TABLE OF CONTENT

Similar documents
Corrosion is defined in different ways, but the usual interpretation of the term is an attack on a metallic material by reaction with its

Pipeline Construction

TABLE OF CONTENT

Part 1: On-land pipelines

TABLE OF CONTENT

Refining Corrosion Technologist NACE-RCT-001

Cathodic Protection Anodes

Refining Corrosion Technologist NACE-RCT-001

DESIGN OF IMPRESSED CURRENT CATHODIC PROTECTION SYSTEMS

Corrosion Protection

Iron is found in an oxidized state and is mined from the ground as an iron ore.

Refining Corrosion Technologist NACE-RCT-001

INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERS OF THE PHILIPPINES, INC. (IIEE-ERCSA) First IIEE Accredited Foreign Chapter (Charter

Introduction to Cathodic Protection

Cathodic protection of harbour installations

CONSTRUCTION STANDARD FOR CATHODIC PROTECTION ORIGINAL EDITION DEC. 1997

Technical Seminar for Cathodic Protection to GOGC Design Unit Specialists. Dr. Nick Kioupis, Cathodic & Lightning Protection Section Head, DESFA

Sika Galvashield CC Embedded Galvanic Anodes for Corrosion Control in Contaminated but Sound Concrete

Regards. Table 1a for Corrosion and Concrete without CP high-lights ASTM BSI DIN ASTM STP Corrosion Rates of Steel in Concrete

Ships and marine technology Cathodic protection of ships

***************************************************************************************************************

This document is a preview generated by EVS

Refining Corrosion Technologist NACE-RCT-001

Corrosion Control using Cathodic Protection for Prefabricated Buried Steel Pump Stations1

NAPCA Bulletin

SECTION FACILITY LIGHTNING PROTECTION

CATHODIC PROTECTION SYSTEM

THE POWER TO PROTECT

SECTION LIGHTNING PROTECTION SYSTEM

Linings of Aboveground Petroleum Storage Tank Bottoms API RECOMMENDED PRACTICE 652 FOURTH EDITION, SEPTEMBER 2014

The DuoGuard Hybrid Anode Range Installation Guidelines

SECTION GROUND STORAGE TANK

CATHODIC PROTECTION FOR SOIL STEEL BRIDGES 1

SAMPLE CHAPTERS UNESCO - EOLSS CATHODIC PROTECTION OF PIPELINES

CORROSION ENGINEERING AND CATHODIC PROTECTION

AREMA COMMITTEE 8. Letter Ballot Number

Fiberglass Basin Installation Reference Guide

Pipeline Systems PIP PLE00006 Cathodic Protection Systems for Pipelines

Dates of Innovation Development: January, 2014 to July 2015 Web site: Summary Description: Cathodic Protection

Cathodic Protection System in Oil & Gas Exploration Industry September 2016, Dubai ISO 29990

MANAGEMENT OF CATHODIC PROTECTION SYSTEMS IN MARINE ENVIRONMENTS

APPLICATION NOTE 6. Use of Decouplers for AC Voltage Mitigation. PART 2: DESIGN CONSIDERATIONS

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

DIVISION 5 METALS SECTION STRUCTURAL STEEL

TRANSKOR ASIA THE POWER TO PROTECT

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows:

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

Cathodic Protection System in Oil & Gas Exploration Industry

CATHODIC PROTECTION AN OVERVIEW

Mixed Metal Oxide Anode

Rawabi Corrosion Technology

UNISTRUT CORPORATION GENERAL NOTES 1. THIS UNISTRUT SUPPORT SYSTEM IS DESIGNED TO SUPPORT A MAXIMUM UNIFORM LOAD OF PSF.

Section REINFORCING STEEL

IOM3 Underground Seminar. Health and Safety Laboratory Buxton. 27 May 2010

Impressed Current Cathodic Protection Installation

MAST ARMS: ALUMINUM, TRUSS TYPE AND DAVIT TYPE

Specification for Pipe Fittings

Introduction. Jeremy Hailey, P.E.

