I. Khoo, BEng(Hons), G.J. Levermore, BSc, ARCS, PhD, DIC, CEng, FCIBSE, MASHRAE, MInstE, K.M. Letherman, BSc, MSc, PhD, CEng, FIEE, FCIBSE.

Similar documents
Proposed Fan System Measures for NCC Section J, 2019

Modular Active Chilled Beams

ANSI/ASHRAE STANDARD , METHODS OF TESTING CHILLED BEAMS

BACK TO BASICS: DUCT DESIGN. Matthew Low, M.AIRAH, CPEng 15 MAY 2013

Engineering Update JANUARY VOLUME 9 THIS PACKAGE INCLUDES A COLLECTION OF ARTICLES FROM VOLUME 9 OF THE JANUARY 2013 ENGINEERING UPDATE.

How to acquire Demand Controlled Ventilation with energy optimal functionality? John Woollett CEng Reserachers from SINTEF; Mads Mysen & Peter Schild

Canada Published online: 28 Feb 2011.

Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619

Energy simulation in early stage building design: simplified models and impact on results

Commercial Building Performance Evaluation System for HVAC Diagnostics and Commissioning

HVAC SYSTEM CONFIGURATIONS, AN ENERGY ASPECT

MODELING AND VALIDATION OF EXISTING VAV SYSTEM COMPONENTS

DISPLACEMENT VENTILATION

Aalborg Universitet. CLIMA proceedings of the 12th REHVA World Congress Heiselberg, Per Kvols. Publication date: 2016

Energy Efficiency in Building Active Design Part II

Pressure Independent Valve Systems. ASHRAE Seminar College of the North Atlantic, Doha, Qatar 20 th April 2013

A DEVELOPMENT OF A HVAC EXPERIMENTAL CHAMBER AND ITS NUMERICAL MODELâ ÒNUMERICAL HVAC EXPERIMENTAL CHAMBER,Ó ON A COMPUTER

Contents. Air-side systems. Fundamentals of HVAC&R Part 2 Presented by: Ir Dr. Sam C. M. Hui

Proceedings of Clima 2007 WellBeing Indoors

Dynamic Reset for Multiple-Zone Systems

Underf loor For Schools

Using System Curves to Avoid Problems in VAV Systems

Water-side Systems. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

Principles of Ventilation and Air Conditioning Design & Installation

Hourly Analysis Program v.4.1 Page 1 of 1

Energy Effort of Air Distribution Systems

DEMAND CONTROLLED VENTILATION (DCV) SYSTEMS

Numerical Investigation on Ventilation Strategy for Laboratories: A Novel Approach to Control Thermal Comfort Using Cooling Panels

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC. B. Testing, adjustment, and balancing of refrigerating systems.

TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify,

Achieving acoustical standards in the classroom Study of HVAC systems and classroom acoustics

PLUME ANALYSIS AND CFD MODELING FOR EFFECTIVE EAF MELTSHOP ENVIRONMENT CONTROL

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS

Hourly Analysis Program v.4.1 Page 1 of 1

BUILDING DESIGN FOR HOT AND HUMID CLIMATES IMPLICATIONS ON THERMAL COMFORT AND ENERGY EFFICIENCY. Dr Mirek Piechowski 1, Adrian Rowe 1

Large University Central Chiller Plant Design Considerations

Demand Controlled Ventilation. A Detailed Study of Energy Usage by Simulation

University of Strathclyde Faculty of Engineering

CHAPTER 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

Mechanical Depth. Redesign and Analysis

Centigrade s Testing & Training Facility Sponsored by:

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

Hourly Analysis Program v.4.1 Page 1 of 1

Ministerio Público Fiscal de la Ciudad de Buenos Aires Fiscalía General Departamento de Infraestructura y Apoyo Operativo

Fundamentals of Acoustics

2. The requirements of Sections 502, 503, 504 and 505. In addition, commercial buildings shall comply with either Section 506.2, or

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing.

Airflow Measurement for HVAC Systems Comparing Technologies June 11, 2003

Demand Control Ventilation; Experiences from theory to real projects

Thermodynamics: An Engineering Approach, 6 th Edition Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2008

Development and Testing of the Characteristic Curve Fan Model

SECTION AIR DISTRIBUTION

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

RadiFit EC centrifugal fans. Compact, efficient, easily upgraded.

