Michael Gillam Deputy Program Director - Southern California

Similar documents
Environmental Impact Statement for the California High-Speed Rail System Burbank to Los Angeles Section, CA

California High-Speed Train Program FEIR/EIS

MEETING DATE: July 28, 2017 ITEM 20. Update on Coordination with the California High Speed Rail, Link US Projects, and Freight Railroads

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Welcome High Desert Corridor

ES.0 EXECUTIVE SUMMARY. ES.1 Los Angeles to San Diego via the Inland Empire Section HST Project Background

SB 375: California s Grand Experiment in Regional and Intergovernmental Planning. American Planning Association April 16, 2012

Richard Clarke Executive Director Program Management. Capital Program Management

Advancing Sustainable Design. Jeff Morales, Chief Executive Officer APTA Sustainability Workshop Monday, August 4, 2014

Welcome! Overview Agenda: 6:00 pm 6:30 pm: Welcome & Sign-In. 6:30 pm 7:00 pm: Link US Presentation. 7:00 pm 8:00 pm: Open House

Moving Towards the Future: The Era of High Speed Rail in the U.S.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

High Desert Corridor: Investment Grade Ridership & Revenue Forecasts

THIS PAGE INTENTIONALLY LEFT BLANK.

INCREASING CAPACITY ON THE SAN JOAQUIN CORRIDOR A PUBLIC-PRIVATE PARTNERSHIP

Presentation to the Streets and Freeways Subcommittee

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Interagency Meeting June 19, 2017

Central Valley Rail Working Group 1. INTRODUCTIONS

CALIFORNIA HIGH- SPEED RAIL PROGRAM UPDATE. October 9, 2018 SPUR, San Jose, CA

Metropolitan Bakersfield High-Speed Rail Terminal Analysis and Evaluation

TECHNICAL MEMORANDUM

Transit 101 A Legislative Briefing. March 24, 2015 Sacramento, CA

SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections

Economic Perspective PACIFIC RIM TRADE

Welcome High Desert Corridor

FACT SHEETS SAN BERNARDINO COUNTY

Peninsula Rail Program Project Update

Transit Works. Improving the quality of life for all Californians.

Appendix H References

Chapter 4 Future Demand Forecasts

William W. Hay Railroad Engineering Seminar. #2 Capacity Allocation in Vertically Integrated Railway Systems: A Sequential Bargaining Game Approach

E2 D0 U 1 C 3 A E T D IUOCNA A T IL O S N E A R L I E S S E R I E S HUB/DBE/SBE R A I L

Technical Memorandum 3 Executive Summary Existing Conditions and Constraints Presentation. March 22, 2006

Airports in the Region Case Study

NALEO ANNUAL CONFERENCE JUNE 24, Hasan Ikhrata, Executive Director Southern California Association of Governments

California State Rail Plan. Santa Cruz County Regional Transportation Commission November 2, 2017

Truck Management ` Strategies in Los Angeles

Riding HSR to a Sustainable Future

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Towards a Greener Southern California: Regional Transportation Plan/ Sustainable Communities Strategy

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

FACT SHEETS LOS ANGELES COUNTY

Importance of Railroad,Trucking, and Warehousing Data in Public Sector Decision Making

Funding Intelligent Transportation Systems in the Los Angeles Region

Goods Movement COLLABORATIVE AND PLAN. Arthur L. Dao, Alameda CTC Executive Director ALAMEDA COUNTY TRANSPORTATION COMMISSION. September 17, 2015

Strategic Transportation Plan FOCUS ON TRANSIT

TECHNICAL MEMORANDUM

CANNABIS CULTIVATION LAND

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Los Angeles Area Chamber of Commerce, 08/05/14

APPENDIX A. Analysis Of The High Speed Rail Authority s Planned Pricing William H. Warren July 2, Management Summary

WHILE LOCAL COMMUNITIES MAY NOT BE ABLE TO DIRECTLY INFLUENCE THE EQUIPMENT USED ON NEARBY RAIL CORRIDORS, LOCAL COMMUNITIES

STATEMENT OF QUALIFICATIONS

Environmental Report Checkpoint C Sacramento Summary Report Stockton Transbay Transit Center Modesto Millbrae-SFO San Jose Redwood City or Palo Alto

