QA Programme Requirements

Warm Mix Asphalt (WMA)

AMENDMENT TO OPSS 313, MARCH 1993 AND OPSS 1149, MARCH Special Provision No. 103F34 March 2006

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SUPERPAVE HOT MIX ASPHALT PERCENT WITHIN LIMITS

A. Provide all labor, materials, and equipment as necessary to complete all work as indicated on the Drawings and specified herein.

Quality in Construction Under 50,000 Tons

Warm Mix Asphalt (WMA)

SPECIAL PROVISION Asphalts, Oils and Emulsions

Minnesota Department of Transportation. Curing Compound Manufacturer Approval Program. July 17, 2017

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

DMS-7305 Fabrication and Qualification Procedure for Multi- Project Fabrication Plants of Precast Concrete Drainage Structures

Superpave Design Guidelines for Using Hot-Mix Recycled Asphalt Pavement and Recycled Asphalt Shingles

May 2004 Asphalt Pavements 400-i. Table of Contents 401 HOT-MIX ASPHALT PAVEMENT DESCRIPTION OF WORK

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Quality Management System

Pre-Audit Application Form

S-26 (2360) PLANT MIXED ASPHALT PAVEMENT (LOCAL AGENCY) (2013 version )

UNIFIED FACILITIES GUIDE SPECIFICATIONS

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

Tex-205-F, Laboratory Method of Mixing Bituminous Mixtures

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

DMS WATERPROOFING

Quality Management System

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX

Special Provision No. 308F01 May 2010

INDIANA DEPARTMENT OF TRANSPORTATION MATERIALS AND TESTS DIVISION. CERTIFIED AGGREGATE PRODUCER PROGRAM ITM No P

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1074 CONCRETE PIPE CERTIFICATION PROGRAM FEBRUARY 12, 2003

Commercial Warehousing Program

Standard Test Procedures Manual

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure

SUPPLIER QUALITY REQUIREMENTS

MATERIAL SPECIFICATION FOR PERFORMANCE GRADED ASPHALT CEMENT

Design-Builder Peformance Evaluation (DBPE)

DESIGN OF BITUMINOUS MIXTURES

Colorado Department of Transportation Bituminous Laboratory

QUALITY AGREEMENT. The following Agreement has been concluded between

TECHNICAL SPECIFICATIONS

Transcription:

Test Procedure for ASPHALT BINDER QUALITY PROGRAM TxDOT Designation: Tex-545-C Effective Date: February 2017 1. SCOPE 1.1 The Asphalt Binder Quality Program (ABQP) provides the requirements and procedures for the Construction Division, Materials and Pavements Section (CST/M&P) to inspect and approve asphalt binders and related products at the source of manufacture. 1.1.1 Use this procedure for approval of the following types of material, as specified in Item 300, Asphalts, Oils, and Emulsions, of the Department s Standard Specifications and in DMS-6310, Joint Sealants and Fillers : asphalt cement (AC), cutback asphalt, asphalt emulsion, performance graded (PG) binder, asphalt recycling agent, polymer-modified emulsion crack sealer, emulsified joint sealant (Classes 9 and 10), and other specialty materials addressed by Item 300. 1.1.2 The Materials and Pavements Section of the Construction Division (CST/M&P) maintains the Material Producer List (MPL) of all materials conforming to the requirements of the ABQP. Materials appearing on the MPL, entitled Asphalt Binders, require no further testing unless deemed necessary by the Engineer. Materials not appearing on the MPL may not be used on Department projects. 1.1.3 Suppliers wishing to provide asphalt binders for use on Department projects must gain acceptance to the ABQP by pre-qualification under either of two approaches described in Sections 8 9 of this procedure. Seek approval for individual tanks or batches of finished binders, as described in Section 9; or Seek approval to supply binders for a specific time period, as described in Section 10. 1.1.4 Sections 2 8 of this procedure apply to both of these approaches. CONSTRUCTION DIVISION 1 9 EFFECTIVE DATE: FEBRUARY 2017

