Layher SpeedyScaf Instructions for Assembly and Use

Similar documents
Accessories. Layher Railing clamp Instructions for Assembly and Use. Quality management certified as per DIN ISO 9001:2008 by TÜV-CERT

Layher. Keder Roof and Keder Hall. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

LAYHER ZIFA / ZIFA P2 TOWER INSTRUCTIONS FOR ASSEMBLY AND USE

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

Edition Ref. No Quality management certified according to ISO 9001:2008 by German TÜV-CERT

LAYHER ALLROUND SCAFFOLDING SHORING TG 60

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

LAYHER ALLROUND SCAFFOLDING INSTRUCTIONS FOR ASSEMBLY AND USE

Edition Ref. No Quality management certified according to ISO 9001:2008 by German TÜV-CERT

Edition Ref. No Quality management certified according to ISO 9001:2008 by German TÜV-CERT

SYSTEM-FREE ACCESSORIES CATALOGUE

SYSTEM-FREE ACCESSORIES CATALOGUE

Layher. Cut costs, improve safety, increase efficiency: Layher AllroundScaffolding. Allround Scaffolding

Successful Façade Scaffolding: Layher SpeedyScaf. SpeedyScaf

LAYHER ACCESS TECHNOLOGY CATALOGUE

Allround Scaffolding

Stil Title lasdag of ene presentation 2012

LIGHTER MEANS BETTER.

Layher Aluminium Lattice Beams. Information and User Guide. Aluminium Lattice Beam 750 (Product Code 4903XXX)

LAYHER SPEEDYSCAF SYSTEM CATALOGUE

SpeedyScaf System. Layher SpeedyScaf System. Catalogue Edition Quality management certified according to ISO 9001:2008 by German TÜV-CERT

The Layher Cassette roof

LAYHER SYSTEM SOLUTIONS FOR SHORING AND PROPPING

LAYHER EVENT SYSTEMS CATALOGUE

LAYHER EVENT SYSTEMS CATALOGUE

Allround Scaffolding System

ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE

Instructions for erection and use of the RUX-SUPER 65 Rapid-Erection Scaffolding. - Standard Design - Rapid-Erection Scaffolding RUX-SUPER 65

Cut costs, improve safety, increase efficiency: Scaffolding for shipyards and offshore. Layher. More Possibilities. The Scaffolding System.

Reliant Holdings Ltd Safety Management System

Allround Scaffolding. Propping Technical Brochure. The universal system for everyday and engineered scaffolding solutions

USER S MANUAL HAKI COMPACT STAIR TOWER

Layher. Allround Scaffolding. Made of galvanised steel or corrosion-proof aluminium. General construction approvals Z , Z

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

UNIFIX 70. Approval No. Z Standard Version (as of Dezember20,2004)

LAYHER ALLROUND SCAFFOLDING CATALOGUE

ASSEMBLY.

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

USER S Manual. HAKI Bridge System (HBS)

Mobile Towers - 3T Method

Modular Scaffolding MEKA 48

LAYHER PROTECT SYSTEM

USER S MANUAL HAKI CONTINENTAL

Industrial Aluminium Towers

LAYHER ALLROUND SCAFFOLDING CATALOGUE

PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

USER S MANUAL HAKI STAIR TOWER

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES

USER S MANUAL HAKI PUBLIC ACCESS STAIR

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

USER S MANUAL HAKI UNIVERSAL ALUMINIUM

Industrial Aluminium Towers

INSTRUCTION MANUAL MOBILE ACCESS TOWER

LAYHER PROTECTIVE SYSTEMS CATALOGUE

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method

Layher Allround Scaffolding

USER S MANUAL HAKI UNIVERSAL

USER S MANUAL. HAKI Loading Tower

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door

As a scaffold user, Mr Scaffold recommends Method 1, but both options are suitable.

Contents 2017 VR ACCESS SOLUTIONS ALL RIGHTS RESERVED.

