Air Permitting for Major Sources/Title V (Part 2)

Similar documents
Workshop G. Wednesday, July 19, :45 p.m. to 4:15 p.m.

Greenhouse Gas Permitting Training Mike Gordon, Dave Talley US EPA-Region III

PSD Background Presentation

Fourth Session Other Aspects of PSD and Title V Permitting

STATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P.

Brought to you by Winston & Strawn LLP and Environmental Resources Management.

Update on USEPA Actions to address Climate Change. Colleen McKaughan Associate Director, Air Division US EPA Region IX June 10, 2010

Municipal Solid Waste Landfill Air Regulation Updates Scott Martin, P.E. Burns & McDonnell July 1, 2014

Air Pollution Control Program Permits Section

The Supreme Court and EPA Carbon Rules. Michael B. Gerrard Environmental and Energy Study Institute briefing March 6, 2014

Technical Contact. Edward Sievers Plant Manager (828) P. O. Box 2029 Hickory, NC 28603

An Overview on GHG PSD Permitting

SLIDES: Details of the Regulatory Framework: Air Quality Regulation of Oil and Gas Development

Greenhouse Gas Permitting Issues and Approaches for Addressing Greenhouse Gas Emissions

Final Mandatory Greenhouse Gases Reporting Rule. Overview

Mandatory Reporting of Greenhouse Gases Final Rule (74 Fed. Reg. 56,260)

REGULATING GREENHOUSE GASES: PSD FOR GHGS

Chapter 14. Are Coal Mines Now Stationary Sources Under the Clean Air Act?

PERMIT APPLICATION REVIEW SUMMARY

Huber Engineered Woods, LLC, TV Page 1 of 7

Technical Contact. Ross Reed Plant Environmental Manager (336) Boston Road Roxboro, NC 27574

PSD PERMITTING FOR GREENHOUSE GAS EMISSIONS IN THE FERTILIZER INDUSTRY. Philip D. Cobb, Ph.D., P.E.

Montmorency-Oscoda-Alpena Solid Waste Management Authority SRN: N8248. Located at Landfill Road, Atlanta, Montmorency, Michigan 49709

Global Warming Legislation and EPA Rules: Their Impact on State and Local Air Agencies. Amy Royden-Bloom

Engineering Guide #87: Guidance Concerning Rule Citations for the <10 tons/yr BAT Exemption

A. Federally-Enforceable: All limitations and conditions which are directly enforceable by U.S. EPA, including:

Michigan Department of Environmental Quality Air Quality Division RENEWABLE OPERATING PERMIT STAFF REPORT. General Motors LLC - Orion Assembly Plant

NORTHERN SONOMA COUNTY AIR POLLUTION CONTROL DISTRICT

Air Quality Program Update. SWEP Regulatory Update Meeting Harrisburg, PA November 5, 2015

Serving Two Masters; Understanding Texas and EPA Permitting Programs

Clean Air Act Emission Limits

The 3 N s of Air. Diane H. Leche Air Permit Coordinator ExxonMobil Baton Rouge

The requirement to obtain a Part 70 operating permit under this rule shall not apply to:

EPA Phases In Regulation of Greenhouse Gas Emissions Under the Prevention of Significant Deterioration Program of the Clean Air Act

Jeff Muffat Member of EPA s GHG BACT Workgroup & Manager of Environmental Regulatory Affairs for 3M Company

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015.

Certified Mail 5/16/2012. Rainer Ingmann MB MANUFACTURING CORPORATION 2904 Symmes Road Fairfield, OH 45014

EASTERN SANITARY LANDFILL 6259 DAYS COVE ROAD WHITE MARSH, MD PART 70 OPERATING PERMIT NO

Technical Contact. Jeff Hardin SH&E Manager (704) Rocky River Road North Monroe, NC 28110

Technical Contact. Reed Caron Quality Manager (704) Airport Road Monroe, NC 28110

Kim Dirks Tyson Foods, Inc.