1.1.5 Other acceptance methods may be required by the plans and specifications for individual projects or materials. 2. DEFINITIONS 2.1 Supplier the entity that provides approved materials addressed by this test procedure to a Department project. 2.1.1 Off-site facilities such as refineries and blending plants are the primary suppliers. 2.1.2 Terminals or storage facilities are considered the suppliers of all materials they ship to Department projects, even if the binders are originally from other approved sources. 2.1.3 Contractors who blend materials, add modifiers, or otherwise process binders on-site are considered the suppliers of those finished products. 2.2 Modifier any material added to a basic asphalt binder to adjust or alter the finished grade of the binder. This includes materials that enhance or assist the effect of other modifiers. Examples include polymer, rubber, re-refined engine oil bottoms (REOBS), polyphosphoric acid (PPA), and chemical enhancers. 2.3 Additive any material added to a basic asphalt binder with the intention of altering the performance of the paving mixture. Examples include warm mix additives and anti-strip agents. 2.4 Asphalt Laboratory the Asphalt Binder Laboratory of the Asphalt, Chemical, and Calibration Branch of CST/M&P. The Asphalt Laboratory is responsible for administration of this program. 3. PRE-QUALIFICATION PROCEDURE 3.1 Pre-Qualification Request: 3.1.1 Submit a request for evaluation under Tex-545-C to DMS_Prequal@txdot.gov. Include the following information in the request: company name; physical and mailing addresses; contact person, phone number, and email address; and approval sought for: individual tanks or batches of finished binders, as described in Section 9, or supplying binders for a specific time period, as described in Section 10. 3.1.2 With the pre-qualification request, provide a quality plan that includes the following for each facility addressed: address and contact information; CONSTRUCTION DIVISION 2 9 EFFECTIVE DATE: FEBRUARY 2017

brief narrative description of the facility including number of tanks, loading racks, rail or barge facilities, general types of products, and capacity; site map showing locations of tanks, loading racks, rail lines, buildings, and other major features; proposed binder grades to be provided to the Department; listing of modifiers and additives used in each grade with approximate concentration ranges indicative of the makeup of the product; general description of binder manufacturing process, including blending processes; organizational chart and biographical information and qualifications for key personnel; training and calibration procedures that will be used (and records kept) to assure that technicians perform tests according to correct procedures and that equipment is maintained and calibrated (Facilities may reference their AMRL accreditations, where applicable, rather than describing these procedures.); name, location, and qualifications of any off-site laboratories that provide testing service; schedule of routine quality control (QC) tests for all products; schedule of full specification testing for all products; normal schedule of independent sampling by CST/M&P and basis of approval; description of methods used for monitoring or analyzing test results to identify production problems, inconsistencies, or deficiencies (This might include control charts, statistical analyses, trial formulations, or other procedures.); procedures for addressing failing test results; and transport inspection and loading procedures to ensure proper material handling and shipment of the correct materials. 3.1.3 CST/M&P will review the submittals and may ask for revisions or additional information. 3.2 Qualification: 3.2.1 Upon approval of the quality plan, CST/M&P will add each facility addressed by the plan to the MPL as a pre-qualified asphalt binder source. 3.2.2 Seek approval for specific grades of asphalt binder by submitting samples to the Department on the schedule established in the quality plan or as requested by CST/M&P. 3.3 The Department reserves the right to sample and test materials at any time and to reject material that does not meet the contract requirements. CONSTRUCTION DIVISION 3 9 EFFECTIVE DATE: FEBRUARY 2017

4. QUALITY MONITORING (QM) REQUIREMENTS 4.1 Reporting: 4.1.1 Submit regular reports of activities related to the quality plan in electronic form to CST/M&P. 4.1.2 Submit the following monthly reports for each calendar month by end of the 10th working day of the following month: monthly summary of all quality control testing and results, including any actions taken to address failures or other material problems; and monthly summary of showing the total quantity of each grade of material shipped from each facility. This should include material delivered to the Department, to Department projects, or to Contractors who may reasonably use the material for Department work. 4.1.3 Submit a quarterly report indicating whether there are any changes to the facility or manufacturing process that differ materially from the quality plan, and describing those changes. Submit quarterly reports for each 3-month quarter of the calendar year by the end of the 10th working day of the following quarter. 4.2 Random Sampling: 4.2.1 Department personnel may visit suppliers facilities as deemed necessary to collect samples, verify compliance with the quality plan, or investigate any issues related to the materials. 4.2.2 The Department may collect random check samples from tanks, loading facilities, or transports. 4.2.3 Department visitors will comply with facility safety policies. 4.3 Disqualification: 4.3.1 Facilities that do not supply any material to the Department for 1 year will be removed from the MPL unless a new pre-qualification request and updated quality plan is submitted before end of that period. 4.3.2 Facilities may be disqualified for noncompliance for any of the following reasons: failure to meet the reporting requirements of this test procedure and the facility quality plan, failure to perform quality or testing activities identified in the quality plan, failure to respond to Department communications or requests, or unresolved problems with materials used on Department projects. CONSTRUCTION DIVISION 4 9 EFFECTIVE DATE: FEBRUARY 2017

