Asset Management Performance Measures for Privatized Highway Concessions in British Columbia

Similar documents
Developing an Asset Management Plan for Highway DBFO Projects

Adapting BC's Pavement Management System to Keep Pace with Data Collection Technology. Shawn Landers, MSc.Eng., P.Eng. Opus International Consultants

Sea to Sky Highway 2010 Winter Olympics

Manitoba Infrastructure: Service Delivery Review

Ministry of Transportation. 2005/06 Annual Service Plan Report

What Do Clients Want from Engineering Consultants

B.C. MINIST RY OF TRANSPORTATION. Maintenance Specification Chapter FLOOD CONTROL AND WASHOUT RESPONSE

Coordinating Minnesota s Transportation Assets and Climate Change and Extreme Weather Vulnerability

Using Performance Measures to Enhance Asset Management in New Zealand

Independent Technical Review of the George Massey Crossing. December, 2018

Transportation BUSINESS PLAN ACCOUNTABILITY STATEMENT

Local Area Specifications for Okanagan Lake Crossing Concession

Canadian Society of Value Analysis

SERVICE PLAN 2003/ /06

RESOURCE ROAD MAINTENANCE GUIDELINE

MINISTRY OF TRANSPORTATION 2004/ /07

TELLER COUNTY PUBLIC WORKS

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS

Highway Construction Program

3.14 Maintenance of the Provincial Highway System

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE

PAVEMENT SURFACE CONDITION RATING MANUAL

Performance audit report. New Zealand Transport Agency: Information and planning for maintaining and renewing the state highway network

Pavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads

ODOT Asset Management Plan 0

2009/ /12 Service Plan

STRUCTURE AND BRIDGE DIVISION

FEDERAL HIGHWAY ADMINISTRATION

Ministry of Transportation and Highways. First Hybrid Electric Car the Toyota Prius / /2004 PERFORMANCE PLAN

Bridge Deck Drainage

Activity: Roads and Footpaths. How this Activity Contributes to Related Community. Outcome

Safety. Introduction. Total System

Audits of Two P3 Projects in the Sea-to-Sky Corridor

B.C. MINISTRY OF TRANSPORTATION. Maintenance Specification Chapter HIGHWAY INSPECTION

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer

SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Transportation Investment Corporation 2015/ /18 SERVICE PLAN

Special Provision No. 103F31 December 2014

British Columbia Highways: An Overview of Historical and Current Design Challenges

CITY OF WINDSOR Municipal Performance Measurement Program (MPMP) 2011 RESULTS 1.1 GENERAL GOVERNMENT - EFFICIENCY 3.7% 4.7%

CLA /10.54, PID Project Description:

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

ODOT Transportation Systems Management & Operations Plan

CHAPTER 3 SCOPE SUMMARY

Special Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction.

NEW MEXICO LAND OF ENCHANTMENT

PWC Neighborhood Services Conference. February 20, 2016 Aleksandra Tuliszka Assistant Transportation and Land Use Director

SA 2 Local Area Specifications Schedule 1 Section 7

Ministry of Highways and Infrastructure. Plan for saskatchewan.ca

Kicking Horse Cantilever Structure. Bruce Hamersley, P.Eng., Klohn Crippen Berger Ltd. Keith Mitchell, P.Eng., Klohn Crippen Berger Ltd.

Forest Practices and the Hummingbird Creek Debris Flow

TRANSPORTATION AND ADAPTATION A Canadian Perspective. Elizabeth Smalley Manager, Adaptation Policy Transport Canada June 7-8, 2018

Ministry of Highways and Infrastructure. Plan for

TABLE OF CONTENTS. Manual Section. Introduction 1. Using This Manual 2-3. Administrative Actions 4-6. Road and Bridge Project Types 7

Core Business Area: Highway Operations Outcome Measure Data Target Strategic Actions to Achieve Target

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Scheduling Activities. THE SALVAGE, RECLAMATION AND ABANDONMENT OF THE GRANDUC MINE by M.R. Walker INTRODUCTION

