MIAMI-DADE COUNTY PUBLIC SCHOOLS OFFICE OF ECONOMIC OPPORTUNITY PREQUALIFICATION FORUM

Similar documents
MIAMI-DADE COUNTY PUBLIC SCHOOLS OFFICE OF ECONOMIC OPPORTUNITY PREQUALIFICATION SEMINAR

Office of Superintendent of Schools April 1, 2019 Board Meeting of April 17, 2019

M-DCPS Quarterly Chat Friday, March 23, 2018

Office of Superintendent of Schools February 25, 2019 Board Meeting of March 13, 2019

Subcontractor Qualification Form

PROJECT STATUS AS OF MARCH 18, 2019

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Office of Superintendent of Schools March 19, 2014 Board Meeting of April 9, 2014

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

REQUEST FOR QUALIFICATIONS DESIGN BUILD SERVICES FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNEX FAIR PARK DALLAS, TEXAS

Job Order Contracting (JOC) ITB JE Overview August 2016

Prequalification Form

Subcontractor Pre-qualification Statement

Architectural Services Consultant Registration Form

Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR

CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE 2 GENERAL CONSTRUCTION STATE PROJECT # EA WINDSOR, CT. INVITATION TO BID

Doing Business with the Metropolitan Washington Airports Authority

FACILITY COMPONENTS - MIDDLE SCHOOL

Coos Bay Best Bond Cost Breakdowns

MIRACLE BUILDING CAPITAL PLAN BID OPPORTUNITY

EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES/RFQ #14-Q-009-KR BY AND BETWEEN

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016

NOTICE TO BIDDERS / ADVERTISEMENT FOR BIDS GEORGE C. SIMKINS JR. ELEMENTARY SCHOOL

FACILITIES Summer Projects. September 8, 2015 Board Meeting

MARYLAND STADIUM AUTHORITY

Lealman Community Redevelopment Area Non-Residential Improvement & Demolition Grant Program Application Package

Houston Dynamo Stadium

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

DALLAS INDEPENDENT SCHOOL DISTRICT. BID PACKAGE # 209 ORG 056 E. D. Walker Middle School Addition & Renovations

2007 Projects: MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, North Medford High School:

FACILITY COMPONENTS - ELEMENTARY SCHOOL

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Cheldelin Middle School

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Boynton High School & Blackford Site

Building Excellence IV Capital Levy Projects Under Construction

How to Increase Business Opportunities by Responding to Bids from Miami-Dade County Public Schools ( M-DCPS )

Work Performed Please see the attached list of Construction Codes and mark all that your company typically performs

Request for Qualifications For Master Agreement

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

FOR SALE. BHSMiami.com Miller Dr (SW 56 Street) Miami, FL 33156

This is NOT an application For the opportunity to become a registered supplier for BCPS you must visit the eprocure Supplier Portal.

10 Year Plan. Facilities Planning Guide. December 15, 2014

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION:

FACILITIES PROJECTS UPDATE BOARD OF EDUCATION. August 11, 2015

PAWLEYS ISLAND TOWN HALL

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

N o v e m b e r

2014 MASTER PLANNING PORT ARTHUR INDEPENDENT SCHOOL DISTRICT Revised, August 5, 2014

COMPANY. Critical Facility Upgrades 2018 Progress Update GREATER ALBANY PUBLIC SCHOOLS. Investments in Existing Capital Assets: Safe Warm - Dry

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.

Committee Meeting. Procurement Processes for Professional Services and Contractors

THE BID DUE DATE FOR ALL BID PACKAGES HAS BEEN EXTENDED TO THURSDAY, APRIL 12, 2:00 P.M.

Addendum to Agenda Item: SUPERINTENDENT S PROPOSED CAPITAL IMPROVEMEMT PLAN

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4

BOARD OF TRUSTEES OCTOBER 13, 2014

FACILITY COMPONENTS - ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

Chino Valley Unified School District Monthly Construction Update

ORANGE COUNTY PUBLIC SCHOOLS

5. Project Construction Cost (Provide cost for new construction, the addition or the alteration): $ Estimated Project Budget is $125,000.

