EXPERIENCE IN MANAGING CITARUM RIVER BASIN

Similar documents
IN JASA TIRTA II PUBLIC CORPORATION

INTEGRATED WATER RESOURCES MANAGEMENT IN CITARUM RIVER BASIN - INDONESIA

Member s Annual Report 2005

Foreword. Jatiluhur, February 26 th, JASA TIRTA II PUBLIC CORPORATION President Director, Ir. Djendam Gurusinga, Dipl. HE NIK.

Member s Annual Report 2009

Member s Annual Report 2007

THE THEMATIC WORKSHOPs of NARBO ACTIVITIES.

Thematic WS 3: Water-Food-Energy Nexus

Keywords - Integrated water resources management, decision support system, capacity development

SEDIMENTATION PROBLEM IN WEST TARUM CANAL WEST JAWA, INDONESIA. Endah Kurniyaningrum and Trihono Kadri

WATER SUPPLY OF JAKARTA

K water s s Collaboration Activity in the Citarum River Basin

NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS

Subject: - Development of Fisheries Floating Nets for Resettlement Program of Hydropower Project Cirata Dam

Jasa Tirta II Public Corporation I N D O N E S I A

Policy of Water related Disaster Preparedness in Indonesia

Keys for Success in IWRM in the Bengawan Solo River Basin

with the Decree of the Governor Head of Level I Region of East Java. Number: 59 of the year 1994

WATER RESOURCES MANAGEMENT IN THE 6 CIS RIVER BASIN TERRITORY

WATER ALLOCATION IN THE BRANTAS RIVER BASIN CONFLICTS AND ITS RESOLUTIONS

Conceptual modelling for improving quality of surface water abstraction in Jakarta, Indonesia

Decree of the Governor Head of Level I Region of West Java Number: 18 of 1994

Experiences in Mainstreaming CC into IWRM at CRB

CONCEPTUAL MODELING FOR MANAGEMENT OF THE CITARUM/CILIWUNG BASINS, INDONESIA. Y.R. Fares

EXAMPLE OF THE DECISION MAKING PROCESS. 1. Introduction

ROADMAP FOR INTEGRATED WATER RESOURCES MANAGEMENT IN THE CITARUM RIVER BASIN

Study on Effects of Land Use Change. on Hydrological Characteristic of Watersheds ADB. IN THE 6 CI's RIVER BASIN TERRITORY - PACKAGE B DRAFT REPORT

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR JATILUHUR IRRIGATION MANAGEMENT AND IMPROVEMENT (JIMI) - Content -

FIVE BASIC FOUNDATIONS CONCEPT FOR IRRIGATION MODERNIZATION IN INDONESIA

MANAGER TRAINEE AND CERTIFICATION

Special Seminar on Food Security: Focusing on Water management and Sustainable Agriculture

Support for Community and CSO Driven Initiatives for Improved Water Supply and Sanitation

Assessing Impact of Land Use and Climate Changes on River Flow and Electricity Generation: Case Study at Citarum Watershed of Bandung District

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

Krueng Aceh Irrigation Project

Ex-Ante Evaluation (for Japanese ODA Loan)

FLOOD HAZARD MAPPING INDONESIA

Water demand in the study area is projected for five areas as shown in Figure

A preliminary assessment towards integrated BBWQM through priority analysis in the UCR Basin, Indonesia

Ex-ante Evaluation. Indonesia have one of the important strategic programs of increasing stable water supply and

SOLUTIONS FOR SUSTAINABLE WATER USE AND MANAGEMENT IN DA NANG CITY

Technology Dynamics and Transition Management in China

UPSTREAM-DOWNSTREAM INTEGRATION Lessons Learned from INTERDAWM Project, Indonesia

Budhi Gunawan. Padjadjaran University. International Conference on Sustainability Science in Asia March 2011

Impact of Land Use Change and Land Management on Irrigation Water Supply in Northern Java Coast

Indonesia: Integrated Water Resources Management Program

Ex-Ante Evaluation (for Japanese ODA Loan)

Collaboration Effort to Maintain the Water Resources Degradation at Batu Municipality, East Java, Indonesia

Roadmaps for river basin development. CRBOM Small Publications Series No. 3. Sri Hernowo M

Rehabilitation of Irrigation and Flood Alleviation Works

WELCOME TO. The First General Meeting Network of Asian River Basin Organisation

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

IRRIGATION MANAGEMENT TO INCREASE AGRICULTURE PRODUCTION ( Indonesian Experiences)