Special Provision No. 103F31 January 2014

Peterborough County Road Safety Audit Guideline Pilot

BA Blacktop Ltd. An ISO 9001:2008 registered

ISO-9001:Quality Management System Progress Report

Contract Administration Manual. Appendix 9

Nova Scotia s Primary and Secondary Highway Systems: 10-Year Needs

Transportation Improvement Program (TIP)

Climate Change Adaptation in the Transport Sector:

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update

MONITORING IMPLEMENTATION AND PERFORMANCE

PROJECT BRIEF for the John Hart Generating Station Replacement Project

IMPROVING I 81 IN MARYLAND

Licensed Science Officer Benchmark

A CASE STUDY ON OVERLAY DESIGN USING HDM-4

Service Business Plan

Appendix 13-5 Greenhouse Gas Emissions Assessment for East Side Road Authority All-Season Road Projects

0100 GENERAL. C. The limits for Maintenance Services are set forth in Attachment 3 to this Maintenance Specification.

ANNUAL REPORT. Pursuant to: Code of Virginia

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

ADAPTATION SYMPOSIUM Nicole Legault Environmental Policy Directorate Transport Canada

SOME STRATEGIES FOR SUSTAINABLE MAINTENANCE OF RURAL ROADS IN INDIA Agarwal, P. K 1 *, Singh, A. P. 2

ENVIRONMENTAL APPEAL BOARD Province of British Columbia

4.11 TRAFFIC AND CIRCULATION

The Highway Economic Requirements System (HERS): How HERS Works

Emily Ireland REF: OIA-3970

McTAVISH ROAD INTERCHANGE A ROUNDABOUT SOLUTION. Tim Blackburn, P.Eng., Urban Systems Ltd.

Pavement Management Systems

The Great Impact of Geotechnical Features on System Performance

Minnesota DOT Kirby Becker

Implementing a Pavement Management System PASER Based City of Omaha, NE

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Roadway Surfaces and Traffic Control Elements

PAVEMENT MANAGEMENT SYSTEM

Manual of Aesthetic Design Practice

CONTINUOUSLY REINFORCED CONCRETE AND UNPAVED ROADS CONDITION SURVEY FIELD MANUAL PUBLICATION 343 APRIL 2017 PUB 343 (4-17)

Preventive Maintenance Project & Treatment Selection

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Support to the Transport Sector Development Programme

ROAD MAINTENANCE MANAGEMENT SYSTEMS IMPLEMENTATION OF THE ROAD MENTOR 4 SYSTEM IN THE CENTRAL ZONE

IDOT PERFORMANCE BASED PROJECT METRICS. February 2018

Washington State DOT s Vulnerability Assessment: Asking the Climate Question

Transcription:

Asset Management Performance Measures for Privatized Highway Concessions in British Columbia Travis Gilbertson Geoplan Opus Consultants Inc. Victoria, British Columbia Canada 1

Outline 1. DBFO Projects in British Columbia, Canada 2. OMR Requirements 3. OMR Output Specifications 2

DBFO Projects in British Columbia British Columbia Ministry of Transportation has embarked on several major highway improvement initiatives. All to be delivered within a design-build-financeoperate (DBFO) model. Outcome performance based contracts over a 25 to 30 year period. 3

DBFO Projects in British Columbia Development of Asset Management Performance Measures was fundamental to describing the required outcome in terms of Operations, Maintenance, & Rehabilitation Ensure that any privately operated public highway deliver service levels that are equal to or better than comparable provincially operated highways. Geoplan Opus has been Lead OMR Advisor working closely with Ministry staff since 2002 on all provincial DBFO projects. 4

DBFO Projects in British Columbia Sea to Sky Highway Project www.seatoskyimprovements.ca 25 year performance based contract $600 million capital + OMR 2010 Winter Olympics 320 lane-km of highway / 155 major structures Status: Awarded and underway 5

DBFO Projects in British Columbia Okanagan Lake Crossing Project www.okanaganlakebridge.ca 30 year performance based contract Replacement of unique Floating Bridge Structure Integral part of transportation system in Kelowna Status: Awarded and underway 6

