WELCOME! Public Scoping Meeting for the Proposed Partial or Complete Closure of Defense Fuel Support Point San Pedro, California

Similar documents
DEPARTMENT OF DEFENSE DEPARTMENT OF THE NAVY

CHAPTER 6 ADDITIONAL CONSIDERATIONS REQUIRED BY NEPA

Environmental Restoration in Harbor and Port Areas

COMPARISON OF ALTERNATIVES

SPECIAL PUBLIC NOTICE

9 OTHER CONSIDERATIONS REQUIRED BY NEPA

PUBLIC NOTICE LOS ANGELES DISTRICT. APPLICATION FOR PERMIT Port of Los Angeles Berths : Wilmington Waterfront Promenade

APPENDIX H Summary of Changes in the Recirculated Draft EIR

PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS

Washington Dulles International Airport EXECUTIVE SUMMARY

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

Carpinteria Valley Water District Carpinteria Advanced Purification Project

3.12 UTILITIES Introduction Environmental Setting

Oil Lines and Wells Utilities and Service Systems. Solid Waste Affected Environment Electricity. Natural Gas.

Union Pacific Railroad. Application for Development Project Approval. Intermodal Container Transfer Facility (ICTF) Modernization Project

Berth [China Shipping] Container Terminal Project - Environmental Review -

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR COALINGA OIL FIELD EIR No. 7180

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Western Technical Operations Anchorage, Alaska

ENVIRONMENTAL ASSESSMENT FOR PROPOSED DISPOSITION OF DEFENSE FUEL SUPPORT POINT, NEWINGTON, NEW HAMPSHIRE

Navy Region Southwest CONVERSION TECHNOLOGY PROJECT

[FWS R8 ES 2017 N107; FXES FF08ECAR00] Endangered and Threatened Wildlife and Plants; Incidental Take Permit

Notice of Intent to Prepare an Environmental Impact Statement for the. Proposed Upland Pipeline in Williams, Mountrail, and Burke Counties,

[FWS R8 ES 2014 N213; FXES F2 145 FF08ECAR00] Orange County Transportation Authority, Orange County, California; M2 Natural

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

T h e U r b a n W i l d l a n d s G r o u p, I n c.

Notice of Intent to Prepare a Draft Environmental Impact Statement for the

Karner Blue Butterfly

Project Description. 2.1 Introduction and Project Overview. 2.2 Project Location and Setting. Chapter 2

Central San Pedro Neighborhood Council Port Committee Meeting February 19, 2014 Augie Bezmalinovich Port of Los Angeles

Updates on FAA Order F. Agenda. Communicate FAA Order Updates. Educate attendees on the changes to FAA Order

Public Presentation. Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard

3.0 CUMULATIVE PROJECTS SCENARIO

APPENDIX H HAZARDOUS MATERIALS PROCEDURES AND RESULTS

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION

Environmental Management Division, Port of Los Angeles

ENVIRONMENTAL ASSESSMENT 51 AREA RESERVOIR REPAIR

APPENDIX A. Notice of Intent/Notice of Preparation/Initial Study (NOI/NOP/IS)

Port of Long Beach Port Master Plan Overview December 22, 2008

Draft Environmental Assessment Closure of Former Defense Fuel Support Point at Moffett Field, Santa Clara County, California

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

CESPL-RG 16 February 2010

Notice of Availability of the Draft Environmental Impact Statement for the. Converse County Oil and Gas Project, Converse County, Wyoming

PUBLIC HEARING NOTICE PORT OF LONG BEACH LONG BEACH, CALIFORNIA

Community Environmental Newsletter

WAKE ISLAND SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT

Manchester Tank Farm Improvements (P-856) Public Draft EA June Abstract

III. BASIS FOR CUMULATIVE ANALYSIS

DRAFT FINDING OF NO SIGNIFICANT IMPACT ADDRESSING AN ARMY AND AIR FORCE EXCHANGE SERVICE LIFESTYLE CENTER AT FORT SAM HOUSTON, SAN ANTONIO, TEXAS

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

Berths [Everport] Container Terminal Improvements Project Draft EIS/EIR Public Meeting

MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING November 14, 2006

DATE: NOVEMBER 14, 2008 ENVIRONMENTAL MANAGEMENT DIVISION

World War II-era warehouses with asbestos-containing siding removed prior to demolition.