Agenda ISO Corrosion Protection Of steel Structures

Flygt Advanced Low Pressure Sewer System Package

Model Specifications for Sclairpipe High Density Polyethylene (HDPE) Pipe

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

Wastewater Capital Projects Management Standard Construction Specification

SECTION COMMON WORK RESULTS FOR ELECTRICAL

Regional Cathodic Protection Design of a Natural Gas Distribution Station

ABSTRACT EXECUTIVE SUMMARY

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

TABLE OF CONTENT

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

TILE TILE

APPENDIX B Corrosion Management System Framework and Guidance

NORSOK STANDARD COMMON REQUIREMENTS CATHODIC PROTECTION M-503. Rev. 2, September 1997

SECTION 807 PUMP STATION REHABILITATION

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

SECTION STRUCTURE MOUNT RAILING SYSTEM

FDOT CATHODIC PROTECTION PRACTICES FOR BRIDGE PRESERVATION

Section 2: Underground

Alaska Railroad Corporation. Seward Marine Terminal Passenger Dock Cathodic Protection System Repair Project. Design Package

FACILITIES BUILDING STANDARDS

Corrosion Control and Cathodic Protection Data Sheet

Corrosion Protection

SECTION DUCTILE IRON PILES

OFFSHORE CATHODIC PROTECTION 101: WHAT IS IT AND HOW DOES IT WORK? Dick Baxter & Jim Britton

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

TECHNIACL SPECIAL PROVISION FOR NON-STRUCTURAL AND STRUCTURAL INTEGRAL PILE JACKET WITH SACRIFICIAL CATHODIC PROTECTION

CORROSION CONTROL OF ABOVE GROUND STORAGE TANK BOTTOM STEEL PLATES USING ALUMINUM MESH ANODE WITH NEWLY DEVELOPED BACKFILL

SERVICES. NDT Inspection Non Destructive Testing. Installation of Cathodic Protection System

SECTION STRUCTURAL STEEL

Application of Computational Modeling to Predict the Effectiveness of CP on a PCCP Transmission Pipeline

SUPPLIER QUALITY MANUAL

NEW GC-16 IN WEST KUWAIT MATERIAL REQUISITION FOR LEVEL GAUGE TABLE OF CONTENTS

(PROJECT STANDARDS AND SPECIFICATIONS)

NATIONWIDE SAN ANTONIO SALES & SERVICE CENTER

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Scope of Work Bid Package C-8 - West Overhead Doors

Exhibit D Measurement & Regulation Facilities Records Required for DETI Operational Responsibilities

SECTION GROUNDING

Transcription:

Page : 1 of 52 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES 3 DEFINITION AND TERMINOLOGY 6 DOCUMENT PRECEDENCE 7 SPECIFICATION DEVIATION/ CONCESSION CONTROL 7 QUALITY ASSURANCE/ QUALITY CONTROL 7 DOCUMENTATION GENERAL 7 CONTRACTORS/ VENDORS 8 HANDLING 9 Packaging and Shipping 9 Preservation and Storage 9 EXECUTION 10 Responsibility of Contract 10 DESIGN BASIS 11 General Basis 11 Schedule of Cathodic Protection Systems 12 Current Requirements 13 Performance Criteria 15 SITE SURVEY 15 General Terrain 16 Soil Resistivity Measurements for Groundbed Site 16 Chemical Properties of Soil 17 EQUIPMENT AND MATERIALS 17 Schedule of Equipment and Materials 17 Impressed Current Anodes 19 Sacrificial Anodes 20 Backfill Materials for Pre-Packaged Sacrificial Anodes 21

