PRE-CAST HOUSE CONSTRUCTION

Similar documents
1 Site Preparation & marking L.S 1, brickwork in basement in cm 1: cft 19,975.00

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

PROGRESS JAIPUR PH-II AS ON 20 JULY 2018

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

A Block Activities : Internal painting, Flooring work in progress

PROGRESS JAIPUR PH-II AS ON 30 NOV 18

PROGRESS JAIPUR PH-II AS ON 20 DEC 18

THE DALAI LAMA INSTITUTE FOR HIGHER EDUCATION CONSTRUCTION PROGRESS REPORT (PHASE II) Brief description on the current work status of each block:

Elevated Slab Sequence

CIVIL WORKS Mahesh G. Nair

PRICED BILL OF QUANTITIES

Purna Fashions Ltd. RH Attire Ltd

Temecula Medical Center Temecula, CA

Central Power Research Institute Prof Sir C V Raman Road, Sadashivnagar Post Office Post Box No: 8066, Bangalore

TOWER 7 - Masonry & plastering works in progress

BILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of

Warn Knit Fashion Sun Knitwear Ltd. ARS Printing Chanmari, Near New Court, Fatullah, Narayanganj 1400, Bangladesh ( N, 90.

Scanned by CamScanner

Statement of Special Inspection Requirements

Civil Engineering Construction I (CBE5031)

Monthly Progress Report for the month of NOVEMBER 2013

Good Construction Practices Part I

Review Paper on Conventional and Mivan Formwork used for Construction

footings are provided with a concrete grade of M20. The maximum axial load 1600 KN as arrived from design is taken for the design of the footing.

Analyze time-cost required for conventional and prefabricated building components

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

Lattice Plate Flooring

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

INTERNSHIP REPORT GOUTHAM.J

cornish concrete products Crosswall Construction low carbon fast track buildings

Project Address: Name of Person Completing Form:

THE TECHNOLOGY DETAILS. 3D Monolithic Precast

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING

SPECIAL INSPECTION AND TESTING AGREEMENT

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA

Lecture 13 CONCRETE WORKS

Cork Institute of Technology. Summer 2006 Structural Design & Detailing I (Time: 4 Hours)

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Introduction. Structures may be classified on the basis of materials used for construction, as follows: Steel structures. Aluminium structures

THE WINSTEP CONCEPT. The challenge

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Locrete Building System: the Technology Handbook

cornish concrete products Structural precast

Construction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed

STRUCTURAL STEEL FRAMING

Amity Design Ltd. House #7&9, Road #9 Block #D, Section #11 Mirpur Dhaka 1216, Bangladesh (23.820N, E) 03.MARCH.2014

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM :

Handloom Marketing Complex at Janpath,

Estimate FOR THE SEPTIC TANK

Commercial Structures

Construction of Shopping Complex at MNIT campus.

Building Elements. Roof Wall. Slab/beam. Superstructure. Column. Basement. Substructure. Foundation

Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj ( E, N) 28 June 2014

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014

S B Design Ltd. Famous Design Ltd. 246/1/F, West Agargaon, Sher-E-Bangla Nagar, Dhaka-1207 ( N, E) 17 February 2015

TECHNICAL MANUAL. PC Beam Shoe. Hidden Beam Shoe for Corbel System

PC Beam Shoe. Corbel system to support beams. Technical Manual. Version: DK 4/2012 Design standard: DS EN Eurocodes + NA (Denmark)

A/E REVIEW CHECKLIST STRUCTURAL

ABSTRACT SHEET Name of Work : Main Building Proposed Construction of RSETI Building On Plot No. 7/1 & 9 At-Babupeth, Chandrapur

CHAPTER 16 - GANTRIES

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

Chapter 9 ALTERNATIVE TECHNOLOGIES

Emerging construction technologies

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

HOUSE BUILDING DIGEST

Hollowcore Slabs. Hollowcore slabs are used mainly for flooring and roofing, but can also be used for wall purposes.