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

Nam Theun 2. TNC workshop April 2014

Water Resources Management in Cambodia

ROADMAP FOR A BETTER FUTURE CITARUM

Pham Thi Nguyet Nga Vietnam Environment Administration (VEA) Ministry of Natural Resources and Environment (MONRE)

HYDRAULICS DIVISION. Assoc. Prof. Dr. Mustafa ERGİL. Assoc. Prof. Dr. Umut TÜRKER

Decision Making Structure For the Health Sector in Indonesia

Decree of the Governor Head of Level I Region of Central Java Number : 605.3/185 of 1994

APPENDIX DECREE NUMBER 112 IN 2003 ON STANDARD QUALITY OF DEMESTIC WASTE BY MINISTRY OF LIVING ENVIRONMENT

DR.FRANSISCA MULYANTARI

The NARBO TWINNING PROGRAM ACTIVITIES & 2007

Revitalizing Irrigation in Indonesia

BASIN WATER RESOURCES MANAGEMENT AND ORGANIZATION IN INDONESIA

ROLES OF RBOs OR PUBLIC AGENCIES ON WATER RESOURCES MANAGEMENT, WATER ALLOCATION AND RELATED ISSUES IN VIETNAM. Presented by NAM VU PHUONG

인도네시아찌다룸강유역거주자의수질관리인식도조사

Current State of Water in Myanmar

Water harvesting techniques for sustainable water resources management in catchments area

SHARING THE EXPERIENCES IN MODERNIZATION OF IRRIGATION SYSTEMS IN KOREA POPULATION IN THE WORLD

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, and RUDAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities

Water Security Agency. Plan for saskatchewan.ca

NATIONAL STRATEGIES. 5 th Regional Workshop, Southeast and Eastern Asia Safe and Productive use of Wastewater in Agriculture,

ENVIRONMENTAL and SOCIAL MANAGEMENT PLAN (ESMP)

Large Reservoir and Small Pump Capacity. Complicated Network of Drainage System. Planning without Consideration of Secondary and Tertiary Drains

RECONNAISSANCE STUDY OF THE INSTITUTIONAL REVITALIZATION PROJECT FOR MANAGEMENT OF FLOOD, EROSION AND INNER WATER CONTROL IN JABOTABEK WATERSHED

Session: For more information:

Ex-Post Monitoring for Completed ODA Loan Projects

Ex-ante Evaluation - 1 -

Aquatic Ecosystem Restoration:

FILE COPY. Document of The World Bank. Public Disclosure Authorized FOR OFFICIAL USE ONLY. Report No. 2232b-IND. Public Disclosure Authorized

STUDY ON FINAL REPORT SUMMARY. February 2013

The Study on Capacity Development for Jeneberang River Basin Management Final Report. Supporting Report L CORPORATE FINANCIAL PLAN

The 9th Disaster Risk Management Seminar

Improving Water Security for the future through IWRM and better Water Governance in the Red Thai Binh river basin (Vietnam)

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

ROLES AND EFFORTS OF THE IRRIGATION SECTOR IN MYANMAR AGRICULTURE PRACTICE

Study on Economic Partnership Projects. in Developing Countries in FY2007. Study on Construction of Underground Flood Retention. Ponds in DKI Jakarta

Autumn 2004 (Network of Asian River Basin Organizations) NARBO Newsletter Third Issue

Water Management in Phuket. Water Management in Phuket

Rural & Agricultural Water Resource Information System in KOREA

m:..district Agriculture an<lforestry Of.fkes

Management of Water Resources in Cyprus

DROUGHTS, SALTWATER INTRUSION IN VIETNAM. 7-9 June 2016 Bangkok, Thailand

Pamarayan Ciujung Irrigation System Rehabilitation Project

IWRM IMPLEMENTATION & CAPACITY BUILDING IN RBO

GOVERNMENT OF THE ARAB REPUBLIC OF EGYPT

NCICD From planning to Implementation

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Report No.: AB5273 Project Name Water and Irrigation Sector Management Program 2 (WISMP 2) Region

Transcription:

JASA TIRTA II PUBLIC CORPORATION EXPERIENCE IN MANAGING CITARUM RIVER BASIN Bangkok Chiang Mai, Thailand July 26 th August 6 th 2004 Integrated Waetr Resources Management (IWRM) Training Course

ORIENTATION MAP WEST JAVA PROVINCE Indonesian Archipelago Western part of the world Java island West Java Province

CITARUM RIVER BASIN

HISTORICAL BACKGROUND Based on the study paper writen by Prof.Dr.Ir. W.J.van Blomestein, presented in Paris Seminar (1948) with the title Integrated Water Resources Development in the Western Part of Java Island (514,000 ha.of paddy field); Reviewed by Ir.van Schravendijk in 1956 in the form of Integrated Water Resources Development in Citarum River Basin (240,000 ha of paddy field); Designed and supervision by Coyne et Bellier Consultant (COB) of France; Construction by Compagnie Francaise d Enterprise (CFE),Paris of France; Financed by Bilateral Loan from France Government.

