Key Process Audit Checklist Record answers and notes on blank turtle diagrams or audit checklist or note page

Similar documents
SUPPLIER QUALITY SYSTEM SURVEY Please complete and return, within 10 days of receipt, to: GENERAL INFORMATION Attn: Manager of Quality

SUPPLIER QUALITY SYSTEM SURVEY

Vendor Qualification Survey

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

Supplier Quality Manual

COMPLETED QUALITY SYSTEMS QUESTIONNAIRE

SUPPLIER MANUAL Quality Policy

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Master Air Parts, Inc Skyway Drive, Suite 303 Santa Maria, CA (805) Phone (805) Fax

Langham Creek Machine Works, Inc.

Process Mapping and Process- Based Internal Audits

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

Supplier Quality Requirements SQR-1.0 Rev. 3

KEY PERSON MANAGEMENT SYSTEMS CERTIFICATION. (attach copy of certificate) MAIN CUSTOMERS

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

Florida Department of Transportation Office of Freight, Logistics and Passenger Operations Part 4 QUALITY ASSURANCE PROVISIONS #TRIPS-17-CA-RFP

ADVANCED INTERNAL AUDIT WORKSHOP

SUPPLIER QUALITY SYSTEM SURVEY

Verification Auditing

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

SUPPLIER QUALITY ASSESSMENT

Quality Manual Revision: C Effective: 03/01/10

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Quality Systems Basics

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

HFI Fluid Power Products Quality Manual Revision # 5 dated 02/07/10. HFI FLUID POWER PRODUCTS A Division of Hydraulic Fittings, Inc.

Reference Paragraphs. Appendix B AQS Auditor Handbook

QUALITY ASSURANCE MANUAL CHAPTER COVER. PAG # 1 of 1 REVISION DATE 05/27/2014 FLUID FILTRATION MANUFACTURING CORPORATION UNCONTROLLED COPY

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

QUALITY SYSTEMS INSPECTIONS TECHNIQUE

AESOP 15604; ISSUE 2; STATUS PENDING APPROVAL; AUTHORITY CARL BLAZIK This document is the property of NSF ISR. Page 1 of 9

Quality Manual ISO 9001:2000

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

ISO 13485: :2015 CLIENT TRANSITION CHECKLIST

I. Development, Submittal, and Acceptance of a Quality Management System

Tech Ord Supplier Quality Survey. Supplier Survey Evaluation

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

INTERNAL AUDIT CHECKLIST

Report No: SARA-CA Assessment Type: Re-Certification & Upgrade. Assessment Dates: 09/19/ /21/2016. Page 1

Transitioning from ISO/TS 16949:2009 to IATF 16949:2016 Presented by Brandon Kerkstra Revision: 10/24/2016

To support organizations in making a successful transition to IATF Quality Partner has developed several documents to help:

SUPPLIER QUALITY MANUAL

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

IATF transition. Only 1 year to go for over 69,000 ISO/TS16949 certified organizations to transition to ISO9001: 2015 and IATF 16949: 2016.

IBS Electronics, Inc.

Quality Manual. Manasota Optics, Inc & 1749 Northgate Boulevard Sarasota, FL Issue # 7 dated 05/10/2018

List of Documented Information (Document & Records)

Quality system implementation from a manufacturers viewpoint

Self-Evaluation/Audit Checklist for Food Supplement Manufacturers

QMS CO-ORDINATOR & GENERAL PROCEDURES:-

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

HACCP audit checklist

Correlation matrices between ISO 9001:2008 and ISO 9001:2015

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

Appendix C: Non Conformance Notification and Corrective Action Request

Overview of Draft API Standard 20M

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No

SUPPLIER SURVEY FORM Instructions

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

INS QA Programme Requirements

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

How to conduct Stage 1 and Stage 2 Audits

Supplier Quality Requirements

ASME NQA-1 Certification. Matthew Vazquez September 4, 2017

Quality management systems

Quality System Requirements for Suppliers

Click here to order the IFSQN FSSC Certification Package Now. Food Service FSSC Food Safety Management System Implementation Workbook

Supplier Quality Manual

RABQSA Certified Occupational Health and Safety Management System Lead Auditor Training Course

ACCREDITATION OF PRESSURE RELIEF VALVE REPAIR ORGANIZATIONS

Quality Assurance Manual

Manufacturing Supplier Requirements Manual

UNI EN ISO 22000:2005 STANDARD CHECK-LIST

Ten Requirements for Effective Process Control

SUPPLIER QUALITY MANUAL

INTEGRATING ISO 9000 METHODOLOGIES WITH PROJECT QUALITY MANAGEMENT

How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System

Integrated Quality Systems

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

Quality Systems Manual

4-OF AS9102 FAIR Forms and Instructions (SC)

Quality Assurance Manual

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

QMS-002. Quality Management System Manual. Conforms to ISO 13485

Access MRP Software. Material requirements planning software for growing manufacturers. Designed to support small to medium manufacturers