BRIO Modular scaffolding

LAYHER ALLROUND SCAFFOLDING CATALOGUE

STAIRMAX 700. Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE

Industrial Aluminium Towers

Assembly and usage instructions. Z600 brace-free mobile scaffold

Modular Scaffold MEKA 48

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

SCAFFOLDING PROCEDURE

Industrial Aluminium Towers

Allround Scaffolding. I n g e n i o u s. S t r o n g. L i m i t l e s s. Layher Allround Scaffolding Layher Allround Technology

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

Uniscaff User Guide. Uniscaff. George Roberts Total Reliability of Supply. George Roberts Total Reliability of Supply

STAIRMAX 700 MK2 USER GUIDE. Aluminium Tower 700 Climbing Rung. 3T - Through The Trapdoor Method

BRIO Modular scaffolding

Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT

LEGAL SUPPLEMENT 43. to the Government Gazette of Mauritius No. 13 of 8 February 2014

Safety First Mobile Towers - 3T Method INTRODUCTION

NZQA registered unit standard 9184 version 6 Page 1 of 5

Cantilever Loading Platform Erection Procedures and Guidance Notes

Allround Scaffolding

Generation Hop up brackets to be removed and boards moved to lift above.

USER S MANUAL HAKI COMPACT STAIR TOWER

USER S MANUAL HAKI PUBLIC ACCESS STAIR

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT

Stark gerüstet. Welcome. to MJ-Gerüst GmbH. English.

Scaffolding. Safety Guide. STOP! Before you climb

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

SAFETY SYSTEM. G-Deck Consideration. Manual Handling

INTER-DEPARTMENTAL PROCEDURE

3T - Through The Trapdoor Method

This document is a preview generated by EVS

Transcription:

Layher SpeedyScaf Instructions for Assembly and Use Edition 11.2013 Ref. No. 8102.230 Quality management certified according to DIN EN ISO 9001:2008 by TÜV-CERT

Contents 1. Introduction... 4 2. Measures to prevent falls...6 3. Supplementing the SpeedyScaf equipment...10 4. Basic components of Layher SpeedyScaf equipment...11 5. Assembly sequence... 13 6. Anchoring... 16 7. Scaffolding accesses... 20 18. Freestanding scaffolding levels...30 19. Safeguarding against wind forces... 30 20. Coverings... 31 21. Rolling tower... 31 22. Use of the scaffolding... 32 23. Dismantling the scaffolding... 32 24. Components of the system...33 8. Corner solutions... 21 9. Brackets... 22 10. Aluminium bridging ledgers...25 11. Bridging... 25 12. Gantry frames... 26 13. Reducer... 27 14. Frame for balustrade...27 15. Protective roofs... 27 16. Weather protection at top level...28 17. Brick guards... 29 2

Note The products or assembly variants shown in these instructions for assembly and use may be subject to country-specific regulations. The user of the products bears the responsibility for compliance with such regulations. Subject to local regulations, we reserve the right not to supply all products illustrated here. Your Layher partner on the spot will be happy to provide advice and answers to all questions relating to the approvals for the products, to their use or to specific assembly regulations. 3

1. Introduction General These instructions for assembly and use relate to assembly, modification and dismantling of the main assembly variants of the SpeedyScaf scaffolding from Wilhelm Layher GmbH & Co. KG, of Gueglingen- Eibensbach, Germany. The instructions cannot cover all the possible applications. If you have any questions about specific applications, please contact your Layher partner. Caution: The stability of the scaffolding must be verified and assured at all times, including in the assembled state. Layher SpeedyScaf equipment may only be assembled, modified and dismantled under the supervision of a qualified expert and by technically trained employees. Caution: For assembly, only original Layher scaffolding components identified with the conformity mark <Ü> and the appropriate German approval number (Z-8.1-16.2 for SpeedyScaf 70 steel, Z-8.1-844 for SpeedyScaf 70 aluminium and Z-8.1 840 SpeedyScaf 100 steel) may be used. Caution: Assembly, alteration and dismantling of the Layher SpeedyScaf equipment involves risk from falls. Perform the scaffolding construction work in such a way that the risk of falls is ruled out or minimized. Assembly situations where there is a risk of falls are identified in these instructions with the following symbol inside the assembly pictures. The scaffolding erector must stipulate, on the basis of how he assesses the risk, suitable measures to prevent or minimize risks for the actual case and/or the respective activities involved. The measures must be selected with due consideration of the actual risk, their usefulness and their practical possibilities, and also depending on the qualification of the employees, the type and duration of the activity in the high-risk area, the possible fall height, the state of the surface onto which the employee might fall and the state of the workplace and its access. Technical and personnel-related measures can be applied during assembly, modification and dismantling. Possible measures can include, depending on the assembly situation, the use of qualified personnel specifically informed of the respective risk situation, the use of the advance guardrail, or in specific cases the use of suitable personal safety apparatus. In any event, the assembly sequence must be designed such that side protection is installed at once, so that personnel work predominantly in secured areas. Fig. 1 3: Identification of original Layher scaffolding components Visually check all scaffolding components prior to installation to ensure that they are in flawless condition. Do not use damaged components. If the use of personal safety apparatus against falls (PSAaf) or of an advance guardrail is required or is specified by local regulations when Layher SpeedyScaf equipment is assembled, the attachment points shown in section 2 or the advance guardrail as shown must be used. The suitability of PSAaf for preventing falls must be checked. Particular attention must be paid here to the assembly of the second and third scaffolding levels. 4