DBFO Projects in British Columbia Kicking Horse Canyon Project www.th.gov.bc.ca\kickinghorse 25 year performance based contract Key highway corridor that traverses thru the Rocky Mountains Severe mountainous terrain and conditions Replacement of Park Bridge, highway improvements and OMR Status: Proponent selected / finalizing arrangements 7

DBFO Projects in British Columbia Gateway Program www.gatewayprogram.bc.ca Response to the impact of growing regional congestion and traffic demands throughout Greater Vancouver Four major highway corridor improvement initiatives to complement other regional road and transit projects Pitt River Bridge Design Build project underway Focus on Port Mann Bridge / TCH corridor project (330 lane km) 8

OMR Requirements Operations, Maintenance & Rehabilitation 9

OMR Requirements Scope of OMR Services: Routine Maintenance of Highway and Structures Rehabilitation of Highway and Structures Highway Operations and Corridor Management Winter Maintenance Avalanche Control and Weather Stations Emergency Response and Repair Traffic Maintenance and Line Marking Electrical Asset Maintenance and Rehabilitation Slope Stabilization Routine and Incident Inspections Record Management and Reporting Communications 10

OMR Requirements Key Principles: Concessionaire is fully responsibility for delivery Service levels defined as specified performance measures - min conditions / response times Based on best practices review and built upon BCMoT Road and Bridge Maintenance Specifications for routine maintenance Desire by BCMoT to standardize service delivery across all DBFO projects Service levels consistent with adjacent highways Asset performance measures encourage good management practices that limit asset consumption 11

R & B Rehabilitation MoT Functions Clarification OMR Output Specifications Highway Maintenance Specifications Asset Preservation Performance Specifications Corridor Management Specifications Reporting Specifications MoT Functions Site Specific Quality Management Local Area Specifications Highway Asset Preservation Performance Highway Measures Asset Preservation for Highway Concessions Performance Highway Measures Asset Preservation for Highway Concessions Performance Measures for Highway Concessions Site Specific End of Term Requirements October, 2004 October, 2004 October, 2004 12

Development History Developed over a three year period Incorporated best practices from other DBFO highway projects in Australasia, North America and UK Developed in extensive consultation and review with BCMoT staff, DBFO Project teams and Proponents Future changes to the specifications have to be considered relative to all MoT concessions and implemented by change provisions 13

General Specification Structure Delivery of OMR services is guided by 3 levels of performance measures: Key Performance Measures - focus on key objectives for asset and corridor mgmt Asset Preservation Performance Measures - focus on ensuring sound asset mgmt takes place Operational Performance Measure - focus on day to day serviceability 14

Key Performance Measures Define the principal outcomes in the Management of the DBFO project and delivery of services in the key strategic areas of: Asset Preservation Corridor Management Objectives: Preserve the current value of assets by maintaining structural integrity during the term of the Concession. Maximize the reliability, safety and availability of the highway corridor at all times. 15

Key Performance Measures Example Table 2.2.1: Highway Running Surfaces KPMs Item Key Performance Measure a. Paved Highway Traffic Lanes Ensure paved highway traffic lanes are safe (free of hazards) and available. Ensure access at all times for all legal and permitted vehicles. No traffic delays. Provide two-way, two-lane access at all times. Provide acceptable riding comfort for Highway Users. b. Paved Shoulders c. Paved Medians d. Paved Pullouts & Rest Stop Areas e. Paved Entrance/Exit Ramps f. Paved and Gravel Side Roads g. Management Ensure shoulders are safe and available. Ensure medians are fully functional, tidy and free-draining. Ensure pullouts and rest stop areas are safe and available. Ensure entrance / exit ramps are safe and available. Ensure gravel side roads are safe and available. Ensure unlimited vehicle usage and access, at all times, for all legal and permitted vehicles. No traffic delays. Provide a minimum of two-way, two-lane access at all times. Provide acceptable riding comfort for Highway Users. Ensure minimal dust on gravel roads. Ensure inspection, condition survey and updating of the Ministry Highway Pavement Management System (RPMS) is complete and accurate. Ensure programming of physical works is complete and based upon long term focus. Ensure best practices and continual improvement are applied. 16

