Connection & Compliance processes Session 2

Similar documents
DEMAND RESPONSE SERVICES CODE (DRS) CONTENTS. (This contents page does not form part of the Grid Code)

Proposal for categorization of Significant Users

DESIGN NOTE FOR THE COORDINATION OF ASSETS: PART I - OUTAGE PLANNING

Overview of current services from DSR and future challenges

Primary control - description of main technical and design characteristics

Intra-Belgian division of competences and EU influence

DNVGL-SE-0124 Edition March 2016

Response of Associations representing DSOs to ACER s call for comments on the Network Code on Emergency and Restoration (NC ER)

Adequacy calculations for Belgium LOLE and strategic reserves volume

Certification and Training Requirements

Derogation Criteria for the High Voltage Direct Current Network Code

Belgian RfG implementation

Harmonisation. ENTSO-E guidance document for national implementation for network codes on grid connection. 16 November 2016

Taskforce Balancing. 21 April 2016

GOVERNANCE OF THE COMPLIANCE PROCESS Paper by National Grid

FUTURE ROLES AND RESPONSIBILITIES FOR THE DELIVERY OF ANCILLARY SERVICES

DESIGN NOTE FOR THE COORDINATION OF ASSETS: PART II SCHEDULING AND REDISPATCHING

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

Clean Energy for all Europeans

The Power Potential project Heads of Terms Subject to contract

I N T R O D U C T I O N

System Operation Guideline (SOGL) GB Implementation

DG Interconnection Procedures Collaborative. January 20, 2017

GC0114: System Operation Guideline: Prequalification Processes

FAC Facility Interconnection Requirements

FAC Facility Interconnection Requirements

Maximum Admissible active power reduction at low frequencies

Belgian RfG implementation

DECLARATION OF AUTHORITY. This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following:

COMMISSION OPINION. of

MODIFICATION PROPOSAL FORM

Standard Development Timeline

Status Working Group Balancing. Users Group 30/03/17

WESTERN ELECTRICITY COORDINATING COUNCIL GENERATING UNIT MODEL VALIDATION POLICY

A. Introduction. B. Requirements and Measures

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

SO GL implementation: update on ongoing activities. System Operation European Stakeholder Committee 12 June 2018

Adequacy calculations for Belgium - Strategic reserves volume

CALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL

Council of the European Union Brussels, 13 December 2017 (OR. en)

Need for Flex & Capacity

TF Balancing. Elia Users Group 05/06/2014

NERC/SERC Planning Standards on Generation Modeling

ENTSO-E AISBL Avenue de Cortenbergh Brussels Belgium Tel Fax www. entsoe.

Revised Draft Final Proposal for Participation of Non-Generator Resources in California ISO Ancillary Services Markets

Certification and Training Requirements

COMMISSION OPINION. of

Incremental Black Start RFP Response Template & General Information

Standard EOP System Restoration from Blackstart Resources

FCR prequalification design note

TSO and DSO Protocol. DSO WFPS Testing

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

TSO and DSO Protocol. DSO WFPS Testing

A separate notification will be provided to NPCC Members announcing the start of the formal 10 day ballot period.

Mandatory Energy Management Requirements under Energy Conservation Act

Standard EOP System Restoration from Blackstart Resources

Objective, transparent and regulated grid access tariffs

Feedback from TF Balancing. Users Group 26/09/2013

Power System Testing. Peter Vaessen DNV GL

ACER call for comments on the Network Code Emergency and Restoration

ARP Workshop. Thursday, 16 th March Square Meeting Center, Brussels

Introduction to the UCTE Operation Handbook (OH)

THE HARMONISED ELECTRICITY MARKET ROLE MODEL

Network Codes: Consultation on Requirements for Generators (RfG) Banding Thresholds in Ireland. TSO Minded To Position

THE HARMONISED ELECTRICITY MARKET ROLE MODEL

EU Netcode Emergency & Restoration

California Independent System Operator Corporation Fifth Replacement Tariff

Internal Revenue Service

SECTION LEED(TM) DOCUMENTATION FOR DESIGN-BUILD 02/10

Outage Management Redesign Consultation Process (SE-109) September 4, 2013

Paid-as-cleared for R2 & R3 activated energy

Requirements for Generators: Banding Setting Progress

Contractor Performance Evaluation Procedure

Standard Development Timeline

California Independent System Operator Corporation Fifth Replacement Tariff

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM

Backup flexibility for winter

Renewable Energy Impact to Distribution Network Performance and Reliability. ENGR. ROBERTO D. ISIP JR. Head, Network Asset Planning, MERALCO

Whereas. (2) This Proposal takes into account the general principles, goals and other methodologies set in EBGL.