TITLE V OPERATING PERMIT STATEMENT OF BASIS

Technical Contact. Conrad Carter, Jr., P.E. President (704) PO Box 1760 Albemarle, NC

Eastern Kern Air Pollution Control District

CEC Carlson Environmental Consultants, pc

Michigan Department of Environmental Quality Air Quality Division RENEWABLE OPERATING PERMIT STAFF REPORT

CHP, Waste Heat & District Energy

Technical Contact. Ann Quillian Sr. Environmental Specialist (919) PO Box 1551 Raleigh, NC 27602

PERMITTING INNOVATIONS

ENVIRONMENTAL MANAGEMENT COMMISSION FISCAL NOTE FOR PROPOSED AMENDMENTS TO GREENHOUSE GAS PERMITTING

Operating Permit Application. Instructions

EPA ISSUES FINAL GREENHOUSE GAS MONITORING

MPCA Citizens Board. Michael Sandusky Director Environment Analysis and Outcomes Division

P.O. Box 1276 Westerville, OH (614)

STATEMENT OF BASIS FOR CITY OF SPOKANE NORTHSIDE LANDFILL CHAPTER 401 AIR OPERATING PERMIT AOP-16 RENEWAL #2

Presented By: Steven M. Carpenter, Vice, President ADVANCED RESOURCES INTERNATIONAL, INC. Arlington, VA. MRR & BACT: What have we learned?

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

New York State Department of Environmental Conservation Permit Review Report Permit ID: / /10/2012

Facility Name: Dolco Packaging City: Lawrenceville County: Gwinnett AIRS #:

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO

STATEMENT OF BASIS FOR CITY OF SPOKANE NORTHSIDE LANDFILL S CHAPTER 401 AIR OPERATING PERMIT AOP-16 RENEWAL #1

Air Permi>ng: A Major Piece of the Puzzle or Trying to Keep All of

Preemption and Alteration of EPA and State Authority to Regulate Greenhouse Gases in the Kerry-Lieberman Bill

Draft Technical Support Document For Air Emission Permit No

"LIST AND CRITERIA" INDEX INTRODUCTION Section 1 - General Application Information... 5

Prevention of Significant Deterioration (PSD) Permitting. Scoping Meeting

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. The City of Chaska AND

GOVERNMENT of PUERTO RICO OFFICE OF THE GOVERNOR ENVIRONMENTAL QUALITY BOARD

Workshop A. Wednesday, July 19, p.m. to 2:30 p.m.

Minor Source BAT Programs

Greenhouse Gas Emissions in New Jersey

Who is a Major Source?

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by

Presented by Cindy C. Thompson

STATEMENT OF BASIS. Cheney Lime & Cement Company Landmark Plant Alabaster, Alabama Shelby County Facility No

ASA Bloomingburg, LLC. Air permit-to-install (PTI) number Public Hearing Date April 18, 2006 Comment Period End Date April 25, 2006

DTE Gas Company - Belle River Mills Compressor Station SRN: B6478. Located at Puttygut Road, China, Saint Clair County, Michigan

DRAFT DO NOT QUOTE OR CITE. Oklahoma s State Implementation Plan (SIP) Submittal Infrastructure Checklist

Technical Contact. Mike Gurley Environmental Manager (704) Morehead Road Concord, NC 28027

NSPS, NESHAPs, NSR. Jana Milford, J.D., Ph.D. Mechanical Engineering University of Colorado Boulder

New Source Review Staff Presentation Community Advisory Council

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

AIR REGULATION IN SOUTH CAROLINA 3 JUNE 2016

Current Topics In Air Quality

The Minnesota Pollution Control Agency intends to adopt the above described rules. We plan to

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. ConAgra Food Ingredients Co

RULE 36 - NEW SOURCE REVIEW - HAZARDOUS AIR POLLUTANTS (Adopted 10/6/98)

Overview of EPA s Clean Power Plan. Presented by Brandy D. Olson, JD Director, Legal & Regulatory Services Muscatine Power & Water

United States Environmental Protection Agency, Region 9. Air Division. Technical Support Document. for. EPA s Notice of Proposed Rulemaking.