4.3.3 The Department will work with the supplier to find remedies to any nonconformities or problems. 4.3.4 If the supplier is unresponsive or uncooperative, or has repetitive quality issues, the Department will transmit a demand letter for remedy with a due date for compliance. 4.3.5 Failure to comply with the demand letter by the required date will result in disqualification. 5. SAMPLE SUBMISSIONS 5.1 Conduct all sampling in accordance with Tex-500-C, with witness by the Engineer if the samples are to be submitted to CST/M&P for testing. 5.1.1 The Department will assign an inspector to witness sampling and deliver the samples to CST/M&P whenever practical. 5.1.2 Contact the Asphalt Laboratory for instructions if no inspector is available. 5.2 Provide a certificate of analysis (COA) with all samples submitted for approval. 5.2.1 The COA must represent a sample taken from the same product stream or tank within 1 day of submission of the sample. 5.2.2 The COA must clearly show: name, location, and contact information for the material supplier; dates of sampling and testing; name and contact information of the laboratory performing the analysis, if an outside laboratory is used; and test results demonstrating that the material meets the specifications for the intended grade. 6. GENERAL APPROVAL PROCESS 6.1 Unless other specific arrangements have been made with either CST/M&P or the Engineer, do not deliver material to Department projects until CST/M&P issues a test report with a sample identification number indicating approval, (referred to as a lab number ). 6.1.1 The Asphalt Laboratory will distribute test reports by fax or email. 6.1.2 The test report will include: date the report is issued, name and location of the supplier, grade of material, CONSTRUCTION DIVISION 5 9 EFFECTIVE DATE: FEBRUARY 2017

period of approval, quantity of material approved, if applicable, and lab number. 6.1.3 The Asphalt Laboratory will issue test reports for failing samples. These reports will not include a lab number and do not indicate approval of the material. 6.2 Approval granted by any test report will expire at the end of the period or quantity shown on the test report. Test reports will show the valid dates for the approval. 6.3 Resolve any discrepancies or referee testing, if allowed, before delivering material to Department projects. 6.4 Include the following information on the invoice or loading certificate for each shipment of binder: supplier s name and location; consignee and destination; type and grade asphalt; tank and seal numbers for material approved by tank; batch number for material approved by batch; period of approval for materials under approved quality plans; temperature, date, and time of loading; lab number; highway project number and/or requisition number, if applicable; specific gravity at 77 F (25ºC) for AC and PG binders, or at 60 F (15.5ºC) for cutbacks and emulsions, and; net weight. 6.4.1 Incorrectly identified materials will not be accepted. 6.4.2 Provide COAs and CST/M&P test reports to the Contractor and Department project personnel upon request. 7. TESTING CHARGES 7.1 The Department does not charge for testing of passing samples. 7.2 The Department will assess a charge for failing samples, as required by Title 43 of the Texas Administrative Code (Title 43, Part I, Rule 13.8, Testing Asphalt ). 7.2.1 CST/M&P may allow the supplier to submit a second sample for retesting. 7.2.2 If the second sample passes, there will be no charge for either sample. CONSTRUCTION DIVISION 6 9 EFFECTIVE DATE: FEBRUARY 2017