CITARUM RIVER BASIN AREA Propinsi Banten JAKARTA, SWS Citarum & Sebagian SWS Ciliwung Cisadane Bandung Bandung Propinsi Jawa Barat

HISTORY OF CITARUM WATERSHED MANAGEMENT CONTRUCTION PERIOD Jatiluhur Multipurpose Project (1956-1967) OPERATION AND MAINTENANCE PERIOD Jatiluhur State Owned Company (1967-1970) Government Regulation (GR) No. 8/1967, 24 Juli 1967 Jatiluhur Authority Public Corporation GR 20/1970, 23 Mei 1970 GR 35/1980, 13 Oktober 1980 GR 42/1990, 23 Agustus 1990 Jasa Tirta II Public Corporation GR 94/1999, 13 Oktober 1999

SCHEME OF JATILUHUR WATER RESOURCES SYSTEM JAVA SEA CBL (Q max 800 m3/det) Q maks 1600 m3/det Saluran Tarum Utara Cab Barat Kedung Gede Saluran Tarum Utara Cab Timur Q maks 678 m3/det Q maks 300 m3/det B. Walahar Saluran Tarum Utara Ciherang B. Jengkol Q maks 350 m3/det Q maks 1050 m3/det Cipunegara B. Lebiah B. Gadung B. Bekasi B. Karang Saluran Tarum Barat Saluran Tarum Timur Cilamaya Ciasem Cilalanang B. Curug B. Salamdarma Ciliwung B. Beet B. Barugbug K. Bekasi Cikarang Cibeet Citarum Cigadung Waduk Ir. H. Djuanda Volume 2,5 M m3 ( + 107.00 m ) Cijengkol Waduk Cirata Volume 1,9 M m3 ( + 220.00 m ) Waduk Saguling Volume 0.9 M m3 ( + 643.00 m )

SAGULING DAM

CIRATA DAM

JATILUHUR DAM

CURUG WEIR West Tarum Canal Citarum River to Walahar Weir East Tarum Canal

SALAM DARMA WEIR (Cipunegara River) EAST TARUM CANAL Cipunegara River Bugis Main Canal (Secondary Irrigation Canal)

BEKASI WEIR

WALAHAR WEIR

MACAN WEIR

BARUGBUG WEIR

CIBEET WEIR

IRRIGATION TERTIER CANAL

FARMING AREA AND TERTIER CANAL

WATER RESOURCES INFRASTRUCTURE MANAGED BY PJT II No Description Unit Quantity 1 Large dam Nos 1 2 Small dam Nos 6 3 Weir Nos 34 4 Primary diversion structure Nos 100 5 Secondary diversion structure Nos 895 6 Romijn Gate Nos 2,894 7 Primary siphon Nos 10 8 Secondary siphon Nos 14 9 Primary Drop Structure Nos 1 10 Secondary Drop Structure Nos 68 11 Silt trap Nos 11 12 Primary box culvert Nos 139 13 Secondary box culvert Nos 264 14 Electric pump station Nos/unit 2/10 15 Hydraulics pump unit 17 16 Raw water pipe line Km 30 17 Primary canal Km 236 18 Secondary canal km 1,430 19 Inspection road km 1,365 20 Primary drainage canal km 569 21 Secondary drainage canal km 2,104

Water Balance in Citarum River Basin (from 1990 to 2002) ANNUAL FLOW ( Million m 3 /year) Utilization (Million m 3 /year) Year Citarum River Other Rivers Total Irrigation Domestic Industrial Total Water Balance 1990 5.452,8 3.857,5 9.310,3 5.702,7 204,6 81,3 5.988,6 3.321,7 1991 5.561,3 3.901,5 9.462,8 5.563,6 235,3 108,2 5.907,1 3.555,7 1992 7.463,0 6.407,0 13.870,0 5.619,9 198,5 117,5 5.935,9 7.934,1 1993 8.478,7 6.660,4 15.139,1 5.053,2 249,7 110,6 5.413,5 9.725,6 1994 7.235,3 5.167,4 12.402,7 5.418,7 331,3 126,8 5.876,8 6.525,9 1995 6.544,2 5.841,2 12.385,4 6.113,4 294,3 147,4 6.555,1 5.830,3 1996 6.864,3 6.062,8 12.927,1 6.789,6 331,3 137,9 7.258,8 5.668,3 1997 4.644,2 3.236,2 7.880,4 5.472,1 395,3 155,9 6.023,3 1.857,1 1998 6.661,4 6.442,6 13.104,0 7.151,1 448,1 149,4 7.748,6 5.355,4 1999 5.587,0 4.692,4 10.279,4 5.687,6 422,9 153,8 6.264,3 4.015,1 2000 4.966,6 5.505,9 10.472,5 5.978,3 428,2 164,7 6.571,0 3.901,5 2001 7.122,3 6.461,9 13.584,2 6.317,1 471,2 196,4 6.984,8 6.599,4 2002 5.540,1 5.882,0 11.422,1 5.781,6 522,2 203,6 6.507,4 4.914,7

