NORTH AMERICAN Precast Concrete Sustainable Plant Program

Similar documents
Fourth Quarter 2016 CPCI SUSTAINABLE PLANT PERFORMANCE REPORT CPCI SPP 16-04

Content Copy Of Original

Content Copy Of Original

SUMMARY OF COMMENTS/RECOMMENDATIONS

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Suggested Best Management Practices (BMPs)

Content Copy Of Original Ministry of the Environment, Conservation and Parks Ministère de l Environnement, de la Protection de la nature et des Parcs

Content Copy Of Original

Job Name: London School of Hygiene & Tropical Medicine, Tavistock Place, London

Stormwater Pollution Prevention Best Management Practices (BMP s)

Content Copy Of Original

Content Copy Of Original

Content Copy Of Original

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001

Content Copy Of Original

Greater Vancouver Regional District Concrete and Concrete Products Industries Emission Regulation Bylaw No. 1084, 2008

Content Copy Of Original

Content Copy Of Original

Stormwater / Wastewater Awareness esafety Training

SECTION AIR POLLUTION AND HAZARDOUS WASTE CONTROLS

SCHEDULE "J" CODE OF PRACTICE FOR OUTDOOR STORAGE YARD OPERATIONS

Content Copy Of Original

12-SW General Permit

SECTION TEMPORARY ENVIRONMENTAL CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES

Appendix G: Source Control Mitigation Measures Intentionally Left Blank

Environmental Leadership Program Inspection Form Portable Asphalt Facility

EF10 Site Environmental Audit - 1 / 8

Environmental Guidelines for Construction Sites

one (1) hot mix asphalt silo, operating at a maximum temperature of 163 degrees celsius;

Content Copy Of Original

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of:

Crushing and Screening Management Procedure Environment

Government Gazette Staatskoerant

Content Copy Of Original

SUMMARY OF COMMENTS/RECOMMENDATIONS

Last updated Sept. 15, Fugitive Dust. Cassie Archuleta and Jenna Channel

Environmental Plans and Procedures

Facilities Environmental Protection Plan: Burnaby Terminal

Vehicle and Equipment Cleaning

Air and Water Quality

Environmental Plans and Procedures

Chapter 6 Regulations and Requirements

Content Copy Of Original

ANNUAL CCR FUGITIVE DUST CONTROL REPORT

Department of Public Health Proposed Rules and Regulations for the Handling and Storage of Bulk Material Piles (Proposed December 19, 2013)

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

BEST MANAGEMENT PRACTICES PLAN FOR FUGITIVE DUST Greenwood Aggregates Company Limited Violet Hill Pit > Town of Mono, ON

City of Tacoma Surface Water Management Manual

TOWER BETON - VERTICAL BATCHING AND MIXING PLANTS CONCRETE BATCHING PLANTS

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index.

SECTION STORMWATER POLLUTION PREVENTION

ZAB Hearing May 14, 2015

Fugitive Dust Management Plan

Good Housekeeping and Employee Training

Content Copy Of Original

Maryland Department of the Environment. 12-SW Permit Update for Stormwater Discharges Associated With Industrial Activity

Environmental Guideline for Saskatchewan Asphalt Plants

RECOMMENDED GUIDELINE ENVIRONMENTAL MANAGEMENT PRACTICES CANADIAN READY MIXED CONCRETE INDUSTRY FOR FOR

CONCRETE BATCHING PLANT

Industrial Storm Water Permits. Summit County Safety Council Meeting Nov 15, 2018

APPENDIXG FUGITIVE DUST CONTROL PLAN

Content Copy Of Original

Water Pollution Control for Work in Sensitive Areas

ENVIRONMENT, HEALTH AND SAFETY (EHS) REQUIREMENTS FOR SERVICE PROVIDERS

Environmental Control Plan

Parking Area Maintenance

POLLUTION PREVENTION TEAM MEMBER ROSTER. Leader: Members: (1) Title: Worksheet #1 Completed by: Title: Date: Title: Office Phone: Responsibilities:

NELSON PLANT CCR FUGITIVE DUST CONTROL PLAN

CCR Fugitive Dust Control Plan

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

Material & Hazardous Waste Storage Best Management Practices

Plaza and Sidewalk Cleaning

Content Copy Of Original

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

Permitted Uses. Permitted uses in the "LI" District include: Offices (except contractors offices), office-showrooms, and office-warehouses

CHAPTER 5. NPDES PHASE II EVALUATION

ENVIRONMENTAL GUIDELINES FOR PREVENTION AND CONTROL OF FUGITIVE EMISSIONS FROM CEMENT PLANTS

NRMCA Member National and Regional Life Cycle Assessment Benchmark (Industry Average) Report

AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 3824-AV3R9Q Issue Date: February 20, 2018