Page : 2 of 52 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia Backfill Materials for Impressed Current Beds in Soil 21 Cables 21 Transformers/ Rectifiers 23 Anode Terminal Boxes 25 Test Stations 26 Polarization Coupons 26 SYSTEMS ENGINEERING AND INSTALLATION 27 Qualification of Design Personnel 27 Tank Bottoms 27 Buried Tanks 29 Tank Internals 30 Buried Piping System 32 Sacrificial Anode Beds 34 Impressed Current Anode Beds 34 Connection of Cables 36 Electrical Earthing 40 Electrical Continuity 40 Electrical Isolation 41 Stray Currents 43 Installation of Junction Boxes and Test Stations 43 Remote Monitoring and System Control 46 SPECIAL FACILITIES 47 Temporary CP Systems 47 Designs near High Voltage Power Lines 47 Designs in Areas of Lightning Activity 48 DOCUMENTATION REQUIREMENTS 48 Design Documents 48 Material Schedules 49 Installation Procedures 49

Page : 3 of 52 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia Pre-commissioning Testing and Inspection 50 Cathodic Protection Manual 51 Training 51 SAFETY 52

Page 4 of 52 SCOPE This Project Standard and Specification covers the minimum requirements for cathodic protection of the following steel items: Buried steel piping Bottom surfaces of on-grade storage tanks in contact with soil. Bottom surfaces of on-grade storage tanks in contact with soil. Interior surfaces of water boxes and tanks, which are in contact with water. Cathodic protection (CP) systems can be utilized for corrosion control of ferrous metals in contact with soil, buried concrete and water. For this specification, only the components listed above are given the requirements for CP. Internal cathodic protection for water tanks and water boxes shall be installed only if indicated on the Equipment data sheets. REFERENCES The following codes and standards shall, to the extent specified herein, form a part of this specification. 1. American Society for Testing and Materials (ASTM) ASTM G57 ASTM B418 Field Measurement of Soil Resistivity Using the Wenner Four-Electrode Method Cast and Wrought Galvanic Zinc Anodes 2. International Electrotechnical Commission (IEC) IEC 146 IEC 269 IEC 529 Semiconductor Converters Low Voltage Fuses Degrees of Protection Provided by Enclosures (IP Code) 3. International Standards Organization (ISO) ISO 8501-1 (Part 1) Preparation of Steel Substrate Before Application Of Paints And Related Products-Visual Assessment Of Surface Cleanliness ISO 9001-2000 Quality Management System Requirements ISO 9004-2000 Quality Management Guidelines for Performance Improvement System

Page 5 of 52 ISO 19011 Guidelines for quality and/or environmental management systems auditing 4. British/European Standard BS 7361 BS EN 12499 BS EN 12954 BS EN 13636 BS EN 13509 BS EN 14505 Cathodic Protection - Part 1, Code of Practice for Land and Marine Applications Internal Cathodic Protection of Metallic Structures Cathodic Protection of Buried or Immersed Metallic Structures General Principles and Application for Pipelines Cathodic Protection of Buried Metallic Tanks and Related Piping Cathodic Protection Measurement Techniques Cathodic Protection of Complex Structures 5. National Association of Corrosion Engineers (NACE) NACE SP0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems. NACE SP0177 Mitigation of Alternating Current and Lightning Effects on Metallic Structures and Corrosion Control Systems NACE RP0193 External Cathodic Protection of On-Grade Metallic Storage Tank Bottoms NACE SP0286 The Electrical Isolation of Cathodically Protected Pipelines. NACE SP0572 Design, Installation, Operation, and Maintenance of Impressed Current Deep Ground Beds. NACE RP0196 Galvanic Anode Cathodic Protection of Internal Submerged Surfaces of Carbon Steel Water Storage Tanks NACE RP0285 Corrosion Control of Underground Storage Tank Systems by Cathodic Protection NACE SP0387 Metallurgical and Inspection Requirements for Cast Sacrificial Anodes for Offshore Applications NACE SP0388 Impressed Current Cathodic Protection of Internal Submerged Surfaces of Carbon Steel Water Storage Tanks NACE SP0187 Design Considerations for Corrosion Control of Reinforcing Steel in Concrete 6. National Electrical Code NEC NFPA-70 (ANSI-C1) National Electrical Code

