Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

Similar documents
Inglewood Oil Field Specific Plan Project Draft Environmental Impact Report

5.1 CALIFORNIA ENVIRONMENTAL QUALITY ACT REQUIREMENTS FOR ALTERNATIVE ANALYSIS

Purpose of the EIR. Chapter 1 Introduction

Morro Bay Water Reclamation Facility Draft Environmental Impact Report Public Meeting

Neighborhood Advisory Committee. EIR Process Overview. Chapman University April 20, 2016

Revisions to the Kern County Zoning Ordinance, 2015 C

California State University Stanislaus Physical Master Plan Update. Program Environmental Impact Report

Introduction CHAPTER Project Overview

SECTION 6.0 Alternatives to the Proposed Project

RESOLUTION NO:

DRAFT ENVIRONMENTAL IMPACT REPORT

CEQA FINDINGS IN CONNECTION WITH THE APPROVAL OF THE INTEGRATIVE GENOMICS BUILDING PROJECT, LAWRENCE BERKELEY NATIONAL LABORATORY

6. Cumulative Impacts

ATTACHMENT B. Findings for Approval and Statement of Overriding Considerations Eastern Goleta Valley Community Plan

Amador County General Plan Final Environmental Impact Report

Section 2.0 Introduction and Purpose

Appendix D1 Screening Analysis

2. Introduction. California Environmental Quality Act (CEQA) of 1970, as amended (Public Resources Code Section et seq.)

Scoping Meeting for Vista Del Agua Project Environmental Impact Report

1.0 Introduction. 1.1 Project Background

SECTION 1: INTRODUCTION

ENVIRONMENTAL REVIEW PROCESS AND ADOPTION OF MITIGATED NEGATIVE DECLARATION

7.0 Other CEQA-Mandated Sections. 7.1 Unavoidable Significant Adverse Effects. Section 7: Other CEQA-Mandated Sections

PUBLIC SCOPING MEETING. Date: November 8, To: Responsible Agencies, Trustee Agencies, and Interested Persons

5. OTHER CEQA CONSIDERATIONS

Planning Commission Hearing

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1

SECTION 9.0 Effects Found Not To Be Significant

CALIFORNIA NATIONAL PRIMATE RESEARCH CENTER RESPIRATORY DISEASES CENTER PROJECT

The California Environmental Quality Act

CEQA Scoping Meeting. West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report

1.0 INTRODUCTION 1.1 CEQA REQUIREMENTS 1.2 PUBLIC REVIEW PROCESS

2035 General Plan Update, Belmont Village Specific Plan, and Climate Action Plan

EXECUTIVE SUMMARY INTRODUCTION

1 INTRODUCTION 1.1 PROJECT REQUIRING ENVIRONMENTAL ANALYSIS 1.2 PURPOSE AND INTENDED USES OF THIS DRAFT EIR

An Overview of the California Environmental Quality Act

3.1 Existing Setting Regulatory Framework Changes in Population, Employment, and Housing

Carpinteria Valley Water District Carpinteria Advanced Purification Project

City of Fountain Valley. Fountain Valley Crossings Specific Plan Project: Draft EIR Public Hearing. January 25, 2017

APPENDIX M CEQA Initial Study Checklist

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR COALINGA OIL FIELD EIR No. 7180

County of El Dorado Notice of Preparation Tilden Park Project

CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

5.0 LONG-TERM CEQA CONSIDERATIONS

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

5.0 ALTERNATIVE VARIATIONS

1.0 INTRODUCTION 1.1 EIR REQUIREMENT

Draft Environmental Impact Report for The Farm at Alamo Creek Specific Plan Project

1.0 INTRODUCTION 1.0 INTRODUCTION. 1.1 Project Overview. Project Planning Information. Project Information

Environmental Quality Act. October 19, 2016

CEQA and Health Effects

CITY OF LOS ANGELES SAN PEDRO COMMUNITY PLAN

Subject: Notice of Preparation of a Draft Environmental Impact Report

Notice of Preparation of Draft EIR Notice of Public Scoping Meeting ARB Southern California Consolidation Project