Environmental Leadership Program Inspection Form Permanent Asphalt Facility

Trash Enclosure Area Guidelines for New Construction and Redevelopment Projects

COPY. EMS Compliance Requirements for Port Users Environmental Performance

Mecklenburg County Sustainable Facilities and Development Policy

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

Last updated September Fugitive Dust. Fugitive Dust. Training Presentation

STORMWATER MANAGEMENT PROGRAM. Table of Contents

Content Copy Of Original

Annual CCR Fugitive Dust Control Report. Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

SPECIAL CONDITIONS GENERAL PERMIT NO. WMGM016

DUST MANAGEMENT PLAN MILLER PAVING LIMITED BRAESIDE QUARRY. Prepared by: Church & Trought Inc. 885 Don Mills Road, Suite 106 Toronto Ontario M3C 1V9

Exhibit G. Construction Mitigation Plan

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS

Facilities Management

City of Waukegan, Illinois

Environmental Plans and Procedures

IAFBC Abbotsford, BC. Poultry Litter and Animal Carcass Gasification Plant Project No

Re: Erosion Control Report and Drawings Requirements Accompanying Document

Outdoor Storage of Materials

Transcription:

NORTH AMERICAN Precast Concrete Sustainable Plant Program The North American Precast Concrete Sustainable Plant Program is a joint initiative from the members of the Canadian Precast/ Prestressed Concrete Institute (CPCI), the National Precast Concrete Association (NPCA) and the Precast/Prestressed Concrete Institute (PCI).

The goal of this program is to reduce the environmental impact at the manufacturing level while creating a culture of sustainability within the North American Precast Concrete Industry. The benefits of sustainable business practices are well documented. As the leading technical resources for the precast concrete industry in North America, the Canadian Precast/Prestressed Concrete Institute (CPCI), the National Precast Concrete Association (NPCA) and the Precast/Prestressed Concrete Institute (PCI) are providing a web based Software Tracking Program, developed by Athena Sustainable Materials Institute, for its member plants. This program allows plants to track environmental performance measures, monitor changes and improvements in performance, and enhance their environmental and economic performance. OVERVIEW: The North American Precast Concrete Sustainable Plant Program (NAPCSPP) is a program designed to encourage continuous improvement and compliance to environmental and sustainability regulations and standards. Environmental performance is determined based on the intents of all applicable government environmental policies. Sustainability performance builds on the North American Precast Concrete LCA research already completed by the North American Precast Concrete Industry. The program is not intended to replace municipal, provincial/state or federal environmental acts and their requirements; it is a program designed to track the improvements implemented by each manufacturer. It is the responsibility of each individual manufacturer to understand and comply with the applicable government requirements. As part of this program, facilities are required to submit confidential benchmark reports on a quarterly basis. The aggregated results of the program are communicated to the public through the North American Precast Concrete Industry Sustainability Report. The environmental and sustainability requirements are based on the following sub-categories: A. ENVIRONMENTAL PERFORMANCE STANDARDS a. Dust Control b. Process Water, Storm Water and Chemical Management c. Noise Control B. SUSTAINABILITY PERFORMANCE STANDARDS a. Energy b. Materials c. Transportation d. CO2 equivalent e. Total Primary Energy f. Water Consumption

A. REQUIREMENTS FOR ENVIRONMENTAL PERFORMANCE STANDARDS a. Dust Control The facility tracks the following measures related to controlling dust including any dust produced by traffic, storage activities or the handling of materials, and meeting the requirements of local ordinances. The program tracks whether: 1. The facility maintains a best management practice plan for the control of fugitive dust emissions. 2. Process / waste water is: directed to the storm sewer, recycled in the process, collected for transfer to an approved off-site facility, or Discharged to the ground. In this case, the plant ensures that the runoff has acceptable levels of ph, acceptable levels of suspended solids, and acceptable hydrocarbon concentration. 2. All bulk cementitious materials are stored in silos equipped with bag houses/dust collectors. 3. Facility ensures that silo emissions are in compliance with their best management practices. 4. All silo emissions meet relevant government requirements. 5. All cementitious material bag houses are inspected a minimum of once per month. 6. All outside aggregate storage is in three-walled enclosures. 7. Aggregate is washed prior to receiving at plant. 8. All exterior aggregate conveyor systems are equipped with protective wind enclosures. 9. All weigh hoppers are located inside an enclosed building. 10. All unpaved traffic areas on plant facility (including storage area traffic locations) use approved dust suppression techniques or environmentally friendly chemicals. 11. Paved traffic areas (including storage area traffic locations) have a regular sweeping program in place. 12. All sand blasting (or similar post-manufacture applied finish that creates dust) is done in an environment (indoors or outdoors) that controls and collects fugitive dust. 13. Crushing of waste concrete is conducted in such a manner not to affect the environment as defined in their facility best management practices. b. Process Water, Storm Water and Chemical Management Requirements - Participating plants must be located on sites that do not discharge untreated process / waste water to the natural environment, and meet the requirements of local ordinances. The program tracks whether: 1. The facility maintains a best management practice plan for the control of process water, waste water, and chemical management. 3. Process water discharged to the ground is sampled and analysed a minimum of once/month. 4. Storm water run-off from the yard and traffic areas is; captured and recycled on site OR captured and discharged to the municipal storm sewer OR captured and transported off-site for disposal OR if discharged to a creek, has been reviewed and is in compliance with local authority approved drainage plans. 5. All effluent from acid etching or retarding chemical washing procedures are captured on site and disposed of according to applicable requirements. 6. All sealants, acids, chemical retarding agents or form release agents meet acceptable VOC requirements. 7. All chemicals stored in clearly marked containers with safety markings, and enclosed in spill containment areas where required by WHMIS or OSHA. 8. All fuel is stored on-site in approved containers and enclosures as required by applicable regulations.