Page 6 of 52 DEFINITIONS & TERMINOLOGY For the purposes of this specification, the following definitions shall apply: CONCESSION REQUEST - A deviation requested by the CONTRACTOR, usually after receiving the contract package or purchase order. Often, it refers to an authorization to use, repair, recondition, reclaim, or release materials, components or equipment already in progress or completely manufactured but which does not meet or comply with COMPANY requirements. A CONCESSION REQUEST is subject to COMPANY approval. SHALL - The use of the word shall indicates a mandatory requirement. SHOULD - The use of the word should indicates a strong recommendation to comply with the requirements of this document. DEEPWELL/ DEEPGROUND BED - One or more anodes installed vertically at a depth of 15 meters or more below the earth s surface in a drilled hole. ELECTROLYTE - Moist soil and water in contact with the STRUCTURE. PARALLEL BED - When used in the matters related to pipe, wire or cable type anode placed parallel to the pipe run. When used in the matters related to tank bottoms, wire or cable type anode in a coil or grid form in a plane parallel to the tank bottom at a specified depth under the tank bottom. SHALLOW BED - One or more anodes installed vertically at a depth of 5 to 15 meters below the earth s surface. STRUCTURE - The surface to which cathodic protection is being applied. A foreign structure means a surface to which cathodic protection is being provided unintentionally.

Page 7 of 52 STRUCTURE-TO-ELECTROLYTE POTENTIAL - The voltage difference between a buried (or immersed) metallic surface and the electrolyte which is measured with reference to an electrode (such as copper/copper sulfate and silver/silver chloride electrodes) in contact with the electrolyte. SURFACE BED - One or more anodes installed horizontally or vertically at a depth of 5 meters or less, below grade. DOCUMENT PRECEDENCE The CONTRACTOR shall notify the COMPANY of any apparent conflict between this specification, the related data sheets, the Codes and Standards and any other specifications noted herein. Resolution and/or interpretation precedence shall be obtained from the COMPANY in writing before proceeding with the design/manufacture. In case of conflict, the order of precedence shall be stated in the AGREEMENT or other PROJECT documents as applicable. SPECIFICATION DEVIATION/CONCESSION CONTROL Any technical deviations to this specification shall be sought by the CONTRACTOR only through CONCESSION REQUEST format. CONCESSION REQUESTS require CONTRACTOR'S and COMPANY'S review/approval, prior to the proposed technical changes being implemented. Technical changes implemented prior to COMPANY approval are subject to rejection. QUALITY ASSURANCE/QUALITY CONTROL APPLICATOR S proposed quality system shall fully satisfy all the elements of ISO 9001. The quality system shall provide for the planned and systematic control of all quality related activities performed during design/development, production, installation or servicing (as appropriate to the given system). Implementation of the system shall be in accordance with the Quality Manual and Project Specific Quality Plan, which shall both together with all related/referenced procedures be submitted to COMPANY for review, comment and approval as required by purchase/contract documents.

Page 8 of 52 DOCUMENTATION - GENERAL CONTRACTOR shall submit the type and quantity of drawings and documentation for authorization or information as listed in the individual Material Requisitions, Purchase Orders and Document Requirement Section of this Specification. Mutual agreement on scheduled submittal of drawings and engineering data shall be an integral part of any formal Purchase Order. Comments made by COMPANY on drawing submittal shall not relieve CONTRACTOR of any responsibility in meeting the requirements of the specifications. Such comments shall not be construed as permission to deviate from requirements of the Purchase Order unless specific and mutual agreement is reached and confirmed in writing. Each drawing shall be provided with a title block in the bottom right-hand corner incorporating the following information: Official trade name of the company. CONTRACTORs drawing number. Drawing title giving the description of contents whereby the drawing can be identified. A symbol or letter indicating the latest issue or revision. PO number and item tag numbers. Revisions to drawings and documents shall be identified with symbols adjacent to the alterations, a brief description in tabular form of each revision shall be given, and if applicable, the authority and date of the revision shall be listed. The term "Latest Revision" shall not be used. CONTRACTORS/VENDORS The CONTRACTOR shall assume unit responsibility and overall guarantee for the equipment package and associated equipment. The CONTRACTOR shall transmit all relevant purchase order documents including specifications to his SUBCONTRACTORS. It is the CONTRACTOR'S responsibility to enforce all Purchase Order and Specification requirements on his SUBCONTRACTORS.

