COAL AND COAL SEAM GAS REGULATION

Similar documents
Santos Gas Field Development Project (GFD Project)

WENTWORTH GROUP OF CONCERNED SCIENTISTS

Major environmental impact assessment (EIA) processes in Queensland

Commonwealth Lands and Activities of the Commonwealth and Commonwealth Agencies

Spring Gully North-West and North-East Project Preliminary Documentation. Appendix 2: Cross Reference with Request for Information

The Standard Criteria, current as of November 2013, as defined in Schedule 4 of the EP Act are as follows:

BIODIVERSITY OFFSETS ISSUES PAPER AND POLICY April 2014

Regulatory reform to enhance efficiency & effectiveness of Environmental Impact Assessment

SUBMISSION GUIDE ECOLOGICALLY SUSTAINABLE DEVELOPMENT. May

australian network of environmental defender s offices

LNP Policy for a Sustainable Coal Seam Gas Industry

Committee Secretary Senate Standing Committees on Environment and Communications PO Box 6100 Parliament House Canberra ACT 2600

Protection of Ramsar Wetlands under the EPBC Act

Cotton Australia welcomes the opportunity to comment on the Water Trigger Review.

Consultation Regulatory Impact Statement

Protection of World Heritage Properties under the EPBC Act

Australian Dairy Industry

6 IMPACT ASSESSMENT METHOD

in brief corrs Policy What it means for developments in april 2012

Appendix J: IESC Advice and Response Checklist

Coal Seam Gas Water Management

OEH response to the Independent Review of the Biodiversity Assessment Method Recommendation 12 of the biodiversity legislation review called for a

PART 2 Tabs EIS General Comments

Section 3. Legislative Framework and Impact Assessment Process

Advice to decision maker on coal mining project

Environmental Impact Assessment and Climate Change Australia

Section 4 Environmental Impact Assessment Framework

Freshwater Related Environmental Management Principles and Guidelines

ENVIRONMENTAL APPROVALS

Carmichael Mine Project Protecting the Doongmabulla Springs

EDO NSW Key Issues Summary Biodiversity Certification: Upfront planning for conservation & future impacts 1 November 2017

NSW Biodiversity Law Reform

QUEENSLAND ENVIRONMENTAL OFFSETS FRAMEWORK 20 August Nelson Wills

Certainty in uncertainty: navigating environmental impact assessment regulatory processes

Awaba Waste Management Facility Biodiversity Offset Strategy

Submission. Specific concerns - Missing Information

environmental defender s office new south wales

Western Rail Coal Unloader

2018 SA ELECTION ENVIRONMENTAL LAW REFORM PRIORITIES PAPER

Ipswich City Council PLANNING SCHEME FACT SHEET NO. 4

Response to the Murray-Darling Basin Royal Commission Report 31/01/2019

Mining & the Environment: What you need to know & how to have your say

7 May Proposed Action: Alpha North Coal Mine Project Reference Number: 2018/8189

Environmental Impact Statement Surat Gas Project

Mined Land Rehabilitation in Australia

Section 15 Environmental Protection

Environmental Risk Analysis

Appendix A. Australian Legislation including the Precautionary Principle

Adani Mining Pty Ltd v Land Services of Coast and Country & Ors.

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

Reflections on the new role of the National Water Commission. Water Law & Policy Conference Canberra, 7 December 2012

Central Eyre Iron Project Infrastructure, Eyre Peninsula, SA (EPBC 2014/7285)

Chapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements

Summary: Coal and Gas Mining in Australia - Opportunities for National Law Reform

Notification of REFERRAL DECISION AND DESIGNATED PROPONENT - controlled action DECISION ON ASSESSMENT APPROACH

National Farmers Federation

Land Management and Biodiversity Conservation Reforms

NORTH STAR TO NSW/QLD BORDER PROJECT STUDY AREA SELECTION REPORT

Response to OEH draft Biodiversity Offsets Policy for Major Projects

Draft guidance and criteria to assist a decision maker to determine a serious and irreversible impact

