DRAWING NUMBER REVISION TITLE REV DATE PAGE

Similar documents
DRAWING NUMBER REVISION TITLE REV DATE PAGE

INS QA Programme Requirements

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

EVANS CAPACITOR COMPANY

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

Trident Precision Manufacturing

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual

QUALITY SYSTEM MANUAL

UNCONTROLLED DOCUMENT

SUPPLIER QUALITY PROGRAM Procurement Standard

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

Control Of Non-conforming Material

C Control of Records 08/ of 6

Quality Manual ISO 9001:2000

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

GKN Aerospace Advanced Composite Structure

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

A1 The supplier shall operate and maintain an approved Quality System that is subject to approval by Curtiss Wright Defense Solutions Dayton.

Procurement Quality Assurance Requirements

QMS-002. Quality Management System Manual. Conforms to ISO 13485

Purchase Order Quality Clauses These quality clauses are in addition to the Standard Ameriflex Inc.Terms & Conditions

Odyssey Electronics, Inc Fairlane Livonia, MI 48150

Documenta tion and Records

DRAWING NUMBER REVISION TITLE PAGE G Identification and Traceability 1 of 11

TURBO MACH A DIVISION OF VT SAA

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

Medtronic XOMED. Top Level Procedure for General Inspection and Testing

Supplier Quality Manual

PRODUCTION SUPPLY INCORPORATED. QUALITY ASSURANCE POLICY MANUAL (Mil-I-45208A) # QAD REV. A

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

IBS Electronics, Inc.

QUALITY CONTROL INSTRUCTION

PURCHASING QUALITY CLAUSES

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

Correspondence Between ISO 13485:2016 and 21 CFR Part 820 QMS Requirements

Supplier Quality System Survey

Quality Control Manual Revision 5 1/21/2011

SUPPLIER QUALITY ASSESSMENT

Clauses applicable only when specified by Q-number on the purchase order.

Page 1 / 11. Version 0 June 2014

Supplier Quality Requirements

QUALITY MANUAL QM0492 ISO SUPPLEMENT III

REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES

QUALITY POLICY MANUAL

Purchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015

TITLE: SQR-001 Supplier Quality Requirements

These requirements apply to all suppliers:

POLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy


Warehouse & Distribution Services Procedure

SUPPLIER QUALITY SYSTEM SURVEY

Materion AMTS Supplier Quality Manual

002 Supplier Quality System Compliance with Rocker Quality System for Suppliers is required for this Purchase Order.

PI Purchase Order QC Codes

LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL

Langham Creek Machine Works, Inc.

QUALITY MANUAL REVISION CONTROL LOG. Number Rev Rev Date SS Description of Change By Chk App

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

Self-Audit Checklist

Supplier Quality Requirements Document (SQRD)

ISO 9001 QUALITY MANUAL

Counterfeit Control Plan for Electrical, Electronic and Electromechanical Parts

YOUR TRANSPORTATION CO.

Purchase Order Quality Requirement Clauses

Space Information Laboratories, LLC. Suppler Quality Notes Rev C

Supplier Quality Clauses

Supplier Quality Requirements SQR-1.0 Rev. 3

SUPPLIER QUALITY SYSTEM SURVEY

Document 2007 Rev 0 December 2005 Page 1 of 8

Quality Assurance Audit Checklist

Supplier Quality Manual

CORPORATE QUALITY MANUAL

PERFORMANCE EXCELLENCE Procurement Standards

Supplier Quality Requirements Manual AEC-300

NATO STANDARD AQAP-2131 NATO QUALITY ASSURANCE REQUIREMENTS FOR FINAL INSPECTION AND TEST

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

THE FOLLOWING GENERAL REQUIREMENTS APPLY ON ALL ORDERS

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

Replaces: Not applicable.

AS9003A QUALITY MANUAL

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

Supplier Quality Requirements

QUALITY CONTROL MANUAL

Rosen Aviation Supplier Quality Assurance Requirements

General Quality Assurance Procedure (QAP) QAP: 9.0 Subject: Process Control Date: 3/24/14 Created By: Approved By: Rev: C

D. All distributors shall be reviewed and approved as per company procedure.

Transcription:

DRAWING NUMBER REVISION TITLE REV DATE PAGE 90-2000-7.5.1 C PRODUCT RESOURCES NEWBURYPORT, MA Control of Production and 11/2016 1 of 5 NOTICE: THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE PROPERTY OF PRODUCT RESOURCES. THIS DOCUMENT MAY NOT BE REPRODUCED IN ANY FORM WHATSOEVER, WITHOUT PRIOR WRITTEN PERMISSION FROM PRODUCT RESOURCES. 1.0 Policy Production Control shall administer the issuance of material and documentation in accordance with planned production. The control of quality in manufacturing shall be accomplished through design, training, documentation, inspection, supervisor control, and employee awareness. Any equipment critical to the quality of PRI's products is regularly checked and maintained. Production areas shall be clean and provide a suitable working environment. Only qualified personnel using approved procedures shall perform servicing on company products. Product returned by the customer because of field failure shall be evaluated to determine the cause of failure and any corrective action required. 2.0 Responsibility Production Control is responsible for production scheduling and for ensuring that all required documentation is issued with each job. The Manufacturing Department under the direction of the Manufacturing Manager is responsible for the production environment and production equipment. The Department has responsibility for the servicing, support, and repair of the company s products. The Quality Assurance Department has responsibility for quality data analysis and reports. 3.0 Specific Additional Requirements for Medical Devices For ISO 13485, to which Product Resources Quality system applies when handling medical devices, there are specific requirements for cleanliness of product, for installation activities, and for sterile devices. For cleanliness, all requirements are product specific and shall be documented on the product s manufacturing routing. This shall be accomplished via the design and development outputs procedure 90-2000-7.3.3 and controlled via the medical device RTM procedure that it calls for, 43-4521.