SR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014

Silicon Valley Rapid Transit Corridor Final Supplemental EIR

CMAA - BREAKFAST OF CHAMPIONS May 2, 2012

Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

CALIFORNIA ERIC GARCETTI MAYOR. April 6, 2017 NOTICE OF AVAILABILITY. Responsible Agencies, Trustee Agencies, Stakeholders and Interested Parties

MOBILITY PARTNERSHIP. Wednesday, August 16, 2017 MINUTES

CHAPTER 1 PROPOSED PROJECT

Pearson Realty. Kings and Tulare Counties, California. 5,813.68± Assessed Acres

Texas Transportation Forum The Fast Track: Passenger Rail In Texas. Federal Railroad Administration Karen Rae, Deputy Administrator

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address.

Coalition for America s Gateways and Trade Corridors

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003)

Imagine we could vote to truly, finally clean the air in Southern California... and at the same time catalyze the world to abate climate change.

Exposition Light Rail Transit Project

NORTHERN CALIFORNIA PROGRAM UPDATE

Peninsula Corridor Electrification Project. Draft Environmental Impact Report

Purpose and Organization PROGRAM ENVIRONMENTAL IMPACT REPORT. Native American Consultation Workshop

THE IMPLEMENTATION OF CALIFORNIA SB 743 REVISIONS TO TRANSPORTATION ANALYSES CONDUCTED FOR CEQA

1.1 Environmental Assessment/Environmental Impact Evaluation for the New Haven, Hartford and Springfield High-Speed Intercity Rail Project

Presentation Topics The Alameda Corridor Project Corridor Performance Goods Movement Challenges

INTERNATIONAL GREEN FREIGHT WORKSHOP: HOW GOVERNMENT CAN SUPPORT BUSINESS

Airport Metro Connector. Scoping Meeting February 23, 2015

Source: Utah Department of Transportation. Page 1

Metro Blue Line Improvements & Project Update

Caltrain Downtown Extension Project

Take Infill Score & Develop Action Plan

STAFF REPORT. MEETING DATE: March 6, 2013 AGENDA ITEM: 7

Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director

BNSF Railway. The West Coast is the Best Coast. Fred Malesa. Vice President International Marketing Oct. 11, 2011

Strategic Transportation Plan. Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc.

6. Cumulative Impacts

Economics and Alluvial Fans. Alluvial Fan Task Force Plenary Meeting 4 March 14, 2008

Southern California Leadership Council POSITION PAPER

INTELLIGENT TRANSPORTATION SYSTEMS APPENDIX

Capitol Corridor Vision Implementation Plan Vision for the Megaregion. CCJPA November 2017

Where Could SB 375 Take Us? The Land Use - Transport - Climate Connection Michael Woo, Los Angeles City Planning Commissioner

Catastrophic Response Planning

California Partnership for the San Joaquin Valley. Delivering Transportation Projects

Update and Status Report for the Comprehensive Transportation Plan. December 2, 2011

METROPOLITAN BAKERSFIELD GENERAL PLAN UPDATE GREATER BAKERSFIELD CHAMBER OF COMMERCE

Water for Southern California: How Bay-Delta is Key to All of the Above Strategy

CHAPTER 2.0: INTRODUCTION

CHAPTER 1 INTRODUCTION

Economic Development Planning, Summary 30

PREMIER DEVELOPMENT LAND (For Sale or Lease)

Transcription:

International Right of Way Association Los Angeles Chapter: C A L I F O R N I A H I G H - S P E E D R A I L Michael Gillam Deputy Program Director - Southern California January 25, 2011

A Statewide System High-speed rail systems are successful when connecting major metropolitan cities 300-500 miles apart Ridership/revenue is based on that point-to-point connection Phase 1 is San Francisco Bay Area to Los Angeles / Anaheim $42.6 billion estimate Build-out by 2020 Phase 2 would extend to San Diego and Sacramento

World High-Speed Railway Network Country Operating Miles Miles Under Construction Total miles/country China 2193 4161 6372 Spain 997 1373 2376 Japan 1524 367 1890 France 1163 145 1309 Germany 798 235 1003 Italy 574 0 574 Turkey 146 317 463 South Korea 205 51 256 Taiwan 214 0 214 Belgium 130 0 130 Netherlands 75 0 75 United Kingdom 70 0 70 Switzerland 22 0 22 Russia Under Construction Finland Under Construction CHINA - CHINA RAILWAYS CRH 3 ITALY - ETR 500 FRECCIAROSSA FRANCE- TGV