LA WATERFRONT PROGRAM WILMINGTON & SAN PEDRO

Former Georgia-Pacific Mill Site

APPLICATION FOR DEVELOPMENT PROJECT APPROVAL FOR INTERMODAL CONTAINER TRANSFER FACILITY JOINT POWERS AUTHORITY. P.O. Box 151 San Pedro, CA

Hazardous Materials Remediation and Demolition ENVIRONMENTAL REMEDIATION & DEMOLITION

ISLAND TIMES. ENVIRONMENTAL INVESTIGATION AND CLEANUP NEWS Former Naval Station Treasure Island. Summer 2012, Newsletter No. 18

WELCOME to the Southern Edwards Plateau Habitat Conservation Plan Environmental Impact Statement. Public Meetings

3.1 AESTHETICS AND VISUAL RESOURCES

Summary of Federal Contracting Qualifications

Chapter 4 ALTERNATIVES COMPARISON

M.A. - Marine Affairs, Environmental Management Emphasis, University of Rhode Island, 1998

PORT-RELATED NOISE IMPACT STUDY FOR COMMUNITY OF SAN PEDRO, CALIFORNIA

Berths [China Shipping] Container Terminal Project Draft Supplemental EIR Public Hearing

Gateway Infrastructure Development Programs in Urban Centers on the west coast of North America

Presentation Topics The Alameda Corridor Project Corridor Performance Goods Movement Challenges

Berths [PBF Energy] Marine Oil Terminal Wharf Improvements Project

EVALUATION AND ACCEPTANCE OF APPLICANT PREPARED ENVIRONMENTAL INFORMATION DOCUMENT AND DRAFT FINDING OF NO SIGNIFICANT IMPACT (FONSI)

APPENDIX IV.D-1 Hazards Analysis

Site 75, KAYO-SB Ag Well Potential Navy Legal Investigation for Potentially Responsible Parties.

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Appendix Q Conceptual Mitigation Plan for Impacts to Wetlands and Other Waters of the United States

The Caltrans Contract Manager will assign specific projects to the Consultant through the issuance of Task Orders.

S1D1S SS SX064A S180110; S2D2S SS SX064A00 17XS501520

Central Santa Rosa Library: 211 E Street, Santa Rosa Forestville Regional Library: 7050 Covey Road, Forestville Water Agency s administrative office

Final Environmental Assessment

Public Safety Plan. Relationship to Other Plans and Programs. Authority. Purpose. State Standardized Emergency Management System

2018 SECDEF Environmental Awards Environmental Restoration Installation: DLA San Joaquin

PUBLIC NOTICE NO. FP13-AB03-05 August 30, 2013 CESAM-PD-EC JOINT PUBLIC NOTICE

PUBLIC NOTICE RECEIPT OF APPLICATION FOR A CORPS PERMIT, NOTICE OF INTENT TO PREPARE A DRAFT EIS AND HOLD A PUBLIC SCOPING MEETING

OF; Som$m~~ B,BO 1. Sandy Olliges, Chief, Environmental Services Division

DRAFT FINDING OF NO SIGNIFICANT IMPACT (FNSI)

Environmental Planning and Assessment Act 1979

Port Authority of Guam

[RR , XXXR4079V4, RX ] Notice of Intent to Prepare an Environmental Impact Statement and Notice of Public

Why Camden s environment is important to everyone in the Delaware Watershed...

E. Other Federal Requirements and CEQA Considerations

PUBLIC NOTICE ADDITIONAL INFORMATION PERTAINING TO DEPARTMENT OF THE ARMY PERMIT APPLICATION

County of San Diego DEPARTMENT OF PARKS AND RECREATION. Administrative Office: (858) Fax: (858) Reservations: (858)

Newport Chemical Depot, IN. Conveyance Progress Report

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

FERC PDF (Unofficial) 10/08/2014. Environmental Impact Statement ES-1 Corpus Christi LNG

Draft Finding of No Significant Impact:

Appendix D1 Screening Analysis

DEQ DOCUMENT #1. Unknown

APPENDIX E. Project Description Detailed Elements

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

REQUEST FOR PROPOSALS Engineering Services for Madison Water Utility Prairie Road Water Tower

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

Transcription:

WELCOME! Public Scoping Meeting for the Proposed Partial or Complete Closure of Defense Fuel Support Point, California Crowne Plaza Los Angeles Harbor Hotel Wednesday, March 18, 2015 6:00 p.m. to 8:00 p.m. Navy and Defense Logistics Agency representatives are available to provide information and answer your questions. Thank you for coming. We look forward to receiving your input!