Monitoring compliance with Environment Protection and Biodiversity Conservation Act 1999 Conditions of Approval: Follow-on audit

NSW Government finalises Strategic Regional Land Use Plans

Catchment management bodies in four Australian states: structures, legislation, and relationships to Government agencies

Northern Territory. BALANCED ENVIRONMENT STRATEGY Discussion Draft

Banksia Beach Borefield

Climate Change and Renewable Energy Bill 2017*

Ecologically Sustainable Development

A Risk to Groundwater from Coal Seam Gas Extraction in the Surat Basin

Australian Network of Environmental Defender s Offices

GUIDELINE. environmental management of mining. GUIDELINE 11 - Terms of Reference and Preparation of an Environmental Impact. Statement.

Submission Guide: Ecologically Sustainable Development

Bowen Gas Project. EIS Community Information Sessions. June Arrow s Moranbah Compression Station Bowen Basin

Arrow Energy EIS GROUNDWATER IMPACT ASSESSMENT. April 2012

IN BRIEF CORRS SENATE INQUIRY INTO WIND FARMS RELEASES FINAL REPORT 05 AUGUST 2015 INTERIM REPORT

THE PRECAUTIONARY PRINCIPLE - ITS ORIGINS AND ROLE IN ENVIRONMENTAL LAW

The Murray Darling Basin Plan. May This occasional paper provides an overview of the process of developing the Murray Darling Basin Plan.

ASSESSING THE CUMULATIVE EFFECTS OF MINING ON GROUNDWATER AND CONNECTED SYSTEMS

MINERALS COUNCIL OF AUSTRALIA VICTORIAN DIVISION

Submission on Lake Eyre Basin Intergovernmental Agreement

COAG ENVIRONMENTAL REFORM AGENDA ANEDO RESPONSE IN DEFENCE OF ENVIRONMENTAL LAWS. May 2012

Office of Coal Seam Gas

Managing Country. Aboriginal Communities. Overview. Last updated: March 2013

12. A Sustainable Murray Darling Basin: The legal challenges

in brief corrs Delivery of the Strategic Regional Land Use Policy What it means for coal and gas projects on or near strategic agricultural land

Stakeholder Engagement Guideline. APGA Guideline for Stakeholder Engagement

3. LEGISLATIVE FRAMEWORK

Arrow Energy. Surat development update. December 2017

Environmental impact assessment of council roadside activities

Abbot Point Stormwater Return Dam (EPBC 2010/5561) Operation Annual Compliance Report, January 2016

Designing a method for assessing the use of produced water from coal seam gas projects to supplement environmental flows

STRATEGIC DIRECTIONS

National Environmental Management Act, 1998: Draft National Biodiversity Offset Policy

Edithvale and Bonbeach Level Crossing removal project. Report of Dr Anthony Smith

Climate Change and Renewable Energy Bill 2017*

Ministry for the Environment advice to the Local Government and Environment Select Committee on the EEZ Bill

12. STATUTORY REQUIREMENTS

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement

The Precautionary Principle Project sustainable development, biodiversity conservation and natural resource management

MINERALS COUNCIL OF AUSTRALIA

Transcription:

COAL AND COAL SEAM GAS REGULATION The Australian Government protects water resources from the impacts of coal and coal seam gas development through the water trigger provisions of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act). The Commonwealth regulatory regime works in concert with state and territory governments which have primary responsibility for water resources and regulating environmental impacts associated with the resource sector. Environment Protection and Biodiversity Conservation Act 1999 The EPBC Act is the main piece of Commonwealth environment legislation and allows the Australian Government to join with the states and territories to provide a national framework for the protection of our biodiversity. The EPBC Act focuses on the protection of matters of national environmental significance, while state and territory legislation focuses on matters of state and local significance. Matters of national environmental significance include `a water resource, in relation to coal seam gas development and large coal mining development as well as world and national heritage, wetlands of international importance and listed threatened species and ecological communities.