W h y W e N e e d I t Jobs 600,000 full-time, one-year, construction-related job-equivalents 5,000 permanent operations and maintenance jobs 450,000 indirect economy-wide jobs by 2035 Mobility Economic power is how fast you move people and goods around the state. Gov. Arnold Schwarzenegger, January 15, 2008. Environment Reduced greenhouse gases AB 32: California s 2006 landmark legislation to reduce greenhouse gas emissions 25% by 2020 P R E S E N T A T I O N T I T L E H E R E Subheads can go here

W h y W e N e e d I t T h e s t a t u s q u o i s n o t a n o p t i o n Population Growth California s population now: 38 million. By 2035: 50 million We can build P R E S E N T A T I O N T I T L E H E R E New freeways, airport runways and more departure gates to address our expected population growth Subheads can go here or 800-mile high-speed train system, powered by 100% renewable electricity generated by clean wind and solar energy

Background 2010 California has been awarded $3.18 Billion in ARRA funds for the high-speed train project, creating a total of $5.5 Billion in available funding. 2008 Voters approve Prop. 1A - $9.95 Billion bond for the High-Speed Rail Authority 2007-present Project-level EIR/EIS process 2005 Statewide EIR/EIS certified by CHSRA/FRA 2002-2005 Statewide (Program-level) EIR/EIS process 1996 California High-Speed Rail Authority created

M o m e n t u m In 2008 Californians passed Proposition 1A P R E S E N T A T I O N T I T L E H E R E $9.95 billion bond measure first state to pass funding in the nation The Federal Government supports helping fund the system through the American Recovery & Reinvestment Act Federal grant awarded in January 2010, $1.85 billion specifically for high-speed rail Largest award for high-speed train funding received by any state Private sector interest Subheads can go here Seeking $10-12B through public-private partnerships (P3) Request for Expressions of Interest issued spring 2008 Next: solicit preliminary comments on planned RFQ process in late 2010 International interest MOUs to share expertise with China, France, Germany, Italy, Japan, Korea, Spain and more.

E n v i r o n m e n t a l P r o c e s s State and Federal Requirements o National Environmental Policy Act (NEPA) o California Environmental Quality Act (CEQA) 2005 Statewide Environmental Analysis o Compared HST project alternative to a no HST project alternative and modal alternatives (expanding highways and airports): High-speed train project was determined to be the preferred alternative o Reviewed benefits and impacts of high-speed train from San Francisco / Sacramento to San Diego Current Environmental Process o Evaluating and narrowing potential alignment and station locations o Analyzing the potential local benefits and impacts of the high-speed train

E n v i r o n m e n t a l R e v i e w P r o c e s s ALT. SCOPING ANALYSIS DRAFT EIR/S FINAL EIR/S PROCESS Public & Agency Outreach Public & Agency Outreach Public & Agency Outreach CONCEPT ALTERNATIVES PRELIMINARY ALTERNATIVES ANALYSIS SUPPLEMENTAL ALTERNATIVES ANALYSIS Public & Agency Outreach Public & Agency Outreach Public & Agency Outreach

Phase 1- A Segmented Approach San Francisco-San Jose San Jose-Merced Merced-Fresno Fresno-Bakersfield Bakersfield-Palmdale Palmdale-Los Angeles Los Angeles-Anaheim

Subsequent Sections and Altamont Corridor Los Angeles-San Diego via Inland Empire Merced-Sacramento Altamont Corridor Rail Project (separate from high-speed train project)

F u n d i n g Projected overall cost: $42.6 billion California Funding: $9B Federal Funding: Local Funding: Private Investment: $17-19B $4-5B $10-12B

R e c o v e r y A c t F u n d i n g : W h e r e? Program Defined Selection Criteria Logical expansion/evolution of alignment to an operational HSR system Minimized construction risk Minimized schedule risk, to meet ARRA criteria of completion by fall 2017 Builds the most useful HST infrastructure at the least cost ARRA/FRA Requirements Construction must be completed by fall 2017 The project must have Operational Independence

T H E F I R S T S T E P T O A T R U E H S R S Y S T E M B E G I N N I N G I N T H E C E N T R A L V A L L E Y P R E S E N T A T I O N T I T L E H E R E Subheads can go here