Saasco Tex (BD) Ltd Muksudpur Apparels Ltd Expo Dress Ltd Julfikar Fashions Ltd

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

FOR BUILDING WORKS PART-I WORK INFORMATION - (TO BE FILLED-UP BY PROJECT) Work is

IIM RAIPUR. Development of Phase I Campus including building for IIM Raipur at Naya Raipur

INSPECTION GUIDELINES: SPECIAL INSPECTION REQUIREMENTS

Project Estimate Summary

East Lyme Middle School EAST LYME MIDDLE SCHOOL

HARVEY MUDD COLLEGE TEACHING AND LEARNING CENTER SECTION Page 1 of 6 VOIDED CONCRETE SLAB

HIDD HEIGHTS PROGRESS REPORT

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Best Buy Corporate Building D (4) Richfield, MN

BUILDING INTEGRITY DEA SUMMARY REPORT

The Construction of the Langham Place in Mong Kok An Introduction

GLASS FIBRE REINFORCED GYPSUM LOAD BEARING (GFRG) PANELS FOR AFFORDABLE HOUSING IN FAST TRACK & ENVIRONMENTAL PROTECTION

Comparative Study of R.C.C and Steel Concrete Composite Structures

Pre-Engineered Construction Analysis and Design of Portal Frame

Hilton Baltimore Convention Center Hotel Western Podium

Camlet Fashions Ltd. Simco Fashions Ltd Fine Craft Ltd Ayesha & Galeya Fashions Ltd

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

KANPUR SMART CITY LIMITED

CBM Engineers India COMPANY PROFILE. Structural Engineering Firm established in 1975 in Houston, Texas - USA Services Offered:

Structural Technical Report #2 By Robert Whitaker

Requirements for Measuring and Pricing of Structural Concrete

CE2401-DESIGN OF REINFORCED CONCRETE AND BRICK MASONRY QUESTION BANK

MARINE WORKS SHAFA AL NAHDAH SHAFA AL NAHDAH. shafaconstruction.com. SHAFA - UAE (HEAD OFFICE) SHAFA Al Nahdah Building Contracting LLC

Mechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company

DIVISION 03 CONCRETE. Number CONCRETE

PROGRESS R E P O R T M A R C H

Thesis Proposal. Matthew R Peyton

Transcription:

PRE-CAST HOUSE CONSTRUCTION

BDA is a Planning and Development Authority Jurisdictional Area is 1370 sq.km. Developed 64 Layouts Distributed 1,40,000 of sites Developed Infrastructure Works like Ring Roads & Grade Separators. BDA is also responsible for approval of Development Plans and Layout Plans of private agencies

BDA has now taken up Construction of Affordable Housing Projects. Over 13000 Housing Units are under Constructions. 5000 units have been completed. To encourage latest available fast track methods of construction, flexible tender conditions adopted.

FOUR DIFFERENT CONSTRUCTION TECHNIQUES ARE BEING USED AT PRESENT

1) CONVENTIONAL METHOD 2) A MANOLITHIC CAST-IN-SITU SHEAR WALL CONSTRUCTION 3) PRE CASTING OF ELEMENTS OF FRAMED STRUCTURE 4) PRECAST PRE-ENGINEERED METHOD OF CONSTRUCTION

TWO TYPES OF PRE CASTING CONSTRUCTION

PRE CASTING OF ELEMENTS OF FRAMED STRUCTURE - Elements of framed structure including slabs are precast and will be assembled at site

PRECAST PRE-ENGINEERED METHOD OF CONSTRUCTION - Load bearing wall elements are precast which will be assembled in to cubicles at the factory. All finishing's will be done at factory. The finished cubicles will then be transported and erected at site

DODDABANHALLI AFFORDABLE HOUSING PROJECT AT SY. NO. 03 USING PRE CASTING OF ELEMENTS OF FRAMED STRUCTURE

SALIENT FEATURES Total cost of the project:- 133.41 Crores Total Number of Buildings:- 7 (3BHK-2, 2BHK-5) Type of structure:- Pre Cast Framed Structure Total Carpet area:- 4,36,482 Sft Total Built-up area:- 7,11,000 Sft Total number of housing units:- 704 Nos Total number of floors:- B+S+18 Floor Total Numbers of lifts:-14 Total Numbers of OHT:- 7

THE ISOLATED FOOTING FOUNDATION IS DONE WITH IN-SITU CONCRETE.