c. Noise Control Requirements - The facility makes efforts to control noise to surrounding sensitive receptors (examples; residences, hotel/motels, nursing homes, hospitals, etc.), and meets the requirements of local ordinances. The program tracks whether: 1. The facility maintains a best management practice plan for the control of noise. 2. The facility has a noise reduction plan such as: performing lower dba activities, using acoustic enclosures, or enclosing noise sensitive operations when manufacturing during non standard hours according to local ordinances or when operating within reasonably close distance to sensitive receptors. 3. The facility controls nuisance vibrations to surrounding sensitive receptors. General The facility documents in writing all environmental incidents that contravene applicable environmental regulations or North American Precast Concrete Sustainable Plant Program requirements. Such documentation includes resolution of complaints. The plant notifies regulatory authorities as required by legislation. 2. The facility tracks and measures all waste streams and implements a plan to reduce non-recyclable waste. 3. The facility recycles production waste and measures recycling activities. 4. The facility recycles waste from office and administrative activities. 5. The facility reports waste reduction from operations, which is then aggregated for industry averaging. The facility benchmarks against the industry and its plan. c. Transportation 1. The facility maintains a best management practice plan for transportation. 2. The facility engages transportation companies that have a commitment to benchmarking and measuring their energy consumption, and have a plan for year over year reduction. 3. The facility tracks fuel consumption for all yard and production vehicles, all company vehicles, and all delivery equipment. 4. The facility reports (in confidence) fuel consumption from operations semiannually to CPCI, which is then aggregated for industry averaging. B. REQUIREMENTS FOR SUSTAINABILITY PERFORMANCE STANDARDS a. Energy 1. The facility maintains a best management practice plan for energy consumption. 2. All energy consumption tied to the manufacturing process is measured and benchmarked; Energy consumption includes electricity, natural gas, and various fossil fuels. 3. All energy consumption tied to office and administration is measured and benchmarked. 4. The facility implements a reduction plan for plant and office energy consumption. 5. The facility reports energy consumption quarterly, which is then aggregated for industry averaging. The facility benchmarks against the industry and its plan. b. Materials 1. The facility maintains a best management practice plan for material usage and disposal. The goal of the North American Precast Concrete Sustainable Plant Program is to benchmark the precast industry s impact on the environment in the areas of global warming potential, energy use, water use, and waste, dust, and noise generation. Ultimately, the precast industry is striving to reduce the environmental impact at the manufacturing level while creating a culture of sustainability within the industry. The benefits of sustainable business practices are well documented. The customised industry software, Precast Plant Sustainability Tracking Program (Version 2.1) developed by the Athena Sustainable Materials Institute (ASMI), enables individual manufacturers to measure their cradle to gate environmental footprint (with cradle being raw material resource extraction and gate being the finished product leaving the precast plant for the construction site). Once a manufacturing facility enters their raw material usage, electricity, natural gas, gas, diesel, heavy fuel oil and liquefied propane gas usage the software uses the ASMI database to calculate the environmental indicators global warming potential (GWP), total primary energy (TPE) and water usage for the plant. The facility also self-evaluates and reports their environmental performance indicators dust, noise and waste materials. Participating plants report their tracked results on a quarterly basis, the results of which are presented in this report along with the year to date results. Individual plants are also provided a customised report on a quarterly basis for their own internal benchmarking. Specifiers and owners can request the sustainability impacts on a project-to-project basis and are also encouraged to include this requirement in their contract specifications. The Canadian industry has now been reporting for two years, and provides a summary report at www.sustainableprecast.ca. The United States will begin reporting in 2015 and a North American report will follow.

NORTH AMERICAN Precast Concrete Sustainable Plant Program www.nasustainableplantprogram.com