C e n t r a l V a l l e y A l i g n m e n t

A l t e r n a t i v e 1 A l i g n m e n t S e l e c t e d D e c e m b e r 2, 2 0 1 0

W h y A l t e r n a t i v e 1? Makes best use of available funding Lays the foundation for expanding the track both north and south Includes the construction of two new stations one in downtown Fresno and the other east of Hanford and continues to Corcoran, north of Bakersfield Will create thousands of jobs in one of the areas in California hit hardest by the national economic recession

1 s t S e g m e n t o f H i g h - S p e e d R a i l i n C a l i f o r n i a Will use about $4.15 billion of the available $4.3 billion to build two new stations, acquire rights of way, construct viaducts, prepare the site, grade, restore vegetation, build rail bridges, realign roadways and relocate existing railways and utilities No construction can begin until the Authority completes its environmental reviews of the project The federal deadline for completing these reviews is September 2011, and construction is expected to begin in 2012 and finish in 2017

S o u t h e r n C a l i f o r n i a In Los Angeles County, the California High-Speed Train project will : Create 54,800 jobs by 2020; 96,300 jobs by 2035* Infuse an additional 2%-4% into the region s economic growth annually* Add $348 million per year to tax revenues by 2020* New visitors will help bring at least $360 million per year of new spending in the downtown LA area (US Mayor s Report) Every day 6,500 California residents will come to downtown LA for business and entertainment instead of going outside of California (US Mayor s Report) *Source: Unlocking the Gridlock in Los Angeles County s Transportation System: The Local Economic Benefits of High-Speed Rail

Southern California: Where Are We Now Transitioning from Planning to Implementation Developing collaborative planning agreements with regional governments Burlington Northern Santa Fe Corporation Gateway Cities Council of Government Orange County Transportation Authority Collaborative Planning Los Angeles County MTA Amtrak Metrolink

S o u t h e r n C a l i f o r n i a : W h e r e? Phase 1 Palmdale - Los Angeles Los Angeles Anaheim Phase 2 Los Angeles San Diego

P r e l i m i n a r y A l t e r n a t i v e s A n a l y s i s P a l m d a l e L o s A n g e l e s Sylmar to Palmdale New right-of-way generally following SR14 corridor 2 alignments west and east entering Palmdale 2 station options, 1 for each alignment alternative LAUS to SR 2 3 tunnel options on west bank crossing under the LA River to north of Rio de Los Angeles Park 1 surface/elevated option crossing the LA River to east bank running east or west side of Rio de Los Angeles Park SR 2 to Sylmar Share Metrolink right-of-way on dedicated high-speed train tracks 5 station options studied (Burbank Metrolink; Burbank Buena Vista; Branford Street; Pacoima Wash; San Fernando) Vertical profile variations compatible with station options, grade crossings

L o s A n g e l e s t o A n a h e i m S t u d y A r e a Parallels the existing Los Angeles-San Diego (LOSSAN) Passenger Rail Corridor 2005 Statewide Level EIR/EIS Grade separations at rail and road interfaces Studying dedicated and shared track options Operating speed of up to 110 mph between Los Angeles and Anaheim P R E S E N T A T I O N T I T L E H E R E Subheads can go here

L o s A n g e l e s t o S a n D i e g o v i a I n l a n d E m p i r e 170-Mile Corridor 515 miles of Alternatives 801 miles, including Design Options Mandated: 1 hour, 20 min. express 8 Stations 18 candidate sites 3 Caltrans Districts Districts 7, 8 and 11 Unique interface opportunity 4 Counties (TWG per county) Los Angeles, San Bernardino, Riverside, & San Diego Nearly 100 Cities Alignments run through: 19 Congressional Districts 23 State Senate 31 State Assembly

N E X T S T E P S 2012 EIR/EIS process complete in all Phase 1 sections, construction start-up for the first sections 2015 Begin testing the first prototype trainsets 2018-20 Launch operations on Anaheim-Los Angeles- San Francisco HST Line (in phases)

C o n t a c t U s For more information, please contact us: Web: http://www.cahighspeedrail.ca.gov Phone: (877) 583-0263 (media inquiry) or (916) 324-1541 (general inquiry) E-mail: los.angeles_anaheim@hsr.ca.gov los.angeles_san.diego@hsr.ca.gov