DPWH STRATEGIC INFRASTRUCTURE PROGRAMS AND POLICIES

Similar documents
DPWH STRATEGIC INFRASTRUCTURE PROGRAMS AND POLICIES

PLANNING AND DESIGNING FOR CLIMATE ADAPTIVE AND RESILIENT TRANSPORT: EXPERIENCE FROM PHILIPPINES

Broadening the Scope of the Proportional System of Representation

STATE UNIVERSITIES AND COLLEGES PC requirement identified by MITHI

List of Agencies Eligible for FY 2015 PBB

Financing Urban Infrastructure in the Era of Climate Change and Disaster Risks: Philippines

Inter-Agency Task Force on the Harmonization of National Government Performance Monitoring, Information and Reporting Systems

2011/9/ Principal rivers (421 river basins) 18 major river basins (with drainage area greater. 72 lakes Extensive groundwater aquifers

DPWH PROGRAMS AND PROJECTS ON DISASTER RESILIENCY

Implementation Status & Results Philippines National Program Support for Environment and Natural Resources Management Project (P096174)

About the RCCs The RCCs are tasked to: Regularly measure local competitiveness indicators Formulate programs to improve competitiveness Engage in inve

Water Resources. Inland freshwater (rivers, lakes, and groundwater) Marine (bay, coastal, and oceanic waters) Rainwater

Indices and Early Warning Systems in the Philippines

Implementation Status & Results Philippines National Program Support for Environment and Natural Resources Management Project (P096174)

Inter-Agency Task Force on the Harmonization of National Government Performance Monitoring, Information and Reporting Systems

Laguna Lakeshore Expressway- Dike Project (LLEDP)

MS. MARINA SALDANA. Tagaytay City Roadshow 25 February

WATER-RELATED HAZARDS AND DISASTER RISK IN CAGAYAN RIVER BASIN, PHILIPPINES

PROJECT NO. 6. CALA Expressway

Transport Infrastructure Framework for the Philippines

PAGASA and its Flood Early Warning Services. HydroMeteorology Division (HMD)

JICA S COOPERATION IN THE PHILIPPINES. November 2016

Understanding and Addressing the New Normal - The Philippine Experience

Climate Change Impact Assessment and Adaptation in the Philippines

Perspective. EMIL K. SADAIN, CESO I Undersecretary for UPMO Operations and Technical Services

MARCH 11, ELECTION VENUES

FOOD AND NUTRITION RESEARCH INSTITUTE

Chronic Food Insecurity Situation Overview in 71 provinces of the Philippines

Boy Scouts of the Philippines 2015 CALENDAR OF SCOUTING EVENTS

Overview of the case study areas in the Philippines

Philippine Presentation

THE ASEAN-PACIFIC ISLAND NATIONS TECHNICAL WORKSHOP ON FISHERIES EDUCATION AND TRAINING. Comments and Suggestions of

Enabling Business Empowering Consumers

EXECUTIVE ORDER NO. 36 PROVIDING FOR THE REORGANIZATION OF THE ADMINISTRATIVE REGIONS IN MINDANAO AND FOR OTHER PURPOSES

PHILIPPINE TRANSPORT INFRASTRUCTURE DEVELOPMENT FRAMEWORK PLAN

Flood and Sediment Management in the Philippines, in view of Cooperation. Minoru Kamoto. Version 2009.Nov.6

MAKING THE LINK IN THE PHILIPPINES. Population, Health, and the Environment

TEMPLATE FOR NERITIC TUNAS STATISTIC DATA

Result of Validation of Good Governance Conditions List of Non-Compliant for Departments and Attached Agencies (as of December 29, 2017)

OVERVIEW OF THE MINING INDUSTRY

Bold Inclusive Reforms for Infrastructure for the Next Decade

Economic Corridors- Mindanao s Gateway to the ASEAN Economic Community

Japan - Philippines Joint Statement On Bilateral Cooperation for the Next Five Years

Republic of the Philippines: Preparing the Irrigation System Operation Efficiency Improvement Project (Financed by the Japan Special Fund)

Level of Urbanization

JANUARY JUNE 2013 ISSN

Impacts of Drought in the e Philippines

Ex-Ante Evaluation (for Japanese ODA Loan)