San Ramon City Center Draft Subsequent EIR

Public EIR Scoping Meeting South Shoreline Specific Plan. October 16, 2014, 6:00 PM City Council Chambers

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

Los Coyotes Country Club Development Plan

Los Cerritos Wetlands Oil Consolidation and Restoration Project

1.0 INTRODUCTION 1.1 PROJECT OVERVIEW

PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) THRESHOLDS OF SIGNIFICANCE

4.7 HAZARDS AND HAZARDOUS MATERIALS

NAPA SANITATION DISTRICT SOLAR PROJECT

TABLE OF CONTENTS ES EXECUTIVE SUMMARY 1.0 INTRODUCTION 2.0 PROJECT DESCRIPTION 3.0 ENVIRONMENTAL ANALYSIS

Final Environmental Impact Report San Marcos General Plan

Whisper Ridge Golf Resort

COMPARISON OF ALTERNATIVES

Therefore, each of the alternatives to the Specific Plan addressed in this EIR were selected based on the following factors:

City of Los Angeles 2010 Bicycle Plan First Year of the First Five-Year Implementation Strategy & Figueroa Streetscape Project Draft EIR

LAX Terminals 2 and 3 Modernization Project DRAFT EIR PUBLIC MEETING. Tuesday, March 21, :00 pm to 8:00 pm

6. Significant Unavoidable Adverse Impacts

Notice of Preparation of Initial Study

E. Other Federal Requirements and CEQA Considerations

6 ALTERNATIVES 6.1 INTRODUCTION

2 ENVIRONMENTAL REVIEW AND THRESHOLDS OF SIGNIFICANCE

Incremental Recycled Water Program 2007 ADDENDUM TO PROGRAM ENVIRONMENTAL IMPACT REPORT

California Environmental Quality Act NOTICE OF PREPARATION FOR AN ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC SCOPING MEETING

SECTION 1.0 INTRODUCTION

Los Cerritos Wetlands Oil Consolidation and Restoration Project

Pacific Wind Energy Project Draft Environmental Impact Report

Bay Fair Transit-Oriented Development Specific Plan EIR Public Scoping Meeting. March 16, 2017 Planning Commission

Environmental Setting, Impacts, and Mitigation Measures

Notice of Preparation for the Copeland Creek Stormwater Detention Basin (CIP Project )

NOTICE OF PREPARATION

5.0 ALTERNATIVES 5.1 INTRODUCTION

D R A F T E N V I R O N M E N T A L I M P A C T R E P O R T S T A T E C L E A R I N G H O U S E N O

Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department

TABLE OF CONTENTS Watson Ranch Specific Plan Draft Environmental Impact Report

David Brockbank, Senior Planner Contra Costa County Department of Conservation and Development 30 Muir Road Martinez, CA, 94553

City of Malibu. Whole Foods and the Park Shopping Center Draft Environmental Impact Report Volume I. Prepared For: Prepared by:

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

Chapter 3 California Environmental Quality Act (CEQA) Evaluation

Table of Contents. City of Redlands - Redlands Crossing Center

Kern County Environmental Checklist Form Environmental Factors Potentially Affected

Chapter 1 Introduction

Revised Final Environmental Impact Report/ Environmental Assessment for the Wilshire Bus Rapid Transit Project

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

Transcription:

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings Tuesday, October 24, 2017 6:30 to 8:00 PM El Rincon Elementary School 11177 Overland Avenue Monday, October 30, 2017 6:30 to 8:00 PM Stoneview Nature Center 5950 Stoneview Drive

Public Information Meeting Agenda Inglewood Oil Field Specific Plan Project 1. Welcome and Introductions 2. Purpose of the Public Meeting 3. California Environmental Quality Act (CEQA) Requirements 4. Inglewood Oil Field Specific Plan 5. Environmental Impact Report (EIR) Topics, Conclusions, and Alternatives 6. Opportunities for Public Input