Before the start of scaffolding work, the contractor must ascertain whether the planned working area contains equipment that might endanger the employees. Assembly, modification and dismantling may only be performed with appropriate protective equipment. Scaffolding components must not be thrown; instead they must be handed over in such a way that they cannot slip or be dropped. After completion of the assembly work and before every use of the scaffolding, a check must be conducted to ensure it is in good condition. With regard to the following instructions for assembly and use of the regular version of the Layher SpeedyScaf scaffolding system, it must be pointed out that as a general principle scaffolding may only be assembled, modified or dismantled under the supervision of a qualified person and by technically trained employees adequately and specifically instructed in this work. To that extent, and with regard to use, we refer to the required conditions set forth in German Ordinance on Industrial Safety and Health (BetrSichV). In the following instructions for assembly and use, we provide the erector and the user, on the basis of our risk analysis, with advice on how to comply with the requirements of the above ordinance in the respective assembly situation. The technical details set forth in the instructions for assembly and use are intended to help the erector and/or user to comply with the requirements of the ordinance and are not mandatory specifications for them. The erector/user must take the measures needed on the basis of the risk assessment, prepared according to the preconditions of the Ordinance, at his own discretion and exercising all due care and diligence. The specific features of the individual case must be taken into account here. It is essential that the following instructions for assembly and use are complied with in every case. It is pointed out that all information, particularly that regarding stability in the assembly variants, applies only when original Layher SpeedyScaf components identified with the approval numbers stated on page 4 are used. The installation of non-layher parts can lead to safety defects and insufficient stability. The present instructions for assembly and use must be available to the supervisor and to the employees involved. During assembly, modification and dismantling, as well as during use of the scaffolding, the legal regulations of the German Ordinance on Industrial Safety and Health (BetrSichV) concerning the erection and use of scaffolding must be complied with. Scaffolding system Layher SpeedyScaf is a steel frame scaffolding made of prefabricated components with a system width of 0.73 m and 1.09 m. The bay lengths are 1.57 m, 2.07 m, 2.57 m and 3.07 m. Short lengths of 0.73 m and 1.09 m are also possible. The frames are 2.00 m high and hence determine the distance between the deck levels. They are joined by spigots arranged on the top at the level of the decks. The diagonal braces and rear guardrails are connected via wedge connections to the upright tubes. The deck parts are held horizontally on the support ledgers by claws and in so doing they stiffen the scaffolding both at right angles and parallel to the façade. The manufacture and identification of components is regulated in the general building authority approvals specified on page 4. Inspection and documentation The scaffolding erector must ensure that the scaffolding is checked by the qualified person after completion of the assembly work, i.e. before handover to the scaffolding user. The inspection must be documented. If certain areas of the scaffolding are not ready for use, particularly during assembly, modification and dismantling, they must be identified with a prohibitory sign indicating no entry. In addition, it must be made clear by barriers that the scaffolding has not been completed and hence must not be entered. After completion of the scaffolding, it is useful to indicate that inspection has been passed by a clearly discernible identification on the scaffolding itself for the duration of its use. This identification should include the following information: Example for identification: Work scaffolding as per EN 12811-1, protective scaffolding as per DIN 4420-1 Width class W06 and load class 3 Evenly distributed load max. 2.00 kn/m² Date of inspection Name of company Address of company Telephone number of company 5