LESSONS LEARNED IN MODELING UNDERFLOOR AIR DISTRIBUTION SYSTEM

Thermal Thermal Applications Category Version 6.4. Integrated Environmental Solutions

A NEW ALGORITHM FOR SENSORS VERIFICATION AND CORRECTION IN AIR HANDLING UNITS

Chilled Beams. The new system of choice?

Optimal Set-point Synthesis in HVAC Systems

ENGINEERING UPDATE JULY VOLUME 11 THIS PACKAGE INCLUDES A COLLECTION OF ARTICLES FROM VOLUME 11 OF THE JULY 2013 ENGINEERING UPDATE.

Hourly Analysis Program v.4.1 Page 1 of 1

Dimensioning of Air Ducts in Buildings with Comfort Ventilation

VAV WITH ELECTRIC HEATER

Potential of natural ventilation in shopping centres

Sustainable Chilled Beam Design

A Sensitivity Analysis on Mixing Energy Loss in Air-Conditioned Rooms by Using CFD

Investigation on A Ground Source Heat Pump System Integrated With Renewable Sources

BUILDING PERFORMANCE IMPROVEMENTS FROM NCC2019

Therma-Fuser Systems. Energy Modeling Guide for Therma-Fuser systems. Acutherm was spec d here

Hourly Analysis Program v.4.1 Page 1 of 1

Steven J. Emmerich and W. Stuart Dols National Institute of Standards and Technology Gaithersburg, MD, USA

Ventilation performance measurement of a decentralized mechanical system with heat recovery using Tracer gas decay method

PERCENT OUTDOOR AIR CALCULATION AND ITS USE

Therma-Fuser Systems. Energy Modeling Guide for Therma-Fuser systems. Acutherm was spec d here

ACC Users Group 5 th Annual Meeting October 16 th, 2013 Performance Characteristics of a Novel Modular Air-Cooled Condenser

SMART HVAC & LIGHTING SYSTEMS. Savings From Two Major C&I End Uses

TO Stanley A. Mumma, Ph.D., P.E.

Proposal: Mechanical System Redesign

CFD Modelling and Analysis of Different Plate Heat Exchangers

MODERN PRACTICES FOR MEASUREMENT OF GAS PATH PRESSURES AND TEMPERATURES FOR PERFORMANCE ASSESSMENT OF AN AXIAL TURBINE

Requirements of the ErP Directive on HVAC systems. What you need to know.

Analysis of Uniformity and Energy Consumption in. Supermarket installed DurkeeSox Air Dispersion System. with PE Air Dispersion Model

Supply Fan Energy Use in Pressurized Underfloor Air Distribution Systems

ARE YOUR VARIABLE SPEED PUMPING APPLICATIONS DELIVERING THE PREDICTED SAVINGS? IMPROVING CONTROL TO MAXIMIZE RESULTS

Experimental study on performance of contra-rotating axial flow fan

CONSTRUCTION REQUIREMENTS

Trane Water-Source Variable Refrigerant Flow

Gerald R. Ford Museum

CFD and Wind Tunnel Study of the Performance of a Multi- Directional Wind Tower with Heat Transfer Devices

NUMERICAL STUDY ON FILM COOLING AND CONVECTIVE HEAT TRANSFER CHARACTERISTICS IN THE CUTBACK REGION OF TURBINE BLADE TRAILING EDGE

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

PROPOSAL OF JAPANESE STANDARD OF THE MEASURING METHOD OF AIRFLOW RATES OF BUILDING EQUIPMENTS

Thesis Proposal. Clemson University Advanced Material Research Laboratory Anderson, SC. David Anderson Mechanical Option. Photo by Fred Martin

EVALUATION OF DISTRIBUTION SYSTEM PERFORMANCE IN DISTRICT HEATING AND COOLING SYSTEM

You Can t Afford Discomfort. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

Acutherm was spec d here. Building Automation Guide for Therma-Fuser Systems

HVAC INTEGRATED CONTROL FOR ENERGY SAVING AND COMFORT ENHANCEMENT vahid Vakiloroaya

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Recommended Methods to Evaluate Performance of Variable Air Volume Fume Hood Systems

Energy Consumption and Indoor Environment Predicted by a Combination of Computational Fluid Dynamics and Building Energy Performance Simulation