Inglewood Oil Field Specific Plan Project Introductions City of Culver City/Subcommittee Jim B. Clarke, Council Member Meghan Sahli Wells, Council Member Carol A. Schwab, City Attorney Heather Baker, Assistant City Attorney Contract Project Manager City of Culver City Melanie Doran Traxler, AICP Psomas Environmental Consultant Kristin Starbird, Sr. Project Manager/Vice President

Inglewood Oil Field Specific Plan Project Purpose of the Public Meetings Information Sharing Proposed Project has been subject of public interest City is committed to informing the community about important projects Facilitate CEQA Public Review Process Provide overview of Specific Plan and Draft EIR Discuss opportunities to provide input on the Draft EIR Encourage interested parties to provide written comments on the Draft EIR Please hold questions until the end of the presentation This is not a public hearing; Comments must be made in writing

Opening Remarks Council Member Clarke Council Member Sahli Wells

California Environmental Quality Act (CEQA) Requirements

California Environmental Quality Act Inglewood Oil Field Specific Plan Project 1. Inform decision makers and public about potentially significant environmental effects; 2. Identify ways to avoid or significantly reduce environmental impacts; 3. Prevent significant avoidable impacts through feasible alternatives and/or mitigation; and 4. If a project is approved with significant impacts, disclose to the public the reasons why.

Inglewood Oil Field Specific Plan Project Roles and Responsibilities Lead Agency: Independently review and analyze all reports Circulate an EIR that reflects its independent judgment City Council to consider EIR and approval, modification, or denial of the Project EIR Consultant: Hired by the City to provide objective expert analysis Works on behalf of the City staff to prepare the EIR Does not advocate for any particular position or decision

Inglewood Oil Field Specific Plan Project CEQA Environmental Topics Aesthetics Agriculture & Forestry Resources Air Quality Biological Resources Cultural and Tribal Resources Geology, Soils, and Seismicity Greenhouse Gas Emissions Hazards, Hazardous Materials, and Risk of Upset Hydrology and Water Quality Land Use and Planning Mineral Resources Noise Population and Housing Public Services and Facilities Recreation Transportation and Traffic Utilities and Service Systems Other: Growth Inducing, Energy Note: Scoped out through the Initial Study and not addressed in the Draft EIR

Inglewood Oil Field Specific Plan Project What Must an EIR Include? 1. Table of contents and executive summary 2. Environmental setting (baseline for impact analysis) 3. Project description and Project objectives 4. Environmental impact analyses (based on substantial evidence) of direct, indirect, and cumulative impacts from all project phases 5. Determination of impact significance, and mitigation measures to reduce significant impacts. 6. Identify any unavoidable significant adverse impacts 7. Alternatives to the Project to avoid/reduce significant impacts

What is the CEQA process for the City s EIR? Notices and Scoping Inglewood Oil Field Specific Plan Project Notice of Preparation (NOP) and Initial Study 30 day Public Review: October 12, 2015 through November 12, 2015 Early public consultation to solicit input for scope/content of EIR Public Scoping Meeting: October 22, 2015 Prepare EIR Must satisfy CEQA requirements and Lead Agency Includes consideration of input from NOP/Scoping Conclusions must be based on substantial evidence (i.e. fact, a reasonable assumption predicated upon fact, or expert opinion supported by fact) in light of the whole record

Inglewood Oil Field Specific Plan Project CEQA process, continued Public Review of EIR Friday, September 15, 2017 through Tuesday, November 14, 2017 60 day public review (extended beyond mandatory 45 day review) Two public information meetings Final EIR Draft EIR and any corrections/additions, if required Responses to written comments received on the Draft EIR through November 14, 2017 Mitigation Monitoring and Reporting Program City must ensure that mitigation measures are implemented

Inglewood Oil Field Specific Plan Project CEQA process, continued Findings If an EIR identifies significant effects, written findings must be made for each effect. Possible findings include: Changes (i.e. mitigations) have been made to the project to reduce impacts If a different agency is responsible for implementing the changes, it has been (or can be) adopted by that agency Economic, legal, social, technological, or other considerations make the mitigation measures or alternatives infeasible Statement of Overriding Considerations Provide specific reasons for approval (e.g. economic, legal, social, technological or other benefits)

Inglewood Oil Field Specific Plan Project CEQA process, continued City Council Public Hearing Anticipated February/March 2018 Approval of Project or Alternative; modify Project; or deny Project Notice of Determination File NOD within 5 days of approval Starts 30 day statute of limitations on court challenges under CEQA

Opportunities for Public Input

Inglewood Oil Field Specific Plan Overview

What is the City IOF Project?