ADVICE FOR OBTAINING PERMIT EXEMPT APPLICABILITY DETERMINATIONS

THE TITLE V PROGRAM - GUIDANCE

Rule PREVENTION OF SIGNIFICANT DETERIORATION

MINNESOTA POLLUTION CONTROL AGENCY STATEMENT OF NEED AND REASONABLENESS (SONAR)

Module 4.1 Pollution Prevention

STATEMENT OF BASIS FOR CHAPTER 401 AIR OPERATING PERMIT AOP-6 RENEWAL #3 TRANSCANADA GAS TRANSMISSION NORTHWEST LLC (GTN)

Regulation I Rule 111 Federal Permitting Requirements for Sources of Greenhouse Gases

THE TITLE V PROGRAM - FREQUENTLY ASKED QUESTIONS

Technical Support Document for Draft Air Emission Permit No

NSR Program for PM-2.5 NAAQS. Overview of Potential Proposal

INDEX. August 23,

Transcription:

Air Permitting for Major Sources/Title V (Part 2) Bob Hodanbosi Bob.hodanbosi@epa.state.oh.us Mike Hopkins Mike.hopkins@epa.state.oh.us

Introduction Who, what, where, why of Title V permitting How can I avoid needing one? How do I modify my Title V? What do I need to include in the renewal application? What s new in Title V? Where can I get help? 2-MH

3-MH What is a Title V Permit? Operating permit for air pollution sources Based on the requirements found in 1990 CAAA, Title V Designed for large air pollution sources

What is a Title V Permit? Contains all applicable air pollution requirements Contains emission limits, operational restrictions, monitoring requirements, testing requirements and reporting requirements Applies to entire facility 4-MH

Who needs a Title V Permit? Any facility that is a major Title V source. Major Title V thresholds are: 100 tons per year or more of any one regulated pollutant (PM10; nitrogen oxides; sulfur dioxide; carbon monoxide; volatile organic compounds; and lead), or 100,000 tons per year GHGe (NEW!), or 10 tons per year or more of any one hazardous air pollutant (HAPs), or 25 tons per year or more of any two or more HAPs. Based on potential to emit 5-MH

What does potential to emit (PTE) means? Maximum capacity to emit Under physical and operational design Can include air pollution equipment, operating restrictions if; Federally enforceable, or Legally and practically enforceable by the state 6-MH

What does potential to emit (PTE) mean? OAC rule 3745-77-01(CC), "Potential to emit" means the maximum capacity of a stationary source to emit any air pollutant under its physical and operational design. Any physical or operational limitation on the capacity of a source to emit an air pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is federally enforceable or legally and practicably enforceable by the state. Secondary emissions do not count in determining the potential to emit of a stationary source 7-MH

How do you figure out what your PTE is? Must calculate for each emissions unit (air pollution source) Calculate emissions with controls at maximum capacity Each criteria pollutant Total GHGe Each HAP Sum of HAPs 8-MH

How do you figure out what your PTE is? Determine if physical or operational restrictions apply Check for rules that restrict emissions Check to make sure controls/restrictions/rules are federally/practically state enforceable Sum them together for entire facility 9-MH

Other triggers for Title V permits Any source subject to Section 111 of the act (NSPS) Any source subject to section 112 of the act unless exempt (HAPS, MACT) Any affected source (utilities) Any 40 CFR Part 70.3 source (Describes required elements for Title V programs) 10 - MH

What rules apply Ohio Administrative Code (OAC) rule 3745-77 http://www.epa.ohio.gov/dapc/regs/regs.a spx#tvpermitrules 11 - MH

Preparation & Processing Issues Application preparation time is significant May take 18+ months for Ohio EPA to process Permit lasts five years Must be renewed No application fee, no permit issuance fee Fees based on emissions Fee for reporting year 2012 is $46.73/ton. 12 - MH

How do you apply? Applications must be submitted electronically through Air Services Air Services is an web based emissions unit, permit tracking and application system Part of Ohio EPA s ebusiness Center https://ebiz.epa.ohio.gov/login.html;jsessionid=xdrytvpbxf4 nm3x05j8r4ydhnfg2qpz2nf2nsfp5vcvwpmjnvv8s!- 966781721 Must get a User ID and password to work in Air Services 13 - MH

What are the processing steps? You submit application Ohio EPA reviews and creates permit Draft permit issued for any interested party comment Preliminary Proposed Permit issued for the application s comments Proposed Permit issued for USEPA comments Final permit issued 14 - MH

What does the permit contain? Applicable rules Emission limits Operational restrictions Monitoring requirements Reporting requirements Testing requirements 15 - MH