Outlook and Updates on Mindanao Power Situation

Agriculture at the Crossroads

Population Projection, Metro Manila Skyway (MMS) Existing Road Network. Manila Cavite Toll Expressway (MCTE) Daang Hari Road

Philippines Metro Manila Road Pavement Rehabilitation Project

LIST OF ACTIVATED POST OFFICES (as of 01 MAY 2015)

96.47 million inhabitants km2 322 inhabitants/km % mm/year million m3 /year m3 /inhabitant 17 %

Organic Trading Posts (Retailing Centers) with Local Governments In Rural Philippines

Climate Change Impacts to the Water Environment and Adaptation Options in the Philippines¹. by: Lourdes V. Tibig 2

National Logistics Master Plan Enabling Business, Empowering Consumers.

DEPARTMENT OF ENERGY

ATM SITES (Off-Site) Agusan Del Norte Cantillan Bank Inc., Santiago, Agusan Del Norte

COUNTRY REPORT: PHILIPPINES

FINANCIAL INCLUSION IN THE PHILIPPINES: A REGIONAL ASSESSMENT TATUM BLAISE TAN

CHERYLON AIVAN A. HERZANO Project Officer. Fostering Partnership for the Environment

FEBRUARY 2019 MASTER PLUMBER LICENSURE EXAMINATION PERFORMANCE OF SCHOOLS IN ALPHABETICAL ORDER

ENGINEERING AND DEVELOPMENT CORPORATION OF THE PHILIPPINES

LIST OF SEAOIL STATIONS THAT ACCEPT CREDIT CARDS. NCR Caloocan 1584 A. Mabini St., Brgy. 7, Caloocan City

Susan P. Abano Engineer IV Policy and Program Division

Price and Food Security Update Philippines

CONTENDING VIEWPOINTS: ANALYZING THE 1996 MNLF-GRP FINAL PEACE AGREEMENT. Ms. Amina Rasul PCID Lead Convenor

THE MANILA BAY EXPERIENCE

The 2002 LGU E-Governance Readiness Survey Report ACKNOWLEDGMENTS

UCPB SAVINGS BANK ACQUIRED PROPERTIES AVAILABLE FOR SALE METRO MANILA. Lot 33 Block 31 Salubong St., Lagro Subd., Novaliches, Quezon City

Seeks to assist water utilities to improve their operational

Chapter 5: Philippine Land Holding Patterns and Agricultural Production

Report and Recommendation of the President to the Board of Directors

ACKNOWLEDGMENTS. Padada Water System Cooperative

THE STUDY ON FLOOD CONTROL PROJECT IMPLEMENTATION SYSTEM FOR PRINCIPAL RIVERS IN THE PHILIPPINES

Philippines 3W: Typhoon Nesat ("Pedring") and Typhoon Nalgae ("Quiel") On-going and Planned Activities in Bulacan and Pampanga as of 13 October 2011

Value Chain Analysis of Calamansi

Impact of food inflation on poverty in the Philippines

SUSTAINABLE LAND IN THE PHILIPPINES

THE STUDY ON FLOOD CONTROL PROJECT IMPLEMENTATION SYSTEM FOR PRINCIPAL RIVERS IN THE PHILIPPINES

Jetfabrik Multipurpose Theme. All Rights Reserved.

PNS CONSTRUCTION, INC. NIPPON STEEL & SUMITOMO METAL GROUP OF COMPANIES

Rice Production and Consumption Trends in the Philippines from 2000 to Benedict A. Exconde

R.S. Caparros Associates & Co. ASEP PICE CPMAP

Supported by: PHILIPPINES. Is the fun drying up? Implications of intensifying El Niño conditions for drought risk and food security

IDP PROTECTION ASSESSMENT REPORT

Report No.: ISDSA131 11

A Proposal for Updating the MWSS Master Plan. Metropolitan Waterworks & Sewerage System. A proposal for updating the MWSS 2005 Master Plan

TERMS OF REFERENCE FOR CONSULTANTS

MAINSTREAMING POVERTY AND ENVIRONMENT INITIATIVES IN THE UTILIZATION OF NATURAL RESOURCES (NATIONAL WEALTH TAX), PROVINCE OF BENGUET

Protecting the Environment

THE PHILIPPINE DEVELOPMENT PLAN

M&E at the Microenterprise Level

INVESTMENT OPPORTUNITIES in the Philippine Energy Sector

CHANGES IN EIRR ESTIMATES OF ODA-FUNDED PROJECTS

WATER POLLUTION, SANITATION AND HEALTH

Research Grant Program

1.4 Borrower/Executing Agency The Government of the Republic of the Philippines / The Department of Public Works and Highways (DPWH).