Trend of Water Balance in Citarum River Basin (From 1990 to 2025 ) No. DESCRIPTION 1990 2005 2025 m 3 /s 10 6 m 3 m 3 /s 10 6 m 3 m 3 /s 10 6 m 3 1. SOURCES: Citarum and its Reservoirs 182.33 5,750.00 182.33 5,750.00 182.33 5,750.00 Other rivers 60.25 1,900.00 61.83 1,950.00 63.42 2,000.00 2. DEMANDS: Irrigation 177.30 5,591.71 175.00 5,518.80 168.00 5,298.05 Industry 7.91 249.45 15.00 473.04 25.00 788.40 Drinking water 9.77 308.11 21.30 671.72 45.00 1,419.12 Fisheries 1.00 31.54 10.00 315.36 20.00 630.72 Flushing 2.00 63.07 10.00 315.36 15.00 473.04 Peak Load 9.51 300.00 3.17 100.00 0.00 0.00 3. WATER BALANCE: Sources 242.58 7,650.00 244.16 7,700.00 245.75 7,750.00 Demands 207.49 6,543.88 234.47 7,394.28 273.00 8,609.33 Water Balance 35.09 1,106.12 9.69 305.72 (27.25) (859.33) source: BCEOM, 1990

WATER RESOURCES POTENTIAL IN CITARUM RIVER BASIN Total ± 12.95 Billion m 3 /tahun Consist of : Citarum River 6 Bm 3 /year and Other rivers 6.95 Bm 3 /year Regulated 7.65 Bm 3 /year equal to 59.07% (from Citarum ± 6 Bm 3 /year and other rivers ±1.65 Bm 3 /year) Unregulated ± 5.3 Bm 3 /year equal to 40.93% (wasted to the sea) Plantation 0.66% Jakarta Water Supply 5.9% Distric Water Supply 0.83% Industries 2.78% Irrigation 89.83%

TASKS AND RESPONSIBILITIES OF JASA TIRTA II PUBLIC CORPORATION 1. Operation and maintenance of water resources infrastructures in the Citarum River Basin and Ir. H. Djuanda hydro-electric power plant. 2. To do business in water resources and hydro-electric power generation. 3. Watershed management includes conservation, development, and utilization of water and water resources in Citarum River Basin. 4. Rehabilitation on water resources infrastructures and hydro-electric power plant as well.

BENEFIT OF CITARUM WATER RESOURCES DEVELOPMENT Flood occurs during rainy season that inundated 20,000 ha of fertile land in the plain could be minimized; Technically irrigated of agricultural area of 296,000 ha with two crops annually, produce 3 million of hull equal to Rp 4.50 trillion Raw water supply for domestics and municipalities especially for Jakarta, the capital city of Indonesia, 435 million m 3 /year equal to 80% of total requirement; as well as for strategic industries along the north plain area of West Java of about 300 million m 3 /year. Hydropower plant with the installed capacity of 150 MW; Fresh water as well as brackish water fisheries development in coastal c area; Beautiful scenery surrounding the reservoir for tourism and water r sport

Organizational Chart Of Jasa Tirta II Public Corporation MINISTRY OF FINANCE MINISTRY OF Resettlement& Reg. Infra MINISTRY OF STATE OWN COMPANY BOARD OF SUPERVISOR PRESIDENT DIRECTOR BOARD OF DIRECTORS INTERNAL SUPERVISION UNIT TECHNICAL DIRECTOR OPERATION & MAINTENANCE DIRECTOR ADMINISTRATION & FINANCE DIRECTOR BUREAU OF RESEARCH & DEVELOPMENT BUREAU OF GENERAL AFFAIR BUREAU OF EXPLOITATION & MAINTENANCE BUREAU OF FINANCE BUREAU OF PLANNING BUREAU OF HUMAN RESOURCES DIVISION I, II, III, IV UPPER CITARUM DIVISION QUALITY MANAGEMENT UNIT TOURISM DEVELOPMENT UNIT SMALL INDUSTRY AND COMMUNITY DEVP. UNIT