THE RCC COLUMNS AND RETAINING WALL OF BASEMENT FLOOR IS DONE WITH IN-SITU CONCRETE.

VIEW OF THE RCC COLUMNS AND GRADE SLAB OF BASEMENT FLOOR

THE BASEMENT SLAB (PODIUM) IS DONE WITH IN-SITU CONCRETE. VIEW OF THE SHUTTERING WORKS

BATCHING PLANT

FABRICATION OF LATTICE GIRDER AT SITE..

BEAM CASTING IN PC YARD...

COLUMN CASTING IN PC YARD...

VIEW OF PRE-CAST COLUMNS

VIEW OF SHIFTING OF PRE- CAST COMPONENTS

CURING OF PRE-CAST COMPONENTS

STACKING YARD

COLUMN ERECTION...

VIEW OF ERECTED COMPONENTS...

VIEW OF ERECTED COMPONENTS

VIEW OF ERECTED COMPONENTS

AFTER COMPLETION OF SLAB ERECTION...

VIEW AFTER SLAB ERECTION

PROP SUPPORTS FOR PRE-CAST SLABS

AERIAL VIEW...

VIEW OF ROOFS READY FOR SCEEDING

BLOCK WORK PROCESS

VIEW OF EXTERNAL PLASTERING IN PROGRESS..

VIEW OF EXTERNAL PLASTERING GROOVE MAKING IN PROGRESS..

SAMPLE TENAMENTS

NORTH SIDE ELEVATION

ALUR HOUSING PROJECT USING PRECAST PRE-ENGINEERED METHOD OF CONSTRUCTION

SALIENT FEATURES Name of the Project : AFFORDABLE HOUSING FOR ECONOMICALLY WEAKER SECTION AT SY.NO. 113 OF ALUR VILLAGE, DASANAPURA HOBLI, BANGALORE NORTH TALUK (PHASE 1). Name of the client Name of the Agency Technology No. Of Units Cost as per accepted tender : BANGALORE DEVELOPMENT AUTHORITY : Sri. C.P Umesha : Pre-Cast Technology. : 1520 (1 BHK) : Rs. 110.23 Crores Date of execution of Agreement : 29-03-2013 Date of Commencement of Work : 29-03-2012 Date of Completion : 31-08-2015

LAYOUT PLAN

View of Completed Structures

BATCHING PLANT

Plant & Assembly Line

Steel Fabrication Work

Steel Fabrication Work

Vertical Mould System Shuttering

VMS shuttering

Vertical Mould Section

Vertical Mould Section (Top view)

De-Moulding & Lifting

Hardened Concrete Panels

Welding of Panels with Angle plates and Steel Column

Welding of Panels with Angle plates and Steel Column

Assembling of Panels with Angle plates and Steel column

Assembled Units

Floor Slab Reinforcement

Electrical Works

Flooring

Kitchen Counter & Dadooing

Bathroom: Dadooing

Putty & Painting

Finished Big Cubical Unit

Finished Small Cubical Unit

Excavation & PCC

Plinth Beam at Casting Yard

Erected Plinth Beam at Site

Footing Concreting

Footing Concreting

Transporting the Housing Unit

Transporting the Housing Unit

Lifting of Housing Unit

Placing of Housing Units

Anchorage Bars

Placing of Housing Units

Placing of Housing Units

Blocks & Placed Units

Blocks & Placed Units

Staircase Mould

Staircase Units

Lifting of Staircase Unit

Stairs

Staircase Flooring

Corridor

Finished Unit

Finished Unit

Finished Unit

Terrace Water Proofing

Finished Block

Finished Block

Finished Block

Finished Block

Finished Block

Finished Block

Finished Block

ADVANTAGES OF PRE CAST CONSTRUCTION TECHNIQUES Optimum use of Construction Materials : Fly Ash and GGBS are used to maximum possible extent. Very Less Wastage of Construction Materials. Better Quality Control : As the components are manufactured in control factory environment : Rigid and uniform quality control is possible. Recycling of Material is ensured : Usage of River sand and Water reduced substantially. Clean and Healthy built / construction environment. Environmental Friendly, Energy Efficient, Green Building Construction is possible. Construction time is reduced substantially.

THANK YOU