Water trigger Australia has extensive reserves of coal and coal seam gas. Developing these reserves has the potential to affect both surface and groundwater. For example, extracting groundwater can reduce flow in rivers and affect ecosystems, and mining operations will generally affect water quality. In 2013 the Commonwealth amended the EPBC Act to include water resources as a matter of national environmental significance when affected by coal mining or coal seam gas extraction. The water trigger allows coal and coal seam gas developments that are likely to have a significant impact on water resources to be comprehensively assessed at a national level. As a result of the introduction of the water trigger, the Minister can set appropriate conditions as part of the project approval to ensure that any impacts from these projects on a water resource are acceptable. Role of the states and territories Primary responsibility for regulating environmental impacts associated with the resource sector rests with state and territory governments. Thus coal and coal seam gas activities are primarily assessed and regulated under state government legislation, which covers matters such as flood and pollution control measures.

So far, most major coal and coal seam gas extractions have been in Queensland and New South Wales. Queensland Queensland has two main departments involved in the assessment of coal and coal seam gas operations. They are: Department of Environment and Heritage Protection Department of Natural Resources and Mines (including the Office of Groundwater Impact Assessment) Queensland also has an Office of the Coordinator-General which operates under the Department of State Development. The Coordinator-General is responsible for declaring coordinated projects, which require an environmental impact statement. The majority of coal and coal seam gas projects in Queensland are assessed under the bilateral agreement with the Queensland Government, either with the Office of the Coordinator-General (coordinated projects) or with the Queensland Department of Environment and Heritage Protection. GasFields Commission Queensland is an independent statutory body formed to manage and improve sustainable coexistence among rural landholders, regional communities and the onshore gas industry.

Australian Government role and processes The EPBC Act provides a legal framework to protect and manage nationally and internationally important flora, fauna, ecological communities and heritage places defined in the Act as matters of national environmental significance. Before taking an action that could have a significant impact on a matter protected by the EPBC Act, the proposed action must be referred to the Australian Government Minister for the Environment. The Australian Government's Department of the Environment becomes involved when a coal seam gas development or large coal mine is likely to have a significant impact on a water resource - or another matter of national environmental significance. There are two stages in the environment assessment process required by the EPBC Act: 1. Referral to determine if a project requires approval under the Act 2. Assessment/decision whether to approve. The referral is submitted to the Department for decision by the Minister. Once a valid referral is received the Minister has 20 business days to decide whether the coal seam gas project or coal mine requires assessment and approval, which includes a 10-day public comment period.

If a significant impact on water resources is likely, the activity will need to be assessed and approved before it can proceed. This is called a `controlled action. Coal seam gas or coal mine projects can be assessed using one of five methods: accredited assessment, assessment on referral information (assessment done solely on the information provided in the referral form), assessment on preliminary documentation (referral form and any other relevant material identified by the Minister as being necessary to adequately assess a proposed action), assessment by environmental impact statement (EIS) or public environment report, and assessment by public inquiry. The EPBC Act sets out the process and timing requirements for each type of assessment with each process involving periods for public comment. When deciding if a proposed action should be approved and what conditions to impose the Minister must take into account: the principles of ecologically sustainable development the results of the assessment of the impacts of the proposed action, including the relevant recommendation report from the secretary of the federal environment department referral documentation community and stakeholder comments

any other relevant information available on the impacts of the proposed action, and relevant comments from other Australian Government and state and territory government ministers. The principles of ecologically sustainable development, reflected in the objects of the EPBC Act, are fundamental to decision-making under the Act. The principles include the precautionary principle; and the balancing of economic, social and environmental considerations. The Minister may also take into account the environmental history of the individual or company proposing to take the action, including the environmental history of the executive officers of companies, and parent companies and their executive officers. Following the assessment, the Minister will decide whether to approve the action, approve the action subject to constraints (that is, place conditions on the action), or not approve the action. The conditions may protect againts, mitigate or offset environmental damage. Conditions can include bonds or other securities, independent environmental audits and compliance monitoring. Specialist officers monitor approved projects to ensure that conditions are complied with non-compliance is treated seriously and significant penalties can be applied.