Asset Preservation Performance Measures Sound asset management that guides long term rehabilitation Defined for: Highway Running Surfaces Major Structures Drainage Structures Based on: Limiting asset consumption Achieving design life expectations BCMoT condition rating systems 17

Asset Preservation Performance Measures Highway Running Surfaces: Annual measures Surface distress, roughness, rutting RPMS specifications Major Structures: Annual and 5 Year measures BMIS specifications Extensive calibrations Drainage Structures: 5 Year measures 18

Asset Preservation Performance Measures Example: Structures APPM Hierarchy Structure Sub-Category Level Structure Feature Performance Measure Intervention Type Bridges Major Retaining Walls 1 2 Components Structure Component Condition Rating Structure Condition Index Limit Asset Consumption Serviceability Reactive Limit Asset Consumption Serviceability Major Culverts and Tunnels Major Sign Structures 3 4 Stock Network Components Stock Condition Index Extent of Network Component Condition Serviceability Limit Asset Consumption Serviceability 19

Asset Preservation Performance Measures Example: Highway Running Surfaces - Roughness 100% Pavement Roughness Profile - Cumulative Distribution All Travel Lanes 90% Percent Less Than 80% 70% 60% 50% 40% Conforming Pavement The pavement is conforming in respect to Pavement Roughness w hen the limits as set by the distribution curve are met or exceeded 30% 20% 10% 0% <0.5 <0.6 <0.7 <0.8 <0.9 <1.0 <1.1 <1.2 <1.3 <1.4 <1.5 <1.6 <1.7 <1.8 <1.9 <2.0 <2.1 <2.2 <2.3 <2.4 <2.5 Baseline 0% 1% 5% 10% 15% 25% 35% 45% 55% 65% 70% 75% 80% 85% 90% 93% 94% 96% 97% 98% 100% Average Wheel Path International Roughness Index Value 20

Highway Maintenance Specifications Consistent with BCMoT R&B specifications that cover: surface maintenance drainage maintenance winter maintenance roadside maintenance traffic maintenance structure maintenance emergency response Key differences: routine/quantified combined caps removed 21

Corridor Management Specifications Managing corridor operations and extends the Maintenance Specifications covering: key performance measures environmental management winter operations public relations / customer care safety management utilities coordination line marking electrical maintenance rest areas 22

Reporting Specifications Documents the OMR reporting requirements for the concession covering: Management Plans Reports Data Quality and OMR Plans 5 Year Mgmt Plan Annual AM Plan Salt Mgmt Plan Monthly OMR Reports Asset Condition Reports Traffic Accident Reports Asset Inventory Data Asset Condition Data Traffic Data 23

Quality Management Specifications Defines QM requirements for OMR services Part of standard QM specifications for design, construction, traffic, OMR and environmental Specifications for OMR Quality Management Plan ISO certification for OMR services Province audit program Consistent with existing BCMoT privatized road and bridge maintenance contracts QM auditing and performance linked to payment mechanism 24

Local Area Specifications Captures requirements that are specific to the concession. Maintenance specifications for specific structures, systems R&B local area specifications Specific asset mgmt requirements Landscape maintenance Traffic management Unstable slope mitigation program Landslide management Snow avalanche/weather monitoring Traffic counting stations Specific reporting 25

End of Term Requirements Define hand-back criteria at end of concession term Developed in consultation with BCMoT Mandatory compliance with APPM s and other Performance Measures Additional compliance specified criteria for: - Highway running surface (remaining service life) - Structure component condition - Drainage and debris control structures - Rockfall catchment areas - Avalanche control structures - Electrical systems 26

Questions. Travis Gilbertson Geoplan Opus Consultants Inc. Victoria, BC travis.gilbertson@geoplanopus.ca 27