CURRICULUM VITAE RELEVANTE

Similar documents
University Zagreb, Faculty of Civil Engineering, Master of Science Degree in Civil Engineering

Conventional Tunnelling

Field trips 7, 14, 15. Brenner Base Tunnel

Japanese.

Introduction to Tunnel Construction

PROFILE STRABAG TUNNELLING

COMPETITIVENESS OF PIPE-JACKING TUNNEL LININGS

SEMMERING BASE TUNNEL LOGISTIC CHALLENGES

Tunnelling SEGMENTAL LININGS IN FOCUS. journal THE KORALM S SEGMENT TRACKING SYSTEM. April/May 2013

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

RISK MANAGEMENT. Harald Wagner PhD, PE

Experts in tunneling with Tunnel Boring Machines

Excellence in tunnel engineering. Consulting, planning, realisation

Pipe Jacking. Progress is built on ideas.

Experiencia Internacional Proyectos de Obras Subterráneas. Davorin Kolic

CURRICULUM VITAE P E R S O N A L D A T A D E G R E E ( S ) O R D I P L O M A ( S ) O B T A I N E D. Institution, type of degree

TBM rescue projects using shafts and ground freezing

CURRICULUM VITAE. Vordingborg - Denmark (Italy) Italian


SPIEKERMANN Consulting Engineers Company Presentation

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

These challenges can only be mastered by a partner familiar with the complexity of building metros.

Tunnel. Immersed Tunnels

PRELIMINARY VENTILATION AND COOLING DURING THE CONSTRUCTION OF THE BRENNER BASE TUNNEL

EL VALOR DE INNOVACION EN TUNELES

Tel: Neil: Tony: Website:

ALAN AULD GROUP ALAN AULD GROUP LTD. Proposal for Technical & Commercial Support to the Laguna Project

CC1602 Microtunneling

Tunnelling Division. STRABAG Group. Tunnelling. Metro Algier, Algeria STRABAG AG.

GEOTHERMAL TUNNEL LINING

COMPANY PROFILE. HARKE Capability Statement. Insideout

Full-text paper MAGLEV REQUIREMENTS FOR TUNNELS

Intelligent building creates connections.

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

Hydropower. Identifying needs. Our service offering

Geo-treatments in Constructing a Tunnel in Karst Strata: Lessons Learned from the Metro Subway Project in Guangzhou, China

Performance review of a pipe jacking project in Hong Kong

SELECTION OF CONSTRUCTION METHODS IN ROCK TUNNELING

MEMBER NATION ACTIVITY REPORT

Qatar Rail Doha Metro

D&B versus TBM some case stories

Occupational Health & Safety Risk Management in Tunnel Works. Donald R Lamont C.Eng.,FICE. Animateur ITA WG5 - Health & Safety in Works

THIRTYFIVE YEARS OF APPLICATION OF MICROPILES IN AUSTRIA

Tunnel Geothermics International experiences on regenerative energy concepts in tunnel projects

Date (month / year) from to. Field of specialisation 5. LANGUAGE SKILLS (ON A SCALE OF 1 TO 5, WITH 5 BEING THE BEST MARK)

Loshan pipe manufacturing Co. LOSHAN PROFILE

Summary, Conclusion and Outlook

Construction Technology B (CON4313)

CURRICULUM VITAE. Hornitex Werke, Horn Bad Meinberg Enegieanlagenelektroniker

MINING: FROM CONCEPT TO START-UP, OUR COMPREHENSIVE CONSTRUCTION OFFER

Fukuei , Ichikawa-shi, Cjiba-ken, Japan

Use of FIDIC Red Book on International Road Projects

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS.