7.2.3 Additional samples after a retest will be treated as new submissions. 7.2.4 Contact the Asphalt Laboratory for a schedule of test charges. 7.3 Do not submit samples for purposes other than approval for use on Department projects, except by special arrangement. 8. ADVANCED ACCEPTANCE 8.1 In some cases, to avoid delays in material supply, CST/M&P may approve materials before testing is complete. 8.1.1 The decision to allow or deny advanced acceptance is at the discretion of CST/M&P and is based on the performance history of the supplier for the grade in question. 8.1.2 As a minimum, the 3 most recent submissions of that grade from the supplier must meet the specifications. 8.1.3 Results submitted in a COA should provide reasonable assurance that the sample will pass when tested by the Asphalt Laboratory. (The results are not borderline. ) 8.2 Contact the Asphalt Laboratory to request advanced acceptance. 8.2.1 Perform testing on the material no more than 1 day prior to the request. 8.2.2 Provide a COA for the material by fax or email prior to the request. 8.2.3 Sample the material and submit to CST/M&P on the day of the request. 8.3 If advanced acceptance is granted, the Asphalt Laboratory will immediately issue a preliminary test report with a lab number. 8.3.1 CST/M&P will withdraw approval and rescind the lab number if: the sample is not received by the Asphalt Lab within 5 business days, or the sample does not pass all specifications when tested by the Asphalt Lab. 8.3.2 The material supplier accepts all risk up to and including nonpayment for shipments if advanced acceptance of the material is withdrawn. 9. APPROVAL BY TANK OR BATCH VOLUME 9.1 Use this method when seeking approval for discrete quantities of finished product or blend stocks stored in tanks. 9.1.1 Provide covered tanks of a size commensurate with the quantity of material produced so that excessive sampling will not be required. CONSTRUCTION DIVISION 7 9 EFFECTIVE DATE: FEBRUARY 2017

9.1.2 Set storage and loading temperatures as desired, as long as they are within the limits shown in the current Department specifications. 9.1.3 Provide a satisfactory means of effectively sealing the inlet or fill line. 9.1.4 Equip tanks with convenient sampling ports at least 3 ft. above the bottom of the tank. AASHTO T 40 shows recommended designs for sampling valves. 9.1.5 For blended materials, provide convenient sampling ports at the loading facilities. 9.1.6 Provide clear, unique identifying numbers for each tank. 9.2 When the material in a finished product tank is ready for shipment, submit a sample from the tank as described in Section 5. 9.2.1 At the time of sampling, with witness by the Engineer, seal the inlet or fill line of the tank with a numbered railroad-type seal. 9.2.2 Include the tank number, seal number, and the volume of material in the tank on all documentation relating to the sample. 9.2.3 Approval of the material, if granted, is for the volume of material in the tank at the time of sampling. Approval of the material expires when: approved volume is consumed, seal on the tank is broken or removed, any material is added to the tank, or after 60 days for AC or PG binders, or 30 days for emulsions or cutbacks. 9.3 When the supplier is ready to blend specification grade materials from blend stocks using an inline mixer, obtain a sample from the first load and submit the sample as described in Section 5. 9.3.1 At the time of sampling, seal the inlet lines of the blending stock tanks with numbered railroad-type seals and report the volume of blending stocks on hand. 9.3.2 Assign a unique batch number to the sample. 9.3.3 Include the batch number and seal numbers on all documentation relating to the sample. 9.3.4 Submit a sample as described in Section 5, with a unique batch number, for each grade to be produced from the same blending stocks. 9.3.5 Approval of the materials, if granted, is for shipments of the sampled grades made from the blending stocks on hand at the time of sampling. Approval of these materials expires when: seal on either blend stock tank is broken, material is added to either blend stock tank, or CONSTRUCTION DIVISION 8 9 EFFECTIVE DATE: FEBRUARY 2017

after 60 days for AC or PG binders, or 30 days for emulsions or cutbacks. 9.4 The Department may collect random check samples from tanks, loading facilities, or transports. 9.4.1 The material supplier may capture the check samples with witness by the inspector. 9.4.2 No COA is required with random samples. 10. APPROVAL BY SPECIFIC TIME PERIOD 10.1 Use this method when seeking approval for specific time intervals established in the facility quality plan. 10.2 Submit samples as described in Section 5. 10.2.1 Submit samples before the beginning of the normal approval period (maximum 15 days early) to avoid lapse of approval. 10.2.2 Include the requested approval period on all documentation related to the sample. 10.2.3 CST/M&P may require more frequent independent sampling and testing during initial implementation of the plan. 10.2.4 No COA is required with random samples. 10.3 Approval will be based on the review of supplier test data and the Asphalt Laboratory s quality assurance (QA) testing. 10.4 Approval of the material, if granted, is for the period and grade shown on the Asphalt Lab s test report. 11. ADDITIONAL INFORMATION 11.1 For more information on this subject and on related materials, contact the Asphalt Laboratory of CST/M&P by voice at (512) 506-5820, by fax at (512) 506-5825, or by email at CST_AsphaltLab@txdot.gov. 12. ARCHIVED VERSIONS 12.1 Archived versions are available. CONSTRUCTION DIVISION 9 9 EFFECTIVE DATE: FEBRUARY 2017