Prior Investment. Disaster Risk Reduction

Transcription:

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DPWH STRATEGIC INFRASTRUCTURE PROGRAMS AND POLICIES Acting Secretary MARK A. VILLAR September 29, 2016

PHILIPPINES INFRASTRUCTURE BUDGET (Billions and % of GDP) Particulars 2016 (P B) 2017 (P B) Total Infrastructure: 756.4 B 860.7 B % of GDP 5.1% 5.4% TARGET INFRASTRUCTURE SPENDING 7% of GDP P756.4B P860.7B (5.4%) Growth Rate 31.4% 13.8% (5.1%) Road Networks 298.1 328.2 P575.7B Flood Control Systems 69.0 75.8 (4.3%) Seaport Systems 1.8 2.7 P346.2B Airport Systems 9.6 5.7 (2.7%) School Buildings 91.3 124.6 Hospitals & Health Centers 19.2 10.0 Irrigation Systems 23.6 26.0 Other Infrastructure Assets 170.4 224.5 TOP 10 EXECUTIVE DEPARTMENTS P175.4B (1.8%) P215.7B (2.0%) P306.9B (2.7%) P144.3B P190.9B P273.9B P363.5B P419.7B* Department 2016 (P B) 2017 (P B) P90.7B P99.5B DepEd 433.4 567.6 DPWH 397.1 458.6** DILG 125.4 150.1 DOH 125.0 144.3 Source: Department of Budget and Management (as of Sep. 2016) DND 117.7 134.5 DSWD 110.9 129.9 DOTr 44.3 55.5 DA 48.9 45.3 DENR 22.3 29.4 DOF 20.2 23.0 Philippines Infrastructure Budget (Php) Percentage of GDP (%) DPWH Capital Outlays (Php) *Capital Outlays (Infrastructure) only. ** Capital Outlays including PS, MOOE, RLIP, MVUC 2

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DPWH MANDATE The DPWH is mandated to undertake (a) the planning of infrastructure, such as national roads and bridges, flood control, water resources projects and other public works, and (b) the design, construction, and maintenance of national roads and bridges, and major flood control systems. CONDITION OF PHILIPPINE ROAD NETWORK As of December 31, 2015 Road Classification Total (km) Paved (km) % Paved National 32,633 28,919 88.6% Primary 7,067 7,059 99.9% Secondary 14,118 12,653 89.6% Tertiary 11,448 9,207 80.4% Local Road 177,595 33,479 18.9% Total: 210,229 62,398 29.7% DPWH STRATEGIC PROGRAMS AND POLICIES Rural Road Development Program Traffic Decongestion Program Integrated and Seamless Transport System Livable, Sustainable and Resilient Communities Public-Private Partnership Program Participatory Governance and Citizens Engagement Program Clean and Efficient Government 3

Rural Road Development Program: Local access roads to designated tourism destinations, seaports, airports, & economic zones and Farm to Market Roads. Name of Project Length (Km) Cost (Php B) Major Tourism Roads (On-going): Taal Lake Circumferential Road, San Nicolas-Sta. Teresita, Alitagtag, Batangas 15.00 km 0.30 Gurel-Bukod-Kabayan-Buguias Road (leading to Mt. Pulag, Bulalacao Lakes, Kabayan Mummies), 48.69 km 1.36 Bokod, Kabayan & Buguias, Benguet Cagaray Circumferential Road, Bacacay, Albay leading to Misibis Resort and white beaches in 39.00 km 0.89 Albay Taytay-El Nido Road, Palawan 44.60 km 1.13 Jct. (Tagbilaran East Road, TER) Guindulman-Anda-Badiang Cogtong Road leading to beaches and 10.57 km 0.21 resorts, Anda, Bohol Borongan-Llorente Closed Canopy Forest Area, Maydolong, Eastern Samar 18.30 km 0.67 Island Garden City of Samal (IGaCoS) Circumferential Road, Davao del Norte 30.62 km 1.08 4