How is the permit organized? Cover letter Table of Contents Authorization A. Standard Terms and Conditions B. Facility-Wide Terms and Conditions C. Emissions Unit Terms and Conditions Grouped by emissions unit Organized by previous slide 16 - MH

What are the major obligations under the permit? Permit needed to have legal authority to operate Make sure sources comply with limits Comply with operational restrictions Do any monitoring required 17 - MH

What are the major obligations under the permit? Compile records, submit reports Timely completion of any testing Complete annual certification of compliance (Responsible Official must be able to attest to compliance) 18 - MH

How do you avoid needing a Title V permit? Obtain federally enforceable/state practically enforceable restrictions such that your potential to emit is less than the thresholds Restrict operation time, materials processed, etc. Reduce emissions from processes Add controls Change processes Change materials Etc. 19 - MH

If you avoid needing a TV permit, what do you get? State-based operating permit Permit-to-install and Operate (PTIO) May get one or more PTIOs to cover all emissions units Subset - Federally Enforceable State Operating Permit (FESOP), or synthetic minor Must live within restrictions 20 - MH

How do I modify my Title V? Determine what needs to change Discuss change with permit contact Determine if need Permit-to-Install first Determine the modification type (Each type has different obligations) 21 - MH

Modification Types Mod Type For: When Effective? Off-permit change Administrative Permit Amendment (APA) Minor Permit Modification (MPM) Non conflicting PTIs; exemptions; not addressed or prohibited in permit Typos; name, address change; increased monitoring Changes that are not SPM (see below) Appl. Submitted or PTI issued, TV mod issued When request is submitted When final mod issued (Proposed, then final only) Significant Permit Modification NSPS, MACT, PSD, Nonattainment mods; minor change to monitoring, recordkeeping etc. When final mod issued (Draft, PPP, PP, Final must be issued) 22 - MH

Significant Permit Modification SPM is used for significant changes to the Title V that typically include: Changes in existing units such as: Emissions increases above Title I modification levels, or Significant changes to monitoring or relaxation of reporting or recordkeeping terms Incorporating new units that quality as a Title I modification (PSD or major nonattainment NSR) NSPS applicability to existing source 23 - MH

24 - MH Significant Permit Modification What is considered a Title I modification? 1. NSPS Source existing sources only: - If it meets the definition of a modification as defined in 40 CFR 60.14 2. HAPS Sources existing and new sources - If the PTE increases and it is considered a construction or reconstruction of a major source of HAPS as defined in 40 CFR 60.14 - If the PTE for HAPS increased but it is not considered a reconstruction, however, now a MACT is applicable to the source category

Significant Permit Modification What is considered a Title I modification cont d? 3. PSD Sources existing and new sources - If it meets the definition of a major modification under Part C of Title I (PSD) and therefore, a PSD PTI is required 4. Nonattainment Area Sources existing and new sources - If it meets the definition of a major modification under Part D of Title I (Nonattainment Areas) and, therefore, will require a major nonattainment new source PTI which includes obtaining air emission offsets 25 - MH

When can the facility begin the change? Step 1 Would operation of the change requested be prohibited by the current Title V permit? NO YES Operation of the source and change can begin immediately after receiving the PTI, but permittee must apply for the SPM within the 1 year period required by the PTI Operation of the change cannot begin until the SPM is issued final. Proceed to Step 2 26 - MH

When can the facility begin the change? Step 2 Could the source be operated in a way that would not be prohibited by the current Title V permit (in compliance with all T&Cs)? YES Operation of the source can begin, in compliance with the current Title V permit, but operation of the change cannot begin until the SPM is issued final NO Operation of the source and change cannot begin until the SPM is issued final 27 - MH

Minor Permit Modifications Conditions for Use 1. Cannot violate an applicable requirement include a PTI 2. Cannot be a Title I modification (major modification PTI) 3. Cannot involve significant changes to existing monitoring, reporting of recordkeeping terms 4. Cannot require or change a case-by-case determination under federal requirements 5. Cannot seek to change terms condition for which there is no underlying applicable requirement (i.e. emissions cap) 28 - MH

Monitoring Recordkeeping & Reporting Existing Units The following mechanisms can be used for changes to MRR: APA increases in monitoring or reporting frequency MPM insignificant changes to existing MRR SPM significant changes to existing monitoring or a relaxation of reporting or recordkeeping Reopening if there was a material mistake or inaccurate statement made when establishing the MRR 29 - MH