Small Diameter Rock TBM Tunneling in Baltimore

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

Study on Effects of Disc Cutter Sensors Arrangement on Electrical Resistivity Survey

Herrenknecht Pioneering Underground Technologies

TBM experiences from the Koralm railway tunnel (Austria) and re-use of TBM muck. Gerhard HARER

Working Group 14 Mechanized Tunnelling Working Group 19 Conventional Tunnelling

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling)

TBM Performance and Development State in Korea

Rowa Customer Day. Innovative Heading System for Mines. Concept study for Rio Tinto; Heading system for Resolution Copper Company

Progress update (November to March) 03/23/2009 2

Microtunnelling. Building infrastructures and power supply systems underground, while life above continues unaffected.

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P.

LUCOEX Conference Oskarshamn, June F. Chauvet & al. CIGEO/

COMMUNITY BOARD EIGHT

THE GROUNDBREAKING TUNNEL

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

Tunneling Spring semester Tunneling Course Project: Tunneling Project in the Bakony. Exercise 1- Choice of three possible alignments

GEOTESTA - CONSULTING ENGINEERS

CAPABILITY STATEMENT RAISE BORE DIVISION CAPABILITIES FLEET SPECIALIST EXPERIENCE LEADERS IN UNDERGROUND MINING

CAPABILITY STATEMENT RAISE BORE DIVISION CAPABILITIES FLEET SPECIALIST EXPERIENCE LEADERS IN UNDERGROUND MINING

2 Support of the cavity and settlement Support of the face Natural support Mechanical support...

Long-Term Relations Between Joint Venture Partners A Supplier s Perspective.

1) QA CONTROLLER (GERMAN NATIVE SPEAKER) MADRID, SPAIN

TURUN SEUDUN PUHDISTAMO OY KAKOLANMAKI WASTEWATER TREATMENT PLANT INCREASING THE OUTLET PIPE CAPACITY PIPE JACKING CONTRACT

Concerning tunnels and stations for the. Preliminary Design - Tel Aviv Metropolitan Section

GOVERNMENT OF GRENADA GEOTHERMAL RESOURCE DEVELOPMENT PROJECT

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

CURRICULUM VITAE. 59 Racari Street, Bl 30A, Sc 1, Ap 45 Bucharest, Romania Cell

TUNNEL BORING MACHINE & AUXILIARY EQUIPMENT ELECTRICAL CAPABILITY EPS AUSTRALIA. Suite 1702, Tower 2, 101 Grafton St, Bondi Junction NSW 2022

Curriculum Vitae Dr. Gunther Roiss

Curriculum Vitae SAMI AYYAD, PH.D. Objective. To add business value to my work place in world class institutions. Synopsis

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

Underground works in urban environment

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Workshop Brief Notes on: Construction of Pipe Roof and Support System

Curriculum Vitae. Thomas Bisig, born on May in Glarus, unmarried, Swiss citizenship

RAPID EXCAVATION and TUNNELING CONFERENCE

February 7, Purpose. Background. the BDCP. needs the project. Discussion. Facilities 1. plants) 1, October 1, 2013,

INTERNATIONAL DESIGN & CONSTRUCTION

Selection of alignment and tunnelling methods in urban settings

Minister of European Integration * * * Member of the Chamber of Deputies, Bucharest Constituency; * * *

CHALLENGING SITES & HYDRO TUNNELLING CHOICE OF TECHNOLOGIES AND CONTRACT IMPLICATIONS

Building the present, creating the future

Future mayor tunneling projects in the Netherlands,

Transcription:

CURRICULUM VITAE RELEVANTE My Way Qualifications & Education / S2 My Projekts 2014-2010 / S3 2010-2000 / S4 2000-1994 / S5 Christian BMSTR. DIPL. ING. Gamper Owner & Generally sworn and Court-certified Expert