Traffic Decongestion Program: Master Plan on High Standard Highway (HSH) Network Development in the Republic of the Philippines and Roadmap for Transport Infrastructure Development for Metro Manila & its Surrounding Areas HSH Network in Metro Cebu HSH Network in Tagum-Davao- Gen. Santos Corridor 5

Traffic Decongestion Program: Master Plan on High Standard Highway (HSH) Network Development and Roadmap for Transport Infrastructure Development for Metro Manila & its Surrounding Areas High Standard Highways / Expressways: Ongoing/For Implementation: 245.27 km (DPWH-125.32 km; Toll Regulatory Board, TRB-119.95 km) Name of Project Length (Km) Cost (Php B) Start Date Completion Date NAIA Expressway 6.90* 20.45 2014 2016 NLEX-SLEX Connector Road 8.00 23.30 2018 2020 Metro Manila Skyway Stage 3 (TRB) 14.80 37.43 2015 2018 NLEX Harbor Link, Segment 10 (TRB) 5.65 9.00 2014 2017 NLEX Harbor Link, Segment 8.2 (TRB) 7.50 6.50 2016 2018 C6-Phase I, Southeast Metro Manila Expressway. (TRB) 34.00 31.32 2016 2020 Cavite-Laguna (CALA) Expressway 44.63 35.68 2017 2020 SLEX TR4, Sto. Tomas-Lucena (TRB) 58.00 13.10 2016 2020 Plaridel By-Pass Road, Phase II 9.96 3.43 2014 2018 Tarlac-Pangasinan-La Union Expressway (Section 3 -Urdaneta City- 25.83** 5.79 2015 2018 Rosario, LaUnion) Central Luzon Link Expressway, CLLEx Phase I (Tarlac-Cabanatuan) 30.00 14.94 2016 2019 * The 6.90 km is for the Main Viaduct-4.70km and At Grade-2.20km. It does not include the 7.95km entry and exit ramps. ** Excludes 63.02 km completed sections (Tarlac City-Urdaneta City) Tarlac Pangasinan La Union Expressway Propose/Pipeline (For Study): 282.30 km NAIA Expressway Muntinlupa-Cavite Expressway Plaridel By-Pass Road Name of Project Length (Km) Cost (Php B) Central Luzon Link Expressway - Phase II (Cabanatuan-San Jose) 35.70 9.46 Manila Bay Integrated Flood Control, Coastal Defense and Expressway Project 50.00 399.66 R7 Expressway 16.10 7.77 North Luzon Expressway East (NLEE) Phases I and II 91.20 44.61 Pasig Marikina Expressway 15.70 34.65 East-West Connection Expressway 26.60 7.93 Laguna Lakeshore Expressway Dike 47.00 TBD 6

Name of Project Length (lm) Cost (Php B) Start Date Completion Date Sen. Gil Puyat Ave.-Paseo De Roxas / Makati Ave. Underpass 880 m 1.01 2015 2018 C-2 (Gov. Forbes St.)/R-7 (Espana St.) Interchange Project 1,600 m 2.43 2018 2019 MMICP VI-EDSA/North Ave.-West Ave. Interchange 661m 0.56 2018 2019 MMICP VI-North Ave.-Mindanao Ave. Interchange 951.90 m 0.52 2017 2019 MMICP VI- C-5 / Greenmeadows / Acropolis /Calle Industria Interchange 1,374.40 m 1.14 2017 2019 MMICP VI-EDSA/Roosevelt-Congressional Avenue Interchange 573.50 m 0.61 2017 2019 Bonifacio Global City-Ortigas Center Link Road Project Sta. Monica-Lawton Bridge Sta. Monica-Fairlane-Brixton Road Lawton Ave.-Global City Viaduct EDSA-Taft Flyover Traffic Decongestion Program: Master Plan on High Standard Highway (HSH) Network Development and Roadmap for Transport Infrastructure Development for Metro Manila & its Surrounding Areas Interchanges / Flyovers / Underpasses Ongoing/For Implementation: 11,753.57 lm 613.77 m 200 m 337m NB-1,696 m SB-1,046 m 1.22 TBD 0.45 2017 2017 2017 2018 2018 2018 2.70 TBD TBD UP-Miriam-Ateneo Viaduct along C-5/ Katipunan, 1,820 m 1.97 2017 2018 Propose/Pipeline: 2,700.00 lm Name of Project Length (lm) Cost (Php B) C-5 Kalayaan-Bagong Ilog Improvement Project 2,700 7.50 7