Monitoring Recordkeeping & Reporting Existing Units Don t get caught up in thinking it s the emissions that trigger the modification type, often it can be the changes to MRR. Is it a MPM or a SPM? Ohio EPA has developed guidelines to help identify the significance or relaxation of an MRR change. 30 - MH

Modification Types Guidance for Incorporating Facility Changes into a Title V Permit: http://www.epa.ohio.gov/portals/27/title_v/3-9- 05guidancefinal.pdf 31 - MH

Part 64 (CAM) design principles Monitoring sufficient to provide a reasonable assurance of compliance with the applicable requirements (e.g., emissions limits) and to ensure operators pay the same level of attention to pollution control measures as to production activities. 32 - BH

What is CAM rule? 40 CFR Part 64 - Compliance Assurance Monitoring Implements the monitoring design principle for a reasonable assurance of compliance Targets facilities with add-on control devices Requires source owners to design monitoring to fit site and incorporate into permits 33 - BH

Who will be affected by CAM? Rule applies to each pollutant-specific emissions unit (PSEU) that: Is located at major source subject to Title V operational permits program, and Is subject to emission limitation and has a control device to meet that limit (e.g., ESPs, scrubbers, fabric filters), and Has precontrol emissions >major source size threshold (e.g., >100 tons/year uncontrolled emissions). 34 - BH

Who will be affected by CAM? Part 64 can and often will apply where existing rule or permit already includes some monitoring: Data collection frequency not sufficient, Operational data not well related to control device efficiency characteristics, Indicator ranges not established or correlated with testing. 35 - BH

Who is exempt from CAM? Exemptions are by rule type, not facility type: Acid rain rules, Post-1990 EPA rules, Rules with continuous compliance determination methods (e.g., Da facilities for SO2), Rules with annual caps or emissions trading. One exemption exception: Municipally-owned peaking units. 36 - BH

How does CAM rule work with other rules and Title V program? SIP NSR PSD PTE limits Part 64: (CAM) monitoring Part 70: required monitoring review Permit with monitoring requirements Pre-1990 NSPS NESHAPs Acid rain Other trading rules Post-1990 EPA rules (MACT & New NSPS) 37 - BH

What is required in part 70 for monitoring? Monitoring requirements from applicable rules including part 64, NSPS, NESHAP, SIP Monitoring to fill gaps If applicable rule has no monitoring, no frequency, initial testing only, Gap-filling monitoring to provide reliable data from relevant time period representative of compliance (70.6(a)(3)), Possible adjustments to existing periodic monitoring if not sufficient to assure compliance (70.6(c)(5)(ii)) (e.g., once/term testing not really monitoring). 38 - BH

What must the source owner do to get a permit? Develop and propose monitoring in permit application that at a minimum: Satisfies part 64, as applicable, and Includes applicable monitoring requirements. May also propose monitoring to fill gaps including applying or improving existing monitoring. 39 - BH

How is the monitoring described in a permit? Permit elements (EPA s part 64 guidance has example format): Description of monitoring (what is measured, how, frequency, averaging time), What defines excursions and consequences (e.g., excursion triggers corrective action and reporting obligation), excess emissions, deviations. QA/QC schedules and procedures. 40 - BH

What does source owner do with monitoring results? Use the data to assure and assess compliance with applicable requirements by: Operating control device(s) within designated CAM or other indicator ranges, and Responding to excursions, excess emissions, deviations with appropriate corrective action; and Operating other control measures in accordance with applicable conditions. 41 - BH

GHGs -The Tailoring Rule Issued on May 13, 2010 Tailors the requirements to focus PSD and Title V permit requirements on the largest emitting facilities Subjects facilities responsible for nearly 70 percent of the national GHG emissions from stationary sources to CAA permitting requirements - This includes the nation s largest GHG emitters power plants, refineries, and cement production facilities - Small farms, restaurants, and commercial facilities are shielded by this rule 42 - BH