Inglewood Oil Field Specific Plan Project The Inglewood Oil Field (IOF) An oil reservoir that is defined by various surface, subsurface, ownership and rights boundaries Most tangible to the community is the Surface Field boundary of the oil field, which is the visible working area at ground surface Overall, the IOF (surface field) is approximately 1,000 acres About 90% of the IOF is within unincorporated Los Angeles County (the County IOF) The County IOF is regulated by the County s Baldwin Hills Community Standards District (CSD) Only the northerly 10% is within Culver City (the City IOF)

The Inglewood Oil Field (IOF) Context and Boundaries

The Inglewood Oil Field (IOF) City IOF Area

Inglewood Oil Field Specific Plan Project The City IOF Context + 80 acres Surrounded by City Park and Open Space along the north, west and east Abuts Blair Hills neighborhood at the north east County IOF extends to the south

The Inglewood Oil Field (IOF) City IOF Area

Inglewood Oil Field Specific Plan Project The City IOF Plan Areas The specific Plan area consists of four non contiguous areas Two of the plan areas (Areas 2 and 3) are located within the Culver City Park Area 4 to the west is located adjacent to an active commercial/industrial area Area 1 represents the largest plan area with active oil related operations throughout

City IOF Planning Areas

The City IOF Existing Oil Operations Inglewood Oil Field Specific Plan Project The City IOF has been used for oil drilling and production since the 1920 s 69 total wells are documented to have been drilled within the City IOF At least 28 of those wells have been abandoned 41 wells within the City IOF are existing active or potentially active wells Sentinel Peak Resources (SPR) is the Oil Field Operator as of January 1, 2017

City IOF Existing Wells and Conditions

The City IOF Future Oil Operations Inglewood Oil Field Specific Plan Project The existing conditions (41 active/potentially active) wells would be allowed to continue Up to 30 new wells could be drilled under the City IOF Project Drilling of new wells would be limited to a period of 15 years Only 2 or 3 wells could be drilled per year Placement of any new wells would generally be limited to within the allowed drilling area Continued and new oil production operations would be regulated, permitted and monitored in accordance with the City IOF Specific Plan (and Drilling Regulations)

City IOF Specific Plan Allowed Drilling Areas

What is A Specific Plan?

Inglewood Oil Field Specific Plan Project A Specific Plan Is a tool for implementing the City s General Plan Provides refined planning policy applicable to a defined area Is used to directly regulate land uses for a defined area Coordinates focused policy and regulation for a defined development project within a defined area

Inglewood Oil Field Specific Plan Project Authority for Specific Plans Authority is established by the CA Government Code (Sections 65450 thru 65457) The scope must be consistent with the City s adopted General Plan A specific plan can be adopted by resolution (policy driven) or ordinance (regulation driven)

Inglewood Oil Field Specific Plan Project Contents of a Specific Plan Similar to a General Plan, the specific plan addresses required planning elements It must address the location, type and intensity of land uses (including open space) It must address programs for providing services and supporting infrastructure It typically includes standards and criteria for regulating development within the specific plan area It includes a program for implementation and administration of the specific plan

How will the City IOF Specific Plan Work?