Beaver Machine. Quality Manual

Western Diversified Plastics, LLC. Supplier Requirements Manual

SUPPLIER QUALITY MANUAL

Quality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard

ISO 13485:2016 Mandatory documentation requirements & MyEasyISO

UNIVERSITY OF NAIROBI

Transcription:

What machines, equipment, software, and materials are used to do this process? Are there adequate resources? Is the equipment maintained and supported? Are there gauges that require calibration? What Inputs are required to do this process? Are these good and correct? What comes from internal and external customers? Any legal or regulatory requirements? What measurement or performance indicators exist? What monitoring or measuring is there? How is the performance and trends? What goals are there? Any customer feedback? How effective is the process? Are employees and management aware of negative trends and is anything being done? What is the Process being audited? Observe all aspects of the process being done. Ask questions about how the process gets done by the people doing the process. Who is the Process Owner? What role, responsibility and authority? Collect documents looked at, it s number and revision date. Verify against master documents. Any obsolete documents in use? Are all documents used for production controlled? Are documents populated and signed as required? Who is involved with this process? (Departments and job functions) What training and skills are required? Any special skills, certifications or training needs? What records of training exist? What Outputs come out of this process? What gets delivered to internal and external customers? What current records and historical evidence can you see to prove effectiveness of the process? Are records adequate per plan? What procedures or work instructions exist for this process? Get copies of all appropriate documentation and review. Do the people clearly demonstrate that they can do their jobs per the documented procedures and work instructions? What other Processes does this one link to or interact with? What examples can be followed into other processes? Follow audit trails from this process into other processes to assure the linkage, sequence and interaction are working as intended. What are the applicable ISO 9001 clauses that affect this process?. Key Process Audit Checklist Record answers and notes on blank turtle diagrams or audit checklist or note page List people audited and verify training and competency records: Verify records against the jobs you saw them performing 2010 simpleque Inc. All Rights Reserved 249 S. Garber Dr., Tipp City, OH 45371 740-305-0868 www.simpleque.com

Audit Checklists for Support and Management Processes Please note that checklists for support and management processes will be more old school checklists that use questions following the specific clause of the ISO standard (possible examples of support and management processes are: management review, internal audits, HR/training, corrective action, preventive action, document control, record control). Additional questions should be added to review document control, records, training, etc., but expect more traditional checklists that follow the ISO clause and requirements. The Key Process Audit Checklist is not applicable for support and management processes.

People Interviewed (Shift): Auditors: 8.2 What is monitored, measured and reported for this production process? Select a process and look at the performance data. Copy the data or record a summary here. 8.2 8.4 Are there any negative trends or bad performance against goals? 8.5 If yes, what is being done for continual improvement? 1

8.2 7.2 Are there any customer problems, scorecards, negative feedback or high reject rates? Is there any specific part number or customer that should be used for audit samples due to poor performance? 5.5 Are appropriate employees aware of any recent customer problems? 2

7.5 Get a copy of the work instructions for the production process or part number being observed and audited. Watch and see if the work instruction matches exactly what is being done in production. Get a copy of the traveler and routers. Are they being followed? Note any discrepancies between documentation. 6.2 Has the operator been trained on the job you are observing them perform? What records exist for the training? 3

4.2 Are all necessary documents available in production? Work order, checklists, visual cards, routers, etc. List all the documents and their revision levels. Are all the documents the most recent version? 4.2 Look at records from the last time this part was run. Can the records be found? Were production records properly filled out and completed? Evaluate records from multiple shifts. 4

7.5 Look at raw material being used. Is there adequate identification and traceability to a lot (if required)? 7.5 Is purchased part lot traceability information being carried forward to production records? 8.3 Is any scrap properly handled and identified? 5

8.3 Are there any examples of nonconforming product or rework? 8.3 Is this material properly identified? 8.3 Is the procedure for nonconforming or rework material being followed? 6

7.5 Evaluate preventive maintenance records for the machines being observed or audited. What preventive maintenance was supposed to have been completed? What preventive maintenance has been completed? 4.2 Are preventive maintenance records complete? 7

7.1 8.3 Are there any deviations or exceptions in the production process? Is the deviation process and procedure being followed? How long is the deviation for, or for how many parts? When did the deviation start? When is it supposed to end? Is the deviation still open? 8.3 Is the customer involved and have they approved the deviation, if appropriate? 8

7.6 Record information from any measurement gauges or test equipment. 7.6 Check to see that gauge calibrations are up to date and that calibration records are maintained. 8.2 Are measurement records complete for any inspections that are supposed to be recorded? 8.2 Are any measurements out of spec? If yes, what was done? Is this per procedure? 9

8.1 8.2 8.4 Were there any targets for productivity and effectiveness? What is OEE versus the goal? What is scrap versus the goal? What is PPM versus the goal? What is process capability versus the goal? What is the standard time or rates versus the goal? 6.2 5.5 Are operators aware of bad performance or negative trends? 8.5 Is anything being done to make improvements in areas that aren t performing as planned? 10

6.1 Observe the work environment and equipment. Are there adequate resources (space, equipment, and people) to do the job as planned? 6.3 6.4 Is the work environment appropriate, clean and safe? 11

Add your own supplemental questions: 12