Traffic Decongestion Program: By-Passes / Diversion Roads Name of Project Length (km) Cost (Php B) Start Date Completion Date Plaridel By-Pass Road, Phase II 9.96 3.43 2014 2018 Davao City By-Pass Construction Project, Road 44.58 16.82 2019 2022 Mindanao Tunnel - 2.28 Candon City By-Pass Road, Ilocos Sur 14.40 0.62 2015 2017 Laoag City By-Pass Road, Ilocos Norte 7.98 1.3 2012 2018 Carcar By-Pass Road, Carcar City, Cebu 8.83 0.13 2013 2017 Palo West By-Pass Road (Pawing-Campetic- 2.49 0.63 2015 2018 Guindapunan-San Jose-Arado), Palo, Leyte Tacloban City By-Pass Road, Leyte 17.58 2.57 2015 2020 Cotabato City East Diversion Road 12.73 1.14 2012 2016 Alae by-pass Road (from south of Cagayan de Oro City to the Mindanao Container Terminal, MCT) MLIN Project 12.17 0.81 2015 2017 Laoag City By-Pass Road Plaridel By-Pass C otabato City East Diversion Road 8

Integrated and Seamless Transport System: Inter-Island Linkage Projects Panguil Bay Bridge Construction of a bridge across Panguil Bay connecting the City of Tangub in Misamis Occidental and Municipality of Tubod in Lanao del Norte. The bridge shall have the following features; 320 meters of center span (main bridge) and 2,040 meters of approach viaduct; 856 meters of approach roads at Tubod and 260 meters at Tangub City) Project Cost: P4.863 Billion (KEDCF-Assisted) Schedule: 2017-2020 Panay-Guimaras-Negros (PGN) Island Bridge Project Construction of 13.16 km (estimate) long bridges linking the Visayas islands of Panay, Guimaras and Negros. Estimated Project Cost: P21.67 Billion Project Duration: Six (6) years Proposed Inter-Island Linkage Projects (for further study): Mindoro-Batangas Super Bridge Camarines-Catanduanes Friendship Bridge Luzon-Samar Link Bridge Cebu-Bohol Link Bridge Cebu-Negros Link Bridge Bohol-Leyte Link Bridge Samal Bridge Leyte-Surigao Link Bridge 9

Integrated and Seamless Transport System: Mindanao Logistics Infrastructure Network (MLIN) Length (Km) Amount (P B) TOTAL FUNDING REQUIREMENT (ORIGINAL): 2,073.9 km P 80.41 B Total Released Amount: FY 2015 Budget (GAA) FY 2016 Budget (GAA) 799.3 km 323.1 km 476.2 km P 29.61 B P 10.08 B P 19.53 B Proposed FY 2017 Budget (NEP): Original MLIN Attribution to MLIN 834.2 km 635.4 km 198.9 km P 32.93 B P 23.42 B P 9.50 B Balance (Unfunded): 639.2 km P 27.38 B Road Name Length (Km) Amount (P B) Completion/Construction of east-west lateral roads connecting Agusan del Sur to Bukidnon 284.280 15.68 Construction of Impasugong (Bukidnon) to Las Nieves (Brgy. Lawan-Lawan) link and 181.640 7.53 improvement of national road to Buenavista Upgrading the national roads within Agusan Marsh (e.g., Prosperidad-San Luis-Talacogon- 107.800 3.42 La Paz-Loreto Road) Completion of the missing link in the Datu Paglas-Columbio-Matanao-Padada Road 107.370 2.77 Construction of a new road crossing the mountains from Davao Oriental to Compostela 150.840 6.01 Valley Upgrade Glan (Sarangani)-Malita (Davao del Sur) Road 81.800 3.29 Rehabilitation and Construction of Cagayan de Oro City Roads 60.380 3.82 Reconstruction of the Lake Sebu-Maitum Road 132.460 5.48 Cagayan de Oro-Davao Road Widening Project 186.080 6.41 Cagayan de Oro-Butuan Road Widening Project 144.770 4.36 Butuan-Davao Road Widening Project 289.130 9.73 10

