Decision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013

Similar documents
Harvest Operations Corp.

Signalta Resources Limited

C&B Alberta Solar Development ULC

NaturEner Wild Rose 1 Energy Inc.

Decision B. St. Pierre kW Photovoltaic Micro-Generation System. May 15, 2013

NOVA Chemicals Corporation

Aquatera Utilities Inc.

Grande Prairie Generation, Inc.

Seven Generations Energy Ltd.

Pembina NGL Corporation

SunEEarth Alberta Solar Development Inc.

EPCOR Distribution & Transmission Inc.

Suncor Energy Inc. Errata to Decision Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment

The City of Red Deer

ENMAX Power Corporation

Decision MEG Energy Corp. Amend Christina Lake Industrial System Designation. December 15, 2011

Alberta Electric System Operator Needs Identification Document Application

C&B Alberta Solar Development ULC

Decision D The City of Calgary. Bonnybrook Cogeneration Expansion Project. May 17, 2018

C&B Alberta Solar Development ULC

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document

Burdett Solar GP Corp.

Pteragen Canada Inc.

Greengate Power Corporation

Decision Cenovus FCCL Ltd.

Nexen Inc. OPTI Canada Inc.

Grizzly Oil Sands ULC

Solar Krafte Utilities Inc.

Oldman 2 Wind Farm Limited

Canadian Natural Resources Limited

Alberta Power (2000) Ltd.

Nexen Inc. and CNOOC Canada Inc.

Connacher Oil and Gas Limited

Pengrowth Energy Corporation

C&B Alberta Solar Development ULC

Decision FortisAlberta Inc. Micro-Generation Determination. December 16, 2008

Decision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018

Oldman 2 Wind Farm Limited

AltaGas Utilities Inc.

TransAlta Corporation

AltaGas Utilities Inc.

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

EDF EN Canada Development Inc.

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Renewable Energy Services Ltd.

Up to 9.5MW AC solar project located near Burdett, Alberta

Decision Syncrude Canada Ltd. Mildred Lake Power Plant. July 17, 2014

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Notice of Technical Meeting

Decision D Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints

ATCO Electric Ltd. ATCO Gas (a division of ATCO Gas and Pipelines Ltd.) ENMAX Power Corp. EPCOR Distribution and Transmission Inc. FortisAlberta Inc.

Alberta Electric System Operator AltaLink Management Ltd. Alberta-Pacific Forest Industries Inc.

Your guide to the. SOUTHERN ALBERTA Transmission Reinforcement

Alberta Electric System Operator

COMMUNITY FUND AND INVOLVEMENT

ATCO Gas and Pipelines Ltd.

Ellerslie Substation Expansion

Canadian Natural Resources Limited

HYDRO AND ELECTRIC ENERGY REGULATION

Welcome to our Open House!

ALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATIONS NO AND ENVIRONMENTAL IMPACT ASSESSMENT

SUNDANCE 7 January 2014

E.L. SMITH SOLAR FARM PROJECT UPDATE

October 30, 2012 Our File:

Grand Valley Wind Farms Phase 3 Wind Project Wind Turbine Specification Report

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

SUNCOR ENERGY CEDAR POINT WIND POWER PROJECT DESIGN AND OPERATIONS REPORT. Attachment D. Property Line Setback Assessment

EOG Resources Canada Inc.

Proposed Enhance CO 2

CITY OF EDMONTON ANNEXATION APPLICATION APPENDIX 1.0 SE NOTICE OF INTENT TO ANNEX (MARCH 2018)

PROTOCOL FOR THE DEVELOPMENT OF TELECOMMUNICATION TOWERS IN THE TOWN OF MIDLAND

E.L. Smith Solar Farm Project Open House. Lower Level

ATCO Gas and Pipelines Ltd. (South)

AREA STRUCTURE PLAN SW W4M CAMROSE COUNTY BYLAW ## JULY 2017(REVISED) PREPARED BY: AUSTROM CONSULTING &VICINIA PLANNING & ENGAGEMENT INC.

Proposed Boykins Substation Microwave Tower May 31, 2017

The Meeting was called to order by the Reeve, Steve Wikkerink at 9:01 A. M. Keith Bodin, Municipal Supervisor Paula Mueller, Executive Assistant

Alberta Electric System Operator

THE PROJECT. What is happening? Why is this facility needed? Why did you choose this location?

Environmental Assessment Program

# 14 ) ZN AMERICAN DIALYSIS CENTER OF NORTH LAS VEGAS M-2, GENERAL INDUSTRIAL DISTRICT TO M-1, BUSINESS PARK INDUSTRIAL DISTRICT PUBLIC HEARING

Directive 026: Setback Requirements for Oil Effluent Pipelines

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

Project Location. The CEC is a 320 MW combined-cycle power generation

Environment ENVIRONMENTAL PROTECTION ORDER NO. EPO SSR. Sears Canada Inc. [Sears] C/O. Lloyd McLellan. Eli Consulting Canada Inc.

Land Use Amendment in East Shepard Industrial (Ward 12) at multiple addresses, LOC

TransAlta MidAmerican Partnership

EDP Renewables SH Project GP Ltd.

CALGARY METROPOLITAN REGION BOARD REGULATION

OUTDOOR STORAGE/RECREATIONAL VEHICLES

Proposed Southampton Substation Microwave Tower May 31, 2017

D-1. SOUTH PEACE EAST AND WEST SOP PROJECTS PATRICK HENN, DEVELOPMENT MANAGER PRRD Board of Directors Meeting, April

SemCAMS Area Project Description

Lakeshore Looks to the Future with Renewable Energy

SPRINGBANK Phase 1 Background Report

Include this form in your application submittal.