Relevant Qualifications Mediator 2016 Generally sworn and Court-certified Expert 2016 Master s examination as a master builder, Austria 2008 Dipl. Ing. for Civil Engineering Technical University of Innsbruck, Austria 1992 work experience Over 20 years of experience in the tunnel construction department of Strabag AG, one of the largest European construction companies. 2-year activity as structural engineer at the engineering firm Dr. Ulf Krückl in Perg. Education Education as a mediator at the renowned institute MIT under the supervision of Mag. Wolfgang Vovsik. Successful completion of the education on 18.12.2016. Disclosure of the Expert s verdict on 8.9.2016. Appointment as general sworn and court certified expert for the Areas of Expertise 72.03 Estimation, Procurement, Construction, Building Accounting, and 72.06 Tunnel Construction. Education as a master builder and passing the proficiency test for the trademaster builder in November 2008. Studied civil engineering with specialization in construction and construction business at the Leopold-Franzens University in Innbruck. Graduated as a graduate engineer in 1992. Technical Director / Senior Project Manager Several years of professional experience as a project manager and in the following years as Technical Director for many underground construction projects in Austria, Germany, Hungary, Croatia and Italy. The experience includes all engineering activities in construction management, planning and project management in inner-city subway construction with tunnel structures and stations as well as in road and motorway infrastructure projects or railway tunnel. As Technical Director, responsible for the acquisition and construction work for the Innsbruck and Vienna department including the Brenner Base Tunnel project. Responsible for the conclusion of the contract and cooperation with Rio Tinto, in which new innovativ tunnelling technologies were developed, and a project in Australia was successfully completed. Leading the successful consulting of Strabag s four tunnel constructions for the Olympic Games in Sochi. Technical Area Manager / Technical Project Manager Responsible for the management of various infrastructure projects as project managers in the fields of accounting, preparation of work, planning coordination, contract and supplement management, controlling, tendering and contracting, quality management, as well as the contractual development of the project with the client and the management of the employees and commercial employees of the project. Site Manager / Site Manager Tunnelling Extensive experience as the first site manager or tunnelling engineer of tunnel construction sites in the NATM construction, both in blasting and excavation in loose ground conditions, compressed air drives and excavation using ground freezing in conventional drives. In addition, experience with TBM drifts, both in the case of hard rock tunnel boring machines and slurry shield machines. Seite 2 / 5

Over 20 years of experience in complex infrastructure buildings, Motorway and railway tunnels Successful international projects Great experience in excavation work with the NATM - New Austrian Tunnelling Method Skills Summary Extensive experience with the handling of TBM tunnel boring machines One of the biggest challenges was a Hydroshild-TBM excavation with Diameter of more than 12 m in the Unterinntal, Tyrol. 2014 Ende Juli 2016, STRABAG AG, Tunnelling Division / UB2I Technical Director / Department Mining & Tunnelling Management, economic and human responsibility for the international handling of the tunnel construction sites and for the tendering of national and international tunnel construction projects. Also responsible for the projects on the Brenner Base Tunnel between Munich and Verona, both on the Italian (project ISARCO) and on the Austrian side (tunnel Tulfes Pfons) of the projecting line. Management of the projects U1 / 09 and U1 / 10, sub-sections of the development of the U1 in Vienna. Management of the entire development and acquisition in the field of mine construction and implementation of the project: Rio Tinto Tunnel Boring System Trail, Northparkes Mine, Australia. 2006 2013, STRABAG AG, Tunnelling Division / UB2I Technical Area Manager / Department Mining & Tunnelling The business unit is responsible for the Brenner Basis Tunnel project in Austria, for the subway in Vienna and for projects in Slovakia. Responsibility includes the acquisition and development of projects. Successful consultation on four tunnel construction projects in Sochi 2013. Acquisition of the contract with Rio Tinto, and preparation for the work in North Park Mines, Australia. 2009 2010, Tunnel chain M6 / motorway M6 / M60, Budapest - Pecs, Hungary Technical Area Manager The contract involves the planning and construction of 8 highway tunnels with a total length of 6,500 m under extremely difficult geological conditions. The excavation work was carried out according to the NATM construction method and over long stretches with a precaution by means of a piperoof. Order value: 121,000,000.00 Seite 3 / 5