ORANGE COUNTY PUBLIC SCHOOLS

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project.

Building Excellence IV Capital Levy Projects Under Construction

ADDENDUM 2 - JULY 14, 2015

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

UNC Chapel Hill Informal Contracting Guidelines

DISTRICT ADVISORY COMMITTEE MEETING MAY 2, 2018 HALF CENT SALES TAX PROGRESS REPORT

How to Respond to Bids issued by Miami Dade County Public Schools ( M DCPS )

INVITATION TO BID. University of Connecticut Health Center Academic Bldg. Addition and Renovation Project Farmington, CT (Project #901729)

AZUSA UNIFIED SCHOOL DISTRICT

EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES/RFQ #14-Q-009-KR BY AND BETWEEN

Jackson Health System Miracle Building Plan Outreach Roundtable. May 16, 2017

ALTERNATIVE PROJECT DELIVERY METHODS

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

2006 FUSD Bond Information Guide

DOCUMENT BID DOCUMENT

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

Division 00 Procurement and Contracting Requirements

Semi-Annual Report. January 1, 2012 June 30, 2012

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE

Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

2016 BOND INFORMATION

DENNIS TOWNSHIP FEASIBILITY STUDY

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

CIRCLE K SUB-CONTRACTOR BID FORM

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

PHYSICAL RESOURCES COMMITTEE MEETING PROJECT UPDATES FEBRUARY 3, 2016

WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.

LUFacilities Policy Service Level Agreement v1.1

Transcription:

MIAMI-DADE COUNTY PUBLIC SCHOOLS OFFICE OF ECONOMIC OPPORTUNITY PREQUALIFICATION FORUM THURSDAY, May 4, 2017

OVERVIEW OF M-DCPS CONTRACTOR PREQUALIFICATION 2

GENERAL CONTRACTING ELECTRICAL BUILDING ROOFING MECHANICAL ALARM SYSTEMS FIRE ALARMS AIR CONDITIONING (HVAC) For additional disciplines please visit the Florida Department of State Requirements for Educational Facilities (SREF) website at: http://www.fldoe.org/finance/edual-facilities/staterequirements-for-edual-facilitie/ 3

Who needs to be prequalified by the District? Any company that is a Registered Vendor who proposes to work for the District as a prime contractor on capital or maintenance construction projects. The District employs the following delivery methods to construct, renovate and maintain facilities: Construction Management @ Risk (CM @ Risk) Design-Build Conventional (hard-bid) Job Order Contracts (JOC-term) CM @ Risk Miscellaneous Contracts (term) Term Contracts 4

NEW ONLINE PREQUALIFICATION APPLICATION PROCESS Prior to accessing the online application, you will be required to register, by securing an account through www.miamidadeschools.diversitycompliance.com Follow the prompts for New Contractor Prequalification application. 5

CONTRACTOR PREQUALIFICATION REVIEW COMMITTEE (CPRC) MEETING The CPRC members are comprised of District staff, as well as members from construction organizations. They are professionals who bring different disciplines and expertise to the table, such as knowledge of the construction industry, SREF and its application, finance, insurance, bonding requirements, and legal issues. CPRC reviews all prequalification applications, after which the approved applications are forwarded to the Superintendent and School Board for official action. Single Bid Limits are determined based on the highest completed project multiplied by 2. 6

Board Policy 6334 Prequalification of Contractors for Educational Facilities Construction provides that the Board may, for good cause, suspend a contractor for part or all of a prequalification period, or revoke a prequalification certification. Reasons for suspension or revocation: Misleading statements Default Bankruptcy Liquidated damages Failure to pay subcontractors and suppliers Delinquent Suspended or revoked license No longer meet prequalification criteria 7

ALL PREQUALIFICATION QUESTIONS: Christine Howard, SBE Compliance Manager 305-995-2654 howardcj@dadeschools.net 8