Livable, Sustainable and Resilient Communities (Integrated Water Resources Management Program): Complete and update the flood control and drainage master plans and feasibility studies of the 18 Major River Basins & critical Principal Rivers. River Basins with Master Plans/Flood Control Plan: Name of MRBs Region Drainage Area (sq.km.) River Length (km) Cagayan II-Cagayan Valley, 27,280 505 CAR Mindanao XII-Soccsksargen, 23,169 373 ARMM Agusan XI-Davao Region, 10,621 350 XIII-CARAGA Pampanga III-Central Luzon 9,759 260 Agno I-Ilocos Region 5,952 206 Pasig-Marikina- NCR, IV-A- 4,678 78 Laguna Bay CALABARZON Bicol V-Bicol Region 3,771 136 Ilog-Hilabangan NIR-Negros Island 1,945 178 Region Panay VI-Western 1,843 152 Visayas Tagoloan X-Northern 1,704 106 Mindanao Cagayan De Oro X-Northern Mindanao 1,521 90 River Basins without Master Plans/Flood Control Plan: Name of MRBs Region Drainage Area (sq.km.) River Length (km) Abra I-Ilocos Region, 5,125 181 CAR Abulug II-Cagayan Valley, 3,372 175 CAR Tagum-Libuganon XI-Davao Region 3,064 89 Davao XI-Davao Region 1,623 150 Buayan-Malungun XI-Davao Region, 1,434 64 XII-Soccsksargen Jalaur VI-Western 1,503 123 Visayas Agus X-Northern 1,645 36 Mindanao, ARMM Note: Major River Basin Drainage Area > 1,400 sq.km. 11

Livable, Sustainable and Resilient Communities (Integrated Water Resources Management Program): Master Plan for Flood Management in Metro Manila and Surrounding Areas Based on river basins: Pasig-Marikina River Basin and Laguna Lake Basin. Name of Project Pasig-Marikina River Improvement and Dam Construction Meycauayan River Improvement Est. Cost P198.44 B P14.04 B Malabon-Tullahan River Improvement P21.64 B South Parañaque-Las Piñas River Improvement East Mangahan Floodway (Cainta & Taytay River Improvement) West Laguna Lakeshore Land Raising Land Raising for Small Cities around Laguna Lakeshore Improvement of the Inflow Rivers to Laguna Lake P17.34 B P25.90 B P25.19 B P7.16 B P0.64 B Manila Core Area Drainage Improvement P27.26 B West Mangahan Area Drainage Improvement P5.52 B Boundary of Study Area and the River Basins Total area: 4,354 km 2 Total Population: 17.1 M Valenzuela-Obando-Meycauayan (VOM) Improvement Total Estimated Requirement: P8.61 B P351.72 B 12

Livable, Sustainable and Resilient Communities (Integrated Water Resources Management Program): Master Plan for Flood Management in Metro Manila and Surrounding Areas Major Flood Control Projects : Ongoing/For Implementation: Name of Project Cost (Php B) Start Date Completion Date Pasig-Marikina River Channel Improvement Project, Phase III (JICA PH-P252) 7.55 2014 2017 Blumentritt Interceptor Catchment Area 0.62 2013 2016 Mandaluyong Main Drainage Project 0.61 2013 2016 Metro Manila Flood Management Project, Phase 1 23.47 TBD TBD Propose/Pipeline: Name of Project Pasig-Marikina River Channel Improvement Project (Phase IV) Laguna Lakeshore Expressway Dike Marikina Dam Flood Protection Works in the Marikina River including Retarding Basin Flood Mitigation Project in the East Mangahan Floodway Area (Stage 1) 13

Livable, Sustainable and Resilient Communities (Integrated Water Resources Management Program): Other Major Flood Control Projects (Nationwide) Name of Project Cost (Php B) Start Date Completion Date Flood Risk Management Project (FRIMP) in Cagayan, Tagoloan and Imus Rivers (JICA, PH-P253) 6.18 2016 2019 Integrated Disaster Risk Reduction and Climate Change Adaptation Measures in the Low Lying Areas of Pampanga Bay (KEDCF, PHL- 17) Flood Risk Management Project (FRIMP) in Cagayan de Oro River (JICA, PH-P259) 4.22 2017 2020 8.55 2018 2022 Bacoor Retarding Basin Imus Retarding Basin 14