The National Environmental Policy Act (NEPA) and Community Involvement The National Environmental Policy Act (NEPA) of 1969 requires United States (U.S.) federal agencies to consider the potential environmental impacts of their actions before making decisions. In compliance with NEPA, the U.S. Navy is preparing an Environmental Assessment (EA) to analyze the potential environmental impacts that may result from the proposed partial or complete closure of Defense Fuel Support Point San Pedro, CA. NEPA PROCESS The purpose of an EA is to determine whether a proposed action or its alternatives would have potentially significant impacts to the human or natural environment. In preparing the EA, the Navy will develop, describe, and study a reasonable range of alternatives in support of the Proposed Action. The Navy will use the findings of the analysis to determine the next steps in the NEPA process. If the findings indicate environmental impacts would be significant, the Navy would prepare an Environmental Impact Statement and conduct additional analyses. If the findings indicate environmental impacts would not be significant, the Navy would prepare a Finding of No Significant Impact (FONSI). The FONSI would describe how the Navy determined the Proposed Action would have no significant impacts. The Navy would then proceed with the Proposed Action. Public Scoping Meeting and Comment Period (ends April 3, 2015)* FONSI Notice of Availability of Final EA/FONSI Preparation of the Draft EA Draft EA 15-Day Public Review Comment Period * You are here. Preparation of Final EA Notice of Intent to Prepare an Environmental Impact Statement Indicates opportunity for public involvement. COMMUNITY INVOLVEMENT The NEPA process provides opportunities for public input during both the Public Scoping period and the EA development. The public participates in the process by helping to identify environmental issues and potential alternatives, and by evaluating the analysis of the Proposed Action and alternatives. The Navy will consider all relevant comments received. NEXT STEPS When the Draft EA is made available for public review, the public will be notified and will have the opportunity to provide comments. Interested parties can request to be added to the project mailing list by contacting the Navy Public Affairs Officer. The Draft EA will be available for review during the 15- day public review period. Public Meeting

Defense Fuel Support Point () Harbor City Wilmington Port of Long Beach Vincent Thomas Bridge Pier 12 San Pedro Marine Terminal Port of Los Angeles PORT OF LONG BEACH Highway PORT OF LOS ANGELES Fuel Facility and Marine Terminal Pipeline (Approximate) 0 0.2 0.4 Miles Kilometers 0 0.2 0.4 consists of: (331 acres) Marine Terminal (9 acres) Off-site pipelines (totaling over 15 miles) History: 1942: Navy constructs the facility 1980: Defense Logistics Agency takes over operations; Navy still owns property Currently: Property in a temporary closure status

Palos Verdes Dr N S Western Ave N Gaffey St Ball Fields LAPD Shooting Range N Taper Ave PORT OF LONG BEACH Project Area PORT OF LOS ANGELES Lease Areas (Not part of project) 0 200 400 0 100 200

Marine Terminal Long Beach Middle Harbor Pier 12 Marine Terminal Nimitz Rd PORT OF LONG BEACH Marine Terminal Marine Terminal PORT OF LOS ANGELES 0 50 100 0 25 50 O

Purpose and Need, Proposed Action, and Alternatives PURPOSE AND NEED The purpose of the Proposed Action is to partially or completely close the Defense Fuel Support Point () fuel facility. This includes the, Marine Terminal, on-site and offsite pipelines, and associated infrastructure. The project is needed to close aging infrastructure and/or upgrade infrastructure as needed, limit environmental risk, and generate cost savings for the Department of Defense. PROPOSED ACTION Under the Proposed Action: fuel facility would be partially or completely closed in accordance with applicable federal, state, and local laws and regulations. The existing Defense Logistics Agency (DLA) and Navy Host-Tenant Real Estate Agreement would be terminated. The Navy would continue to own. Aboveground storage tanks at the NOT PART OF THE PROPOSED ACTION The following items are not included as part of the Proposed Action: The Environmental Assessment (EA) does not evaluate property disposal issues such as potential community reuse. No changes are proposed with respect to the ball fields or the Los Angeles Police Department (LAPD) Shooting Range; these areas would remain in their current condition and would continue to be available for public and LAPD use. Pier 12 would not be demolished under any of the proposed alternatives considered in the EA. ALTERNATIVES The Navy has identified four action alternatives (Alternatives 1, 2, 3, and 4) for the Proposed Action. In addition to these four action alternatives, the No Action Alternative will be analyzed in this EA: Alternative 1: Complete Closure with Partial Demolition Alternative 2: Complete Closure with Minimal Demolition Alternative 3: Complete Closure with Complete Demolition Alternative 4: Partial Closure with Minimal Demolition No Action Alternative: Resume Operations NO ACTION ALTERNATIVE cannot permanently or indefinitely remain in a temporary closure status, but must instead either achieve permanent regulatory closure or be returned to operational status. Therefore, while implementation of the No Action Alternative would initially leave the facilities in their current temporary closure status, in the event of such implementation, it is assumed timely action would be taken to restore operational status.