MOD Data for Power System Modeling and Analysis

ENTSO-E Network Code on Capacity Allocation and Congestion Management Day Ahead Section

NATIONAL ELECTRICITY RULES ELECTRICITY CONNECTION FOR RETAIL CUSTOMERS CHAPTER 5A. Page 615

NATIONAL GRID GAS PLC-UK. Moderator: Sue Hughes-Payne May 16, :07 am CT

The Harmonised Electricity Market Role Model

3 Product & Imbalance Need

Joint European Stakeholder Group. Thursday 21 September 2017 Meeting 24 WebEx

New Brunswick Electricity Business Rules. Chapter 3 Reliable Operations

Transmission System Security and Planning Standards

Comments to ENTSO-E Electricity Balancing Network Code

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles

Implementation Plan PRC Generator Relay Loadability Project Phase II Relay Loadability

Further Submissions relating to Capacity Market Pre-Qualification

Town of Poughkeepsie BUILDING DEPARTMENT 1 OVEROCKER ROAD POUGHKEEPSIE, NY12603 (845)

DECLARATION OF AUTHORITY. This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following:

EIB Procurement Policy

Comparison of IV.A.M2 and IV.A.M3 to EOP-005-1

Implementation Plan for IRO Reliability Coordination Facilities Prerequisite Approvals Adoption of IRO-001-2, IRO-010-0, COM-001-2

Federatie van de Belgische Elektriciteits- en Gasbedrijven Fédération Belge des Entreprises Électriques et Gazières Federation of Belgian Electricity

Requirements for Real and Reactive Power Testing

Transcription:

Connection & Compliance processes Session 2 Experts Group Implementation NCs Brussel, 25/02/2016 Ann Larsen

Approval of minutes of last meeting Draft minutes have been sent around to all participants. No comments were received. 2

Agenda 1 Reminders 2 Operational Notification Procedure for auxiliary loads 3 Demand Response Services 4 Derogations Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 3

Reminders 4

Reminders Elia philosophy: Integrate the NCs requirements for the connection of grid users (generation and demand facilities) in the existing process. No intention to completely modify the process if not required, but potential re-evaluation of specific points are possible. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 5

Operational Notification Procedure for auxiliary loads 6

Operational Notification Procedure for auxiliary loads Answer to question session 1 Synchronous power generating module = an indivisible set of installations which can generate electrical energy such that the frequency of the generated voltage, the generator speed and the frequency of network voltage are in a constant ratio and thus in synchronism Also supply auxiliary (indivisible unit) EON/ION/FON/LON applicable for the whole unit of type D connected to the transmission grid. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 7

Operational Notification Procedure for auxiliary loads Answer to question session 1 An EON shall entitle the power generating facility owner to energise its internal network and auxiliaries for the power generating modules by using the grid connection that is specified for the connection point. An ION shall entitle the power generating facility owner to operate the power generating module and generate power by using the grid connection for a limited period of time A FON shall entitle the power generating facility owner to operate a power generating module by using the grid connection. The power generating facility owner shall apply to the relevant system operator for a LON, if the power generating facility owner reasonably expects the circumstances described in paragraph 1 to persist for more than three months. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 8

Demand Response Services 9

Code requirements TITLE III CONNECTION OF DEMAND UNITS USED BY A DEMAND FACILITY OR A CLOSED DISTRIBUTION SYSTEM TO PROVIDE DEMAND RESPONSE SERVICES TO SYSTEM OPERATORS CHAPTER 1 GENERAL REQUIREMENTS Categories (art. 27) Specific provisions (art. 28-30) CHAPTER 2 OPERATIONAL NOTIFICATION PROCEDURE Distinction based on the connection voltage level (below & above 1000V) Confirm ability to satisfy the technical design and operational requirements (art. 31) Notify in advance modification offer Procedure (art. 32 and 33) Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 10

Strategic Reserve & Ancillary Services Current situation MVAR & Black start: not for demand units Strategic Balancing product Reserve Prod. Dem. R1 R2 R3 Prod. / XB Load Prod. Prod. R3DP ICH In scope Out scope Contract Notice Procedure System Qualification Procedure System Qualification Procedure Contract Notice Procedure Depending of the services: two different procedures to procure the services Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 11

Categories of Demand Response Services Categories defined in the code DCC Remotely controlled Current services Demand response active power control Strategic Demand Reserve, R3DP, ICH Demand response reactive power control - Demand response transmission constraint management - Autonomously controlled Demand response system frequency control R1 load Demand response very fast active power control - DCC Art. 27.3 The categories are not exclusive and this Regulation does not prevent other categories from being developed. This Regulation does not apply to demand response services provided to other entities than relevant system operators or relevant TSOs. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 12

OPERATIONAL NOTIFICATION PROCEDURE DCC Art. 31.1: Distinction based on the connection voltage level DRS Demand units connected <=1000V Demand units connected > 1000V Installation Document Demand Response Unit Document Does not currently exist Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 13