Livable, Sustainable and Resilient Communities: Disaster Risk Reduction and Climate Change Adaptation Program Rehabilitate, Retrofit and Strengthen Existing Bridges Metro Manila Priority Bridge Seismic Improvement Project (Guadalupe Bridge and Lambingan Bridge) Replacement of outer bridges amd replacement of substructure including foundation of inner bridge of Guadalupe Bridge. Replacement of Lambingan Bridge with vertical geometry improvement of both sides approach road. Project Cost: P4.29 Billion Schedule: January 2019-July 2022 Provide Alternative Safe Access on Highly Vulnerable Areas Dalton By-Pass Road Project Project Cost: P4.80 Billion Schedule: To Be Determined Build evacuation centers incorporating requirements prescribed by NDRRMC. Adopt Design Guidelines, Criteria & Standards (DGCS) 2015 which incorporates resilient design to address climate change impacts to all infrastructures. Use geo-hazard maps for infrastructure planning and disaster risk reduction measures Deploy equipment and manpower within 24 hours from the first advisory of NDRRMC, PAG-ASA and PHIVOLCS. Use of eco friendly coconets and geosynthetic materials in slope protection works 15

Livable, Sustainable and Resilient Communities: Infrastructure Support for Marginalized Sectors: Construct accessibility and other support facilities for marginalized sectors (Senior Citizens, Physically Challenged Persons, Women Sector, etc.). Expand and Improve Bicycle and Pedestrian Infrastructure: Promote Safe and Clean Transportation System thru the construction of Bike Lanes. Provide safe and unimpeded access for pedestrians. 16

Distribution of FY 2017 Budget by Region (Capital Outlays): Amount in Billion Pesos NCR P 23.4 B (6.8%) SOUTHERN LUZON-P60.1 B (17.5%) Region IV-A P 23.6 B Region IV-B P 15.8 B Region V P 20.7 B VISAYAS P58.5 (17.1%) Region VI P 13.0 B Negros Island Region-P 10.6 B Region VII P 12.4 B Region VIII P 22.6 B NIR NORTHERN LUZON-P67.2 B (19.6%) CAR P 13.1 B Region I P 16.6 B Region II P 13.4 B Region III P 24.1 B MINDANAO P133.1 B (38.9%) Region XIII P 23.2 B Region X P 38.7 B Region IX P 16.6 B Region XI P 38.1 B Region XII P 16.5 B TOTAL : P 342.3 B * Excludes Inter-Regional/Nationwide-P77.3B 17

DPWH Strategic Programs and Policies Improve Expenditure Performance: FY 2015 (Full Year) Allotment 445.5 Obligation 351.4 Disbursement 244.0 Obligation vs. Allotment (%) Disbursement vs. Allotment (%) Disbursement vs. Obligation (%) FY 2015 Fund Utilization (Full Year): FY 2016 vs. FY 2015 Fund Utilization (January-July): 79% 55% 69% FY 2015 (Jan.- July) FY 2016 (Jan.- July) % Increase Allotment 402.51 503.55 25% Obligation 219.62 309.14 41% Disbursement 117.59 172.46 47% Obligation vs. Allotment (%) 55% 61% Disbursement vs. Allotment (%) 29% 34% Disbursement vs. Obligation (%) 54% 56% Improve Expenditure Performance Enforce 24/7 work schedule on major infrastructure projects implemented in urban areas. Creation of an Infrastructure Monitoring and Advisory Group (IMAG). Use of Multi-Year Obligational Authority (MYOA) for multi-year infrastructure projects Strictly impose calibrated sanctions/penalties on contractors with negative slippages. Strictly enforce uniform guidelines on suspension and blacklisting contractors/suppliers/consulting firms. Revisit level of authority of District Engineering Offices based on performance and absorptive capacity. Integrate physical and financial accomplishment to existing DPWH system for an integrated real time reporting. Expedite ROW resolution based on new ROW Law. Streamline procurement process based on New Procurement Manual. 18

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS THANK YOU! www.dpwh.gov.ph