CHART OF RESPONSIBILITY CITARUM RIVER BASIN MANAGEMENT CENTRAL Ministry of Public Works National WRM Planning DGWRD Ministry of Mining Groundwater Ministry of Home Affairs State Ministry pf Planning (Bappenas) National Spatial Planning State Ministry for the Environment (Bapedal) National Environment al Planning Directorate for WRM and Conservation (PPSDA) PROVINCE Provincial WRM Committee (PTPA) GOVERNOR Regional MPW office (Kanwil) (planning & Programing) Provincial Dinas Pengairan Provincial Dinas Planning (Bappeda) Provincial Dinas Environmnet (Bapedalda) SWS CITARUM PJT II Technical basin management unit Basin WRM Committee (PTPA) Other Basin DISTRICT BUPATI Water users (PAM, agriculture, Industry) Farmer Water User Association District Dinas Pengairan District Irrigation Committee Command line Guidance Consultation & Coordination

81.51% Irrigation Infrastructure OPERATION AND MAINTENANCE INFRASTRUCTURES COST (Ideal + US $ 20.12 million) PJT II is only capable to provide funding 30% of ideal cost Note: 1 US$ = Rp. 8,500.00 5.52% Hydro-electric Plant 12.97% Main Infrastructure

REVENUE OF JASA TIRTA II PUBLIC CORPORATION (in 2002) Rp. 33.1 B (US $ 3.88 M) 25% Rp. 1.5 B (US $ 0.17 M) 1% Rp. 5.5 B (US $ 0.65 M) 4% Rp. 92.5 B (US $ 10.9 M) 70% Revenue in 2002 Rp. 132.6 Billion equal to USD ±15.6 Million HEP DMI Tourism Others

PROFIT AND LOSS JASA TIRTA II PUBLIC CORPORATION IN THE YEAR 1992-2000 NO EXPLANATION 1992 1993 1994 1995 1996 1997 1998 1999 2000 I INCOME 1 ELECTRIC POER 17,200.92 18,579.12 18,633.20 17,798.60 19,317.50 27,569.80 47,486.40 42,999.40 61,897.08 2 RAW WATER 6,398.76 7,584.92 10,394.94 10,053.40 12,219.00 17,483.70 20,488.10 19,190.20 24,311.80 3 TOURISM 636.34 962.80 809.41 687.70 832.90 1,066.40 513.50 729.00 1,268.18 4 OTHER SERVICE 11,060.98 11,134.91 9,901.18 11,584.80 11,991.90 12,352.60 13,083.50 19,567.30 17,388.76 TOTAL I 35,297.00 38,261.75 39,738.73 40,124.50 44,361.30 58,472.50 81,571.50 82,485.90 104,865.82 II LOAD 1 EMPLOYEE 11,333.96 12,016.32 11,638.20 11,597.90 12,149.50 25,908.40 22,336.80 20,093.74 24,738.28 2 UNEMPLOYYE 9,896.38 10,642.50 11,455.59 18,383.70 21,758.80 21,522.40 22,729.00 24,720.60 34,098.68 3 DEPRE.+AMORT. 2,224.84 2,520.00 2,757.70 2,938.00 3,205.50 3,815.00 6,602.20 6,758.28 7,968.62 4 OTHER 5,214.10 6,784.88 6,436.90 3.38 71.43 0.00 15,662.00 21,343.40 17,146.62 TOTAL II 28,669.28 31,963.70 32,288.39 32,922.98 37,185.23 51,245.80 67,330.00 72,916.02 83,952.20 III LOSS / PROFIT 6,627.72 6,298.05 7,450.34 7,201.52 7,176.07 7,226.70 14,241.50 9,569.88 20,913.62 IV TAX 2,610.00 2,466.13 3,075.43 2,074.90 1,842.70 1,851.30 3,575.50 1,315.90 4,019.04 V NET PROFIT 4,017.72 3,831.92 4,374.91 5,126.62 5,333.37 5,375.40 10,666.00 8,253.98 16,894.58 VI CORRECTION 0.00 0.00 0.00 1,570.30 254.70 65.10 74.80 1.10 279.23 VII END PROFIT 4,017.72 3,831.92 4,374.91 3,556.32 5,078.67 5,310.30 10,591.20 8,252.88 16,615.35

THANK YOU See You Next Time JASA TIRTA II PUBLIC CORPORATION JATILUHUR Purwakarta West Java