Procedures for demand units within a demand facility or a CDS connected at a voltage level of or below 1000V Installation Document (to submit prior offer in the market) Requirements function types of connection and categories of services Location at which the demand unit with demand response is connected to the network. Maximum capacity of the demand response installation in kw. Type of demand response services. Demand unit certificate and the equipment certificate as relevant for the demand response service, or if not available, equivalent information. Contact details of the demand facility owner, the closed distribution system operator or the third party aggregating the demand units from the demand facility or the closed distribution system. The installation document template shall be provided by the relevant system operator, and the contents agreed with the relevant TSO, either directly or indirectly through a third party. The content of the installation document of individual demand units may be aggregated by the relevant system operator or relevant TSO. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 14

Procedures for demand units within a demand facility or a CDS connected at a voltage level above 1000V Demand Units Relevant SO Complete the demand response unit document (DRUD) Receive the DRUD Issue a FON document, issued either by the demand facility owner or the CDSO to the relevant system operator for demand units with demand response and connected at a voltage level above 1000V, which confirms the compliance of the demand unit with the technical requirements set out in this Regulation and provides the necessary data and statements, including a statement of compliance The relevant system operator, in coordination with the relevant TSO, shall specify the content required for the DRUD. The content of the DRUD shall require a statement of compliance which contains the information in Articles 36 to 47 for demand facilities and closed distribution systems. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 15

Operational notification procedure - Requirements Energisation Operational Notification (EON) Interim Operational Notification (ION) Final Operational Notification (FON) - fulfilment TSO requirements - agreement on protection & control - Data and study review process - TSO may request: interim statement of compliance detailed technical data equipment certificates simulation models studies demonstrating expected steady-state and dynamic performance details of intended practical method of completing compliance tests - Removal of all incompatibilities - Data and study review process - TSO may request statement of compliance update of the applicable technical data, simulation models and studies including the use of actual measured values during testing Extended FON for DRS (not mandatory) Information function of the service The requested information will contain at least what is asked currently. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 16

Operational notification procedure - Requirements Energisation Operational Notification (EON) Interim Operational Notification (ION) Final Operational Notification (FON) Extended FON for DRS (not mandatory) Location at which the demand unit is connected to the network Maximum capacity of the demand response installation Type of demand response services Information on the demand unit Contact details Confirmation to satisfy technical design and operational requirements Statement of compliance (for DRUD) The requested information will contain at least what is asked currently. The information to provide will be determined and discussed in the technical topics. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 17

Timing Current Prequalification Service Offer Contract signature (if selected) Notify relevant SO in advance if cease offering DRS Grid users provides specified information Letter SO issues the FON Prerequisite to the offer in the market Delivery of the service t Procurement process DCC Art. 31.3 The demand facility owner or the CDSO shall notify, [ ] the relevant system operator or relevant TSO, in advance of any decision to cease offering demand response services and/or about the permanent removal of the demand unit with demand response. Elia proposal: application and cessation form available on the Elia website, information and documents to provide function of the type of connections & the demand response services Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 18

Derogations 19

Derogations DCC Code Derogations Art. 24.5 Art. 25.4 Art. 26.5 Extension of the period of the validity of the ION Derogation to obtain the FON in case of incompatibility Extension of the period of the validity of the LON RfG Art. 35.5 Art. 36.6 Art. 37.5 Extension of the period of the validity of the ION Derogation to obtain the FON in case of incompatibility Extension of the period of the validity of the LON Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 20

Many thanks for your attention! Ann Larsen ELIA SYSTEM OPERATOR Boulevard de l'empereur 20 1000 Brussels +32 2 546 70 11 info@ elia.be www.elia.be An Elia Group company

Demand response services remotely controlled Definitions Demand response active power control means demand within a demand facility or closed distribution system that is available for modulation by the relevant system operator or relevant TSO, which results in an active power modification. Demand response reactive power control means reactive power or reactive power compensation devices in a demand facility or closed distribution system that are available for modulation by the relevant system operator or relevant TSO. Demand response transmission constraint management means demand within a demand facility or closed distribution system that is available for modulation by the relevant system operator or relevant TSO to manage transmission constraints within the system. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 22

Demand response services autonomously controlled Definitions Demand response system frequency control means demand within a demand facility or closed distribution system that is available for reduction or increase in response to frequency fluctuations, made by an autonomous response from the demand facility or closed distribution system to diminish these fluctuations. Demand response very fast active power control means demand within a demand facility or closed distribution system that can be modulated very fast in response to a frequency deviation, which results in a very fast active power modification. Experts Group: Connection and Compliance Processes (sess.2) - Ann Larsen - 25.02.2016 23