Transcription:

Duct Loops and VAV Modelling and Control I. Khoo, BEng(Hons), G.J. Levermore, BSc, ARCS, PhD, DIC, CEng, FCIBSE, MASHRAE, MInstE, K.M. Letherman, BSc, MSc, PhD, CEng, FIEE, FCIBSE. Abstracts This paper summarises the results of a now completed three year research programme into the modelling and control of variable air volume air conditioning. Three common VAV boxes, used in standard VAV and displacement ventilation systems, were analysed on a rig and new, more detailed, models developed compared to the current HVACSIM+ model. These models were then used to analyse duct loop systems. Although not extensively used in Europe, duct loop systems are shown to save up to 35% in fan power compared to conventional radial duct systems. Conventional, static pressure sensor positioning is briefly discussed and the saving from different positions shown from models of synchronous and asynchronous VAV systems. Stability and box authorities are also briefly discussed. 1

P as 1. Introduction Variable Air Volume (VAV) systems are one of the most common air conditioning systems used in commercial buildings. The duct work which distributes the supply air from the air handling unit (AHU) to each individual zone has been traditionally based on a radial approach. This is where supply air goes through a main duct run and branch ducts will deliver the air to each zone. In a large radial VAV duct network, approximately 60% of the total supply fan power required is used to deliver the supply air from the AHU outlet to each room diffuser. Hence the pressure losses through the duct distribution network are substantial. Duct looping has the potential to reduce the pressure requirements to deliver supply air to the individual zones. The cost of a duct loop installation may be (1) cheaper than a radial systemp there are fewer fittings required, with more uniform duct size requirements. A typical example of a duct loop system can be seen in Figure 1. EAST 10m 1 0.8m 3 /s 2 0.8m 3 /s 3 0.8m 3 /s Duct Loop 10m AHU Balance Point 10m Duct Loop 7.5m 4 0.8m 3 /s 5 0.8m 3 /s 6 0.8m 3 /s 5m 10m WEST 10m Figure 1: VAV Duct Network (Duct Loop) 2. Building Loads The design and control of a VAV duct network is dependent in the distribution profile of the building's cooling load acting on the VAV system. The load distribution profile of a typical VAV system depends on the layout of the duct system to its supplying zones. The load distribution profile can be idealised into two categories, a (2) synchronous and an asynchronous load distribution profilep P. This aids understanding and also the maximum savings in fan energy can then be determined. A synchronous load distribution occurs when the VAV system has been designed to supply a corner of a building over multiple floors. The load on the VAV system varies together as shown in Figure 2. The fan flow rate and power varies 2

widely. The VAV system in this case has to be designed for the sum of the peaks of the building load. Load Zone 4 Zone 3 Zone 2 Zone 1 Zone 4 Zone 3 Zone 2 Zone 1 Four Storey Building Time Figure 2: Synchronous load profile with 4 zones An asynchronous load distribution would be a typical VAV system supplying the entire floor of a building. With perfect diversity, the total load on the AHU is virtually constant as illustrated in Figure 3. In such systems, the fan speed and power variations are small. The savings in such systems are made in the design, capital and running cost i.e. smaller fan and plant. Zone 1 Zone 2 Load Total Load Zone 4 Zone 3 Four Storey Building Zone 1 Zone 2 Zone 3 Zone 4 Time Figure 3: Asynchronous load profile with 4 zones on one floor Most practical systems will fall between these two idealised profiles which would determine the diversity factor to undertake during the duct sizing design process. 3. VAV Box Models Three steady state terminal unit models for use in simulation of VAV system (3) have been derived from test rig experimentsp P. These models (one pressure dependent and two pressure independent terminal units) are different from the damper only modelsp Pbeing used by well established simulation packages like HVACSIM+ or TRNSYS. The total pressure loss across the terminal unit can be expressed in terms of a pressure loss coefficient K as shown in Equation 1. PT = KPV Equation 1 3