OVERVIEW OF M-DCPS SBE, MBE & M/WBE CERTIFICATION 9

APPLY FOR SMALL BUSINESS ENTERPRISE (SBE) OR MICRO BUSINESS ENTERPRISE (MBE) CERTIFICATION The business is independently owned and operated business that is performing a commercially useful function The business has a place of business in Miami Dade County and established for at least one year Business has an occupational license and all required professional licenses The owner and/or qualifier of the business must have the required professional license and contractor license 10

SMALL BUSINESS ENTERPRISE PROGRAM Industry Micro Business Enterprise Small Business Enterprise Professional Services (A/E) Less than $500,000* Tier 1 -Less than $1,000,000* Tier 2- Less than $2,000,000* Goods and Services Less than $1,000,000* Tier 1- Less than $2,000,000* Tier 2 -Less than $4,000,000* Construction & Specialty Trade Professional Services (non A&E) Less than $1,000,000* Tier 1 - Less than $3,000,000* Tier 2- Less than $6,000,000* Less than $1,000,000* Tier 1 -Less than $2,000,000* Tier 2 - Less than $4,000,000* *Revenue averaged over a three year period 11

CON T CERTIFICATION APPLICATIONS CERTIFICATION APPLICATIONS INTERLOCAL AGREEMENTS SBE Miami-Dade County US Small Business Administration 8a Certification M/WBE State of Florida South Florida Minority Supplier Development Council (SFMSDC) 12

APPLY FOR MINORITY/WOMEN BUSINESS ENTERPRISE (M/WBE) CERTIFICATION 51% OWNED & OPERATED BY A MINORITY PERSON ACTUAL BUSINESS IN MIAMI-DADE COUNTY, BROWARD OR WEST PALM BEACH FOR AT LEAST ONE YEAR BUSINESS OWNER MUST HAVE THE REQUIRED PROFESSIONAL LICENSE, LOCAL BUSINESS TAX RECEIPT African-American Asian-American Hispanic-American Native-American Women 13

APPLY FOR SMALL BUSINESS ENTERPRISE (SBE), MICRO BUSINESS ENTERPRISE (MBE) AND MINORITY/WOMEN BUSINESS ENTERPRISE (M/WBE) CERTIFICATION 14

15

CONTACT INFORMATION: Office of Economic Opportunity 1450 NE 2 nd Avenue Suite 428 Miami, Florida 33132 305-995-1307 http://oeo.dadeschools.net https://miamidadeschools.diversitycompliance.com oeo@dadeschools.net 16

13+ Years in the South Florida Construction Market JRT has successfully completed over $75 million of construction projects for Miami- Dade County, City of Miami, Village of Pinecrest, Miami-Dade College, and MDCPS over the last 13 years JRT is a Minority Locally owned Business for over 13 years JRT has successfully completed over 24 MDCPS Projects in over 18 different schools JRT is looking for qualified Subcontractors

PREQUALIFICATION PROCESS Email vaguilar@tarafaconstruction.com and request a prequalification form Completely fill out the prequalification form including all requested attachments such as certificates of insurances, current and past backlog, minority certifications. Contact Valeria Aguilar via telephone at 305-557-9911 to ensure that she received the prequalification form. Once pre-qualified you will be invited to bid on our projects.

UPCOMING BIDDING OPPORTUNITIES Scott Lake Elementary School (MDCPS Project No. 01424300) New parent drop off, New Covered Walkways & Renovations Palm Springs North Elementary School (MDCPS Project No. 01529800) New 10 Classroom Building, P.E. Shelter & Covered Walkways Coral Park Elementary School (MDCPS Project No. 01542800) New 12 Classroom Building & P.E. Shelter Addition Flamingo Park Improvements (City of Sunrise) FIU Golf Complex & Locker Rooms

3050 N.W. 77 th Court Doral, FL 33122 Tel: 305-557-9911 Fax: 305-557-9922

Building the Future with Integrity and Quality 22

ABOUT US LEGO Construction Company was founded in 2006. We are Certified General Contractors and a Certified Small Business. WE SPECIALIZE IN THE FOLLOWING AREAS: DESIGN BUILD GENERAL CONTRACTING CM @ RISK PRE-CONSTRUCTION Our repeat clients are a telltale sign of our performance, quality, and work our good ethic. A lot of which is influenced by our subcontractors OUR MARKETS INCLUDE: Healthcare Education Federal Historical

