Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.

Similar documents
Asbestos Management Program

ASBESTOS MANAGEMENT PROGRAM. Carleton University

Asbestos Management Program

ASBESTOS MANAGEMENT PLAN PROCEDURE

University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES

Asbestos Management Program

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

Page No.: 1. Subject:

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES

In general, the management plan development process consisted of:

UI Procedures for Asbestos Management

3. Asbestos Handling Program

INTRODUCTION TO THE PROGRAM

1.1 SUMMARY.1 Comply with requirements of this Section when performing following work:

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials

Appendix B PROCEDURES FOR REMOVAL OF MOULD-CONTAMINATED MATERIALS

These procedures are to be followed by all persons required to perform the following work:

Asbestos Management Program

Office of Environmental Health and Safety 1.0 INTRODUCTION

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

A Guide to the Regulation Respecting Asbestos on Construction Projects and in Buildings and Repair Operations. November 1, 2007

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

Certification Number: NAT Lead Renovation, Repair and Painting Program

BASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION

"ASBESTOS AWARENESS IN THE WORKPLACE"

Project 6668 Kerrisdale Senoirs Centre-5851 West Boulevard,Vancouver, BC Division 02080

Asbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016

Ministry of Education St Albans Primary School. Asbestos Assessment 7 th of October 2015

EXPOSURE CONTROL PLAN

Asbestos Management System

SECTION 16 ASBESTOS MANAGEMENT

Read Health Canada s Tools for schools Action Kit s Introduction, Backgrounder and pages 14-3 to

Asbestos Management Plan

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT

Project 6668 Second beach Concession-Stanley Park Drive,Vancouver, BC Division 02080

DP ASBESTOS MANAGEMENT

EPA s Lead Program Rule At-A-Glance

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL

MOLD REMEDIATION PROCEDURES

UW ASBESTOS MANAGEMENT PLAN MARCH 21, Scope: 2. Purpose. 3. Definitions / Acronyms

LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER B-4

Asbestos Policy & Guidance

Asbestos Policy & Guidance

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

Asbestos Management Program

PIGEON DROPPINGS CLEAN UP WORK TABLE OF CONTENTS

Asbestos The New Rules

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2065

GENERIC ASBESTOS OPERATION AND MAINTENANCE (O&M) PLAN

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Removing asbestos in workplaces

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

Ensure policy is adhered to by all employees. Follow policy requirements.

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

HMIS Quick Reference Guide

POLICY FOR SAFE WORKING WITH ASBESTOS AT THE CANADA SCIENCE AND TECHNOLOGY MUSEUM CORPORATION

Section Asbestos Removal

LEAD HAZARD CONTROL PROGRAM

Asbestos Management Policy

Standard Operating Procedures for the Control of Lead During Building Maintenance and Construction Activities. Type 1 Lead Operations

Asbestos. Rules of Abatement. What you need to know about removal and maintenance

ASBESTOS CONTAINING MATERIALS (ACM) REFERENCE GUIDE. Environmental Health & Safety Office

Asbestos Elevator Industry Workshop November 25, 2015

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario

Addendum Number One. USC Preston College Bathroom and Flooring Renovations Part II Project Number: H SG

Work Plan dated February 17, Prepared by Axiom Partners, Inc. Stephen E. Minassian Massachusetts Asbestos Designer License #AD051928

Asbestos Management Policy

Asbestos Awareness Program

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION

Asbestos Management Plan

Asbestos cement products in your home

Resource Center. Investigation Areas

Flood / Mold Remediation (FMR) 29 CFR

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

FACILITY ASBESTOS MANAGEMENT PLAN

Asbestos Operating Plan. Keesler AFB

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following Work:

Removing asbestos in workplaces

ARTICLE 4: ASBESTOS CONTROL STANDARDS

FactSheet Protecting Workers from Asbestos Hazards

CORPORATE Asbestos Management Program. Homestead Land Holdings

ASBESTOS MATERIALS REVIEW

Developed and Presented by: Wisconsin Healthcare Engineering Association

Safe handling of asbestos waste at civic amenity (CA) sites

ASBESTOS DISPOSAL INFORMATION (Revised 07/15/18)

Asbestos Policy and Management Plan

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) OSHAD-SF Technical Guideline

EPA s New Renovation, Repair and Painting Rule

Occupational Health and Safety June 2009 ASBESTOS MANAGEMENT PROGRAM

Poisonings from Housing. A Regulatory Update

Asbestos Exposure. COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

Guide for Asbestos Management

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

Module 3: Asbestos. 15 th Annual OSC Readiness Training Program.