PBTB PBVB P which where K Total pressure loss across the terminal unit Pressure loss coefficient Velocity pressure at the inlet of the terminal unit A brief summary of the terminal unit models' pressure loss coefficients is explained here. Equation 2 shows a time-based pressure dependent terminal unit (TU1) model in which T, the travel time from its fully opened position, gives the relative position of the damper. The maximum travel time T for TU1 from fully opened to its minimum damper position is 39 seconds.. ln K = 1626. + ( 9. 68 10 6 T 336 ) Equation 2 Equation 3 and 4 shows the terminal unit models of two commercially popular pressure independent terminal units, TU2 and TU3 respectively. The damper angle θ range for terminal units TU2 and TU3 are 0 to 61.5 and 0 to 45 respectively. In Equation 3, two indices are used in the model to give a better curve fit to the measured pressure loss coefficient K characteristics. The low order index modelled the terminal unit (TU2) characteristic from 0 to 25 within an accuracy 10%. The higher order index extended the valid range of the terminal unit model up to 50. ln K 0.3575 4.37 10-3 1.77 = + θ + 174. 10 17 θ 9.95 Equation 3-7 4.5 ln K = 0.332 + 3.68 10 θ Equation 4 Equation 3 and 4 may be compared with Equation 5P shows the a typical opposed blade damper only model. Under similar authority and percentage damper angles, the installed characteristics of such damper only models could differ as much as 65% of total the volume flow. The damper range for Equation 5 is from 0 to 90 ln K = -1.5 + 0.105 θ Equation 5 (4) 4. Radial and Duct Loop Designs The basic approach to radial duct work design has been well established to size the ducts. Several duct sizing methods include equal friction, static regain and constant velocity. Design methods for duct loop have however not been well known (5) and there are many design variantsp P. But the simplest approach is to design a duct loop, which is equally sized to half of the designed system volume flow rate. This approach will also yield greater stability and ease of supply fan control, as will be shown later. 5. System Comparison under Full Load Conditions 5.1 System Design 4

Twelve configurations of radial and duct loop systems have been looked at for both a small (6 terminal units) and large (24 terminal units) VAV system. A general (6) summary of the layouts can be seen in Figure 4P P. Small Radial VAV System (6 Terminal Units) EAST 1 2 3 Large Radial VAV System (24 Terminal Units) EAST 1 2 12 AHU AHU 4 5 WEST Both High Velocity and Low Velocity Radial Designs 6 13 14 WEST 24 Both High Velocity and Low Velocity Radial Designs Both Large and Small Duct Loop VAV System EAST 1 2 12 Large Two Branch Radial VAV System EAST 1 2 12 AHU AHU 13 14 WEST 24 Three Duct Loop Design Sizes For Each System Case 13 14 WEST 24 Both High Velocity and Low Velocity Radial Designs Figure 4: General summary of the various duct loop and radial design layouts The two building layouts for a large and a small system have been based on a 2 cooling load of 80 W/mP P, with each zone measuring 10 m by 10 m. Each VAV pressure independent terminal unit is sized to supply a maximum volume flow rate of 3 0.8 mp P/s. These larger boxes have been used rather than many smaller boxes to simplify the system without altering volume flow rates. The inlet static pressure at maximum volume flow for a fully opened terminal unit was calculated to be 67 Pa, which included the pressure loss of the terminal unit (based on Equation 4), header box, 5m flexible ductwork and the slot diffusers. A maximum pressure loss of 250 Pa has been taken across the AHU due to the resistance of the filters and coils. The high velocity designs were based on a constant velocity approach in which the ducts were sized to operate between 10 and 15 m/s air velocity during maximum cooling conditions. The low velocity designs were based on a constant 5