INDUSTRIES AND CLIENTS EDUCATION Miami-Dade Public Schools Miami-Dade College School Board of Broward County HEALTHCARE Jackson Health Systems Baptist Health Broward Health FEDERAL GOVERNMENT US Army- Corps Of Engineers US Air Force US Coast Guard US Department Of Homeland Security AVIATION SEAPORT PUBLIC HOUSING CORRECTIONAL PARKS & RECREATION HISTORIC PRESERVATION

South Miami Middle School 6750 SW 60 Street, Miami, Florida 33143 GMP: February 2018 Budget: $2,500,000.00 DESIGN PHASE Window replacements Bathroom remodeling Renovate Basketball area Exhaust fans and hoods in cafeteria HVAC Upgrades

E.W.F Stirrup Elementary School 6750 SW 60 Street, Miami, Florida 33143 GMP: June 2017 DESIGN PHASE Budget: $500,000.00 Walkway ceiling SOFFIT Repair Walk way Concrete Slab repair

Georgia Jones-Ayes Middle School 1331 NW 46th St, Miami, FL 33142 GMP: March 2018 DESIGN PHASE Budget: $2,500,000.00 Scope of work includes: New PE Shelter Recovering and restriping of basketball court Demolition of 6 portables HVAC: Unit Ventilators, Air Handling Units, Controls Renovation of group restrooms Electrical upgrades

28

Our prequalification requirements are as follows: Email jespinales@gecassociates.com for a prequalification form. We expect to have the form on our website for download in the near future. Completely fill out and email to Jespinales@gecassociates.com Follow up with a phone call Jenny Espinales to make sure she got it and to schedule an interview. Once register check periodically with Jenny or check our website for other upcoming projects. 29

Upcoming CM Capital Projects Sunset Park Elementary Project # 01426200 - Bidding Phase Richmond Heights Project # 01619800 - Design Phase Pinecrest Elementary Project # 01530100 - Pre Negotiations Phase Upcoming Maintenance Projects Miami Central High School Track and Field Renovations Francis S. Tucker Portable Demolition Vineland K-8 Window and Door Replacement Traz Powell Stadium Sound System Upgrades Ponce De Leon Middles School New Drainage System Bowman Ashe Elementary School Chiller Replacement Ruben Dario Elementary School Cooling Tower and Chiller Replacement 30

GEC Associates, Inc. Construction Managers & General Contractors 9487 NW 12 th Street Doral Fl. 33172 305-994-2150 Office 305-994-2159 Fax Website: www.gecassociates.com 31

32

UPCOMING PROJECTS MDCPS Project #01550200 Agenoria Paschal/Olinda Elementary School ADA Elevator Addition 5536 NW 21st Ave Miami, FL 33142 Project Summary: The work of this project involves: The addition of a New ADA Elevator, to an existing 2 story historic school facility, including but not limited to; New Holeless Hydraulic Passenger Elevator, HVAC, Electrical, Fire Alarm, Lightning Protection, Plumbing, Concrete & Masonry Work, Wallboard, Insulation, Hollow Metal Doors, Frames & Hardware, Specialites, Waterproofing, Painting, Misc Metals & Railings, Chainlink Fences, Signage Specialties, Roofing, Stucco, Masonry Cutting & Patching, Selective Demolition, Earthwork, Site Restoration. 33

MDCPS Project #01529201 Lenora B. Smith Elementary School New Parent Drop Off 4700 NW 12th Ave Miami, FL 33127 Project Summary: Install New Parent Drop off including Site Drainage, Fencing, Gate Modifications, Tree relocation and removals, Covered Walkways, Sidewalks, Asphalt Paving and Striping, Concrete Curbs, and irrigation modifications. 34

JCI International, Inc. 12315 SW 132 nd Court Miami, Florida 33186 Phone: 305-254-1844 Fax: 305-255-3359 Website: www.jci.us.com 35

36