APPENDIX D1. ASBESTOS NESHAP 40 CFR 61 Subpart M PRE CAA90 40 CFR PART 61 NESHAP

Transcription:

Thames Valley District School Board PROCEDURE Title ASBESTOS PROCEDURES Procedure No. 2005a Department ORGANIZATIONAL SUPPORT SERVICES (HUMAN RESOURCES) Reference(s) Policy: Health and Safety - Occupational Health and Safety Act Reg 838/288 Asbestos on Construction Projects and in Buildings and Repair Operations Effective Date 2001 March 5 The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation. Facility Services will ensure that all Asbestos is identified, monitored and maintained in non-friable condition. (Appendix A) Facility Services will provide a copy of the Asbestos Inventory including any update on removal and condition of the Asbestos to: - The Facility Manager/Principal (to be kept in General Office Files); - The Custodian at the facility (to be kept in a lock box location for access of service providers, contractors, maintenance staff); - The Health and Safety Department (to be kept in General School Files); - The Zone Office Facility Services; - The Master copy is to be kept by Facility Services. The condition of Asbestos within a Board owned building will be monitored by the Charge Custodian on a bimonthly basis, records of these inspection will be forwarded to the facility Principal/Manager, and a copy forwarded to Facility Services (Appendix B) Principals/Building Managers will ensure all staff are aware of the location of asbestos within their facility, have access to the Asbestos Inventory and have a procedure for reporting abnormalities in the condition of the asbestos within their work site. Any abnormalities in the condition of the asbestos is to be reported to the Maintenance Leader on an emergency work order. If the situation warrants, the area surrounding the disturbed asbestos will be sealed off until repairs are completed. Administered By ORGANIZATIONAL SUPPORT SERVICES (HUMAN RESOURCES) Board Resolution No. Amendment Date(s) 2001 June 26 Amendment Resolution No. Page 1 of 8

Board Personnel and Service Contractors are to review the Asbestos Inventory, and use the Ceiling Entry Procedures (Appendix C), if asbestos is present in the ceiling/ceiling space prior to disturbing any suspended ceiling. The Joint Health and Safety Committees will be notified of scheduled Type 3 asbestos removals. Page 2 of 8

Appendix A Asbestos Inventory Board Owned Buildings Section 5 of the Asbestos on Construction Projects and in Buildings and Repair Operations requires that each building owned by the Board have an inventory which details the location and condition of asbestos containing construction materials within the building. Four copies of the inventory will be provided: The Master copy is to be located at Central Facility Services A copy is to be located in the Safety Department, TVDSB Education Centre A copy will be kept by the Charge Custodian at the building inventoried and, One copy will be kept by the Principal at the building inventoried in the School s Central Office Filing under A Asbestos. The Zone Office Facility Services As the condition and status of asbestos materials in a building change through remediation, demolition or degradation, Facility Services will ensure that copies of the changes are forwarded to the Safety Department, Custodian and Principal/Building Manager, Master File and Facility Services Zone Office to be affixed to the Inventory as an Appendix. A copy of the Asbestos Inventory will be provided by Facility Services, to all contractors prior to any building renovations or alterations being tendered or contracted for any area or system in a facility in which asbestos is listed on the inventory. The Custodian s copy of the Asbestos Inventory will be shared by the Custodian with Board Maintenance and Custodial workers assigned duties within the building. The Principal will ensure that all staff within the building are familiar with the Asbestos Inventory and Asbestos Procedures, the location of the inventory and the location and condition of asbestos within their work area. All lease, building rentals and use agreements will advise the user that there is/is not/maybe, asbestos containing building materials within the area they are to occupy, provide access to the inventory and detail a procedure for remediation in the event that asbestos is disturbed during their occupancy. Page 3 of 8

Appendix B Asbestos Monitoring Section 5(1) (e) of Regulation 838, Asbestos on Construction Projects and In Buildings and Repair Operations requires an inspection of asbestos materials at reasonable intervals in order to ensure it remains in non-friable condition. In order to comply with this regulation: Charge Custodians will be trained in Asbestos Monitoring Procedures. Asbestos within a building will be inspected bimonthly by the Charge Custodian, using the Custodians copy of the Asbestos Inventory. Any abnormalities are to be reported to the Maintenance Leader on an emergency work order. Monitoring the Asbestos may require a Charge Custodian to view areas above false ceilings. As disturbances in these areas can go unnoticed, additional precautions are required and the Ministry s Guidelines for Workplace inspections for Friable Asbestos Above False Ceilings. A record of this inspection will be forwarded to Facility Services. This record will note any condition changes. If the condition of the Asbestos has depreciated and repairs are required, the Charge Custodian will immediately notify the Principal of the change and contact the appropriate Maintenance Leader to expedite repairs. Note: TVDSB workers are to be trained to the level of Type 1 asbestos removals or repairs. Type 2 & 3 Asbestos repairs and removals will be contracted. Page 4 of 8

