Belgian Stress Test Nuclear Power Plants (BEST)

Similar documents
Belgian stress tests. National report on nuclear power plants. Man-made events

The present report summarizes the progress made on the stress-tests action plan in the nuclear power plants of Doel and Tihange since 2011.

The present report summarizes the progress made on the stress-tests action plan in the nuclear power plants of Doel and Tihange since 2011.

1. Introduction Development of the national stress test action plan Status of the stress test actions Enhancement of the

IAEA, Vienna, October

STRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT

Post- Fukushima accident. Belgium. Peer review country report. Stress tests performed on European nuclear power plants. Stress Test Peer Review Board

Ageing Management and Long Term Operation of Nuclear Power Plants

INPRO Criterion Robustness of Design Position of the EPR TM reactor Part 3. Franck Lignini Reactor & Services / Safety & Licensing

POST-FUKUSHIMA STRESS TESTS OF EUROPEAN NUCLEAR POWER PLANTS CONTENTS AND FORMAT OF NATIONAL REPORTS

The Nuclear Safety Authority (ASN - Autorité de Sûreté Nucléaire),

From the Accident at the Fukushima Daiichi NPS: Efforts to Improve Safety

The EU-Stresstest Dr. Christoph Pistner

Compilation of recommendations and suggestions

European level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work.

Wolsong-1 Stress Test

Critical remarks on the PLEX-process of Tihange 1 and Doel 1&2

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

Ibero-American Forum of Radiological and Nuclear Regulators, FORO. Complementary Safety Assessments of the Iberoamerican FORO Countries

European Nuclear Stress Test

Implementation of the EU stress test in European nuclear power plants

Bringing safety performance of older plants on par with advanced reactor designs

Final 14 TH September Stress test peer review Follow-up fact finding site visit. Germany

Accident Management Programme for Indian Pressurized Heavy Water Reactors Chander Mohan Bhatia Nuclear Power Corporation of India Limited

THE FUKUSHIMA ACCIDENT: IMPLICATIONS FOR NUCLEAR SAFETY. Edwin Lyman Union of Concerned Scientists May 26, 2011

IAEA Workshop - Research Reactors. Implementation of the post-fukushima Daiichi accident Enhancement Programme for RRs. Sydney - December 2017

TERM TASK FORCE. Presented to: Waste Management Symposia By: Dr. Charles L. Miller. Phoenix, AZ. Fukushima Daiichi NRC Near Term Task Force 1

ESSENCE AND CHARACTERISTICS OF THE ATMEA TECHNOLOGY: THE ATMEA1 REACTOR

in China Nuclear and Radiation Safety Center, Ministry i of Environmental Protection, ti P. R. China August , Vienna

EDF NPPs Post-Fukushima Complementary Safety Assessments

Highlights From the Work of the NEA on Impacts of the Fukushima Accident. Javier Reig Head, Nuclear Safety Division

CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements

CNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria

ASSESSMENTS OF SWEDISH NUCLEAR POWER PLANT IN THE AFTERMATH OF THE FUKUSHIMA DAIICHI ACCIDENT

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

Meetings for Sharing International Knowledge and Experience on Stress Tests

Nuclear Power and Nuclear Safety Post Fukushima

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

Improvements on French Nuclear Power Plants Taking Into Account the Fukushima Accidents

Extension to 60 years lifetime

Answers to Questions on the National Report

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

EPR Safety in the post-fukushima context

SPESS F Document Preparation Profile (DPP)

The Nuclear Safety Authority (ASN),

RAPPORTEURS' REPORT THE NETHERLANDS ENSREG NATIONAL ACTION PLANS WORKSHOP. 1.1 Compliance of the national action plan with the ENSREG Action Plan:

SPESS F Document Preparation Profile (DPP)

Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima

Swedish action plan. for nuclear power plants

RECOMMENDATION 2.3: SEISMIC. The U.S. Nuclear Regulatory Commission (NRC) is issuing this information request for the following purposes:

CNSC Evaluation of Plant-Specific SAMG

Recent Developments in Risk Assessment: Future Perspectives

EU STRESS TESTS: SPANISH RESULTS ON SEISMIC EVENTS IAEA, International Experts Meeting on External Events