City IOF Specific Plan Purpose and Objectives Purpose Inglewood Oil Field Specific Plan Project When adopted, the City IOF Specific Plan will define oil uses as a continuing legal non conforming use within the City IOF, which will be regulated by the City IOF Specific Plan and its related Drilling Regulations. Objectives to ensure. Oil Operations are conducted in a comprehensively coordinated manner consistent with a programmatic plan for a defined physical area and in harmony with adjacent land uses and in a manner that protects the public health, safety and welfare, and the environment; Cooperation and coordination among affected and adjacent government agencies in implementing all reasonable measures to reduce impacts to the surrounding communities;

Inglewood Oil Field Specific Plan Project City IOF Specific Plan Purpose and Objectives (continued) Objectives to ensure. C) Cooperation and coordination for multi agency response to Oil Field emergency situations; D) Minimization of elimination of potential adverse environmental, public health and safety impacts of Oil Operations by the implementation of area specific regulations and mitigation measures; E) Before new Oil Field drilling activities are permitted, that existing Oil Field facilities are in compliance with the requirements of these Drilling Regulations and the Specific Plan; F) Minimization of Oil Field emergencies; in the event that an emergency occurs, regulations are in place to assist affected and adjacent government agencies in identifying all reasonable measures to reduce impacts to surrounding communities;

Inglewood Oil Field Specific Plan Project City IOF Specific Plan Purpose and Objectives (continued) Objectives to ensure. G) Appearance of the Oil Field site is enhanced with landscaping and other property maintenance requirements in order to preserve and improve the visual character and quality of the surrounding uses; and H) New applications for oil and gas Drilling Use Permits address the consolidation of Oil Field facilities to reduce odor, visual, noise, safety, health, and environmental impacts from Oil Operations to surrounding land uses and City residents.

Inglewood Oil Field Specific Plan Project Proposed Drilling Regulations A key component of the Specific Plan is the Drilling Regulations, provided in Appendix C The Drilling Regulations set forth the process and procedures for Oil Operations that are consistent with the City IOF Project objectives The Drilling Regulations establish a 3 tier permitting process, requiring: (1) A Comprehensive Drilling Plan (for Approval by City Council) (2) An Annual Consolidation and Drilling Plan (for Approval by the Community Development Director) (3) Individual Drilling Use Permits (issued by the Community Development Director) The Drilling Regulations establish a comprehensive program for period review, reporting and monitoring

Proposed Development Plan Concepts Inglewood Oil Field Specific Plan Project Chapter 3 of the Specific Plan provides the development plan concepts to illustrate how and where physical development will take place The Development Plan Concepts focus on the policy program (derived from the City s General Plan) that functions as a guideline for how any future drilling program will occur The Concept Plans establish clear expectations for coordination with open space planning, visual and viewshed protection, compatibility with surrounding land uses and safety planning

Implementation and Administration Inglewood Oil Field Specific Plan Project Chapter 5 of the Specific Plan provides a program for how the City IOF Specific Plan will be implemented and administered Any substantial changes to Development Concepts or Drilling Regulations require approval from the City Council The City IOF program will be periodically reviewed to determine if adjustments are needed to ensure that the Objectives are being met

Providing Input on the City IOF Specific Plan or Project Description

Inglewood Oil Field Specific Plan Project Comment on the Proposed City IOF Specific Plan Written Comments by November 14 th (separate from EIR comments) Oral comments at future Public Hearings

Draft Environmental Impact Report Overview

What are the areas of known controversy? Inglewood Oil Field Specific Plan Project Public health, air quality, and water quality concerns associated with both general oil and gas production activities and hydraulic fracturing; Migration and/or explosion of methane gas; Seismic activity and location proximate to fault lines; Use of hazardous materials and spills on the oil field; Aging infrastructure and associated risks; Greenhouse gas emissions; Noise and odors; and Subsidence

Inglewood Oil Field Specific Plan Project What is a Mitigation Measure? Draft EIR impact analysis considers compliance with: Federal, state, local regulations Specific Plan requirements MMs must either avoid, minimize, rectify, reduce, eliminate, or compensate for the impact (must be feasible) MMs are monitored to ensure tracking and implementation Mitigation Monitoring and Reporting Program (MMRP) Included in final documents considered by City Council