Alternative 1: Complete Closure with Partial Demolition Palos Verdes Dr N Under Alternative 1, and subject to obtaining regulatory approval, the Defense Fuel Support Point (), Marine Terminal, and off-site pipelines would be closed in accordance with Unified Facilities Code 3-460-01. The following actions would occur under Alternative 1: S Western Ave MAIN TERMINAL PROJECT AREA Project Lease Areas (Not part of project) Species Management/Habitat Opportunity Area N Taper Ave Operations/Admin Area Surface Infrastructure to be Demolished Underground Infrastructure Plugged/Filled and Inerted then Closed/Abandoned in Place N Gaffey St Ball Fields LAPD Shooting Range 0 200 400 0 100 200 Alternative 1 The Marine Terminal would be demolished; however, Pier 12 would not be demolished. All aboveground storage tanks would be demolished at the terminals. All underground storage tanks would be filled with an inert solid material and abandoned in place. On-site aboveground pipelines would be demolished. On-site underground pipelines would be abandoned in place; except approximately 9,600 linear feet of on-site underground pipeline would be demolished. Off-site pipelines would be abandoned in place. All valve boxes, pump stations/houses, and warehouses would be demolished. All office and administrative buildings would be placed in long-term caretaker condition. A Closure Plan would be prepared to describe the work that would be performed and environmental commitments: - If soil or groundwater contamination is found during the closure process, a follow on site investigation and restoration project would be initiated. - Cleanup would be negotiated with the Certified Unified Program Agency and Regional Water Quality Control Board.

Alternative 2: Complete Closure with Minimal Demolition S Western Ave Palos Verdes Dr N N Taper Ave Note: Specific location for 9,600 linear feet of underground pipeline demolition to be determined. Project Operations/Admin MAIN TERMINAL PROJECT AREA Lease Areas (Not part of project) Buildings to Remain "As-is" Species Management/Habitat Opportunity Area Surface Infrastructure to be Demolished Underground Infrastructure Plugged/Filled and Inerted then Closed/Abandoned in Place Ball Fields N Gaffey St LAPD Shooting Range 0 200 400 0 100 200 Alternative 2 Under Alternative 2, and subject to obtaining regulatory approval, the Defense Fuel Support Point (), Marine Terminal, and off-site pipelines would be closed in accordance with Unified Facilities Code 3-460-01. Less demolition would occur under Alternative 2 than under Alternative 1. The following actions would occur under Alternative 2: At the Marine Terminal, all fuel equipment would be cleaned, secured, and marked Out-of-Service; no demolition would occur. All aboveground storage tanks (ASTs) at both the and the Marine Terminal would be cleaned, isolated/secured, and marked Out-of- Service; no demolition of ASTs would occur. All underground storage tanks would be abandoned in place. On-site aboveground and underground pipelines would be abandoned in place; except approximately 9,600 linear feet of on-site underground pipeline would be demolished. Off-site pipelines would be secured and abandoned in place. Miscellaneous infrastructure would be cleaned and secured (not demolished), with the exception of 12 valve boxes that would be demolished. All office and administrative buildings would be vacated in an as is condition. Utilities would be disconnected. A Closure Plan would be prepared to describe the work that would be performed and environmental commitments: - If soil or groundwater contamination is found during the closure process, a follow on site investigation and restoration project would be initiated. - Cleanup would be negotiated with the Certified Unified Program Agency and Regional Water Quality Control Board.

Alternative 3: Complete Closure with Complete Demolition Palos Verdes Dr N Alternative 3 is similar to Alternative 1, except that under Alternative 3, rather than a limited demolition plan, most of Defense Fuel Support Point () petroleum infrastructure would be demolished, subject to obtaining regulatory approval. The following actions would occur under Alternative 3: S Western Ave N Taper Ave Ball Fields N Gaffey St LAPD Shooting Range All fuel facility aboveground storage tanks, underground storage tanks, on-site pipelines, pump houses, loading racks, vaults, etc. at the and Marine Terminal would be demolished and removed. Administrative and office spaces, as well as Pier 12, would not be demolished. Off-site pipelines would be abandoned in place. A Closure Plan would be prepared to describe the work that would be performed and environmental commitments: - If soil or groundwater contamination is found during the closure process, a follow on site investigation and restoration project would be initiated. - Cleanup would be negotiated with the Certified Unified Program Agency and Regional Water Quality Control Board. Project Operations/Admin Area Alternative 3 Lease Areas (Not part of project) Surface Infrastructure to be Demolished MAIN TERMINAL PROJECT AREA Buildings to Remain "As-is" Species Management/Habitat Opportunity Area 0 200 400 0 100 200