pressure loss approach in which the design criterion was to size the main duct to have a pressure loss of 1 Pa/m. The duct loop was designed similarly on 1 Pa/m and based on half the design volume flow rate. Two reduced sized duct loop designs were also included in the analysis. 5.2 Fan Savings due to design The full load fan power consumption of each system configuration can be seen (6) in Table 1P P. It shows that duct loops can save up to 35% of fan power than an equivalent high velocity system under full load. The maximum duct diameter required can also reduce by up to 65%. System Configuration System Volume Flow 3 Rate (mp P/s) Required Fan Air Power (KW) Fan Saving High Velocity (%) Fan Saving Low Velocity (%) Max. Duct Size (m) *** 1. Hi. Vel. Radial (Small) 4.8 2.73 0* -27 0.71 2. Low Vel. Radial 4.8 2.16 21 0** 0.80 3. 500mm Duct Loop 4.8 2.17 21-1 0.50 4. 560mm Duct Loop 4.8 2.07 24 4 0.56 5. 630mm Duct Loop 4.8 2.02 26 6 0.63 6. Hi. Vel. Radial (Large) 19.2 13.08 0* -25 1.25 7. Low Vel. Radial 19.2 10.43 20 0** 1.40 8. 2 Br. Hi. Vel. Radial 19.2 14.41-10 -38 1.00 9. 2 Br. Low Vel. Radial 19.2 9.91 24 5 1.12 10. 900mm Duct Loop 19.2 9.73 25 7 0.90 11. 1000mm Duct Loop 19.2 8.94 32 14 1.00 12. 1120mm Duct Loop 19.2 8.44 35 19 1.12 Table 1: Results of the Fan Air Power Required and Percentage Fan Savings Under Full Load Conditions * Fan power saving being compared against a High Velocity Radial System. ** Fan power saving being compared with a Low Velocity Radial System. *** Maximum duct size used in design for the distribution of air to each occupied zone. 6. Supply fan control and part-load savings of radial and duct loops systems The part load savings and performance of the supply fan are largely dictated by its controls. 6.1 Fan Savings due to control Simple network analysis indicates the potential of fan savings due to supply fan control applied to three of the examples, a high velocity, a low velocity and duct loop network design. The two control strategies examined are static pressure control and box polling. 6.1.1 Static pressure control Static pressure control is a cheap and effective way of fan speed regulation in VAV. Static pressure control regulates the speed of the supply fan through a PI 6

P to P down controller and maintains the static pressure in the main duct. This method is simple but does not give optimal fan savings. For a radial system, the rule of thumb is to place the static pressure sensor two (7) (8) thirdsp three quartersp the main duct run. Conservative control engineers would place the static pressure sensor close to the supply fan, this was seen in 4 out of 6 installations visited in the United Kingdom. The implications on the placement of the static pressure sensor depend on the systems load distribution profile. If the system load closely follows a synchronous load profile, more fan savings can be achieved with the placement of the static pressure sensor further down the main duct run, perhaps three quarters or more. While in an asynchronous system, a more conservative position perhaps half way down the main duct run is necessary to avoid starvation of any terminal units. Simple network analysis can ensure that terminal units are not starved during part load operation and decide the ideal static pressure sensor position. In duct loop systems, two thirds static pressure sensor position rule cannot be applied. The placement of the static pressure sensor should be at the balance point of the duct loop. For an equally sized main duct loop design, this is the most stable position for the sensor as the static pressure changes due to dynamic flow fluctuations of adjacent terminal boxes is almost negligible. The static pressure set point should be set to the maximum total pressure required by terminal unit branches adjacent to the sensor to avoid starvation. Network analysis should be adopted to validate or increase the static pressure settings if any other upstream branches require more total pressure across the branch than the adjacent terminal unit branches. 6.1.2 Box polling Box polling methods have the potential to yield optimum fan savings in a (9,10,11) VAV system. Several box polling methods have been researchedp P. Terminal unit or box polling is based on the concept of requesting the status values of every terminal unit e.g. damper positions, volume flow demands, inlet pressures, etc. to regulate the speed of the supply fan. This method also aims to lessen the need for the control engineer to know the network details and system load profiles to identify the index terminal unit i.e. the terminal unit which requires the most total pressure. In practical systems, such systems are still experimental and expensive to implement in small to medium installations. Such a control approach is highly dependent on the reliability of every terminal unit. A building energy management system with an outstation module on every terminal unit is also required to relay the terminal unit status to a central processor. Hence box polling methods can only be justified on very large VAV systems and where the load demands are highly diverse. 6.2 Comparison of control strategies under part load conditions Table 2 shows a summary of the potential fan energy consumption for three system examples, high velocity radial, low velocity radial and a duct loop design with the two control strategies. 7