Significant impact guidelines for the water trigger The Department has released Significant Impact Guidelines for the water trigger to assist anyone who proposes to take an action which involves a coal seam gas or coal mining development to decide whether the action is likely to have a significant impact on a water resource. Significant Impact Guidelines 1.3: Coal seam gas and large coal mining developments - impacts on water resources These guidelines outline a self-assessment process, including detailed criteria, to assist in deciding whether or not referral to the Department may be required. These guidelines may also help those who wish to comment on actions which have been referred under the EPBC Act. If a project requires approval under the EPBC Act as well as state or territory legislation, the Australian Government prefers to undertake a joint or bilateral assessment with the relevant state or territory authority. This ensures a streamlined and consistent approach to the assessment and any conditions imposed on a project. Adaptive management Adaptive management is an effective tool that can be used to manage uncertainty and reduce it over time to achieve ecologically sustainable development, which is fundamental to decision-making under the EPBC Act.

The principles of ecologically sustainable development include: that decision making processes should effectively integrate both long term and short term economic, environmental, social and equitable considerations; and the precautionary principle that if there are threats of serious or irreversible environmental damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation. The assessment process draws on independent expert scientific advice to identify the potential environmental impacts of a coal or coal seam gas development project, as well as the effectiveness of proposed management strategies. However, some uncertainties can remain and further work may be required after the approval is granted to address the environmental risks associated with the project. An adaptive management approach set out in the conditions of approval is often used to manage uncertainties about environmental impacts. Adaptive management means that impacts are monitored and changes are made if impacts cross a specified threshold. This approach is critical to managing risks for major projects. Adaptive management is underpinned by: a robust monitoring system to establish site specific baseline information about the current state of water (such as the water table, pressure of aquifers, salinity, etc.)

precautionary triggers which are based on the baseline monitoring data and often require companies to conduct investigations and/or take action at an early stage to avoid an unacceptable impact from occurring triggers that, if reached, require the company to stop the activity. In implementing this approach, coal seam gas projects typically have conditions which limit drawdown of groundwater levels to a certain level. If impacts to groundwater levels reach a certain proportion of that limit, for example 50 per cent, they hit a precautionary investigation trigger, which is an early warning signal for the company to investigate the cause of the drawdown of groundwater levels. A second precautionary trigger is set, for example at 80 per cent of the drawdown limit, which requires the company to take action to halt further drawdown (for example by reinjecting water into the source aquifer or retiring existing bores). The final trigger sets an absolute limit for drawdown that cannot be exceeded, and in that case the company may have to cease CSG production until groundwater levels return to within the acceptable limits. Groundwater modeling on which these triggers are based is usually required to be peer reviewed as a condition of approval. The overall adaptive management approach is also subject to rigorous assessment before it is approved by the Minister.

This allows for a systematic, rigorous approach, that explicitly incorporates risk, knowledge from past and current monitoring results and management actions to improve subsequent management actions. Approval holders are required to develop and implement management actions and manage risk in stages so that they can change or modify their approach to take new information into account. Approval holders are also encouraged to work together to improve their environmental management. For example, the major coal seam gas companies in Queensland are required to undertake aquifer connectivity studies and monitoring of relevant aquifers to ensure that there are no unforeseen impacts to groundwater sources, such as contamination of aquifers, increased connectivity between aquifers or drawdown to EPBC listed springs or other assets. If potential impacts of an activity are considered unacceptable and adaptive management techniques are not able to be used, the Department will consider other mechanisms available under national environmental law to mitigate the impacts. Source: https://www.environment.gov.au/water/coal-and-coal-seam-gas/regulation