Inglewood Oil Field Specific Plan Project Draft EIR Mitigation Overview Aesthetics Air Quality Biological Resources Cultural and Tribal Resources Geology, Soils, and Seismicity Greenhouse Gas Emissions Hazards, Hazardous Materials, and Risk of Upset Hydrology and Water Quality Land Use and Planning Mineral Resources Noise Public Services and Facilities Recreation Transportation and Traffic Utilities and Service Systems Other: Growth Inducing, Energy Note: With regulations and Specific Plan, no significant impacts Note: Mitigation required Note: Still significant after mitigation

Inglewood Oil Field Specific Plan Project Significant Impacts Impact Mitigation Still Significant? Air Quality Peak day construction activity for VOC, NOx and CO Air Quality Localized Significance Threshold (LST) for NOx, PM10 and PM2.5 Air Quality Health Risk due to toxic air contaminants (e.g. diesel) Biological Resources Disturb maternity bat roosts Biological Resources Disturb sensitive vegetation MM AQ 1 through MM AQ 3 MM AQ 1 through MM AQ 3 MM AQ 1 MM AQ 3 MM BIO 1 MM BIO 2 No Yes: Possible for some receptors No No No

Inglewood Oil Field Specific Plan Project Significant Impacts Impact Mitigation Still Significant? Geology, Soils and Seismicity Fault rupture and seismic groundshaking, and induce a seismic event Greenhouse Gas Emissions Conflict with applicable plan, policy or regulation Hazards, Hazardous Materials, Risk of Upset Hazard due to transport, use or disposal of hazardous materials Hazards, Hazardous Materials, Risk of Upset Hazard due to upset and accident conditions Hydrology and Water Quality Violate water quality standards MM GEO 1 through MM GEO 5 MM GHG 1 through MM GHG 4 MM HAZ 1 through MM HAZ 14 MM HAZ 1 through MM HAZ 13 MM HYD 1 Yes No No Yes No

Inglewood Oil Field Specific Plan Project Significant Impacts Impact Mitigation Still Significant? Hydrology and Water Quality Adversely affect groundwater through spills or leaks, ineffective annular well seals, improperly abandoned wells, injection wells, or well stimulation Noise Increase in ambient noise due to 24 hour drilling Utilities Have sufficient water supplies MM HYD 2 through MM HYD 8 MM NOI 1 through MM NOI 3 MM UTL 1 MM UTL 2 No Yes: Possible for some receptors No

Summary of Significant Unavoidable Impacts Inglewood Oil Field Specific Plan Project Significant Unavoidable Impact AQ 1: The Maximum Buildout Scenario could result in direct and cumulative significant and unavoidable impacts for localized emissions of NOx, PM10 and PM2.5 Significant Unavoidable Impact GEO 1: Well stimulation treatments could result in direct and cumulative significant and unavoidable impacts for induced seismicity; rupture of a known earthquake fault; strong seismic groundshaking; and for hazards/accident conditions Significant Unavoidable Impact NOI 1: New well drilling noise could result in direct and cumulative significant and unavoidable impacts from 24 hour well drilling at some potential well locations located in proximity to residences

Inglewood Oil Field Specific Plan Project Summary of Alternatives Alternative 1: No Project Alternative 2: Prohibit Deep Wastewater Disposal Injection Alternative 3: Prohibit all Well Stimulation Treatments, Including Fracturing Alternative 4: Mandatory Use of Electricity to Power Drill Rig and Hydraulic Fracturing Equipment Alternative 5: No Net Increase in Wells Environmentally Superior Alternative Alternative 3 eliminates Impact GEO 1; Alternative 4 eliminates Impact AQ 1 and Impact NOI 1.

Inglewood Oil Field Specific Plan Project To submit written comments, include Subject: Inglewood Oil Field Specific Plan Project Via Email: IOFSpecificPlanProject@culvercity.org Via Fax: (310) 253 5664 Via Mail: City Attorney s Office City of Culver City 9770 Culver Boulevard Culver City, CA 90232 Attention: Heather Baker, Assistant City Attorney Specific Plan and Draft EIR can be viewed or downloaded at www.culvercity.org/inglewoodoilfield City of Culver City Planning Division Julian Dixon Library

Opportunities for Public Input

Inglewood Oil Field Specific Plan Project Environmental Impact Report Thank you for coming!