Gerüstersteller: (ggf. mit Stempel) Telefonnummer: Erstellungsort: Gerüst-Nr.: Kennzeichnung und Freigabe für Gerüste DIN EN 12811/ DIN 4420 Gerüstart: Arbeitsgerüst nach EN 12811 Fassadengerüst Raumgerüst Schutzdach Schutzgerüst nach DIN 4420 Fanggerüst Dachfanggerüst Sondergerüst: Treppenturm Fahrgerüst Bekleidung: Keine Planen Netze Lastklasse: 2 (150 kg/m²) 3 (200 kg/m²) 4 (300 kg/m²) ( kg/m²) Die Summe der Verkehrslasten aller übereinanderliegenden Gerüstlagen in einem Gerüstfeld darf den vorgenannten Wert nicht überschreiten. Breitenklasse: befähigte Person beim Aufbau: Aufbauzeitraum: befähigte Person zur Prüfung: Prüfungszeitraum: Auftraggeber: Telefonnummer: W06 W09 W SW Nutzungsbeschränkungen (Hinweise für den Nutzer siehe Rückseite) : Geprüft und freigegeben befähigte Person des Gerüsterstellers: Datum, Unterschrift Wilhelm Layher GmbH & Co. KG Gerüste Tribünen Leitern Ochsenbacher Straße 56 D-74363 Güglingen-Eibensbach Eigenmächtige Änderungen am Gerüst sind ohne vorige Rücksprache mit dem Gerüstersteller untersagt! Die Anweisungen der Aufbau- und Verwendungsanleitung sind sorgfältig zu befolgen! befähigte Person des Nutzers: Datum, Unterschrift Figs. 4 and 5: Scaffolding identification signs (German only) Use Every employer who requires personnel to use the scaffolding or parts of it must, in the course of the risk analysis in accordance with Section 3 of the German Ordinance on Industrial Safety and Health (BetrSichV), determine whether an inspection prior to use is required. The inspection is intended for confirmation of safe operation depending on the respective use of the scaffolding. After any unusual events that might have damaging effects on the safety of the scaffolding, the employer using it or causing it to be used must immediately ensure that an unscheduled inspection is performed by a qualified person. He must ensure that the scaffolding is checked for obvious defects before use. The employee causing scaffolding to be used is responsible for preserving its operational safety. If defects are found during this check, the scaffolding must not be used in those areas where there are defects until these have been eliminated by the scaffolding erector. Subsequent alterations to the scaffolding are deemed as assembly, modification or dismantling and may only be performed by technically trained employees. If the scaffolding is used by several employers, simultaneously or successively, each employer must ensure that the above inspection is conducted. The legal regulations of the German Ordinance on Industrial Safety and Health (BetrSichV) must be complied with. Further information on occupational safety can be found in the German publication BG-Information Handlungsanleitung für den Umgang mit Arbeitsund Schutzgerüsten governing the handling and use of work and protective scaffolding. The basis for SpeedyScaf approval in Germany are German and European standards. SpeedyScaf equipment has been approved in many other countries and complies with British Standards. Caution: Differing and supplementary local regulations are not taken into account in these instructions, but must be complied with. A detailed list of articles can be found in our catalogue, and information on structural values in our technical documents. 2. MEASURES TO PREVENT FALLS In line with local regulations or as the result of a risk analysis performed by the scaffolding erector, personal safety apparatus against falls (PSAaf), an advance guardrail or a combination of the two, for example, may be necessary for assembly and dismantling of the scaffolding. Attachment points for the personal safety apparatus against falls (PSAaf) If the use of PSAaf is planned for assembly of the SpeedyScaf structure, the attachment points shown in Figs. 6 to 15 must be used. The attachment points shown have been verified by drop tests with original Layher SpeedyScaf scaffolding. If SpeedyScaf scaffolding uses components not identified in accordance with the requirements of the building authority approval Z-8.1-16.2, the suitability of the attachment points for the use of PSAaf must be verified separately by the scaffolding erector/constructor. For attachment to the corner plate (overhead), at least two frames and one guardrail for connecting the frame must be fitted! The wedges of the guardrail fastening must be knocked in firmly, and the half-couplers of the double end guardrail firmly tightened. 6

Wilhelm Layher GmbH & Co. KG Scaffolding Grandstands Ladders Ochsenbacher Strasse 56 74363 Gueglingen-Eibensbach Germany P.O. Box 40 74361 Gueglingen-Eibensbach Germany Telephone +49 (0) 71 35 70-0 Telefax +49 (0) 71 35 70-265 E-Mail info@layher.com www.layher.com Ref. No. 8102.230 Edition 15.11.2013