Installation is excluded from Product Resources scope for medical devices / for ISO 13485; see 90-2000-4.1. Should installation be included in the future, the Quality Manual shall be amended with specific policies, procedures, and responsibilities to govern the installation process. Sterility is excluded from Product Resources scope for medical devices / for ISO 13485; see 90-2000-4.1. Should sterility be included in the future, the Quality Manual shall be amended with specific policies, procedures, and responsibilities to govern the sterilization of devices and the handling of devices that have been sterilized. MANUFACTURING DOCUMENTATION AND THE MANUFACTURING CYCLE This procedure describes the manufacturing cycle, including the establishment, use and responsibility for the documentation controlling the manufacturing process. 2.0 Job Order and Manufacturing Cycle 2.1 Every order to manufacture a product is transmitted to Production using a either a job order for batch builds, or a production schedule for cell builds. With batch manufacturing, the job order is identified by a job order number and accompanies the product through all production phases. Production Control establishes a job order based on either a sales order or a manufacturing order to stock. The job order package is based on the product s routing and consists of the job header, the job order traveler, the job pick list, the job order time sheet, and the bill of materials. All manufacturing documentation referenced by the routing (as sembly drawings, test procedures, etc.) is added by Document Control. This package is then released by Production Control to the Stockroom. The job order package and all materials for the job are then issued by the Stockroom, per procedure 43-2141, to production as the kit. With cell manufacturing, there is no job order or job order package, but rather a production schedule, which is set up by Production Control in the manufacturing computer system. All documentation is kept within the cell, and maintained by Document Control. All material and routings required for cell manufacturing are also kept within the cell.

2.2 Listed on the job order header are product and scheduling information. The PRI assembly number and a description of the product to be built provide a reference to the routing. The product revision level provides product traceablility. The date ordered and date issued provide job traceability. The quantity released, quantity completed, start date, and end date provide records of production scheduling. Cell manufactured items are built per the shipping dispatch, which gives a record of the quantity and date to be shipped. 2.3 Based on the job order documentation package, the product is assembled, tested, and inspected. The job order time sheet form (80-2030) contains a record of assembly, testing, inspection, and first piece visual inspection. Cell builds do not require a job order time sheet, as they are set up with standard costing, and all assembly/test times are automatically figured in the operations. 2.4 All measurements instructed to be taken are to be done using calibrated instruments. An instrument s calibration status will be evident by its dated calibration sticker. See procedure 90-2000-7.6 for more details on the calibration program. 2.5 When the job order is completed, the product is received back into the stockroom. When accepted by the stockroom, the job is closed per procedure 43-2140. When material from a cell is completed, the quantity completed is entered into the production schedule by Production Control, and all raw material is then backflushed from the system upon completion of final product. 2.6 After a product is completed, its job order is retained as an important record. The storage location and retention period are specified in procedure 90-2000-4.2.4 Control of Records. Production schedules are kept within the manufacturing system as record of completion. 2.7 See procedure 90-2000-7.5.5 for how PRI conducts delivery activities for finished product.

3.0 Manufacturing Routing and Documentation 3.1 The routing defines all production operations, materials, and documents that are required for assembly, inspection, and testing of the product. Work instructions may be listed directly on the routing, or documents may be referenced on the routing as assembly drawings, test procedures, test/pack checklists, special manufacturing instructions, or any other technical documents. 3.2 The routing and all documents are normally established by Engineering. 3.3 Copies of the routing and supporting documents are enclosed with the job order through all production phases. 3.4 The routing specifies the Quality plans by referencing appropriate documents; it provides the work, process, and inspection instructions and criteria, and it provides for final inspection and testing records. ESD PROTECTION Refer to procedure 43-2621 ESD Protection Procedure for a description of PRI s system for ESD protection. SERVICE RETURNS 2.0 Policy To provide procedures by which servicing and repairs are accomplished. jobs are follow the same process as all other manufacturing jobs, but there are some special considerations and provisions for jobs, and they are described below.

3.0 and Repairs 3.1 Any material being returned by a customer must be accomplished in accordance with Material Return Procedure 43-2133. All service and repair root part numbers are prefixed with C/O, which signifies that the product has been returned from the field for service or repair. 3.2 The Department is responsible for the verification of material and recording the date received in QT9. Once logged in, the material is segregated. 3.3 The Department is responsible for the servicing and repair of the company s products. In the absence of specific repair procedures, the product is brought up to the latest functional specification. The latest functional specification is identified by the root part number (XX-XXXX). 3.4 The Department in cooperation with the Sales Department and QA determines warranty status. Status of the specific material can be located under its PRI serial number and/or job order number, sales order number, or customer reference number. 3.5 The Department records all product failure information in QT9. Quality Assurance is responsible for analyzing the data and making reports. 4.0 Documentation and Record All product failure data is recorded and saved as quality records. The storage location and retention period for these documents are specified in procedure 90-2000-4.2.4, Control of Records.