Page 9 of 52 The CONTRACTOR shall obtain and transmit all SUBCONTRACTOR warranties to the CONTRACTOR and COMPANY, in addition to the system warranty. HANDLING Packaging and Shipping Preparation for shipment shall be in accordance with the CONTRACTOR'S standards and as noted herein. CONTRACTOR shall be solely responsible for the adequacy of the preparation for shipment provisions with respect to materials and application, and to provide equipment at the destination in ex-works condition when handled by commercial carriers. Adequate protection shall be provided to prevent mechanical damage and atmospheric corrosion in transit and at the job site. Preparation for shipment and packing will be subject to inspection and rejection by COMPANY'S/CONTRACTOR'S inspectors. All costs occasioned by such rejection shall be to the account of the CONTRACTOR. Equipment shall be packed, securely anchored, and skid mounted when required. Bracing, supports, and rigging connections shall be provided to prevent damage during transit, lifting, or unloading. All temporary bracing/supports shall be marked "REMOVE BEFORE EQUIPMENT COMMISSIONING AND START- UP." Separate, loose, and spare parts shall be completely boxed. Pieces of equipment and spare parts shall be identified by item number and service and marked with Contractor's order number, tag number, and weight, both inside and outside of each individual package or container. A bill of material shall be enclosed in each package or container of parts. One complete set of the installation, operation, and maintenance instructions shall be packed in the boxes or crates with equipment. This is in addition to the number called for in the Purchase Order. Preservation and Storage Equipment and materials shall be protected to withstand ocean transit and extended period of storage at the jobsite for a minimum period of 18 months. Equipment shall be protected to safeguard against all adverse environments,

Page 10 of 52 such as: humidity, moisture, rain, dust, dirt, sand, mud, salt air, salt spray, and seawater. All equipment and material shall be preserved and export packed in accordance with Project Preservation and Export Packing Specification. EXECUTION Responsibilities of Contractor CONTRACTOR shall supply all labor, supervision, installed and consumable materials, services, equipment, tools, and each and every item of expense necessary for the design, procurement, installation and commissioning of cathodic protection systems for ferrous materials in contact with soil (buried piping, buried tanks and tank bottoms), and interiors of water tanks and water boxes in contact with the electrolyte herein after called WORK. The WORK shall include the following, by way of example but not by limitation, the following tasks: Obtain, generate and evaluate necessary information to perform complete design, installation, testing, commissioning and documentation of the cathodic protection systems including a predesign site survey. Design and implementation of appropriate measures to ensure reinforcement of concrete foundation walls of on-grade storage tanks is not exposed to stray currents generated by tank cathodic protection systems. Provide detailed design for temporary and permanent cathodic protection systems in compliance with this Specification and referenced standards and suitable for the PROJECT environmental conditions. Supply and install fully operational temporary and permanent cathodic protection systems for the STRUCTURES identified by the COMPANY. Supply and install permanent testing facilities and remote monitoring capabilities to monitor the cathodic protection systems using latest proven technology available at the time of system design. Commission, test and adjust the newly installed temporary and permanent cathodic protection systems. Test for, locate and mitigate any shorts in the cathodic protection systems. Test for, evaluate and mitigate possible interference caused by cathodic protection system on communication and low energy control systems. Test for, evaluate and mitigate stray currents generated by newly installed cathodic protection systems. Provide documentation for system design and installation.