Ultimate Electrical Means for Severe Accident and Multi Unit Event Management. Xavier Guisez Electrabel GDF Suez

Improvements in defense in depth on French NPPs following Fukushima Accidents

Nuclear Safety Standards Committee

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

SAFARI-1 Safety Reassessment and Modifications in light of Fukushima Daiichi Accident

Enhancements to Emergency Preparedness and Response in Spain

Implementation of post-fukushima international recommendations. Switzerland

Canadian Regulatory Approach for Safe Long-Term Operation of Nuclear Power Plants

IAEA Workshop. Implementation of lessons learned from the Fukushima Dai-ichi accident Research Reactors. Sydney - December 2017

Regulatory Review Aspects of Post-Fukushima Safety Enhancements in Indian NPPs

HPR1000: ADVANCED PWR WITH ACTIVE AND PASSIVE SAFETY FEATURES

Romanian National Action Plan post - Fukushima

Post-Fukushima Assessment of the AP1000 Plant

The risk of reactor pressure vessel material degradation Doel-3/Tihange-2

FOLLOW-UP TO THE FRENCH NUCLEAR POWER PLANT STRESS TESTS UPDATE OF THE ACTION PLAN OF THE FRENCH NUCLEAR SAFETY AUTHORITY (ASN) DECEMBER 2017

The Stress Test Process in France (CSA*) Its impact on Research Facilities

Safety enhancement of NPPs in China after Fukushima Accident

Safety enhancement of nuclear power plants in Russia: response to challenges of the time

Post Fukushima actions in India. Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL

Lessons Learned from the Fukushima Daiichi Accident, Actions Taken and Challenges Ahead

Nuclear energy- Between risks and benefits

World Efforts after Fukushima and Lessons Learned from the Accident

Lessons learnt and subsequent actions taken in France after Fukushima accident

MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN

PHWR Group of Countries Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

Lessons Learned from the Fukushima Dai-ichi Accident and Responses in New Regulatory Requirements

An overview of what happened at Fukushima NPPs

Canadian Regulatory Perspective on Safety Challenges for New NPP

KHNP s strategies for Multi-unit Extreme Hazards Response

Safety Research Activities on Severe Accident Management in S/NRA/R after Fukushima Daiichi Nuclear Power Plant Accident

Introduction of Nation-wide Inspection and Reassessment to Chinese Research Reactors after Fukushima Accident

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

European stress tests

6-9. June 2017, Paks Gábor Volent director of safety and security. Severe accident management at Paks NPP

Fukushima-Daiichi - a radiochemical view of the evolving situation in Summer 2011.

WENRA APPROACH WITH RESPECT TO DESIGN EXTENSION OF EXISTING REACTORS

ELETRONUCLEAR s Response to the Fukushima Dai-ichi Nuclear Accident

SALTO PEER REVIEW MISSION FOR DOEL DOEL NUCLEAR POWER PLANT UNIT 1 AND 2 IN BELGIUM

URESANDACTIONSCROSS-BORDERNETHER

International Atomic Energy Agency. Impact of Extreme Events on Nuclear Facilities following Fukushima. Dr C H Shepherd Nuclear Safety Consultant, UK

Japanese Nuclear Accident And U.S. Response. April 15, 2011

Post- Fukushima accident. Ukraine. Peer review country report. Stress tests performed on European nuclear power plants. Stress Test Peer Review Board

A new environment for nuclear safety: Main challenges for the OECD/NEA

Changes in the French Regulations in the light of the lessons learned from the Fukushima Daiichi accident

Nuclear Safety Enhancement in China after Fukushima Event. July 11, 2013

OVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica. 16 th of May 2012 Nuclear 2012 Pitesti, Romania

WENRA Approach with respect to Design Extension of Existing Reactors

Transcription:

Belgian Stress Test Nuclear Power Plants (BEST)

2013-08-26 TM IAEA: Belgian Stress Tests

Stress Test Specifications Technical scope Initiating events Earthquake Flooding Other extreme natural events (extreme weather, bush or forest fire) Terrorist attacks (= aircraft crash) Other man made events» Toxic and explosive gases and blast wave» External attack on computer based controls and systems Loss of safety functions: Loss of electrical power and/or loss of the ultimate heat sink Severe accident management (core damage, containment damage, ) Red = Difference between European and Belgian stress test specifications Green = Accident scenario as seen at Fukushima Daiichi NPP