2006 2011, H8 Tunnel Jenbach / Austria Technical Director / Project Manager The two-track Railway Tunnel Jenbach is part of the northern access to the Brenner Base Tunnel. The work was carried out in a consortium of Strabag-Züblin-Hochtief. The main part of the project was the 3,500 m long tunnel, which was excavated in Hydroschild-method. The breakout cross section was 130 m³ and the drill head of the shield machine had a diameter of more than 12 m. Languages Mother tongue German Other languages English (fluent) International Contracting Contracts according to: - ÖNorm - VOB - Fidic - NEC (New Engineering Contract) The work also included rescue structures consisting of 6 shaft constructions and 6 pipe jacking in the Hydroshield technology. The rescue tunnels were conventionally connected to the main tunnel under compressed air condition. A tunnel in cut and cover construction with a length of 230 m completed the work. Order value: 190.000.000,00 2003 2008, H5 Tunnel Vomp Terfens / Austria Technical Director / Project Manager The two-track, partial three-track Railway Tunnel Vomp-Terfens is part of the northern access to the Brenner Base Tunnel. The work was carried out in a consortium of Strabag-Züblin-Hochtief. The tunnel of Vomp Terfens, with a length of 8,500 m, was excavated according the NATM Tunnelling Method. About half of the tunnel wasexcavated by drill and blast, the second half was successfully driven in loose material with piperoof propulsion. Order value: 200.000.000,00 2002 2003, Tunnel Gric and Tunnel Brinje, Kroatien Motorway A1 / Zagreb Split, Project Manager Responsible for the Tunnel Gric and Tunnel Brinje on the Zagreb-Split motorway in Croatia, both of which were double-track tunnels of 1,250 m and 1,560 m in length, with cross-sections from 80 m to 120 m. The tunnels were excavated in drill and blast process according to the NATM. The geological conditions were very complicated; more than 80 caves in karst formations had to be passed through successfully. Order value: 44,000,000 2000 2002, Exploration Tunnel Brixlegg-West, Tyrol, Austria Responsible for the 1,335m long Exploration Tunnel Brixlegg West, with different cross sections from 12m² up to 100m², driven in drill and blast according to the NATM. Order value: 14,000,000.00 Seite 4 / 5

1998 1999, Tunnel Sveti Marco Karlovac, Croatia Motorway Zagreb Rijeka Responsible for the execution of a 300m long double-tube motorway tunnel with a cross-section of 90m². The excavation was driven according to the principles of the NATM with an additional piperoof precaution. Order value: 11.500.000,00 Mitgliedschaften ÖGG - Austrian Society for Geomechanics SVV- Main Association of Court Judges ÖBM - Austrian Federal Association for Mediation 1997 1998, Exploratory Tunnel A9 Schön / Lainberg, Austria Phyrn-Motorway The exploration tunnel A9, in the future range of the Phyrn-Motorway A9, with a total length of 4.308 m was driven conventional by using drill and blast. The individual tunnel units were excavated according to the following schedule: Exploratory Tunnel Kienberg: Length: 430 m, Cross-section: 12 m² Exploratory Tunnel Klaus: Length: 855 m, Cross section: 12 m² Calotte Tunnel Klaus: Length: 153 m, Cross-section 80 m² Exploratory Tunnel Spering North and South: Length 2,870 m, outbreak cross-section 12 m Order value: 8.000.000,00 1996 1997 City Train Tunnel Unilinie Bielefeld / Bielefeld DeutschlandCity Train Line Unilinie Bielefeld Deputy Site Manager Responsible for a 3,000m-long subway tunnel with a cross-section of 40m² to 90m². The excavation was done with excavator in soft-ground according to the NATM. Part of the excavation work was done with assistance of ground-freezing technology. Two stations were executed cut-and-cover. Order value: 45.000.000 1994 1996, Tunnel Waldau / Stuttgart, Germany Subway-Tunnel Waldau, Stuttgart, Deutschland Deputy Site Manager Responsible for a 1,800m long urban subway tunnel with various cross sections from 22m² to 200m², driven in drill and blast as well as conventional with excavator in soft ground condition according to the NATM. Order value: 32.000.000 Seite 5 / 5