Appendix C Ceiling Entry Precautions It is common for asbestos to be used as a fire retardant in ceiling cavities. When the asbestos inventory indicates that asbestos is present in a ceiling cavity either as a fire-retardant or wrapping on pipes, or has been used in ceiling tiles the following precautions will be used. Asbestos Monitoring Custodian When conducting the bimonthly inspection, it is not known whether there is likely to be asbestos containing material lying on the ceiling surface, the following procedure is to be used. - Disturbance of the ceiling will only take place outside of classroom hours and in unoccupied rooms/corridors. - - Place a drop sheet of polyethylene or other suitable material beneath the area where the ceiling space is to be entered. - Carefully raise the edge of a ceiling tile and examine the surface of adjacent tiles for evidence of fallen insulation. - If the surface of the adjacent tiles is clean, the raised tile may be removed by sliding it over an adjacent tile. - If there is evidence of fallen debris, replace the tile and report by phone immediately to your Maintenance Leader. Ceiling Space Entry by Board Maintenance Staff Before starting any work in a school check with the Charge Custodian or Principal to view the site s Asbestos Report. If asbestos is reported in an area where work is required, the follow steps 1 4 above. If you encounter fallen debris, stop work immediately and contact your maintenance leader immediately. Ceiling Space Entry by Outside Contractors Same as above for Maintenance Staff Page 5 of 8

Appendix C contd. GUIDANCE NOTE FOR WORKPLACE INSPECTIONS FOR FRIABLE ASBESTOS ABOVE FALSE CEILINGS Under O.Reg 654/85 April 2, 1990 Workplace parties may be required under O.Reg. 654/85 to inspect locations above false ceilings. This guidance note provides the procedure under which these inspections should take place. Inspecting a building to find friable asbestos-containing material may require entry into the space above a false ceiling. If sprayed-on insulation has been applied to the building structure, some of the insulating material may have broken free and fallen onto the surface of the false ceiling. Entry into the ceiling space could therefore disturb such fallen material, creating an exposure hazard if the material contains asbestos. Since, in conducting an inspection, it is not known whether there is likely to be asbestoscontaining material lying on the ceiling surface, it is advisable to assume there is and the ceiling space should only be entered from an unoccupied room, in schools, entry should be carried out only outside of classroom hours. The following procedure is recommended: - Place a drop sheet of polyethylene or other suitable material beneath the area where the ceiling space is to be entered. - Carefully raise the edge of a ceiling tile and examine the surface of adjacent tiles for evidence of fallen insulation. - If the surface of the adjacent tiles is clean or very little insulation has fallen the raised tile may be removed, by sliding it over an adjacent tile, and the ceiling space entered. - If a significant amount of insulation has fallen, lower the raised tile and put on protective clothing that is impervious to asbestos and an air purifying respirator with filters approved for protection against asbestos. The protective clothing should have tight fitting cuffs at the wrists and ankles and should include a head cover. When a respirator is worn, a good fit should be ensured by checking the seal between the face and the respirator. Respirators certified by the U.S. National Institute for Occupational Safety and Health meet this requirement. - The ceiling space may then be entered. - When inspection of the ceiling space is completed, replace the ceiling tile. - Clean the drop sheet and the protective clothing by wiping with a damp cloth or vacuuming with a HEPA-filtered vacuum. This damp cloth should then be placed in a plastic bag clearly marked as asbestos waste. The above is a reproduction of the Ministry of Labour s Guideline for Ceiling Entry Please note if any insulation has fallen the ceiling may not be entered until it has been reported to the appropriate Facilities staff and clean-up has been completed. Steps 4 7 will be followed when working in ceiling spaces where asbestos has been identified as being present or when inspecting for the presence of asbestos. Page 6 of 8

Appendix D Wiring Contractor Precautions Asbestos Precautions - Before starting any work in a Thames Valley District School Board facility, check with the Custodian and/or the Principal to view the site s Asbestos Report. - Do not enter ceiling spaces in rooms which are occupied by staff or students. - Follow the attached Guideline on Ceiling Entry, - If you encounter suspected or friable Asbestos, stop work immediately and contact the Project Coordinator or Maintenance Leader. - Always use appropriate Asbestos precautions including cleanup as specified by Regulation. Contractor Signature Date Project Coordinator/ Maintenance Leader Signature Page 7 of 8

Appendix E Asbestos Waste Asbestos fibres, when airborne cause a serious inhalation hazard. It is for this reason that any cleanup of asbestos must not cause fibres to become airborne. Asbestos cleanup is specified by regulation and involves damp mopping and/or the use of a vacuum with a HEPA filter. All staff and contractors will comply with the Environmental Protection Act, RSO 1990, Section 27 and Ontario Regulation 347, Section 17 when disposing of asbestos waste. Page 8 of 8