Time line Belgian stress tests NPPs July 4th, 2011 Belgian Stress Test specifications October 31st, 2011 Electrabel reports submitted to FANC 2012 ENSREG Peer Review Visit Licensee action plan consolidated (06/2012) August 15 th, 2011 Electrabel progress report submitted at FANC September 15th, 2011 Progress report of the Federal Agency (FANC) December 31st, 2011 National report with final assessment by the FANC Bel V Additional demands & requirements

Nuclear power plants (BEST) General Conclusions Belgian plants are robust in design and have particular strengths : Metallic liner Pre-stressed concrete Annulus space Reinforced concrete 5

Nuclear power plants (BEST) Main actions: Review Level Earthquake

Nuclear power plants (BEST) Main actions: Peripheral Flood Wall

Nuclear power plants (BEST) Main actions: dyke reinforcements

Nuclear power plants (BEST) Main actions: New Deep ground water well External events Loss of safety functions Severe accidents Earthquake: Improvement of seismic resistance of several SSC Perform state-of-the-art seismic-hazard reassessment Flooding: Perhiperial protection, reinforcement Weather: Reassessment with longer return periods Explosive gases: Assess need for detection Cyber attack: Perform independent external audit External electrical network: Improve reliability and availability Total loss of electrical power: assess impact on Steam-generator cooling Containment isolation Spent-fuel pools Loss of ultimate heat sink: Set up a water consumption strategy Check / improve availability (eg. new deep ground water well) Assess the risk related to steam explosions when corium falls into a flooded reactor pit Assess the need for new and/or qualified instrumentation for severe-accident management Assess means to control ph inside the containment Filtered containment venting Emergency plan: improve organization, procedures, training (multi-unit, long duration) Rooms for emergency-plan management: guarantee long-term habitability, new OPS center Means to cope with external events: increase capability and / or availability Non Conventional Means

Nuclear power plants (BEST) Main actions External events Loss of safety functions Severe accidents Earthquake: Improvement of seismic resistance of several SSC Perform state-of-the-art seismic-hazard reassessment Flooding: Perhiperial protection, reinforcement Weather: Reassessment with longer return periods Explosive gases: Assess need for detection Cyber attack: Perform independent external audit External electrical network: Improve reliability and availability Total loss of electrical power: assess impact on Steam-generator cooling Containment isolation Spent-fuel pools Loss of ultimate heat sink: Set up a water consumption strategy Check / improve availability (eg. new deep ground water well) Assess the risk related to steam explosions when corium falls into a flooded reactor pit Assess the need for new and/or qualified instrumentation for severe-accident management Assess means to control ph inside the containment Filtered containment venting Emergency plan: improve organization, procedures, training (multi-unit, long duration) Rooms for emergency-plan management: guarantee long-term habitability, new OPS center Means to cope with external events: increase capability and / or availability Non Conventional Means

350 actions identified BEST Action Plan Follow up Very ambitious target dates (2013- ) Action plan follow up by FANC & Bel V Regular update by licensee of action plan progress Periodic progress meetings with FANC & Bel V Steering committee to discuss certain issues with high importance: f.e. seismic level for Ultimate Means on-site inspections to check implementation

BEST Action Plan Inspections 2013 Inspection program FANC includes stress test inspections for Doel & Tihange Follow-up quick wins (non conventional means, ): condition of equipment, training, procedures, maintenance, testing, Unannounced test of deployment of non-conventional means (for example Simulation of total SBO on whole site ) Joint inspections FANC & Bel V

Belgian Stress Test Non-Nuclear Power Plants (BESTA)

Stress test for other nuclear installations in Belgium As requested by Belgian Parliament Scope: Class I facilities in operation SCK CEN, Belgoprocess, FBFC International, IRMM, IRE, WAB Doel Large variety in installations & risks Stress Tests specifications (04/07/2011) have similar structure as specifications for NPPs Timing is different