STAFF REPORT. Planning Commission. Anjanette Simon, Associate Planner

Franklin County Communique to the Planning Board

Municipal Council Support Resolution. Information Package

2.04 Applicability. This ordinance applies to all unincorporated lands within the boundaries of Henry County.

The rezoning application and proposed transportation facility warrants consideration.

Transcription:

Decision 2013-027 Brooks Solar Power Plant January 31, 2013

The Alberta Utilities Commission Decision 2013-027: Brooks Solar Power Plant Application No. 1608532 Proceeding ID No. 1938 January 31, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: 403-592-8845 Fax: 403-592-4406 Website: www.auc.ab.ca

The Alberta Utilities Commission Calgary, Alberta Decision 2013-027 Application No. 1608532 Brooks Solar Power Plant Proceeding ID No. 1938 1 Introduction 1. (GTE) filed an application with the Alberta Utilities Commission (AUC or the Commission) on June 11, 2012 requesting approval to construct, connect and operate a solar power plant (power plant) in the Brooks area. The application was filed in accordance with sections 11 and 18 of the Hydro and Electric Energy Act. 2. The proposed solar power plant would be located on a 78 acre parcel of land located in the southwest quarter of Section 3, Township 19, Range 14, west of the Fourth Meridian. 3. The power plant would consist of 57,600 solar panels with a total generating capacity of 15 megawatts (MW). The solar panels, when installed, would be up to six metres in height. A 2.1 metre fence would be installed on the property line to provide public safety and security. A combination of coniferous and deciduous trees will be placed in areas around the property to enhance the appearance of the site. 4. The proposed power plant would be located east of the town of Brooks on industrial zoned land with the Trans-Canada highway bordering the southwest side of the site. Other properties surrounding the site are farm and pasture land. There is one residence located north of the plant site. 5. The power plant would be connected to FortisAlberta Inc. s (Fortis) distribution system in the southwest quarter of Section 3, Township 19, Range 14, west of the Fourth Meridian, immediately north of the power plant site. The existing distribution line would be rebuilt with larger conductors to accommodate the connection of the power plant. Fortis agreed to facilitate the connection. 6. As part of its public consultation, GTE held a meeting in January 2012 at the Lakeside Recreation Centre in Brooks. Notice of the meeting and project information were sent by mail to all residents, occupants and landowners within 800 metres of the site. The meeting notice was also placed in two local newspapers approximately one month before the public consultation meeting. 7. A development application was filed with the county of Newell. The county of Newell approved the application on July 19, 2012. 8. Alberta Environment and Sustainable Resource Development and the Canadian Environmental Assessment Agency assessed the project and determined that an environmental impact assessment was not required. AUC Decision 2013-027 (January 31, 2013) 1

Brooks Solar Power Plant 9. A Historic Resources Act clearance application was submitted on November 21, 2011. Alberta Culture advised that there are no historical resources on the site. 10. GTE provided a noise impact assessment in the application which indicated that the noise levels were predicted to be in compliance with AUC Rule 012: Noise Control (AUC Rule 012). 11. Notice of the application was issued on October 10, 2012. Two persons objected to the application and one party wrote expressing their support for the project. Following discussions with the applicant, one of the parties withdrew their objection. The remaining party objecting to the application submitted that the proposed power plant would affect property values should it be developed for residential use in the future. The Commission wrote to the intervener on December 12, 2012, asking them to confirm if their objection remained following the discussion with GTE and if they wanted the Commission to consider their objection in a hearing. The Commission did not receive a response by the December 21, 2012 deadline date, or later. 2 Findings 12. The Commission has reviewed the application and determined that the technical, siting, and environmental requirements of the Hydro and Electric Energy Act and AUC Rule 007: Applications for Power Plants, Substations, Transmission Lines, and Industrial System Designations (AUC Rule 007) have been met. 13. The Commission finds that GTE s public involvement project was reasonable and consistent with the requirements of AUC Rule 007. 14. Because the Commission did not receive a response to its December 12, 2012 letter confirming the intervener s objection and their view on the need for a hearing, the Commission finds that it was not necessary to hold a public hearing. 15. The Commission considered the mitigation measures proposed by GTE to address the environmental issues associated with the project. The Commission is satisfied that the project would not cause any adverse environmental impact. 16. The Commission accepts the results of the noise impact assessment whereby the predicted noise levels are predicted to be in compliance with AUC Rule 012. 17. The Commission also notes that various government agencies were consulted in respect of the project and that no agencies raised any concerns with the project. 18. Based on the foregoing, the Commission considers the project to be in the public interest in accordance with Section 17 of the Alberta Utilities Commission Act. 2 AUC Decision 2013-027 (January 31, 2013)

Brooks Solar Power Plant 3 Decision 19. Pursuant to sections 11 and 18 of the Hydro and Electric Energy Act, the Commission approves Application No. 1608532 and grants GTE the approvals set out in Appendix 1 Brooks solar power plant Approval No. U2013-40, and Appendix 2 Brooks solar power plant connection Order No. U2013-41 (the appendices will be distributed separately). Dated on January 31, 2013. The Alberta Utilities Commission (original signed by) Anne Michaud Commission Member AUC Decision 2013-027 (January 31, 2013) 3