Pollutants Covered Sets thresholds for GHG emissions, addressing emissions from six well-mixed GHGs: - Carbon dioxide (CO 2 ) - Methane (CH 4 ) - Nitrous oxide (N 2 0) - Hydrofluorocarbons (HFCs) - Perfluorocarbons (PFCs) - Sulfur hexafluoride (SF 6 ) The aggregate sum of these six GHGs is the identified air pollutant in EPA s Light- Duty Vehicle Rule, and the associated Endangerment Finding and Cause or Contribute Findings To determine applicability, a source s GHG emissions are calculated as the sum of the six gases on a CO 2 equivalent (CO 2 e) basis and compared against the relevant threshold 43 - BH

Step 1 PSD Anyway Sources January 2, 2011 to June 30, 2011 No new permitting actions due solely to GHG emissions during this time period; only sources undertaking permitting actions anyway for other pollutants will need to address GHG PSD permitting applicability: Sources will be subject to the PSD requirements for GHGs only if they increase GHG emissions by 75,000 tpy CO 2 e or more 44 - BH

Step 1 PSD Anyway Sources Title V permitting applicability: Only those sources currently with Title V permits will address GHGs, and only when applying for, renewing or revising their permits No sources will be subject to CAA permitting requirements based solely on GHG emissions Covers sources responsible for 65% of total national stationary source GHG emissions 45 - BH

Step 2 Major for GHGs July 1, 2011 to June 30, 2013 Sources subject to GHG permitting requirements under step 1 will continue to be subject to GHG permitting requirements In addition, sources that emit or have the potential to emit GHGs at or above 100,000 tpy CO 2 e will also be subject to GHG permitting requirements as follows, even if PSD is not triggered from criteria pollutants. 46 - BH

Step 2 Major for GHGs (cont d) PSD permitting applicability triggered with construction that increases emissions A newly constructed source (which is not major for another pollutant) will not be subject to PSD unless it emits 100,000 tpy or more on a CO 2 e basis A modification project at a major stationary source will not be subject to PSD unless it results in a net GHG emissions increase of 75,000 tpy or more on a CO 2 e basis Title V permitting applicability A GHG emission source (which is not already subject to Title V) will not be subject to Title V unless it emits 100,000 tpy or more on a CO 2 e basis 47 - BH

Step 2 Major for GHGs (cont d) These newly subject sources must apply within 1 year after becoming subject to the program, unless the permitting authority sets an earlier deadline. This means that newly subject sources must apply for a Title V permit on or before July 1, 2012 (which is one year from July 1, 2011). Covers sources responsible for nearly 70% of total national stationary source GHG emissions 48 - BH

Steps 1 and 2 GHG Permitting Step 1 continues on after June 30, 2011 for PSD Step 2 may bring in sources not previously covered by permits (e.g. gas separation plants, ethanol facilities, coal mines) Step 3 determines if smaller sources should be regulated 49 - BH

Step 3 GHG Permitting Step 3 issued July 12, 2012 Effective August 13, 2012 U.S. EPA considered lowering thresholds but decided to maintain existing 100,000 ton/yr facility 75,000 ton/yr modification Allows PALs on a CO 2 e basis, not just a GHG mass basis 50 - BH

Permitting Steps under the Tailoring Rule 51 - BH

PSD GHG Technical Information and Guidance U.S. EPA guidance: http://www.epa.gov/nsr/ghgpermitting.html Includes Q&A s, implementation guidance, training slides, source type white papers Ohio EPA rule: 3745-31-34: http://epa.ohio.gov/portals/27/regs/3745-77/3745-31- 34_Final.pdf 52 - BH

BioMass Exemption Issued on July 1, 2011 Provides for a deferral of PSD and Title V permit processing Issued for three years to allow U.S. EPA time to figure out how to consider biomass sources 53 - BH

Where do I get information or assistance on Title V? Engineering Guides http://www.epa.ohio.gov/dapc/engineer/eguides.aspx Answer Place http://ohioepa.custhelp.com/app/home ebusiness Center online help https://ebiz.epa.ohio.gov/portalhelp.jsp Ohio EPA TV Information http://www.epa.ohio.gov/dapc/title_v/titlev.aspx 54 - BH

Where do I get information or assistance on Title V? Talk to your permit writer: http://www.epa.state.oh.us/dapc/general/dolaa.aspx Consultants Can be complex Work with someone experienced Questions? 55 - BH