P P Only System Configuration % Fan Power at 100% Design Load F/E/B* % Fan Power at 75% Design Load F/E/B % Fan Power at 50% Design Load F/E/B % Fan Power at 25% Design Load F/E/B 1. Low Velocity 100/100/100 54/50/42 26/22/13 10/7/2 2. High Velocity 125/125/125 70/58/53 35/22/16 14/6/2 3. 1120mm Duct Loop 81/81** 43/34 20/10 8/1 Table 2: Results of the Percentage Fan Air Power Required under Synchronous Part- Load Conditions * % Fan Power with Static pressure control and SP sensor near fan discharge (F) / SP sensor at end of main duct (E) / Box polling (B). ** % Fan Power with Static pressure control and SP sensor at the balance point / Box Polling. The difference in fan power requirements between static pressure and box polling control is about 8% up to 19% (i.e. F minus B). The difference in potential fan energy consumption by positioning the static pressure sensor near the supply fan opposed to being near the end of the main duct run is in the order of 3% to 13% (i.e. F minus E) fan energy. As shown in Figure 5, static pressure control is an effective method to control the supply fan speed as a savings of up to 45% can be made over constant speed (No fan control/ridding the fan curve) method. With box polling, the maximum potential fan energy saving is increased to 55%. * Figure 5: Comparison of the part-load fan powerp P requirements of a large low velocity radial VAV system with box polling, static pressure and no fan control. * Fan air power is considered. Fan, motor, coupling efficiencies are not included. 6.3 Stability Analysis Box interaction is one of the causes of instability to the supply fan and other terminal units in a VAV system. Duct loops are more robust than radial systems as 8

downstream boxes do not cause large static or dynamic pressure fluctuations due to zonal load changes to the main duct. Pressure fluctuations due to changes in damper position in radial systems are more pronounced especially in high velocity systems. Hence box to box and box to fan interactions are more apparent in such systems. The influence of downstream terminal unit interaction with the supply fan increases as the static pressure sensor is positioned further down the main duct. Box authority and characteristics play an important role in the stability of the VAV system especially in radial design. 6.4 Starvation Starvation occurs when a terminal unit is unable to satisfy the volume flow demanded when its dampers are fully opened. Hence all branch ducts must be designed to supply its maximum volume flow rate under minimum system flow conditions. Due to the small variation in static and total pressures around the duct loop, starvation is unlikely to occur during part-load operation. The static pressure set point would be set to the maximum total pressure required across any branch. 7. Conclusion Duct loops are highly recommended in large systems. As the ease of control, and fan energy and stability is better than radial systems. Duct loops are also very flexible for expansion. The fan energy savings in large systems give an attractive approach for duct designers. 8. References 1. Day P, Private communication. 2. Department of Environment. General Information Report 41 "Variable flow control" Chapter 14. (March 1996), pp 66-71. 3. Khoo I, Levermore G J and Letherman K M, "Modelling of Variable Air Volume Terminal Units Part 1 (Steady State Models)" to be submitted to Building Services Engineering Research and Technology. 4. Legg R C, "Characteristics of single and multi-blade dampers for ducted airsystems". Building Services Engineering Research and Technology CIBSE Series A Vol 7 No. 4, pp129-145 (1996) 5. Chen S, Demster S, "Variable Air Volume and Environmental Quality" Mcgraw Hill Publication. (1995) Pp 80-81. 6. Khoo I, Levermore G J and Letherman K M, "Duct looping in vav systems" Building Services CIBSE Journal Vol 18 No. 10 (1996), pp 55-56. 7. Chartered Institution of Building Services Engineers. CIBSE Applications Manual: Automatic Controls and their Implications for Systems Design. London Chartered Institution of Building Services Engineers, (1985): pp 80-81. 8. American Society of Heating, Refrigerating and Air Conditioning Engineer. "Automatic Control". Chapter 51 in ASHRAE 1987 Handbook: HVAC Systems and Applications. Atlanta: American Society of Heating, Refrigerating and Air Conditioning Engineers, (1987), pp 51.15. 9

9. Hartman T "Terminal Regulated Air Volume Systems." ASHRAE Transactions 99 (1993) Part 1, pp 791-800. 10 Englander S L and Norford L K, "Saving Fan Energy in VAV Systems - Part 2: Supply Fan Control for Static Pressure Minimisation using DDC Zone Feedback", ASHRAE Transaction 98 (1992) Part 1, pp 19-32. 11. Warren M and Norford L K, "Integrating VAV Zone Requirements with Supply Fan Operation." ASHRAE Journal 35 (April 1993), pp 43-46. Acknowledgement This research work was supported by a grant from the Engineering and Physical Science Research Council, which is gratefully acknowledged. 10