Alternative 4: Partial Closure with Minimal Demolition Palos Verdes Dr N Under Alternative 4, and subject to obtaining regulatory approval, a portion of the Main Terminal would be permanently closed and a portion would be taken out of temporary closure status and placed into operation by the Navy. The Marine Terminal would be taken out of temporary closure status and placed into operation. Some of the off-site pipelines would be placed back into service and others would be abandoned in place. The following actions would occur as part of Alternative 4: S Western Ave N Taper Ave Ball Fields N Gaffey St LAPD Shooting Range The Marine Terminal (Pier 12) would be reopened and placed into operation. Aboveground storage tanks at both the and the Marine Terminal would be reopened and placed into operation. The concrete underground storage tanks (USTs) would be abandoned in place. The on-site pipelines associated with these concrete USTs would be abandoned in place. Approximately 9,600 linear feet of underground pipeline would be demolished along with 12 valve boxes. The steel USTs and their associated on-site pipelines would be reopened and placed into operation. Some of the previously active off-site pipelines would be reopened. These include the JP-5 and JP-8 pipelines between the and the Marine Terminal, and the 10-inch pipeline connected to the supplier. The remaining off-site pipelines would be abandoned in place. Note: Specific location for 9,600 linear feet of underground pipeline demolition to be determined. Project Area Operations/Admin Area MAIN TERMINAL PROJECT AREA Lease Areas (Not part of project) Species Management/Habitat Opportunity Area Surface Infrastructure to be Demolished Underground Infrastructure Plugged/Filled and Inerted then Closed/Abandoned in Place 0 200 400 0 100 200 Alternative 4

Resource Areas Addressed in the Environmental Assessment (EA) Biological Resources Cultural Resources Water Resources Geological Resources Visual Resources THE EA WILL ADDRESS THE FOLLOWING RESOURCE AREAS Coastal Resources Hazardous Materials and Wastes Environmental Justice Air Quality Transportation RESOURCE AREAS OF INTEREST Analysis of the following areas of potential interest will be conducted as part of the EA: Coastal California gnatcatcher (Polioptila californica californica). The coastal California gnatcatcher is a federally threatened species that has been observed in the coastal sage scrub plant community at Defense Fuel Support Point (). Noise Land Use Utilities and Services Socioeconomics Public Health and Safety Palos Verdes blue butterfly (Glaucopsyche lygdamus palosverdesensis). The federally endangered Palos Verdes blue butterfly occurs at. An organizational framework for species recovery is active at. TYPES OF ENVIRONMENTAL EFFECTS Direct Effects Indirect Effects Cumulative Effects Conflicts with land use plans, policies, or controls Short-term use of environmental versus longterm productivity Irreversible or irretrievable commitment of resources Source: Audubon: Guide to North American Birds. Photo by Joe Fuhrman/ VIREO http://www.audubon.org/field-guide/bird/california-gnatcatcher. Source: United States Fish and Wildlife Service: National Digital Library Photo by Jane Hendron http://digitalmedia.fws.gov/cdm/search/searchterm/palos%20 Verdes%20Blue%20butterfly/order/nosort. Looking southeast from the

Habitat Types and Federally Listed Species Palos Verdes Dr N Ball Fields S Western Ave Firing Range N Gaffey St N Taper Ave Project Area PVB Butterfly Observations Lease Areas (Not part of project) 0-2 Years Existing Structures 3-5 Years CAGN Observation 6-8 Years Potential CAGN Habitat 9-12 Years Potential PVB Butterfly Habitat PVB Butterfly Observation Habitat and Species at 0 200 400 0 100 200 Notes: CAGN = Coastal California gnatcatcher; PVB = Palos Verdes blue butterfly.

Public Involvement Opportunities HOW DO I PROVIDE MY COMMENTS? Use and submit the comment sheet provided tonight. Mail written comments to: Naval Facilities Engineering Command Southwest EA Project Manager Attn: Code JE20.GB 1220 Pacific Highway San Diego, CA 92132-5190 Email written comments to: nwssbpao@navy.mil Comments must be emailed or postmarked by APRIL 3, 2015. PROJECT SCHEDULE The Draft Environmental Assessment will be available for public review (a 15-day review period) and comment later this year. If selected, the project would be initiated in 2016. Thank You For Coming. We Look Forward To Receiving Your Input!